mercedes–benz stadium project
TRANSCRIPT
Mercedes–BenzStadiumProject
ExecutiveSummarypresentedby:
1MBSEBO#10
11/17/15
Introduction
This Executive Summary has been prepared to provide highlights of the Equal Business Opportunity activities and accomplishments that have occurred from contract inception through 30 September 2015, and to illustrate the progress made toward the M/FBE goal of 31% participation on the construction of the Mercedes-Benz Stadium Project (MBS).
As illustrated on the following pages, currently $276,141,262.54 of the total MBS contract value has been committed to M/FBE firms. This figure comprises the total contract dollars awarded to M/FBEs for the entire scope of the project, which includes the development, design, and construction phases of the NSP. Of the total dollars committed to M/FBEs, $121,943,994.20 has been paid through 30 September 2015, to the firms awarded. As of the close of the third quarter of 2015, M/FBE participation on the MBS was at 33.2% of the total contract.
2MBSEBO#10
11/17/15
PartnershipsforSuccessEvery now and then a story comes alongthat invokes the thought: “THAT’S a greatstory…”or,“ THAT’S how it is supposed togo…”Thisisoneofthosetimes.
ARSMechanical, LLC is a mechanical contractor that specializes in commercialandindustrialheating,plumbing,ventilationandairconditioning(HVAC)repairs,maintenance,andinstallation.Owners,SadatNichols,andConyersnative,AlfredShepard, founded ARS over 13 years ago and maintain the company’sheadquartersinLithonia,Georgia.ItisanAfrican-Americanowned,DBEcertifiedentity.
ARS is responsible for insulation, fabrication, firestopping,coring,andhydronicdistributionintheMercedes-BenzStadium.Andsobeginsthestarttothisgreatstory.ARSisaprincipalandequitypartnerinthejointventureknownasAtlantaStadiumPartners(“ASP”).ThispartnershipiscomprisedofTDIndustries(basedinTexas) and Southland Engineering (based in California). ARS credits HHRMoutreachinitiativeswithbeingtheconduitforthecompaniesjoiningtogetherforthis venture. In fact, ARS’s president, Sadat Nichols, credits the joint venturepartnership–andthementorshiphiscompanyhasreceivedasaresultofit–asbeinganextraordinarybenefittoworkingonthenewstadiumproject.
It is thiscomponentthatmakesthestoryonetogetexcitedabout. InspeakingwithMr.Nichols,thetruesincerityandappreciationonehearsinhisvoicewhentalkingaboutthementorshiphiscompanyisreceivingissomuchmorepowerfulthanthewordsthemselvesusedtoconveythatmessage.Andeventhen,thefullimport of themessage doesn’t become clear until you speakwith other (non-Atlanta Stadium Partners / non-ARS) members of the construction communitywhomakeitclearthatsuchpartnershipsdonotalwaysofferthatvital,
3MBSEBO#10
11/17/15
crucial component of mentorship that Mr. Nichols has come to appreciate somuchonthisstadiumconstructionproject.
In fact,ASP isoneofthe largestsubcontractorsontheMercedes-BenzStadiumproject.1ARS, in its involvement with the stadium construction, not only self-performsbutisalsoinvolvedinthemanagementofthework(andof lowertiersubcontractors)of itsportionofthisconstructionfeat.Thescopeofwork–anditsimplementation–ishuge.Asaresult,ARSisamassinganextraordinarylevelofexperiencethatissuretocatapultitintothehigheststratospheresofitsfield.
WhileARSisnostrangertolargeprojects(itwasajointventurepartnerforworkontheinternationalterminalatHartsfield-JacksonAirport,andithasdoneworkfortheGovernmentServicesAdministrationonfacilitiesinmultiplestates),itstillappreciatestheuniqueeducationthatworkingonacomplex,highprofileprojectsuchastheMercedes-BenzStadiumoffers.
AsaresultofARS’sinvolvementonthestadiumproject,ithasalsoincreaseditsusualranksof33-34employeesbyanadditional14newhires,toensurethat itcontinues tomeet thedemandsofsucha large-scaleproject. Indiscussing themagnitudeoftheworkinvolvedontheMercedes-BenzStadium,Nicholspointedout that “[he] appreciates these efforts for providing opportunities…because itgoesalongwaytogettingEBOfirmsinvolvedinlargescaleprojects….”
And as if that isn’t enough, there is yet another “high-five” component to thiswinningstory.ARS,priortobeginningitsworkonthestadiumconstruction,had
1ASP,oneofthelargestsubcontractorsontheproject,istrackingat40%EBOparticipationonitsportionoftheMercedes-BenzStadiumconstruction.
4MBSEBO#10
11/17/15
met the necessary qualifications and received the necessary certifications toperformfiresafetywork.NorthstarFireProtection(basedinTexas),thecompanychosentocompletethisportionof theconstruction,washavingtroublefindingAtlanta Metro area–based EBO participation in its niche field. Fast forwardthrough outreach initiatives that brought the two firms together, and the finalresultisthatARSwillalsoself-performthefiresprinklermaterialandinstallationportionofthenewstadiumconstruction.Theby-productofthisportionofARS’scontractual duties is sure to lead to more work in the area of fire sprinklerinstallation.
Expandedscopeofworkopportunitiesandexpandedworkcapacitiesusuallygohand-in-hand with expanded company growth opportunities. Here’s to ARSMechanical and itswinning story that has us cheering along the sidelines as itmakesitswaytotheendzone(wehopeyou’vegotagreatvictorydanceinstore.ARS).ThankyoutoARSandtheMercedes-BenzStadiumforthe“THAT’Showitshouldbedone!”story.
5MBSEBO#10
11/17/15
PaymentStatusSummary
PaymentSummaryStatusAABE FBE RemainingEBO’s
Total
TotalContractValue $831,748,230.36
M/FBECommitteddollars116,842,744 $121,374,148 $38,399,407 $276,141,262.54
M/FBEPaidtoDate $121,943,994.20
%committedtoMFBE’s 33.2%
TotalProject%GOAL 31%
1
EBO SummaryCommitted EBO Contracts and Amounts Paid To-Date
PAYMENTSTATUSSUMMARYAABE FBE RemainingEBOs TOTAL
TotalContractValue $831,748,231
M/FBECommittedDollars $116,942,744 $121,274,112 $37,924,407 $276,141,263
M/FBEPaidTo-Date $121,943,994
%CommittedtoMFBE's 33.2%
TotalProject%Goal 31%
ScopeofWork ContractorName ContractValue TotalEBOContractAmountTo-Date
AABE FBE RemainingEBOs
CivilEngineer-RoadwaysProjectsParsonsBrinckerhoff 2,513,005$
Surveyor&UtilityDesign LongEngineering $513,673
SiteLightingWilliams,Russell,Johnson(WRJ) $187,345
Contractor(MangumStreetRelocation)ReevesContractingCo. 3,208,311$
Markings&Signage HighwayServices $32,984
ErosionControl CleanWaterConsultants $2,084
Electrical MEContractors $28,646
TrafficControl TheCorbettGroup $280,000
Asphalt AtlantaPaving $270,000
Trucking MCTrucking $26,158
Fencing C&CFence $30,935
Trucking NavigatorsConstruction $5,874
Trucking GrierBrothers $101,000
Trucking HarrellHaulingInc. $190,193 *
Trucking MARTrucking $5,000
GADomeUtilities,ErosionControl,NSPSiteDemo(Incl.MtVernon) DennisTaylor 1,722,441$
Demolition SouthernSiteDevelopment $195,000
PAYMENTSTATUSSUMMARY
2
AABE FBE RemainingEBOs
C&CFence $2,783
CornerstoneDemolition $551,670
MassExcavationandSiteGrading ReevesContractingCo. 17,862,357$
Paving AtlantaPaving $138,880
Engineering LongEngineering $19,368
Blasting SymmetryRockDrilling $35,000
Trucking HarrellHaulingInc. $1,996,008 *
Trucking GrierBrothers $134,135
Trucking MARTrucking $15,640
Trucking MCTrucking $46,020
TrafficControl TheCorbettGroup $955,106
Shoring AmericanShoring 319,952
Constructionofthevault NewGen $1,460,000
Trucking R.S.Senter $381,295
AugerCastPiles Berkel 7,762,314$
Steel Anatek $982,132
Trucking SAWATransportation $159,497
TruckingAmerconConstructionGroup $39,882
MicscellaneousMaterialRamToolandSupplyCompany $3,935
Fuel S.A.WhiteOilCompany $33,703
Anasteel $2,448
SheetingandShoring Berkel 748,266$
Steel Anasteel $223,348
RamToolandSupplyCo. $668
DrilledPiers ABE 9,061,054$
RamToolandSupply $22,514
S.A.WhiteOilCompany $133,418
Anasteel&Supply $1,528,512
CapitalCityMachineShop $262,866 *
PAYMENTSTATUSSUMMARYAABE FBE RemainingEBOs
3
Superstructure HHRMSelfPerform 123,941,225$
Gunby $1,201,462
RamTool $750,000
Anatek $10,164,640
Anasteel $19,555,961
BrysonConstructors $2,121,909
C.D.MoodyConstruction $11,869,789
C.D.MoodyConstruction(COW) $950,000
S.A.White $100,000
Long $250,000
Technique $53,000
H.J.Russell $11,869,789
EasternData $26,500
F.F.dbaMySupplies $6,663
ContractBusinessInteriors $1,865
ThePrintingPeople $105
EagleSafetySupply $2,638
ShallowFoundation/FirstLift Precision 25,225,867$
Technique $7,857,223
Anatek $3,930,591
RamTool $166,404
GrierBrothers $139,114
FriendshipBaptistChurchDemolitionandAbatement KissbergConstruction 194,220$ $194,220 *
LittleEnvironmental $10,000
StructuralPrecastMaterial Metromont 26,960,977$
Anasteel&SupplyCompany $26,015
BrysonConstructorsInc. $3,658,525
Arch.PrecastSolns. $154,272
StructuralSteelRoof-DesignAssist CanamSteelCorporation 27,365,000$
Amer.CustomManufacturing $2,990,861
BennettLogistics $4,441,592
PAYMENTSTATUSSUMMARYAABE FBE RemainingEBOs
ChampionPainting $2,196,712
RyjohnSteel $54,180
4
Electrical ICUElectric 68,758,790$
Uptime(JVPartner) $8,288,229 *Uptime(Self-performed
work) $8,288,229 *
Mayer $8,000,000
BoyetteBrothersCompany $570,756
JJDalSupply $100,000 *
B&SSupply $400,000
ContractBusinessSolutions $4,000
Mechanical&PlumbingAtlantaStadiumPartners,AJointVenture 120,226,808$
ARS(JVPartner) $6,538,447
ARS(Self-PerformedWork) $5,876,505
F&SMechanical $17,514,610
H&RCommericalFlooring $8,495
PeachtreeMechanical $2,000,851
PrecisionLayoutandDesign $150,000
VulcanIndustrial $3,536,778
SouthsideStreetMetal $4,553,955
AminSheetMetal $1,151,065
AtlantaCommunications $15,565
AlphaInsulation/Wtrprfg. $124,846
ChurchDemolitionSuperiorRigging&ErectingCompany 18,150$
FOTElectrical InglettandStubbs,LLC 198,085$
InteriorMasonry CornerstoneMasonryGroup,Inc. 10,904,735$
AnasteelSupply $1,200,000
TCMLLC $2,267,704
ExteriorEnclosure CrownCorr 47,792,502$
PAYMENTSTATUSSUMMARYAABE FBE RemainingEBOs
TCMWaterproofing $175,000
C&KUnitedSheetMetal $5,442,882 *
EGM $6,572,720 *
ExteriorMetalServices $1,160,000
TBD $1,481,850
5
ArchitecturalPrecast GatePrecastErectionCompany 3,573,955$
ArchitecturalPrecastSolutions $95,932
TCMWaterproofing $237,730
Elevators Kone,Inc. 10,626,569$
MillsSpecialityMetals $979,687
Millwork MortensenWoodwork,Inc. 13,300,000$
ProfessionalCarpentry $2,850,000
FireProtection NorthstarFireProtectionofTX 8,067,520$
AlzanServices,LLC $71,469 *
ARSMechanical $2,456,250
ExteriorMasonry PyramidMasonry 856,738$
MeadowsConstruction $214,185
RoadwaysPhaseII ReevesContracting,Inc. 15,843,032$
HarrellHauling $450,000 *
NewGen $600,000
BonnJ $401,898
Anatek $2,596,882
AtlantaPaving $400,000
CadenConstructionCo. $400,000
C&CFence $8,000
SpecialSystems InternationalBusinessMachines,Inc.60,956,550$
CoLiantSolutions $21,632,151
J&AEngineering $293,800
PAYMENTSTATUSSUMMARYAABE FBE RemainingEBOs
DrywallandAcoustalWorkBelow1061' AcoustiEngineering 17,810,993$
AlphaInsulation&Waterproof $3,500,740
J.S.82ConstructionGroup $1,000,000
APDrywall $900,000
IwesConstructionSrvs. $1,340,030
6
LevelConstructionSrvs. $637,937
SwitchBackRampDemolition D.H.GriffinWreckingCompany 473,097$
KellyConstructionCompany $32,824
DrywallandAcoustical MarekInteriorSystems,Inc. 19,779,941$
AlphaInsulation&Waterproof $5,661,000
Railings RaydeoEnterprises,Inc. 8,363,060$
RemediationGroup,Inc. $3,001,625
DoorsandFramesMaterial SouthernDoorandPlywood,Inc. 3,225,081$ $3,225,081
Hardscape/Landscape/IrrigationValleycrestLandscapeDevelopment5,726,763$
SiteScapes,LLC $1,855,617
SwitchbackStairRailing McPhersonEnterprises,Inc. 149,752$
ElevatorSteel SteinSteelandSupplyCompany 1,140,000$
AmericanCustomManufacturing $958,300
SiteWaterproofing AlphaInsulationandWaterproofing,Inc.4,695,793$ $4,695,793
ConcreteMaterial/PurchaseOrder ArgosUSAReadyMix 914,693$
StructuralPeer/ConsultantAgreementKSIStructuralEngineers 12,215$
PlazaPileCaps&FirstLiftofColumns,WestSide NewGenConstruction,LLC 703,525$ $703,525
SteelStairsandLids Immec,Inc. 2,675,000$
PAYMENTSTATUSSUMMARYAABE FBE RemainingEBOs
Waterproofing/Caulking/ExpansionJoints ChamblissConst.Specialist,Inc. 2,737,787$
LevelConstruction $1,200,000
TCMWaterproofing $175,000
Specialties AccessoriesUnlmited,Inc. 5,273,873$
TBD $2,636,937
7
GraphicsandWayfinding L&HSignsInc. 2,408,000$
TBD $746,480
SiteSecurity/Fencing Tusco,Inc. 1,415,000$ $1,415,000
CIPAisleSteps WorldDynamics 1,507,000$
SouthernDoorandPlywood $14,500
Anasteel $28,000 *
Paint/Wallcovering GoodmanDecoratingCo. 3,480,000$
TBD $1,078,800
PlazaFormwork SkylineFormingofGA,Inc. 2,459,600$
Carpet;ResilientandRubber/WoodFlooring&TileSpectraContractFlooring 6,957,532$
TBD $2,504,712
MiscellaneousSteel VariableSteelUnlimited 2,315,000$ $2,315,000
OverheadDoors/LoadingDockEqp.AcoustiDoorsandSpecialists,LLC 862,671$
AsphaltPaving Atl.PavingandConcreteConstructionCo.306,117$ $306,117
ResteelMaterial AnasteelandSupplyCompany 918,351$ $918,351 *
ResteelInstallation Anatek,Inc. 431,359$ $431,359 *
CONSTRUCTIONREQUIREMENTS
PAYMENTSTATUSSUMMARYAABE FBE RemainingEBOs
ConstructionRequirements 20,317,240$
Fencing C&CFence(CR) $426,007
LongEngineering(CR) $750,000
RamTools(CR) $141,082
BilledDirect AllstateWaste(CR) $153,467ContractedthruWaste
Management AllstateWaste(GC) $387,500
EagleSecurity(CR) $337,880
EasternData(CR) $3,985
8
MySupplies(CR) $68
ThePrintingPeople(CR) $975
JVPartner MoodyConstruction(CR) $1,275,763
EagleSafetySupply,Inc.(CR) $45,768
BrysonConstructors(CR) $76,223
INSURANCE,PERMITS,&FEES
Insurance,Permits,Fees 10,203,383$
JVPartnerC.D.MoodyConstruction(Bonds) $873,984
JVPartner H.J.Russell(Bonds) $598,975
GENERALCONDITIONS
41,991,753$
Fencing C&CFence(GC) $46,024
OfficeFurnitureContractBusinessInteriors(GC) $129,620
AActionVending(GC) $7,499
AActionJanitorial(GC) $88,271
Twelve&Associates(GC) $58,658
PhotosAerialInnovationsofGA(GC) $2,980
MovingServices B&BMovers(GC) $7,346
Electronics EasternData(GC) $130,979
JVPartnerC.D.MoodyConstr.(GCStaff) $1,109,551
ConsultantAgreementOasisConsultingServices,
LLC(GC) $23,710
WorkOrder BrysonConstructors(GC) $523,713
PrintingServices ThePrintingPeople(GC) $10,540
MySupplies(GC) $84,248
RamTools(GC) $6,525
BrysonConstructors(GCStaff) $56,422
JVPartner H.J.Russell(GCStaff) $615,076
FOTLandscaping WidespreadLandscaping $2,500
TOTAL $776,943,050 $110,589,591 $116,431,341 $37,409,308
PAYMENTSTATUSSUMMARYAABE FBE RemainingEBOs
DESIGNTEAM
Architecture-DesignerandArchitectofRecordHOK,Inc. $22,578,522
Architecture-Local TVSDesign
Architecture-Local CNNA
Architecture-Local StanleyBeamanSears $1,219,865
Architecture-Local GoodeVanSlyke $2,296,806
9
CivilEngineering-PrimeConsultantKimleyHorn $2,030,385
CivilEngineering-LocalTeamMemberLongEngineering $381,235
CivilEngineering-LocalTeamMemberSkylineEngineering $65,675
LandscapeArchitecture-PrimeConsultantHGOR $473,925
LandscapeArchitecture-LocalTeamMemberTheCreativeEye,LLC(TCE) $33,250
LandscapeArchitecture-LocalTeamMemberCentricity,LLC $49,875
StructuralEngineering-PrimeConsultantBuroHappold $10,621,655
StructuralEngineering-LocalTeamMemberSykesConsulting $1,340,390
StructuralEngineering-RoofMechanizationUnisystems
Mech,Plumb,ElecandFPEngineer-PrimeConsultantWSPFlack&Kurtz $3,923,765
Mech,Plumb,ElecandFPEngineer-LocalTeamMemberSLKing $600,000
Mech,Plumb,ElecandFPEngineer-LocalTeamMemberKhafra $600,000
LEEDAdministration Ecoworks $172,000 $172,000
A/V WJHW $899,954
A/V-LocalTeamMember J&AEngineering $336,143
FieldDrainageandTurfDesignFTE $75,000 $75,000
FoodService RiccaNewmarkDesign(RND) $181,000
FoodService-LocalTeamMemberComachoAssociates $54,300
PAYMENTSTATUSSUMMARYAABE FBE RemainingEBOs
ExperientialGraphics TBD
BuildingCodesandLifeSafetyFSC $314,000
BuildingCodesandLifeSafety-LocalTeamMemberRLBrown $59,000
Accessibility/ADA UnitedSpinal $89,500
Accessibility/ADA-LocalTeamMemberMcAfee3Architects $22,500 *
VerticalCirculation LerchBates $95,585
DoorHardware StudioEight $16,300
10
BuildingEnvelope Heitmann&Associates $290,776
BuildingEnvelope EpstenGroup $38,000
WindEngineering BMTFM $170,000
WindEngineering RWDI $49,000
TOTAL $41,981,367 $5,017,621 $1,860,975 $465,443
DEVELOPER
Darden&Company
Surveyor LongEngineering $848,872 $848,872
DiversityCoordinator Griffin&Strong,P.C. $340,000 $340,000
MaterialTester NOVA $104,878
MaterialsMngrs&Eng.,Inc. $26,220
FundamentalCommissioningWorkingBuildings $626,800
ConstructionMaterialsTestingAMEC $5,546,512
TriTech/Aldridge $545,000
WillmerEngineeringInc $730,000
DunlopNDT,LLC $300,000
Geotechnical/EnvironmentalEngineerLangan $3,218,890
AdvancedAnalyticalServ. $114,860
ExcaliburDrilling $166,812
PAYMENTSTATUSSUMMARYAABE FBE RemainingEBOs
ContourEngineering $23,436
OasisConstructionServices $28,475
WillmerEngineering $601,195
EnclosurePeerReview MorrisonHershfield $215,335
ME^3 $67,500
NSPSalesCenter HHRM $1,922,527
Uptime $383,032 *
AtlantaContractGlazing $24,569
F&SMechanical&Plumbing $133,912
AllianceFireProtection $15,625
11
MBAWaste $1,980
SouthernDoorandPlywood $13,491
ConstructionClean-up $2,005
TOTAL $12,823,814 $1,335,532 $2,981,796 $49,656
TOTALS $831,748,231 $116,942,744 $121,274,112 $37,924,407