MEPF ENGINEERING SERVICES
DESIGN *ESTIMATE *CONSTRUCTION * FABRICATION
-
7/31/2019 Mepf Feasibility Study
2/11
MEPF works as a whole is one ofthe most vital and costly part ofengineering disciplines in terms of projectbidding, estimates and construction also
testing and commissioning.MEPF occupied the 30% to 60% of
a project construction cost of a buildingfrom commercial to industrial projects.
That is why many businessmantaking the opportunity of venturing thefield specially in construction of supplyand installation works of MEPF.
-
7/31/2019 Mepf Feasibility Study
3/11
Registration requirements:
* DTI * LGU
* SEC (if necessary)* other government institution
* Registration to MEPF professional and
construction organization.
-
7/31/2019 Mepf Feasibility Study
4/11
Proposed Office and Fabrication Site will bethe CMED equipment division location site.
Brgy. Bangkal, Carmona , Cavite
-
7/31/2019 Mepf Feasibility Study
5/11
The FODC ELECTROMECH &
FABRICATION DIVISION looking forward
to be the most competitive MEPF
Trade Con. and Supply Contractor inthe market.
The proponent dreams of
making profit and staying long in the
business.
-
7/31/2019 Mepf Feasibility Study
6/11
FODC ELECTROMECH & FABRICATION DIVISION
COMMERICAL
INDUSTRIAL INDUSTRY
MEPF TRADE CONTRUCTION MEPF MATERIAL SUPPLY
Mechanical Works
HVAC WORKS
Electrical Works
Fire Protection Works
MEPF Small Project Group
Electrical Fabricated Wire way
Cable Ladder Fabrication
Gutter & Pull box Fabrication
Board & Cable Trays Fabrication
Mechanical Metal Sheet Work
TDC Fabrication
Fabri-DuctMech. Sheet Metal Product
-
7/31/2019 Mepf Feasibility Study
7/11
Year of Operation Marketing Strategy Business Plan
FODC-EMFD 1st to 2nd
Year
1. Company Registration to
various MEPF organization.
2. Marketing Accreditation to
various commercial and
industrial establishments.3. Planning of Fabrication and
product engineering.
1. Focus on MEPF works and
Small Project Group.
2. Penetration to industrial
Small project for FODC
accreditation.3. Strengthening the company
engineering capability.
FODC-EMFD 3rd to 4th
Year1. Establishing the company
product line.
1. Promotion of FODC-EMFD
product to the market.
2. Continuous Operation ofMEPF Trade Work
FODC-EMFD 5th Year 1. Full marketing of MEPF Trade
Work and Product line.
1. Full operation of MEPF
Trade Work and Product line.
-
7/31/2019 Mepf Feasibility Study
8/11
PRESIDENT
VP-FODC-EMFD
SR . MANAGER
FODC-EMFD
PURCHASING
DEPARTMENT
MANAGER /
SUPEVISOR
OPERATION /
ENGG DEPT.
PRODUCT
MARKETING
MANAGER /
SUPEVISOR
4 - STAFF
MANAGER /
SUPEVISOR
PRODN/FAB.
DEPARTMENT
MANAGER /
SUPEVISOR
STAFF PER
PROJECT
STAFF PER
PROJECT3 STAFF
SKILLED WORKER AND HELPER AS PER PROJECT REQUIREMENTS
-
7/31/2019 Mepf Feasibility Study
9/11
MACHINERY AND EQUIPMENT: = 26M
MEPF test Equipment Estimate Price: 03.0M
Fabrication Equipment Estimate Price: 19.0M
Transport Vehicle Estimate price: 04.0M
OFFICE AND MANUFACTURING PLANT: = 12M
Office Renovation: 02.0MPlant Construction: 10.0M
MISC., BUILDING MAINTENANCE & UTILITIES(5YRS.) 05.0M = 05M
Projected Annual Operation & Staff Salary: 05.0M = 10M
Legal Requirements and other fee (annual): 00.5M = 0.5M
TOTAL PROJECTED FINANCIAL REQUIREMENTS: 48.5M
-
7/31/2019 Mepf Feasibility Study
10/11
ROI in
Machinery and
Plant
Now 1st
Year
2nd
Year
3rd
Year
4th
Year
5th
Year Total
5yrs. Marketing
Plan(Ave)0 7.6 7.6 7.6 7.6 7.6 38
Cash Out Flow 4 5 7 10 12 38
Cash In Flow
40%
increase/yr.
0 5 7 9.8 13.7 19.2 54.7
Net cash Flow 1 2 2.8 3.7 7.2 16.7
ROI per Year -20.0% 33.3% 36.2% 36.5% 44.0%
ROI = ((Cash In Flow)-(Cash Out Flow)) / (Cash Out Flow)
-
7/31/2019 Mepf Feasibility Study
11/11