metal garden shedpdf.lowes.com › useandcareguides › 1002351640_use.pdf · p3 p5 27 p4 28 28 29...

15
Metal Garden Shed OWNER'S MANUAL Instructions for Assembly Requires two people and takes 1-1.5 hours for lnstallation. Quick & Easy Assembly Ridge Reinforced Walls Wood Storage 9820005 at least Overall Size: L270 x W105 x H130/158 cm Overall Size: L8.8 x W3.4 x H4.3/5.2 Feet

Upload: others

Post on 07-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Metal Garden Shedpdf.lowes.com › useandcareguides › 1002351640_use.pdf · P3 P5 27 P4 28 28 29 22L 22R 12 13 10 10 10L 10R P8 P1 P8 P1 1L 3R C 1R P1 P1 5R 5L 31 31 34 33 L1 L2

Metal Garden Shed

OWNER'S MANUAL

Instructions for Assembly

Requires two people and takes 1-1.5 hours for lnstallation.

Quick & Easy Assembly

Ridge Reinforced Walls

Wood Storage

9820005

at least

Overall Size: L270 x W105 x H130/158 cm Overall Size: L8.8 x W3.4 x H4.3/5.2 Feet

Page 2: Metal Garden Shedpdf.lowes.com › useandcareguides › 1002351640_use.pdf · P3 P5 27 P4 28 28 29 22L 22R 12 13 10 10 10L 10R P8 P1 P8 P1 1L 3R C 1R P1 P1 5R 5L 31 31 34 33 L1 L2

BEFORE YOU START

Owner's Manual

Prior to installation, it is important that you contact your local government authority to

determine if building approval is required. Study and understand this owner's manual.

Important information and helpful tips will make your construction easier and more

enjoyable.

Assembly instructions

Instructions are supplied in this manual and contain all appropriate information for your

building model. Review all instructions before you begin. During assembly, follow the

step sequence carefully for correct results .Please be aware: this unit takes two people

about one full day to complete.

Parts

Check to be sure that you have all the necessary parts for the building.

Separate contents of the carton by the part number while reviewing parts list.

Familiarize

yourself

with

the

hardware

and

fasteners

for

easier

use

during

construction. These are packaged within the carton. Note that extra fasteners have been

supplied for your convenience.

TOOLS MAY REQUIRED

Use heavy duty gloves when handling steel sheets and flashing

PLAN AHEAD

Watch the weather:

Please be sure the day you select for installation is dry and calm.

DO NOT attempt to assemble your shed in windy weather

because of risk of damage to panels, or personal injury. Be careful

of wet or muddy ground.

Teamwork:

Whenever possible, two or more people should work together to

assemble the building. One person can position parts or panels

while the other is able to handle the fasteners and the tools.

3M

1/10"

1/5"

5/16"

Page 3: Metal Garden Shedpdf.lowes.com › useandcareguides › 1002351640_use.pdf · P3 P5 27 P4 28 28 29 22L 22R 12 13 10 10 10L 10R P8 P1 P8 P1 1L 3R C 1R P1 P1 5R 5L 31 31 34 33 L1 L2

PLAN AHEAD

Site Selection

l Avoid overhanging trees as much as possible as leaves will make regular cleaning

necessary and broken branches are a potential hazard.

l Small trees,bushes or fences nearby can be helpful,acting as a wind break.

Site Preparation

The site must be prepared so that the base of the shed is level all round and checking

with a spirit level is required.

The base can be constructed by treated timber or concrete,in order to stop the moisture

getting into the shed.The shed is not designed to be built onto lawn directly.Also the

ground will get muddy during rainy days.

If a concrete pad is made,it is important that this slopes towards the edges to prevent

water ingress.

Time must be allowed for any concrete or cement to dry before building the shed on top.

Bases can also be constructed from bricks,blocks,or mounted on a concrete pad.

The bricks or blocks should be cemented onto firm and level concrete footings and the

greenhouse frame drilled and screwed to the base.

IMPORTANT NOTES:

l Find someone to help you:it is much easier with someone to hold parts,pass tools

ect.Also some steps require two people to lift structures together.This is not very

heavy work so would suit most able-bodied people.

l Allow plenty of time:rushing often causes errors and the re-doing of incorrect

assemblies.If you have never built a shed before,it can take most of a day to carefully

complete the construction.

l Have the right tools to hand.

l Safety clothing as recommended in the 'Tools' section.

l Ideally lat out the parts and check that all are present before commencing

construction.Lay on cloths or plastic sheets if there is any risk of scratching the parts.

l Tighten all nuts carefully,being sure not to miss any.Check the frame is square and

using a spirit level to check that it is upright.

sharp edges

when assembling or performing.

wear work gloves, long sleeves and eye glasses,

Pay attention to the sharp edges. Please

Page 4: Metal Garden Shedpdf.lowes.com › useandcareguides › 1002351640_use.pdf · P3 P5 27 P4 28 28 29 22L 22R 12 13 10 10 10L 10R P8 P1 P8 P1 1L 3R C 1R P1 P1 5R 5L 31 31 34 33 L1 L2

PARTNO. Qty.

PARTNO. Qty.

P1

P3

4

1

1275mm/50.19"

1035mm/40.74"

1L 1

1

2

2

2

2

2

1

1

1

1

1

1

1

1

1

1

1

1

944mm/37.16"

1620mm/63.78"

516mm/20.31"

1R

3

4L

4R

8

9

10

11

13

14

15

1390mm/54.72"

1540mm/60.62"

876mm/34.48"

448mm/17.63"

1615mm/63.58"

1621mm/63.81"

19

20

21L

21R

22L

22R

25

26

592mm/23.3"

1623mm/63.89"

462mm/18.18"

27

28

2

1

1088mm/42.83"

1035mm/40.74"

29

1

1

C

3R

1

1

1

12

939mm/36.96"

1

1

10L

10R

1528mm/60.15"

1

1623mm/63.89"

30

5L

5R

1

1

2

31

799mm/31.45"

1

33

1

34

1264mm/49.76"

P2 1

1390mm/54.72"

P8 2

1528mm/60.15"

1308mm/51.49"

944mm/37.16"

944mm/37.16"

944mm/37.16"

516mm/20.31"

1308mm/51.49"

1528mm/60.15"

939mm/36.96"

1264mm/49.76"

Page 5: Metal Garden Shedpdf.lowes.com › useandcareguides › 1002351640_use.pdf · P3 P5 27 P4 28 28 29 22L 22R 12 13 10 10 10L 10R P8 P1 P8 P1 1L 3R C 1R P1 P1 5R 5L 31 31 34 33 L1 L2

PARTNO. Qty.

P63

592mm/23.3"

P7

1

B6

H1&J5

F1

F2

S3

1

180

1580mm/62.2"

W1

GC

GA

2

1

1

5

230

30

L1

L2

2

2

P41

1035mm/40.74"

P51

D1 1

1263mm/49.72"

B5

1

S4

120

F3

8

1035mm/40.74"

592mm/23.3"

#8AB-18x2/13

#8-32x2/13

#8-32x2/13

Page 6: Metal Garden Shedpdf.lowes.com › useandcareguides › 1002351640_use.pdf · P3 P5 27 P4 28 28 29 22L 22R 12 13 10 10 10L 10R P8 P1 P8 P1 1L 3R C 1R P1 P1 5R 5L 31 31 34 33 L1 L2

3

3

W1

4R

4L

8

9

9

8

P2

20

19

21L

21R

11

11

15

14

30

26

25

P7

P6

P6

P6

GC

GC

GA

GC

GC

GC

P3

P5

P4

27

28

28

29

22L

22R

12

13

10

10

10L

10R

P8

P8

P1

P1

1L

3R

C

1R

P1

P1

5R

5L

31

31

34

33

L1

L2

D1

L2

L1

B6

B6

H1

J5

B5

Page 7: Metal Garden Shedpdf.lowes.com › useandcareguides › 1002351640_use.pdf · P3 P5 27 P4 28 28 29 22L 22R 12 13 10 10 10L 10R P8 P1 P8 P1 1L 3R C 1R P1 P1 5R 5L 31 31 34 33 L1 L2

Door Post of Tool Shed Installation

Base of Tool Shed Assembly

When diagonal measurements are

F1 F1

PARTNO. Qty.

1、equal,the frame is square.

2、The Floor Frame must beBOTH square AND level or theholes will not line up properly.

-7-

PARTNO. Qty.

1L 1

11R

1

1

C

3R

1L

3R

C

1R

5L

5R

1

1

F1

S3

F1

F1

F1

S3C

5L

5R

F1 8

F1

8

S3

6

Inspection

Page 8: Metal Garden Shedpdf.lowes.com › useandcareguides › 1002351640_use.pdf · P3 P5 27 P4 28 28 29 22L 22R 12 13 10 10 10L 10R P8 P1 P8 P1 1L 3R C 1R P1 P1 5R 5L 31 31 34 33 L1 L2

Right Side Wall Panels Installation

Corner Post 10L

P1 2

F1

S3

-8-

PARTNO. Qty.

F1

S3

F1

S3

P8

10R

P1

F2

S3

P1

P1

PARTNO.Qty.

110R

P8 2

F1

S3

F2

S3

PARTNO. Qty.

1

10L

P12

F1

S3

F2

S3

F1

S3

F1

S3

P1

10L

P8

P1

P1

10R

P8

P8

10L

F1

8

S3

10

F2

2

F1

9

S3

12

F2

3

F1

10

S3

14

F2

4

Wall Panels Installation

inside

Corner Post 10R

inside

Left Side Panels Installation

Page 9: Metal Garden Shedpdf.lowes.com › useandcareguides › 1002351640_use.pdf · P3 P5 27 P4 28 28 29 22L 22R 12 13 10 10 10L 10R P8 P1 P8 P1 1L 3R C 1R P1 P1 5R 5L 31 31 34 33 L1 L2

Right Triangle Panel InstallationRight Side Upper Beam Installation

-9-

PARTNO. Qty.

1

12

12

F1

S3

PARTNO.Qty.

122L

1

10

22L

10

22L

10

PARTNO.Qty.

122L

1

10

PARTNO. Qty.

122R

1

10

F1

S3

10

22R

F1

S3

10

22R

F1

9

S3

9

F1

12

S3

12

F1

12

S3

12

Left Side Upper Beam Installation

Left Triangle Panel Installation

Page 10: Metal Garden Shedpdf.lowes.com › useandcareguides › 1002351640_use.pdf · P3 P5 27 P4 28 28 29 22L 22R 12 13 10 10 10L 10R P8 P1 P8 P1 1L 3R C 1R P1 P1 5R 5L 31 31 34 33 L1 L2

(Wood Storage Cabinet)

-10-

PARTNO. Qty.

13

1

F1

S3

F1

S3

13

PARTNO.Qty.

4L 1

14R

1

W1

23

F1

3

3

W1

4R

4L

PARTNO. Qty.

1

1

8

9

P2 1

S3

F1

F2

S3

8

9

P2

8

9

F1

6

S3

6

F1

8

F1

6

S3

8

F2

2

Front Upper Beam Installation

Base of Wood Storage

Cabinet Installation

Side Wall Panel InstallationCorner Post Installation

Page 11: Metal Garden Shedpdf.lowes.com › useandcareguides › 1002351640_use.pdf · P3 P5 27 P4 28 28 29 22L 22R 12 13 10 10 10L 10R P8 P1 P8 P1 1L 3R C 1R P1 P1 5R 5L 31 31 34 33 L1 L2

-11-

PARTNO. Qty.

1

1

8

9

8

9

S3

F1

PARTNO.Qty.

1

1

21L

21R

1

1

21L

21R

2

11

S3

F1

21L

11

11

21R

114

14

PARTNO. Qty.

115

15

S3

F1

F14

S34

F1

14

S3

14

F1

4

S3

4

Right Corner Posts Installation

Front Beam,Frame and Triangle Panels Installation(Wood Storage Cabinet)

Triangle Panels Fixation

Page 12: Metal Garden Shedpdf.lowes.com › useandcareguides › 1002351640_use.pdf · P3 P5 27 P4 28 28 29 22L 22R 12 13 10 10 10L 10R P8 P1 P8 P1 1L 3R C 1R P1 P1 5R 5L 31 31 34 33 L1 L2

-12-

PARTNO. Qty.

PARTNO.Qty.

1

19

1

20

F1

F1

19

20

PARTNO. Qty.

P6 3

P7

1

P6

P6

P6

P7

S3

F1

F1

4

F1

4

F1

16

S3

16

Connection Between Tool Shed and Wood Storage Cabinet

Connection Between Tool Shed and Wood Storage Cabinet

Roof Panels Installation

Page 13: Metal Garden Shedpdf.lowes.com › useandcareguides › 1002351640_use.pdf · P3 P5 27 P4 28 28 29 22L 22R 12 13 10 10 10L 10R P8 P1 P8 P1 1L 3R C 1R P1 P1 5R 5L 31 31 34 33 L1 L2

Eaves and Plastic Ends Installation

-13-

GA

PARTNO. Qty.

P3 1

P4

1

P5

1

P4

P3

P5

S3

F1

PARTNO.Qty.

25&26&27

29&30

1

GC

GA

1

5

GC

GC

GC

GC

GC

27

26

28

29

28

30

25

228

GA

GC

S3

F1

F1

F1

PARTNO.

Qty.

2

L1

2

L2

2

31

L1

L2

31

x2

F1

F1

21

S3

21

F1

10

S3

4

F1 8

Roof Panels Installation (Tool Storage)

Corner Connector Installation

Page 14: Metal Garden Shedpdf.lowes.com › useandcareguides › 1002351640_use.pdf · P3 P5 27 P4 28 28 29 22L 22R 12 13 10 10 10L 10R P8 P1 P8 P1 1L 3R C 1R P1 P1 5R 5L 31 31 34 33 L1 L2

-14-

PARTNO. Qty.

1

33

1

34

D1 1

D13334

34

33

D1

S3

F2

S3F1

PARTNO. Qty.

F3

34

S3

F2

33

2

B6

F1

S3

2

F2

2

PARTNO.Qty.

F1

12

S3

14

F2

2

F3

F1

4

4

Door Panel and Door Frame Assembly

Door Assembly

Door Assembly and Fixation

Turn Opposite

Page 15: Metal Garden Shedpdf.lowes.com › useandcareguides › 1002351640_use.pdf · P3 P5 27 P4 28 28 29 22L 22R 12 13 10 10 10L 10R P8 P1 P8 P1 1L 3R C 1R P1 P1 5R 5L 31 31 34 33 L1 L2

-15-

PARTNO. Qty.

H1&J5 1

B5

1

F2

B5

J5

H1

F3

PARTNO. Qty.

F3

4

F2

2

Door of Tool shed Installation

Doorknob and Bolt Installation

Finishing