    Project Overview

    Staff at Site

    Daily Wages Manpower

    Site Organization

    Machinery & Equipment

    Material Stock Report

    Evaluation of Material & Machinery at Site

    Project Progress

    Quality Control & Quality Assurance

    Construction Schedule

    Site Photographs 2

    Markazi Mosque

  • 8/2/2019 Merkezi Mosque

    3/44

    Project Overview

    3

    Markazi Mosque

  • 8/2/2019 Merkezi Mosque

    4/44

    Project Overview

    Construction of Markazi Mosque is one of the five projects identifiedby ERRA to be completed in New Balakot city. The cost of theconstruction is Rs. 385.40 Million and it will be completed within 18months. The state-of-the-art facility will be built according to Libyan

    Architecture and will accomodate more than 15,000 people.

    4

  • 8/2/2019 Merkezi Mosque

    5/44

    Project Overview

    Client:-

    Qaddafi International Charity & Development Foundation Libya

    Consultant:-

    Impact Design International

    Contractor:-

    TURCON (Private) Limited

    5

  • 8/2/2019 Merkezi Mosque

    6/44

    Project Overview

    Total Area of Mosque:-

    271,428 SFT

    Covered Area of Mosque:-

    63,000 SFT

    Project Cost:-

    4.7 Millions Dollars (PKR 385.40 Millions)

    Project Start Date:- (Actual)28th September 2010

    6

  • 8/2/2019 Merkezi Mosque

    7/44

    Project Overview

    Project Completion Date:- ( According to actual start)

    27st March 2012

    Project Construction Duration:-

    18 Months

    Maximum Capacity of Mosque:-

    15,000 people at a time

    Ablution Area:-125 people at a time

    Car Parking Area with Drive Way:-

    13,000 SFT

    7

  • 8/2/2019 Merkezi Mosque

    8/44

    Menpower at Site

    8

    Markazi Mosque

  • 8/2/2019 Merkezi Mosque

    9/44

    Staff at Site

    9

    NumbersDesignationSr. #

    1Project Manager1

    1Planning Engineer2

    1Construction Manager3

    1Sr. Quantity Surveyor4

    1Manager Accounts5

    2Site Engineer6

    2Site Supervisor7

    1Safety Supervisor8

    1Laboratory Technician9

    1Land Surveyor10

    1Store Officer11

    1Auto Cad Operator12

    1Admin Officer13

  • 8/2/2019 Merkezi Mosque

    10/44

    Staff at Site

    10

    NumbersDesignationSr. #

    1Time Keeper14

    1HTV Mechanic15

    1Assistant Surveyor16

    2Surveyor Helper17

    2Assistant Supervisor18

    1Assistant Store Keeper19

    1Assistant Accountant20

    24Total Staff

  • 8/2/2019 Merkezi Mosque

    11/44

    Skilled and Unskilled Manpower

    11

    Markazi Mosque

  • 8/2/2019 Merkezi Mosque

    12/44

    Manpower

    12

    NumbersTradeSr. #

    45Laborers1

    05Mason2

    08Carpenter3

    04Carpenter Helper4

    10Scaffolder5

    05Scaffolder Helper6

    10Steel Fixer7

    06Steel Fixer Helper8

    08Steel Fabricator9

    04Steel Fabricator Helper10

    18Excavation Team11

    03Mixer Machine Operator12

    01Assistant Mechanic13

  • 8/2/2019 Merkezi Mosque

    13/44

    Manpower

    13

    NumbersTradeSr. #

    02Mechanic Helper14

    02Electrician15

    01Laboratory Helper16

    02General Foreman17

    01Labor Mate18

    01Office Boy19

    03Cook20

    02Cook Helper21

    01Laundry Boy22

    05Watchmen23

    02Driver24

    01Sweeper25

    150Total Strength

  • 8/2/2019 Merkezi Mosque

    14/44

    Site Organizational Chart

    14

    Markazi Mosque

  • 8/2/2019 Merkezi Mosque

    15/44

    Site Organizational Chart

    15

    PROJECTMANAGER

    CONSTRUCTIONMANAGER

    SITE ENGINEER

    SITE

    SUPERVISOR

    GENERALFOREMAN

    SITE ENGINEER

    SITE

    SUPERVISOR

    GENERALFOREMAN

    SURVEYOR

    ASSISTANT

    SURVEYOR

    SURVEYORHELPER

    PLANNINGENGINEER

    MANAGERACCOUNTS

    ASSISTANTACCOUNTANT

    SR. QUANTITYSURVEYOR

    AUTO CADOPERATOR

    STORE OFFICER

    STOREASSISTANT

    ADMIN OFFICERSAFETY

    SUPERVISOR

  • 8/2/2019 Merkezi Mosque

    16/44

    Machinery & Equipment

    16

    Markazi Mosque

  • 8/2/2019 Merkezi Mosque

    17/44

    Machinery & Equipment

    17

    NumbersDescriptionSr. #

    04Single Load Concrete Mixer Machine1

    03Double Load Concrete Mixer Machine2

    01Backhoe/Loader3

    02Small Dumpers4

    01Roller Compactors5

    03Plate Compactors6

    04Jumping Compactors7

    05Concrete Vibrator Engines8

    07Concrete Vibrator Shafts9

    01Transit Mixer Machine10

    03Container (20 x 8)11

    01Diesel Power Generator (35 KVA) 3-Phase12

    01Diesel Power Generator (15 KVA) Single-Phase13

  • 8/2/2019 Merkezi Mosque

    18/44

    Machinery & Equipment

    18

    NumbersDescriptionSr. #

    01Diesel Power Generator (5.5 KVA) Single-Phase14

    01Diesel Power Generator (2.2 KVA) Single-Phase15

    01Bar Bending Machine16

    01Bar Cutting Machine17

    01Air Compressor18

    01Lift Machine19

    01Total Station20

    01Theodolite21

    01Auto Level22

    01Cube Crushing Machine23

    01Water Tanker with Pump24

    01Spray Pump25

    01Pick up Single Cabin26

  • 8/2/2019 Merkezi Mosque

    19/44

    Machinery & Equipment

    19

    NumbersDescriptionSr. #

    02Excavator1

    01Excavator with Jack Hammer2

    05Tractor Trolley3

    01Jeep Mini Pajero4

    01Suzuki High Roof5

    01Tractor Trolley with Water Tanker6

  • 8/2/2019 Merkezi Mosque

    20/44

    Material at Stock

    20

    Markazi Mosque

  • 8/2/2019 Merkezi Mosque

    21/44

    Material Stock Report

    21

    BalanceUsedReceivedUnitDescriptionSr.#

    1,991.0013,109.0015,100.00BagsCement1

    22,726.0026,889.0049,615.00CftSand2

    25,533.0052,654.0078,187.00CftCrush3

    17.5511.09728.650TonSteel #34

    4.1513.32317.474TonSteel #45

    5.1291.90597.027TonSteel #66

    14.15162.983177.129TonSteel #87

    770.001,230.002,000.00KgBinding Wire8

    90.00200.00290.00LtrTermite Proofing Chemical9

    -750.00750.00KgAnti Freeze10

    -210.00210.00LtrRheo-Build (Admixture)11

    20.0020.00LtrNito Bond (Chemical)12

    -2,000.002,000.00Nos.Concrete Blocks13

  • 8/2/2019 Merkezi Mosque

    22/44

    Material Stock Report

    22

    BalanceUsedReceivedUnitDescriptionSr.#

    111.00119.00230.00NosPly Wood (Marine)14

    -1.001.00PktConcrete Nail 115

    11.0028.0039.00PktConcrete Nail 216

    -15.0015.00PktConcrete Nail 317

    16.0034.0050.00KgMS Nail 218

    43.0057.00100.00KgMS Nail 319

    37.0063.00100.00KgMS Nail 420

    300.00300.00600.00RftHazen Cloth21

    -3.003.00RollPlythene Sheets22

    600.001,400.002,000.00RftCuring Pipe23

    140.0060.00200.00KgBolt Nut 0.5 x 1.524

    415.0085.00500.00KgT-Bolt Nut & Washer25

    3,350.001,650.005,000.00Nos.Wooden Wedges26

  • 8/2/2019 Merkezi Mosque

    23/44

    Material Stock Report

    23

    BalanceUsedReceivedUnitDescriptionSr.#

    1,080.00990.002,070.00NosScaffolding Pipe 1027

    302.00220.00522.00NosScaffolding 2028

    1,540.001,620.003,160.00NosScaffolding Joints29

    -50.0050.00NosWooden Batten 4x4x1030

    -146.00146.00NosWooden Batten 4x4x Mix Size31

    -219.00219.00NosWooden Batten 4x2x Mix Size32

    -500.00500.00NosWooden Batten 4x4x1033

    3.0037.0040.00NosWooden Planks 2x8x834

    71.00189.00260.00NosWooden Planks Mix Size35

    -4.004.00NosWater Tank Plastic36

    -7.007.00NosTent37

    -300.00300.00NosMS Shuttering Plate (2 x 4)38

    -350.00350.00NosMS Shuttering Plate (1.5 x 4)39

  • 8/2/2019 Merkezi Mosque

    24/44

    Material Stock Report

    24

    BalanceUsedReceivedUnitDescriptionSr.#

    -40.0040.00NosMS Shuttering Plate (1 x 6)40

    -70.0070.00NosMS Shuttering Plate (4 x 8)41

    -84.0084.00NosMS Shuttering Plate (4 x 12)42

    400.00200.00600.00KgBarbed Wire43

    2.00-2.00SetSteel Column C (1m x 1m ) height 10-0044

    2.00-2.00SetSteel Column C-2 (0.6m x 0.6m) height 10-0045

    1.00-1.00SetSteel Column C-3 (0.6m x 0.3m) height 10-0046

    10.00-10.00SetSteel Column C-5 (12 x 12) height 12-0047

    1.00-1.00SetSteel Column C-6 (as per drawing) height 10-0048

    1.00-1.00SetSteel Column C-7 (0.6m x 0.45m) height 10-0049

    1.00-1.00SetSteel Column C-8 (as per drawing) height 10-0050

    2.00-2.00SetRound Column C-1 (0.9m dia.) height 10-0051

    4.00-4.00SetColumns for Minaret height 10-0052

  • 8/2/2019 Merkezi Mosque

    25/44

    Evaluation of Material &

    Machinery at Site

    25

    Markazi Mosque

  • 8/2/2019 Merkezi Mosque

    26/44

    26

    Evaluation of Material & Machinery at Site

    Amount (PKR)DescriptionSr. #

    6,178,208.00Consumable Materials017,687,300.00Assets (Formwork & Scaffolding)02

    14,955,000.00Equipment & Machinery03

    28,820,508.00Total Amount

  • 8/2/2019 Merkezi Mosque

    27/44

    Project Progress

    27

    Markazi Mosque

  • 8/2/2019 Merkezi Mosque

    28/44

    Earthwork in open cuttings is completed 100 %

    Excavation for foundations is completed 93 %

    Termite proofing under foundation is completed 83%

    Lean concrete for foundation is completed 83%

    Rebar fixing for foundation is completed 80%

    R.C.C for foundation is completed 69%

    28

    Project Progress

  • 8/2/2019 Merkezi Mosque

    29/44

    Activities in Progress

    Excavation for foundations

    Lean concrete for foundations & footing Beams

    Rebar fixing for foundation, footing beams & columns

    Formwork for foundation, footing beams, columns & retaining wall

    R.C.C. for foundations, footing beams, columns & retaining wall

    Backfilling

    29

    Project Progress

  • 8/2/2019 Merkezi Mosque

    30/44

    30

    Project Progress

    Amount (PKR)Unit RateQty ExecutedUnitActivity DescriptionSr.#

    5,595,967.0010.00559,596.70CftEarthwork in Open Cutting01

    Excavation for Foundations02

    2,422,018.1914.00173,001.30Cft0.00 to 6.25 ft02(a)

    1,248,747.0027.0046,249.89Cft6.25 to 10.00 ft02(b)

    2,138,276.2563.2633,801.40CftAbove 10.00 ft02

    686,423.028.0085,802.88SftTermite Proofing03

    1,562,873.39179.508,706.82CftLean Concrete (1:4:8)04

    27,888,903.8099,850.000279.308TonRe-Bar Fixing05

    --16,501.52SftFormwork06

    13,479,047.70296.2345,501.97CftR.C.C. in Foundation (3000 Psi)07

    196,294.60517.66379.20CftR.C.C. in Columns (3750 Psi)08

    1,902,019.50429.554,427.94CftR.C.C. in Wall (3750 Psi)09

    42,701.886.007,116.98CftBackfilling10

    243,017.86298.50814.13CftP.C.C. (1:3:6)11

    57,406,290.19Total Work Done (PKR)

    14.90Total Work Done in terms of financial progress (% Completed)

  • 8/2/2019 Merkezi Mosque

    31/44

    Cumulative Project Progress

    31

    15%

    0%

    20%

    40%

    60%

    80%

    100%

    120%

    %

    Complete

    Time (Months)

    PROGRESS

    Planned Actual

  • 8/2/2019 Merkezi Mosque

    32/44

    Status of Footings

    Graphical Presentation

    32

    Markazi Mosque

  • 8/2/2019 Merkezi Mosque

    33/44

    PROJECT PROGRESS

    33

  • 8/2/2019 Merkezi Mosque

    34/44

    PROJECT PROGRESS

    34

  • 8/2/2019 Merkezi Mosque

    35/44

    PROJECT PROGRESS

    35

  • 8/2/2019 Merkezi Mosque

    36/44

    PROJECT PROGRESS

    36

  • 8/2/2019 Merkezi Mosque

    37/44

    Quality Control & Quality Assurance

    37

    Markazi Mosque

  • 8/2/2019 Merkezi Mosque

    38/44

    Concrete

    As concrete material, approved material from the specified sources inaccordance with the Contract are being used. Sands are being suppliedfrom Lawrencepur and crush from Margalla. For Concrete, the mix

    design have been calculated and tested for strength of 3000 psi and3750 psi for various parts of structures by the Technical University ofTaxila. To ensure the quality, required number of samples (6 cylinders)are being collected and tested at site in the presence of consultants infully equipped site laboratory.

    Re-Bar

    Random samples of steel are being tested from each lot of delivery inthe presence of consultants by U.E.T. Taxila. Upon confirmation of thequality, the material being used which will conform to ASTM standards.

    38

    Quality Control & Quality Assurance

  • 8/2/2019 Merkezi Mosque

    39/44

    Backfilling & Compaction

    Since there is a substantial amount of backfill involved, regular activityof backfill being performed through FDT (Field Density Tests) in thepresence of consultants to check and verify the required level of

    compaction.

    Instruments

    All the instruments and testing machines like Total Station, Theodolite,Cube Crushing Machine, Auto Levels & Mixer Machines are Calibrated

    from reputed firms.

    Admixtures

    Concrete additives, chemicals & admixtures which are approved arebeing used for concreting under severe weather conditions.

    39

    Quality Control & Quality Assurance

  • 8/2/2019 Merkezi Mosque

    40/44

    Construction Schedule

    40

    Markazi Mosque

  • 8/2/2019 Merkezi Mosque

    41/44

    Base Line Construction Schedule

    Project Start Date September 28, 2010

    Project Completion Date March 27, 2010

    Updated Construction Schedule

    Project Start Date September 28, 2010

    Project Completion Date April 05, 2012

    As per updated construction schedule we are 09 days behind from ourschedule, and the reason of this delay is that we encountered very hardrock in excavation for foundations and it took more time as compare toour plan. We will recover these days in superstructure and project willget completed well before due date of completion.

    41

    Construction Schedule (CPM)

  • 8/2/2019 Merkezi Mosque

    42/44

    CONSTRUCTION SCHEDULE

    42

    MARKAZI MOSQUE

  • 8/2/2019 Merkezi Mosque

    43/44

    Site Photographs

    43

    Markazi Mosque

  • 8/2/2019 Merkezi Mosque

    44/44

    Thank You