DESCRIPTION
The East Campus Improvement Project included construction of a new four-level parking structure for 1,100 cars, a new 7,000 gross square foot, single-story college police building and a realignment of the campus' east entry. The new parking structure uses concrete that includes fly ash, a commonly-used coal combustion product that serves as a strengthening agent when added to concrete. As an open parking structure, there is no need for mechanical ventilation systems. Photovoltaic panels are installed on the top level, and help offset energy needs for the police station and nearby Allied Health Building. The realigned east entry provides for a simple, safe way to enter the new parking structure area and provide improved travel around the campus' northern edge.TRANSCRIPT
PROPOSITIONS S & N PROJECT FACT SHEET
San Diego Community College District
Mesa College Parking Structure
Campus San Diego Mesa College
Address 7250 Mesa College DriveSan Diego, CA 92111‐4998619.388.2604www.sdmesa.eduwww.sdmesa.edu
Architect Delawie Wilkes Rodrigues Barker
Construction Manager McCarthy Construction
http://www.sdccdprops‐n.com/Mesa‐College/Projects/1221.aspx
Project Description
Rendering
j p
The new 1,100‐space, four‐level parking structure is part of an overall $34 million East Campus Improvement Project that
includes a complete road realignment and new east campus entry, along with a 7,000 square‐foot police substation.
Photovoltaic panels will be installed on the top level to harvest solar energy, offsetting the energy needs for the new police
station as well as the new Allied Health Building, a $24.9 million project located just west of the parking structure.
Sustainable FeaturesSustainable Features
The concrete used in the new parking
structure includes the addition of fly ash ‐
a commonly‐used coal combustion
product – as a strengthening agent.
When the fly ash is added to concreteWhen the fly ash is added to concrete,
the amount of concrete needed can also
be reduced.
As an ‘open’ parking structure, there is no
need for mechanical ventilation systems.
Th l d l i t fThe landscape plan uses a variety of
drought‐tolerant plants and trees that are
compatible to the neighborhood.
The landscape plan utilizes a highly
efficient irrigation system with a special
controller that automatically measures
San Diego Community College District • 3375 Camino Del Rio South • San Diego, CA 92108Phone: 619.338.6546 • Fax: 619.338.6509 • www.sdccdprops‐n.com
available moisture in the air, and waters
plants accordingly, saving the potential of
tens of thousands of gallons of
water annually.
Fast Facts
Project Name Mesa College Parking Structure
Funding Source Proposition S
Architect Delawie Wilkes Rodrigues Barker
Contractor Barnhart Heery
Civil Engineer RBF Consulting, Latitude 33Civil Engineer RBF Consulting, Latitude 33
Electrical Engineer/Mechanical Engineer TKG Consulting Engineers
Landscape Architect Wimmer Yamada and Caughey
Program Manager for Propositions S & N Gafcon, Inc.
Campus Project Manager Daniel Sicile‐Kira, Gafcon, Inc.
Construction Start Date June 2007
Project Budget $34.4 M (entire East Campus Improvement Project)
Completion Date March 2009