Page 1: Metallic Pipe MTRs - aga.org

Metallic Pipe MTRs

Kate Rendak October 17, 2017

Page 2: Metallic Pipe MTRs - aga.org

2

Agenda

• What is an MTR?• How do MTRs affect tracking and traceability?• What are the challenges?• SOS Responses

Page 3: Metallic Pipe MTRs - aga.org

3

What is an MTR?

Material Test Report

Sometimes called: • Mill Test Report• Metallurgical Test Report• Mill Test Certificate• Inspection Certificate• Certificate of Testing

A quality assurance document used in the metals industry that certifies a material's chemical and physical properties and states a product’s compliance with specific standards

Page 4: Metallic Pipe MTRs - aga.org

4

How do MTRs affect tracking and traceability?

On January 10, 2011, PHMSA issued Advisory Bulletin 11-01 stating:“… operators relying on the review of design, construction, inspection, testing and other related data to calculate MAOP or MOP must assure (sic) that the records used are … traceable, verifiable, and complete.”

The MTR is the record that you have that shows:• When the part was made• That the part complies with the applicable specification’s chemical, mechanical

and reporting requirements

Each specification has a Certification section that identifies the reporting requirements of the specification

Page 5: Metallic Pipe MTRs - aga.org

5

API 5L (45th edition) – PSL 2

Inspection Certificate 3.1.B in accordance with ISO 10474:1991 (EN 10204:2004)

• outside diameter • PSL• wall thickness • type of pipe• pipe grade • delivery condition• chemical composition • carbon equivalent (analysis and acceptance criteria) • tensile test results • CVN impact test results and acceptance criteria• minimum hydrostatic test pressure • hydrostatic test duration• name/location of manufacturer • name/location of plate/coil rolling • name/location of steelmaking • results of other testing specified in the PO

• Additional requirements depending on seam type

3.1.B: issued by the department independent of the manufacturing department and is validated by an authorized representative of the staff independent of the manufacturing department.

Page 6: Metallic Pipe MTRs - aga.org

6

Challenges

General reviews reveal • Incorrect documents• Illegible documents• Missing pages

Detailed reviews reveal gaps• Missing year/edition of specification• Missing Charpy V Notch (CVN) acceptance criteria• Incorrect hydrotest pressure• Missing test data

Page 7: Metallic Pipe MTRs - aga.org

7

Challenges

• Inconsistent format

Page 8: Metallic Pipe MTRs - aga.org

8

Page 9: Metallic Pipe MTRs - aga.org

9

Page 10: Metallic Pipe MTRs - aga.org

10

Page 11: Metallic Pipe MTRs - aga.org

11

Page 12: Metallic Pipe MTRs - aga.org

12

Page 13: Metallic Pipe MTRs - aga.org

13

Challenges

• Inconsistent format• Readability• Varying requirements

• API 5L• API 6D (Incorporates certification requirements for all metallic pressure-

containing and pressure controlling parts)• ASTM A53, A105, A106, A333, among others

• For ASTM standards, it is important to also check the General Specification that the product specification falls under (Example: ASTM A961 is the General Specification for ASTM A105)

Page 14: Metallic Pipe MTRs - aga.org

June 2017AGA SOS Survey: Material Test Report (MTR) Procedures

Page 15: Metallic Pipe MTRs - aga.org

15

SOS Responses

21

8

Do you have an MTR review process?

YesNo

Page 16: Metallic Pipe MTRs - aga.org

16

SOS Responses

19

2Heat Number Match

19

2Material Description Match

YesNo

Page 17: Metallic Pipe MTRs - aga.org

17

1011

Chemistry Review

1110

Tensile Test Review

8

13

Charpy Impact Review

YesNo

SOS Responses

Page 18: Metallic Pipe MTRs - aga.org

18

SOS Responses

Other Properties Reviewed

• Standard and edition• PSL2 Grade• All pages included• Hardness• Minimum post weld heat temperature• Carbon Equivalence• Melt and rolling location • Hydrotest pressure and duration• Purchase Order number• Yield strength• Seam type

• All applicable requirements according to the API or ASTM standard

Page 19: Metallic Pipe MTRs - aga.org

19

SOS Responses

6

5

4

1

1

11 1

Who reviews MTRs?

Project Engineer/ManagerIntegrityEngineeringMaterial InspectionQuality ControlStandardsSupply ChainWarehouse

Page 20: Metallic Pipe MTRs - aga.org

20

SOS Responses

6

55

1

1

11

1 1Who reviews MTRs?

Project Engineer/ManagerIntegrityEngineeringMaterial InspectionQuality ControlStandardsSupply ChainWarehouseProject Inspector

Page 21: Metallic Pipe MTRs - aga.org

21

SOS Responses

0

1

2

3

4

5

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Num

ber o

f Res

pons

es

Size of Department

How large is the responsible department?

5.7 average

Page 22: Metallic Pipe MTRs - aga.org