metal detention and infiltration products...contech’s corrugated metal pipe (cmp) underground...
TRANSCRIPT
Metal Detention and Infiltration Products
2 Learn more at www.contech-cpi.com/cmp
Corrugated Metal Pipe for Stormwater Detention and InfiltrationMeet your stormwater quantity and runoff reduction requirements with ease.CONTECH’s corrugated metal pipe (CMP) underground detention/infiltration systems can be sized and shaped to meet your site-specific needs. The versatile material provides almost limitless opportunities to match individual site requirements while lowering site development costs.
Durable
• Provenservicelife—Exceeds100-yearswithproperspecification that meets all AASHTO and ASTM pipe specifications
• Handlesfillheightsinexcessof100feet–steelgainsstrengthfromsoil
• 100%traceablematerial—maintainsperformanceevenwhen recycled
• Homogenousmaterial—eliminatesfailuresduetostresscracks, shrinkage cracks and air voids
• Variouscoatingsavailablewithpredictableservicelife
- Aluminized Steel™ Type 2
- Galvanized
- CORLIX®
- TRENCHCOAT®
Learn more about our available coatings at www.contech-cpi/cmp
Various coatings available.
Selecting the right stormwater solution just got easier...
It’s simple to choose the right low impact development(LID)solutiontoachieveyourrunoffreduction goals with the CONTECH UrbanGreen Staircase.First,selecttherunoffreductionpracticesthataremostappropriateforyoursite,payingparticularattentiontopretreatmentneeds.Iftheentiredesignstormcannot be retained, select a treatment best management practice (BMP)forthebalance.Finally,selectadetentionsystemtoaddressany outstanding downstream erosion.
Learn more about our low impact development at www.contech-cpi.com/lid
3Learn more at www.contech-cpi.com/cmp
Versatile
• Widerangeofshapesandsizes–roundandpipe-archindiametersfrom6to144inches
• Varietyoflayouts–rectangular,L-shapeandstaggeredcellsarefrequentlyused
• Arrayoffittings–tees,wyes,elbow,saddlebranches,manifolds,reducersandcustomfabricationavailable
Sustainable
• World’smostrecycledcontent–cancounttowards LEED® credits
• Requireslessenergyandmaterialstoproduce–lowerscarbonfootprint
Learn how CONTECH products can help contribute to LEED credits at www.contech-cpi.com/LEED
Easy to Install and Maintain
• Flexibleandforgivingduringinstallation
• Lightweightforeasyhandling
• Quickassemblyshortenssitedevelopmenttime
• Integratedoutletcontrolstructureeliminatesneedfordownstream control structure
• Manholerisersections,completewithladdersfacilitateanyaccess and scheduled maintenance
Tees, wyes, elbows, saddle branches, manifolds and reducers are available.
Rectangu
lar, L-sha
ped
and stag
gered sha
pes are
frequently
use.d.
Typical Spacing for Multiple BarrelsDiameter Spacing* Pipe-Arch Span Spacing*
Up to 24” 12” Up to 36” 12”
24” to 72” 1/2 Diameter of Pipe 36” to 108” 1/3 Span of
Pipe-Arch
72” + 36” 108” to 189” 36”
*Spacingshownprovidesroomforproperbackfilltoenablethestructuretodevelopadequatesidesupport.SpacingwithAASHTOM-145,A-1,A-2,A-3granularfill.Closerspacingispossibledependingonqualityofbackfillandplacing and compaction methods.
4 Learn more at www.contech-cpi.com/cmp
Detention
CONTECHCMPdetentionsystemsstorestormwaterrunoffexceedingasite’sallowabledischargerateandreleaseitslowlyovertime.Installedbelowgrade,thesystemsmaximizepropertyusage and meet your specific water quantity requirements. CMP detentionsystemsareavailableinallAASHTOM-36Types.Forlarger systems, the Optimizer™ flow control device can reduce required storage volume.
Applications
Header
Bands
Barrels
Riser inletto catchbasinor curb inlet
Outlet pipe(sized to control runoff)
CMP detention system
High Volume Storage
CONTECHplatesystemsallowforhighvolumestormwaterstorageinsmallfootprintareas.Thesystemsareofferedinawidevarietyofshapesandsizesinbothaluminumand galvanized steel. Full-pipe systems and three-sided structureswithopenbottomscanbeusedforinfiltration.
Typically, CONTECH plate systems are used on high vertical rise applications or in areas where the smallest possiblefootprintisofthegreatestconcern.Thesystemsare bolted together in the field, which reduces the number offreightloads.Remotesitesorprojectswithchallengingaccessibilityoftenutilizeplatesystems.
Plate system for high volume storage.
5Learn more at www.contech-cpi.com/cmp
CMP infiltration system
Meet Your Low Impact Development Requirements
Infiltration
CMPpipeandpipe-archisavailablefullyorpartiallyperforatedtomeetyourLowImpactDevelopment(LID)requirements.Standardpipe-wallperforations(3/8”diameterholesmeetingAASHTOM-36,Class2)provideapproximately2.5%openarea.SubsurfaceperforatedCMPinfiltrationsystemsstorestormwaterrunoffinthepipeand surrounding stone during a storm until it can be slowly released into the surrounding native soil.
Stormwater runoff is stored in the pipe and surrounding stone.
Pipe arch for low profile applications
Low Profile
Whenverticalspacemustbemaximized,theCMPcanbeutilizedinapipe-archshape.Thelow,widepipe-archdesignallowsforgreater storage in a shallow profile than typical round pipe without losing any structural integrity. Like our round pipe, pipe arch is producedinsixwallthicknessesincluding18,16,14,12,10and8gage,whichareavailablewitheitherhelicalorannularcorrugations.
Pipe-arch for low profile application.
6 Learn more at www.contech-cpi.com/cmp
ApplicationsOn-Site Manufacturing
Ifyourjobsiteisremoteoryouhavelimitedstoragespaceorrestrictedtrafficpatterns,takeadvantageofourMobileProductionVehicle(MPV)forfastandcosteffectiveon-sitesteelpipemanufacturing.ThePIPEMPV®isdesignedtobeaself-supportingfactorythatcanbequicklydeployedandputintoproduction.Onceonsite,pipemanufacturingprogressesquicklyenoughtoallowpipeinstallationwithinfourhours.
ThePIPEMPVcanproducecorrugatedmetalpipeinavarietyofsizes.Diametersfrom36”—192”andlengthsupto35’canbeaccommodated.ThispipemeetsthesamelevelsofqualityconstructionasdoesallCONTECHmanufacturedpipe,withhighcoilfeedratespeedsandthesamelock-seemedgeprocessusedinconventionalpipemanufacturing.
Mobile Production Vehicle
Innovative Solutions for Challenging Sites
TheflexibilityofCMPallowsyoutocreateinnovativesolutionswhendealingwithchallengingsites.Forexample,whentryingtomeetrunoffreductionrequirements,yoursitemaybemostlyimperviousoryoumayhaveathin,shallowclaylayerjustbelowthesurface,limitingtheinfiltrationcapacityofsurfaceBMPs.Onesolution is to utilize CMP infiltration wells. First, collect the site runoffusingourSlottedDrain™aroundtheperimeterofeachdriveisle.TheSlottedDrainthendirectswaterintoverticallengthsofperforatedCMP.TheverticalperforatedCMPislongenoughtopenetrate the clay layer and infiltrate the stormwater into a highly permeablealluviallayerabout12’-14’belowground.Thisallowsthe developer to meet the LID requirements and eliminate the need fortheextendeddetentionbasin.
Slotted DrainCMP infiltration well
7Learn more at www.contech-cpi.com/cmp
Diameter (inches)
Volume (ft3/ft)
Min. Cover Height
Diameter (inches)
Volume (ft3/ft)
Min. Cover Height
Diameter (inches)
Volume (ft3/ft)
Min. Cover Height
Diameter (inches)
Volume (ft3/ft)
Min. Cover Height
12 .78 12” 60 .19.6 12” 120 .78.5 18” 180 .176 24”
15 1.22 12” 66 . 23.7 12” 126 86.5 18” 186 .188 24”
18 1.76 12” 72 .28.2 12” 132 95.0 18” 192 .201 24”
21 2.40 12” 78 .33.1 12” 138 103.8 18” 198 .213 30”
24 3.14 12” 84 .38.4 12” 144 113.1 18” 204 . 227 30”
30 4.9 12” 90 .44.1 12” 150 122 24” 210 .240 30”
36 7.0 12” 96 .50.2 12” 156 132 24” 216 .254 30”
42 9.6 12” 102 .56.7 18” 162 143 24” 222 .268 30”
48 12.5 12” 108 .63.6 18” 168 153 24” 228 .283 30”
54 15.9 12” 114 .70.8 18” 174 165 24” 234 .298 30”
Round Pipe - CMP and Plate (CMP 12-in to 144-in; Plate 60-in to 240-in)
Pipe-Arch - Multi Plate
2” Deep Corrugations
Shape (ft-in.)Volume (ft3/ft)
Min. Cover Height
Shape (Inches)Volume (ft3/ft)
Min. Cover Height
Shape (Inches)Volume (ft3/ft)
Min. Cover Height
Shape (Inches)Volume (ft3/ft)
Min. Cover Height
18-in
Cor
ner R
adiu
s (R
c)
6-1x4-7 22 12” 8-7x5-11 41 18” 8-7x5-11 41 18” 14-1x8-9 97 24”6-4x4-9 24 12” 8-10x6-1 43 18” 8-10x6-1 43 18” 14-3x8-11 101 24”6-9x4-11 26 12” 9-4x6-3 46 18” 9-4x6-3 46 18” 14-10x9-1 105 24”7-0x5-1 29 12” 9-6x6-5 49 18” 9-6x6-5 49 18” 15-4x9-3 109 24”7-3x5-3 31 12” 9-9x6-7 52 18” 9-9x6-7 52 18” 15-6x9-5 114 24”7-8x5-5 33 12” 10-3x6-9 55 18” 10-3x6-9 55 18” 15-8x9-7 118 24”7-11x5-7 36 12” 10-8x6-11 58 18” 10-8x6-11 58 18” 15-10x9-10 122 24”8-2x5-9 38 18” 10-11x7-1 61 18” 10-11x7-1 61 18” 16-5x9-11 126 30”
13-11x8-7 93 24” 16-7x10-1 131 30”
31-
in C
orne
r Rad
ius
(Rc) 13-3x9-4 98 24” 15-4x10-4 124 24” 17-2x11-4 153 30” 19-3x12-4 185 30”
13-6x9-6 102 24” 15-7x10-6 129 24” 17-5x11-6 158 30” 19-6x12-6 191 30”
14-0x9-8 106 24” 15-10x10-8 134 24” 17-11x11-8 163 30” 19-8x12-8 196 30”
14-2x9-10 111 24” 16-3x10-10 138 30” 18-1x11-10 168 30” 19-11x12-10 202 30”
14-5x10-0 115 24” 16-6x11-0 143 30” 18-7x12-0 174 30” 20-5x13-0 208 36”
14-11x10-2 120 24” 17-0x11-2 148 30” 18-9x12-2 179 30” 20-7x13-2 214 36”
1/2” Deep Corrugations
Shape (inches)
Volume (ft3/ft)
Min. Cover Height
Shape (inches)
Volume (ft3/ft)
Min. Cover Height
Shape (inches)
Volume (ft3/ft)
Min. Cover Height
Shape (inches)
Volume (ft3/ft)
Min. Cover Height
17x13 1.1 12” 28x20 .2.9 12” 49x33 .8.9 12” 71x47 18.1 12”21x15 1.6 12” 35x24 .4.5 12” 57x38 11.6 12” 77x52 21.9 12”24x18 2.2 12” 42x29 .6.5 12” 64x43 14.7 12” 83x57 26.0 12”
1” Deep Corrugations
60x46 15.6 15” 81x59 27.4 18” 103x71 42.4 18” 128x83 60.5 24”66x51 19.3 15” 87x63 32.1 18” 112x75 48.0 21” 137x87 67.4 24”73x55 23.2 18” 95x67 37.0 18” 117x79 54.2 21” 142x91 74.5 24”
Pipe-Arch - CMP
Sizing
8 Learn more at www.contech-cpi.com/cmp
We print our brochures entirely on Forest Stewardship Council certified paper. FSC certification ensures that the paper in our bro-chures contain fiber from well-managed and responsibly harvested forests that meet strict environmental and socioeconomic standards.
FSC
Learn moreRead our white paper, Economic Optimization of Infiltration Systems, to learn more.
You’llreceivefreePDHcreditsforcompletingaquickquiz.
Available at www.contech-cpi.com/cmp
Connect with UsWe’realwaysavailabletomakeyourjobeasier.Searchforyourlocalrepatwww.contech-cpi.com.Whileyou’rethere,besuretocheckoutourupcomingseminarschedule or request an in-house technical presentation.
Start a ProjectIfyouarereadytobeginaproject,checkoutourDYODScalculatoravailableforadjustableandrectangularCMPsystems.Downloadatwww.contech-cpi.com/cmp.
CMPDetention-Infiltration5M01/11MC
©2011CONTECHCONSTRUCTIONPRODUCTS,INC.800.338.1122www.contech-cpi.comAll Rights Reserved. Printed in the USA.
NOTHINGINTHISCATALOGSHOULDBECONSTRUE.ASANEXPRESSEDWARRANTYORANIMPLIEDWARRANT.OFMERCHANTABILITYORFITNESSFORANYPARTICULA.PURPOSE.SEETHECONTECHSTANDARDCONDITIONOFSALES(VIEWABLEAT WWW.CONTECH-CPI.COM/COS)FORMOR.INFORMATION.
Get Social With Us!
Next Steps