met vidrio

1
CANT. LONG. ALTO SUBTAL m2 2.139 m2 1.058 Tanque elevado 1 0.660 0.420 0.277 m2 0.277 Tanque elevado 1 0.655 0.420 0.275 m2 0.275 Tanque elevado 1 0.405 0.420 0.170 m2 0.170 Derrame 1 0.790 0.425 0.336 m2 0.336 m2 1.081 Tanque elevado 1 0.715 0.380 0.272 m2 0.272 Tanque elevado 1 0.715 0.380 0.272 m2 0.272 Tanque elevado 1 0.480 0.385 0.185 m2 0.185 Derrame 1 0.830 0.425 0.353 m2 0.353 DEPARTAMENTO 701 DEPARTAMENTO 702 UBICACIÓN ELEMENTOS UND. TOTAL VIDRIOS EN ESTRUCTURA METALICA PARA EL TANQUE ELEVADO VIDRIOS Y CRISTALES

Upload: carlos-aquino-hancco

Post on 14-Dec-2015

213 views

Category:

Documents


0 download

DESCRIPTION

vidrios

TRANSCRIPT

Page 1: Met Vidrio

CANT. LONG. ALTO SUBTAL

m2 2.139m2 1.058

Tanque elevado 1 0.660 0.420 0.277 m2 0.277

Tanque elevado 1 0.655 0.420 0.275 m2 0.275

Tanque elevado 1 0.405 0.420 0.170 m2 0.170

Derrame 1 0.790 0.425 0.336 m2 0.336m2 1.081

Tanque elevado 1 0.715 0.380 0.272 m2 0.272

Tanque elevado 1 0.715 0.380 0.272 m2 0.272

Tanque elevado 1 0.480 0.385 0.185 m2 0.185

Derrame 1 0.830 0.425 0.353 m2 0.353

DEPARTAMENTO 701

DEPARTAMENTO 702

UBICACIÓN ELEMENTOS

UND. TOTAL

VIDRIOS EN ESTRUCTURA METALICA PARA EL TANQUE ELEVADO

VIDRIOS Y CRISTALES