This Executive Summary has been prepared to provide highlights of the Equal Business Opportunity activities and accomplishments that have occurred from contract inception through 31 March 2016, and to illustrate the progress made toward the M/FBE goal of 31% participation on the construction of the Atlanta Falcons Mercedes-Benz Stadium (“MB Stadium”).
As illustrated on the following pages, currently $309,523,912 of the total MB Stadium contract value has been committed to M/FBE firms. This figure comprises the total contract dollars awarded to M/FBEs for the entire scope of the project, which includes the development, design, and construction phases of the stadium. Of the total dollars committed to M/FBEs, $192,838,476 has been paid through 30 April 2016, to the firms awarded. As of the close of the first quarter of 2016, M/FBE participation on the MB Stadium was at 35.5% of the total contract value.
Mercedes-Benz Stadium Project
Page 2
Partnerships for Success
www.longeng.com
Principal: J. Ellen Long
Long Engineering, Inc. is an Atlanta-certified female-owned civil engineering firm that was founded by principal J. Ellen Long nearly two decades ago. It is a 70 member firm that provides an array of specialized engineering services in various fields and has offices in Atlanta and Savannah, Georgia.
Long Engineering has served in both the design phase and construction phase of the Mercedes-Benz Stadium (“MB Stadium”).1 Specifically, it has provided boundary, topographic and utility surveys, Georgia Power transmission line relocation surveys, site design, utility coordination and design, and construction staking for MB Stadium.
Long Engineering is no stranger to audacious projects – it has a long portfolio of impressive engineering services it has provided for major projects (the international terminal at Hartsfield Airport, the forthcoming Atlanta United training facility, and the Atlanta Botanical Gardens Visitor Center, just to name a few)– yet when speaking with principals J. Ellen Long and Shepard Long, it is clear that their firm’s work on MB Stadium is one of the jewels in the firm’s crown. Mrs. Long couldn’t say enough good things about the experience, including that it is an “iconic project that [Long Engineering] couldn’t be more proud to be a part of.”
1 In its capacity as a surveyor for the developer, Long Engineering served as a prime contractor. In its role in the construction phase of the MB Stadium it serves as a subcontractor to Parsons Brinckerhoff and Kimley Horn on separate construction components.
Mercedes-Benz Stadium Project
Page 3
Long Engineering has a unique perspective of the project in that it has truly worked on it from the beginning. It handled all of the land surveying for all potential sites under consideration for the new stadium, as well as the public roadways, utilities, and MARTA accessibility matters that were involved in making the determination for the location of the stadium. And that (working on it from the very beginning), some two years into the construction of the stadium, is what has made the project such an interesting one for the principals. What keeps it interesting is the collaborative effort that all involved have created to ensure that Atlanta is home to a world-class stadium.
Long Engineering will celebrate its 20th anniversary next year. As one reflects on 20 years of learning, growing and building in the Atlanta community Mr. Long may have summed up the take-aways from those experiences the best when he described what it meant for their firm to work on the MB Stadium: “[Long Engineering] is working with the best of the best [to create and build the Mercedes-Benz Stadium]…and it doesn’t get any better than that.”
A FULL SERVICE FIRM PROVIDING CREATIVE ENGINEERING SOLUTIONS
Mercedes-Benz Stadium Project
Page 4
Partnerships for Success
Alpha Insulation and Waterproofing www.alpaiwp.com
Principal: Vic Verma
Alpha Insulation and Waterproofing (“Alpha”) is a City of Atlanta-certified Asian (Pacific Islander) American Business Enterprise. Alpha Insulation was founded in 1982 and has offices in several states. Its Georgia based office is located in Marietta, Georgia.
Alpha is responsible for all of the fire-stopping provided in the Mercedes-Benz Stadium (“MB Stadium”), fireproofing, spray insulation, in-wall installation, and the stadium’s gutter installation.2 According to employees at Alpha, with thirty-four year of experience to date, it is accustomed to working on complex jobs but even still the MB Stadium construction project happens to be an exciting challenge for them.
And it certainly has been beneficial. Alpha recognizes a number of benefits that have come from working on the MB Stadium construction, not the least of which is that it has hired a dozen full time installers to work on the
2 Alpha is the prime contractor for site waterproofing of the MB Stadium; it is a subcontractor to Acousti Engineering for portions of the drywall and acoustical work; it is a subcontractor to Atlanta Stadium Partners for a portion of the mechanical and plumbing components; it is a subcontractor to Glass Stream, Inc. for a portion of the interior glass and glazing; it is a subcontractor to Marek Brothers Systems, Inc. for a portion of the drywall and acoustical; and it is a subcontractor to NES Drywall and Acoustic for a portion of the drywall/ACT.
Mercedes-Benz Stadium Project
Page 5
project. Notably, three of those employees were graduates of the community-based Westside Works program.
Additionally, as a result of the multiple contracts that Alpha serves as a subcontractor on, it has developed new business relationships with five firms with which it had not worked with prior to this project. Naren Patel, Vice President of Alpha’s Southeast Region says that those companies were introduced to Alpha as a result of outreach efforts hosted early on by the stadium’s builders. Mr. Patel looks forward to the possibility of these new business partnerships that have been forged on the MB Stadium construction project continuing well into the future.
Mr. Patel went on to state that it is important to Alpha to participate in the community and that it views its employees as family. “[Alpha] appreciates the opportunity and fairness in doing the work. This [construction of the MB Stadium] took care of a lot of families.” Alpha considers its employee’s family and the MB Stadium project “put a lot of people to work and that’s a good thing.”
WHAT WE DO
Spray Fireproofing | Spray Foam Insulation |
Waterproofing | Insulation | Restoration | Firestop |Expansion Joints
” Whether you are looking for a subcontractor to work on an office building or retail center, a medical facility, a stadium or other sporting facilities, a casino or airport, a correctional, religious or institutional building, we are here to offer you the most
competitive price with our guarantee to do the job right the first time”
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
1617
18
1920
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
A B C D E F G H I
1EBO Summary #12Committed EBO Contracts and Amounts Paid To-Date
PAYMENT STATUS SUMMARY
AABE FBE Remaining EBOs TOTAL
Total Contract Value $872,364,037
M/FBE Committed Dollars $135,778,200 $133,063,142 $40,682,570 $309,523,912
M/FBE Paid To-Date $192,838,476
% Committed to MFBE's 35.5%
Total Project % Goal 31%
Scope of Work Contractor Name Contract Value Total EBO Contract Amount To-Date
AABE FBE Remaining EBOs
Civil Engineer - Roadways ProjectsParsons Brinckerhoff 2,595,128$
Surveyor & Utility Design Long Engineering $513,673
Site LightingWilliams, Russell, Johnson (WRJ) $193,788
Contractor (Mangum Street Relocation) Reeves Contracting Co. 3,208,311$
Markings & Signage Highway Services $32,984
Erosion Control Clean Water Consultants $2,084
Electrical ME Contractors $28,646
Traffic Control The Corbett Group $280,000
Asphalt Atlanta Paving $270,000
Trucking MC Trucking $26,158
Fencing C & C Fence $30,935
Trucking Navigators Construction $5,874
Trucking Grier Brothers $101,000
Trucking Harrell Hauling Inc. $190,193 *
Trucking MAR Trucking $5,000
GA Dome Utilities, Erosion
Control, NSP Site Demo
(Incl. Mt Vernon) Dennis Taylor 1,722,441$
1
3940
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
A B C D E F G H I
Scope of Work Contractor Name Contract Value Total EBO Contract Amount To-Date
AABE FBE Remaining EBOs
C & C Fence $2,783
Cornerstone Demolition $551,670
Demolition Southern Site Development $195,000
Mass Excavation and Site
Grading Reeves Contracting Co. 18,482,055$
Paving Atlanta Paving $138,880
Engineering Long Engineering $19,368
Blasting Symmetry Rock Drilling $35,000
Trucking Harrell Hauling Inc. $2,346,000 *
Trucking Grier Brothers $134,135
Trucking MAR Trucking $15,640
Trucking MC Trucking $46,020
Traffic Control The Corbett Group $955,106
Shoring American Shoring 319,952
Construction of the vault NewGen $1,460,000
Trucking R. S. Senter $381,295
Auger Cast Piles Berkel 7,987,314$
Steel Anatek $982,132
Trucking SAWA Transportation $159,497
Trucking Amercon Construction Group $39,882
Micscellaneous Material Ram Tool and Supply Company $3,935
Fuel S.A. White Oil Company $33,703
Anasteel $2,448
Sheeting and Shoring Berkel 748,266$
Steel Anasteel $223,348
Ram Tool and Supply Co. $668
2
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
A B C D E F G H I
Scope of Work Contractor Name Contract Value Total EBO Contract Amount To-Date
AABE FBE Remaining EBOs
Drilled Piers ABE 9,066,904$
Ram Tool and Supply $22,514
S. A. White Oil Company $133,418
Anasteel & Supply $1,528,512
Capital City Machine Shop $262,866 *
Superstructure HHRM Self Perform 125,562,749$
Gunby $1,221,533
Ram Tool $1,047,856
Anatek $10,547,274
Anasteel $20,965,351
Bryson Constructors $2,785,992
C. D. Moody Construction $12,587,520
C.D. Moody Construction (COW) $574,209
S. A. White $76,419
Long $276,208
H.J. Russell $12,587,520
Eastern Data $22,247
F.F. dba My Supplies $6,649
Contract Business Interiors $1,865
The Printing People $105
Eagle Safety Supply $3,940
H.J. Russell (COW) $53,403
Shallow Foundation/ First
Lift Precision 25,968,894$
Technique $8,097,223
Anatek $4,030,591
Ram Tool $184,254
Grier Brothers $168,018
Friendship Baptist Church
Demolition and Abatement Kissberg Construction 194,220$ $194,220 *
Little Environmental $10,000
Structural Precast Material Metromont 26,280,977$
Anasteel & Supply Company $26,015
Bryson Constructors Inc. $3,658,525
3
111
112
113114
115
116
117
118
119
120121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
A B C D E F G H I
Scope of Work Contractor Name Contract Value Total EBO Contract Amount To-Date
AABE FBE Remaining EBOs
Arch. Precast Solns. $154,272
Structural Steel Roof-
Design Assist Canam Steel Corporation 26,000,000$
Amer.Custom Manufacturing $3,125,183
Bennett Logistics $4,441,592
Champion Painting $2,396,712
Ryjohn Steel $54,180
ADG Enterprises, Inc. $76,950 *
Electrical ICU Electric 69,854,110$
Uptime (JV Partner) $8,948,588 *
Uptime (Self-performed
work) $8,938,643 *
Mayer $8,000,000
Boyette Brothers
Company $737,117
JJ Dal Supply $100,000 *
B & S Supply $400,000
Contract Business
Solutions $4,000
Electrical - FOT ICU JV Electrical 306,384$
Mechanical & Plumbing
Atlanta Stadium
Partners, A Joint
Venture 122,039,550$
ARS (JV Partner) $6,101,978
ARS (Self-Performed
Work) $13,040,464
F & S Mechanical $19,968,811
H & R Commerical
Flooring $8,495
Peachtree Mechanical $2,700,242
Precision Layout and
Design $250,000
Vulcan Industrial $3,953,204
Southside Street Metal $4,745,413
Amin Sheet Metal $1,151,065
Atlanta Communications $15,565
Alpha
Insulation/Wtrprfg. $131,434
Golden Insulation $8,042
Contract Business
Interiors $20,405
Boyette Brothers
Company $100,000
Eastern Power
Technologies, Inc. $910,000
4
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176177
178
179
180
181
182
183
184
185
186
A B C D E F G H I
Scope of Work Contractor Name Contract Value Total EBO Contract Amount To-Date
AABE FBE Remaining EBOs
Church Demolition
Superior Rigging &
Erecting Company 18,150$
FOT Electrical Inglett and Stubbs, LLC 198,085$
Bearing Pads C.M. Steel, Inc. 44,876$
Resinous Flooring CSS Coatings 1,350,000$
REU Renovations, LLC $418,500 *
Interior Masonry Cornerstone Masonry Group, Inc.10,904,735$
Anasteel Supply $1,200,000
TCM LLC $2,267,704
Exterior Enclosure Crown Corr 48,076,620$
TCM Waterproofing $175,000
C & K United Sheet Metal $6,355,243 *
EGM $6,572,720 *
Exterior Metal Services $1,160,000
Bennett Int'l Logistics $7,663
TBD $624,239
Architectural Precast Gate Precast Erection Company 3,573,955$
Architectural Precast Solutions $95,932
TCM Waterproofing $237,730
Elevators Kone, Inc. 10,712,846$
Mills Speciality Metals $979,687
Millwork Mortensen Woodwork, Inc. 13,827,863$
Professional Carpentry $3,456,966
TBD $606,966
Fire Protection Northstar Fire Protection of TX 8,000,000$
5
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
A B C D E F G H I
Scope of Work Contractor Name Contract Value Total EBO Contract Amount To-Date
AABE FBE Remaining EBOs
Alzan Services, LLC $71,469 *
ARS Mechanical $2,500,000
Exterior Masonry Pyramid Masonry 856,738$
Meadows Construction $250,720
Roadways Phase II Reeves Contracting, Inc. 16,244,215$
Harrell Hauling $450,000 *
NewGen $600,000
Bonn J $556,898
Anatek $2,596,882
Atlanta Paving $400,000
Caden Construction Co. $400,000
C & C Fence $9,000
Special Systems International Business Machines, Inc.63,406,550$
CoLiant Solutions $21,632,151
J & A Engineering $308,794
Drywall and Acoustal Work
Below 1061' Acousti Engineering 17,810,993$
Alpha Insulation &Waterproof $3,500,740
J.S. 82 Construction Group $1,000,000
AP Drywall $900,000
Iwes Construction Srvs. $1,340,030
Level Construction Srvs. $637,937
Switch Back Ramp
Demolition D. H. Griffin Wrecking Company 521,711$
Kelly Construction Company $32,824
Knight Steel, Inc. $3,778
Drywall and Acoustical Marek Interior Systems, Inc. 20,224,619$
Alpha Insulation & Waterproof $7,483,109
Railings Raydeo Enterprises, Inc. 9,406,470$
Remediation Group, Inc. $3,001,625
Eddie's Welding $84,000
6
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
A B C D E F G H I
Scope of Work Contractor Name Contract Value Total EBO Contract Amount To-Date
AABE FBE Remaining EBOs
Mills Specialty $425,700
Morgan Constructors $169,716
Doors and Frames Material Southern Door and Plywood, Inc. 3,319,023$ $3,319,023
Hardscape/ Landscape/ IrrigationValleycrest Landscape Development5,801,801$
TBD $2,030,630
Switchback Stair Railing McPherson Enterprises, Inc. 149,752$
Elevator Steel Stein Steel and Supply Company 2,020,907$
American Custom Manufacturing $1,394,946
Site Waterproofing Alpha Insulation and Waterproofing, Inc.4,814,177$ $4,814,177
Concrete Material /
Purchase Order Argos USA Ready Mix 914,693$
Structural Peer/Consultant AgreementKSI Structural Engineers 13,065$
Plaza Pile Caps & First Lift
of Columns, West Side New Gen Construction, LLC 703,525$ $703,525
Steel Stairs and Lids Immec, Inc. 2,876,087$
Waterproofing / Caulking /
Expansion Joints Chambless Const. Specialist, Inc. 2,868,565$
Level Construction $1,200,000
TCM Waterproofing $175,000
Specialties Accessories Unlmited, Inc. 5,273,873$
Pinnacle Service Grp., Inc. $2,636,937
Graphics and Wayfinding L & H Signs Inc. 2,408,000$
C&K United Sheet Metal & Mechanical, Inc. $325,000
JKB, LLC $239,350
Southeast Exhibits and Events, LLC $185,558 *
Site Security / Fencing Tusco, Inc. 1,720,000$ $1,720,000
7
265
266
267
268
269
270
271
272
273
274
275
276
277
278
279
280
281
282
283
284
285
286
287
288
289
290
291
292
293
294
295
296
297
298
299
300
301
302
303
304
A B C D E F G H I
Scope of Work Contractor Name Contract Value Total EBO Contract Amount To-Date
AABE FBE Remaining EBOs
CIP Aisle Steps World Dynamics 1,507,000$
Southern Door and Plywood $65,500
Quiet Link, LLC $110,000
Anasteel $55,000 *
Paint / Wallcovering Goodman Decorating Co. 3,728,359$
Commericlal Painter's 360 $1,155,791
Plaza Formwork Skyline Forming of GA, Inc. 2,745,699$
Carpet; Resilient and Rubber/Wood Flooring & TileSpectra Contract Flooring 7,021,579$
S.L. Gresham Company $2,527,769
Miscellaneous Steel Variable Steel Unlimited 2,638,484$ $2,638,484
Overhead Doors / Loading Dock Eqp.Acousti Doors and Specialists, LLC 862,671$
Asphalt Paving Atl. Paving and Concrete Construction Co.306,117$ $306,117
Resteel Material Anasteel and Supply Company 946,528$ $946,528 *
Resteel Installation Anatek, Inc. 587,177$ $587,177 *
Marquis Sign Demo Southern Site Development 45,500$ $45,500
Interior Glass and Glazing Glass Stream, Inc. 2,398,870$
Alpha Inssulation $30,000
TBD $18,349
Admin Offices - Drywall/ACT NES Drywall and Acoustic 805,000$
Alpa Insulation & Waterproffing $149,925
Accordion Fire Doors Overhead Door Co. of Atlanta 342,583$
Admin Offices - Electrical SystemsPutzel Electrical Contractors 1,021,980$
GC Electrical Solutions $372,265
TBD $36,527
8
305
306
307
308
309
310
311
312
313
314
315
316
317
318
319
320
321
322
323
324
325
326
327
328
329
330
331
332
333
334
335
336
337
338
339
340
341
342
343
344
A B C D E F G H I
Scope of Work Contractor Name Contract Value Total EBO Contract Amount To-Date
AABE FBE Remaining EBOs
Admin Offices - Demountable ParticionsCorporate Enviornments 345,945$ $345,945
Roofing Porter Roofing 8,560,000$
TBD $513,600
AASHTO Girders - Plaza Standard Concrete 1,097,903$
Interior Progressions Multivista 273,478$
Consultant Services Thornton Thomasetti 45,000$
Web Cameras Earthcam 66,434$
General Requirements Brand Energy Solutions, LLC 520,778$
CONSTRUCTION REQUIREMENTS
Construction Requirements 19,993,318$
Fencing C & C Fence ( CR) $456,957
Long Engineering (CR) $750,000
Ram Tools (CR) $383,180
Billed Direct Allstate Waste (CR) $273,089
Contracted thru Waste
Management Allstate Waste (GC) $387,500
Eagle Security (CR) $491,260
Eastern Data (CR) $4,127
My Supplies (CR) $156
The Printing People (CR) $2,505
JV Partner Moody Construction (CR) $1,661,453
Eagle Safety Supply, Inc. (CR) $99,936
Bryson Constructors (CR) $1,354,187
JV Partner H. J. Russell $723,329
Oil/Gasoline Supplier S.A. White $15,140
INSURANCE, PERMITS, & FEES
Insurance, Permits, Fees 10,567,196$
JV Partner C. D. Moody Construction (Bonds) $873,984
JV Partner H. J. Russell (Bonds) $598,975
GENERAL CONDITIONS
9
345
346
347
348
349
350
351
352
353
354
355
356
357
358
359
360
361
362
363364
365366
367
368
369
370
371
372
373
374
375
376
377
378
379
380
381
382
383
384
385
A B C D E F G H I
Scope of Work Contractor Name Contract Value Total EBO Contract Amount To-Date
AABE FBE Remaining EBOs
41,991,753$
Fencing C & C Fence (GC) $61,460
Office Furniture Contract Business Interiors (GC) $137,325
A Action Vending (GC) $11,535
A Action Janitorial (GC) $127,088
Twelve & Associates (GC) $61,150
Photos Aerial Innovations of GA (GC) $3,939
Electronics Eastern Data (GC) $139,969
JV Partner C. D. Moody Constr. (GC Staff) $1,866,283
Consultant Agreement
Oasis Consulting
Services, LLC (GC) $26,066
Work Order Bryson Constructors (GC) $1,155,108
Printing Services The Printing People(GC) $12,375
My Supplies(GC) $112,912
Ram Tools (GC) $9,295
JV Partner H. J. Russell (GC Staff) $1,040,142
Eagle Safety Supply, Inc. (GC) $628
Labor Staffzone $3,575FOT Landscaping Widespread Landscaping $6,500
JV Partner Shumate Mechanical $86
TOTAL $806,498,549 $129,323,269 $125,911,023 $40,062,667
DESIGN TEAM
Architecture - Designer and Architect of RecordHOK, Inc. $23,287,796
Architecture - Local TVS Design
Architecture - Local CNNA
Architecture - Local Stanley Beaman Sears $1,219,865
Architecture - Local Goode Van Slyke $2,342,914
Civil Engineering - Prime ConsultantKimley Horn $2,752,996
Civil Engineering - Local Team MemberLong Engineering $381,261
Civil Engineering - Local Team MemberSkyline Engineering $65,675
Landscape Architecture - Prime ConsultantHGOR $473,925
Landscape Architecture - Local Team MemberThe Creative Eye, LLC (TCE) $33,250
10
386
387
388
389
390
391
392
393
394
395
396
397
398
399
400
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419
420
421
422
423
424
425
A B C D E F G H I
Scope of Work Contractor Name Contract Value Total EBO Contract Amount To-Date
AABE FBE Remaining EBOs
Landscape Architecture - Local Team MemberCentricity, LLC $49,875
Structural Engineering - Prime ConsultantBuro Happold $11,003,194
Structural Engineering - Local Team MemberSykes Consulting $1,346,060
Structural Engineering - Roof MechanizationUnisystems
Mech, Plumb, Elec and FP Engineer - Prime ConsultantWSP Flack & Kurtz $4,233,542
Mech, Plumb, Elec and FP Engineer - Local Team MemberSL King $600,000
Mech, Plumb, Elec and FP Engineer - Local Team MemberKhafra $600,000
LEED Administration Ecoworks $222,000 $222,000
A/V WJHW $1,078,883
A/V- Local Team Member J & A Engineering $407,947
Field Drainage and Turf DesignFTE $108,000 $108,000
Food Service Ricca Newmark Design (RND) $181,000
Food Service - Local Team MemberComacho Associates $54,300
Experiential Graphics TBD
Building Codes and Life SafetyFSC $314,000
Building Codes and Life Safety - Local Team MemberRL Brown $59,000
Accessibility/ADA United Spinal $89,500
Accessibility/ADA - Local Team MemberMcAfee3 Architects $22,500 *
Vertical Circulation Lerch Bates $95,585
Door Hardware Studio Eight $16,300
Building Envelope Heitmann & Associates $290,776
Building Envelope Epsten Group $38,000
Wind Engineering BMTFM $170,000
Wind Engineering RWDI $49,000
11
426
427
428
429
430
431
432
433
434
435
436
437
438
439
440
441
442
443
444
445
446
447
448
449
450
451
452
453
454
455
456
457
458
459
460
461
462
463
A B C D E F G H I
Scope of Work Contractor Name Contract Value Total EBO Contract Amount To-Date
AABE FBE Remaining EBOs
TOTAL $44,366,497 $5,069,399 $1,911,002 $570,247
DEVELOPER
Darden & Company
Surveyor Long Engineering $848,872 $848,872
Diversity Coordinator Griffin & Strong, P.C. $340,000 $340,000
Material Tester NOVA $104,878
Materials Mngrs & Eng., Inc. $26,220
Fundamental CommissioningWorking Buildings $676,800
Construction Materials TestingAMEC $14,000,000
Tri Tech/Aldridge $595,000
Willmer Engineering Inc $730,000
Dunlop NDT, LLC $2,525,000
Geotechnical/Environmental EngineerLangan $3,346,079
Advanced Analytical Serv. $116,120
Excalibur Drilling $166,812
Contour Engineering $23,436
Oasis Construction Services $28,475
Willmer Engineering $634,257
Enclosure Peer Review Morrison Hershfield $259,835
ME^3 $67,500
NSP Sales Center HHRM $1,922,527
Uptime $383,032 *
Atlanta Contract Glazing $24,569
F & S Mechanical & Plumbing $133,912
Alliance Fire Protection $15,625
MBA Waste $1,980
Southern Door and Plywood $13,491
Construction Clean-up $2,004
12
464
465
466
467
468
469
A B C D E F G H I
Scope of Work Contractor Name Contract Value Total EBO Contract Amount To-Date
AABE FBE Remaining EBOs
TOTAL $21,498,991 $1,385,532 $5,241,117 $49,656
TOTALS $872,364,037 $135,778,200 $133,063,142 $40,682,570