memorandum to: power committee members subject: … · 2019. 12. 18. · 851 s.w. sixth avenue,...

40
851 S.W. Sixth Avenue, Suite 1100 Steve Crow 503-222-5161 Portland, Oregon 97204-1348 Executive Director 800-452-5161 www.nwcouncil.org Fax: 503-820-2370 Henry Lorenzen Chair Oregon W. Bill Booth Vice Chair Idaho Bill Bradbury Oregon Guy Norman Washington Tom Karier Washington James Yost Idaho Pat Smith Montana Jennifer Anders Montana October 4, 2016 MEMORANDUM TO: Power Committee Members FROM: John Fazio, Senior Systems Analyst SUBJECT: Background on GENESYS model - Outputs BACKGROUND: Presenter: John Fazio Summary: This will be the second part of a briefing that focuses on the Council’s GENESYS model, used primarily for power supply adequacy assessments. Today will include the portion not addressed in September’s presentation. Primarily a summary of the output data that will focus on key results that are used for adequacy assessments and for other vital uses for the model. Relevance: The GENESYS model is used annually to assess the adequacy of the power supply five years into the future to ensure that the region will continue to provide an adequate supply. Besides providing an annual adequacy assessment, the GENESYS model is use to calculate the adequacy reserve margin and the associated system capacity contribution for new resources. Both of these parameters are inputs to the Council’s Regional Portfolio Model (RPM) and are essential to ensuring that resource strategies produced by the RPM will provide adequate future power supplies.

Upload: others

Post on 20-Jan-2021

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: MEMORANDUM TO: Power Committee Members SUBJECT: … · 2019. 12. 18. · 851 S.W. Sixth Avenue, Suite 1100 Steve Crow 503-222-5161 Portland, Oregon 97204-1348 Executive Director 800452-

851 S.W. Sixth Avenue, Suite 1100 Steve Crow 503-222-5161 Portland, Oregon 97204-1348 Executive Director 800-452-5161 www.nwcouncil.org Fax: 503-820-2370

Henry Lorenzen Chair

Oregon

W. Bill Booth Vice Chair

Idaho

Bill Bradbury Oregon

Guy Norman Washington

Tom Karier Washington

James Yost

Idaho

Pat Smith Montana

Jennifer Anders

Montana

October 4, 2016

MEMORANDUM TO: Power Committee Members FROM: John Fazio, Senior Systems Analyst SUBJECT: Background on GENESYS model - Outputs BACKGROUND: Presenter: John Fazio Summary: This will be the second part of a briefing that focuses on the Council’s

GENESYS model, used primarily for power supply adequacy assessments. Today will include the portion not addressed in September’s presentation. Primarily a summary of the output data that will focus on key results that are used for adequacy assessments and for other vital uses for the model.

Relevance: The GENESYS model is used annually to assess the adequacy of the power supply five years into the future to ensure that the region will continue to provide an adequate supply.

Besides providing an annual adequacy assessment, the GENESYS model is use to calculate the adequacy reserve margin and the associated system capacity contribution for new resources. Both of these parameters are inputs to the Council’s Regional Portfolio Model (RPM) and are essential to ensuring that resource strategies produced by the RPM will provide adequate future power supplies.

Page 2: MEMORANDUM TO: Power Committee Members SUBJECT: … · 2019. 12. 18. · 851 S.W. Sixth Avenue, Suite 1100 Steve Crow 503-222-5161 Portland, Oregon 97204-1348 Executive Director 800452-

Workplan: N/A Background: Utility planners have historically used a simple comparison between

available resources and expected loads to determine whether the power supply has sufficient generating capability to provide adequate service to customers. This deterministic measure, commonly referred to as the load/resource balance, is still being reported in BPA’s White Book and PNUCC’s NRF reports. Since about 1999, however, it was becoming more apparent to planners that a better measure was needed. It was in that year that the Council, with help from other regional entities, developed the GENESYS model to provide this better estimate of the power supply’s adequacy.

GENESYS determines the likelihood that a future year’s power supply will be inadequate by simulating the operation of generating resources for that year thousands of times, each time varying the conditions under which that supply operates. The likelihood of experiencing a shortfall anytime during the year is referred to as the loss of load probability (LOLP) and the Council has set the maximum allowed value for the LOLP at 5 percent. In other words, as long as the LOLP remains at or below 5 percent, the power supply is deemed adequate.

More Info: Please contact John Fazio

Page 3: MEMORANDUM TO: Power Committee Members SUBJECT: … · 2019. 12. 18. · 851 S.W. Sixth Avenue, Suite 1100 Steve Crow 503-222-5161 Portland, Oregon 97204-1348 Executive Director 800452-

GENESYS Exposed!A Primer for the Council’s

Adequacy Model

Page 4: MEMORANDUM TO: Power Committee Members SUBJECT: … · 2019. 12. 18. · 851 S.W. Sixth Avenue, Suite 1100 Steve Crow 503-222-5161 Portland, Oregon 97204-1348 Executive Director 800452-

What is GENESYS• A Computer model that simulates the operation of

the regional power system

• For a single year

• Thousands of times with different combinations of future unknowns1

• River flows• Temperatures• Wind generation• Forced outages

1This is commonly referred to as a Monte-Carlo program.

Page 5: MEMORANDUM TO: Power Committee Members SUBJECT: … · 2019. 12. 18. · 851 S.W. Sixth Avenue, Suite 1100 Steve Crow 503-222-5161 Portland, Oregon 97204-1348 Executive Director 800452-

Where does GENESYS fit in?(Not all links are shown)

3

Regional Portfolio Model

New and ExistingGeneratingResources

AURORAElectricity Prices

GENESYS

Electricity DemandForecast Models Energy Efficiency

PotentialAssessment

Financial andOther Assumptions

Page 6: MEMORANDUM TO: Power Committee Members SUBJECT: … · 2019. 12. 18. · 851 S.W. Sixth Avenue, Suite 1100 Steve Crow 503-222-5161 Portland, Oregon 97204-1348 Executive Director 800452-

GENESYS Flow DiagramLoad

GENESYS

Wind/Solar

Thermal Data

Curtailments

Contracts

Hydro Data

•ThermalDispatch

•Purchases•Generation•Cost

•Elevations•Outflows•Spill

Standby LOLP

Page 7: MEMORANDUM TO: Power Committee Members SUBJECT: … · 2019. 12. 18. · 851 S.W. Sixth Avenue, Suite 1100 Steve Crow 503-222-5161 Portland, Oregon 97204-1348 Executive Director 800452-

GENESYS Output• Monthly

• Hydro reservoir elevations• Outflow and spill by project • Hydro generation by project

• Hourly• Load• Thermal resource generation• Wind generation• Imports/Exports• Aggregate hydro generation• Curtailment

Page 8: MEMORANDUM TO: Power Committee Members SUBJECT: … · 2019. 12. 18. · 851 S.W. Sixth Avenue, Suite 1100 Steve Crow 503-222-5161 Portland, Oregon 97204-1348 Executive Director 800452-

January 1930

-5000

0

5000

10000

15000

20000

25000

30000

35000

40000

45000

1 27 53 79 105

131

157

183

209

235

261

287

313

339

365

391

417

443

469

495

521

547

573

599

625

651

677

703

729

Hour in Month

Meg

awat

ts

Net Demand NW Thermal NW Hydro Unserved Net Imports

Simulated Dispatch January

6

Page 9: MEMORANDUM TO: Power Committee Members SUBJECT: … · 2019. 12. 18. · 851 S.W. Sixth Avenue, Suite 1100 Steve Crow 503-222-5161 Portland, Oregon 97204-1348 Executive Director 800452-

Simulated Hourly Dispatch(typical January week)

0

5000

10000

15000

20000

25000

30000

35000

1 6 11 16 21 26 31 36 41 46 51 56 61 66 71 76 81 86 91 96 101

106

111

116

121

126

131

136

141

146

151

156

161

166

Meg

awat

ts

Hour of the Week

Purc Hydro Thermal Wind6am

Load

7

Page 10: MEMORANDUM TO: Power Committee Members SUBJECT: … · 2019. 12. 18. · 851 S.W. Sixth Avenue, Suite 1100 Steve Crow 503-222-5161 Portland, Oregon 97204-1348 Executive Director 800452-

Simulated Dispatch Order (6am January weekday)

0

5000

10000

15000

20000

25000

30000

Meg

awat

ts

6 am

Simulated Order of Resource Dispatch (January)

Market (out of region)

Market (mixed gas and coal)

Coal (higher heat rate)

Gas - GT (higher heat rate)

Coal (lower heat rate)

Gas - GT (lower heat rate)

Coal - Centralia (PSE)

Gas - CCCT

Hydro

Nuclear

Wind

6am demand

8

Page 11: MEMORANDUM TO: Power Committee Members SUBJECT: … · 2019. 12. 18. · 851 S.W. Sixth Avenue, Suite 1100 Steve Crow 503-222-5161 Portland, Oregon 97204-1348 Executive Director 800452-

Assessing Adequacy• Run every combination of temperature and

streamflow (80 times 77 = 6,160)

• Count only existing resources or those that are sited and licensed

• EE is built into the load forecast

• Count the number of simulations (games) that have at least one curtailment

Page 12: MEMORANDUM TO: Power Committee Members SUBJECT: … · 2019. 12. 18. · 851 S.W. Sixth Avenue, Suite 1100 Steve Crow 503-222-5161 Portland, Oregon 97204-1348 Executive Director 800452-

Loss of Load Probability6160 Simulations

Out of 6160 simulations, 308 had curtailment events (red bins)

Loss of Load Probability (LOLP) = 308/6160 = 5 percent

10

Page 13: MEMORANDUM TO: Power Committee Members SUBJECT: … · 2019. 12. 18. · 851 S.W. Sixth Avenue, Suite 1100 Steve Crow 503-222-5161 Portland, Oregon 97204-1348 Executive Director 800452-

2021 Adequacy Results(LOLP > 5% means inadequate)

CaseLoads

No BoardmanNo Centralia 1

No BoardmanNo Centralia 1

No Colstrip 1 & 2

High Load 24 % 31 %

Med Load 10 % 13.2 %

Low Load 4 % 5.1 %

11

Page 14: MEMORANDUM TO: Power Committee Members SUBJECT: … · 2019. 12. 18. · 851 S.W. Sixth Avenue, Suite 1100 Steve Crow 503-222-5161 Portland, Oregon 97204-1348 Executive Director 800452-

Curtailment Record

• Link to Event Spreadsheet (spinner graph)

Page 15: MEMORANDUM TO: Power Committee Members SUBJECT: … · 2019. 12. 18. · 851 S.W. Sixth Avenue, Suite 1100 Steve Crow 503-222-5161 Portland, Oregon 97204-1348 Executive Director 800452-

Additional Slides

Page 16: MEMORANDUM TO: Power Committee Members SUBJECT: … · 2019. 12. 18. · 851 S.W. Sixth Avenue, Suite 1100 Steve Crow 503-222-5161 Portland, Oregon 97204-1348 Executive Director 800452-

Uses for GENESYS• Power supply adequacy

• Alternative hydro operations

• Climate change analysis

• Short-term extreme weather analysis

• Resource cost effectiveness

14

LOLP

Page 17: MEMORANDUM TO: Power Committee Members SUBJECT: … · 2019. 12. 18. · 851 S.W. Sixth Avenue, Suite 1100 Steve Crow 503-222-5161 Portland, Oregon 97204-1348 Executive Director 800452-

Transmission in GENESYS

• NW region includes: East (E) West (W)

• Solid lines indicate transmission into and out of the region

• Not a power-flow analysis

• East/west transmission capability varies based on BPA data

• Southern interties have fixed transfer capability

• SW modeled as import market only

C

EW

CJ

SWNC

SC

15

Page 18: MEMORANDUM TO: Power Committee Members SUBJECT: … · 2019. 12. 18. · 851 S.W. Sixth Avenue, Suite 1100 Steve Crow 503-222-5161 Portland, Oregon 97204-1348 Executive Director 800452-

Treatment of Reserves• Contingency reserves

• To protect system integrity during a loss of a major resource or transmission line

• After the simulation, if unused resources are not sufficient to cover this reserve, then counted as an outage

• Balancing reserves• Generation with fast ramp times to cover variability in

demand and in wind and solar generation• Preprocessor to GENESYS reduces hydro peaking and

increases hydro minimum generation1

1The redeveloped GENESYS will model balancing reserves dynamically.

Page 19: MEMORANDUM TO: Power Committee Members SUBJECT: … · 2019. 12. 18. · 851 S.W. Sixth Avenue, Suite 1100 Steve Crow 503-222-5161 Portland, Oregon 97204-1348 Executive Director 800452-

GENESYS Flow DiagramLoad

GENESYS

Wind/Solar

Thermal Data

Curtailments

Contracts

Hydro Data

•ThermalDispatch

•Purchases•Generation•Cost

•Elevations•Outflows•Spill

Standby LOLP

Page 20: MEMORANDUM TO: Power Committee Members SUBJECT: … · 2019. 12. 18. · 851 S.W. Sixth Avenue, Suite 1100 Steve Crow 503-222-5161 Portland, Oregon 97204-1348 Executive Director 800452-

Sample Hourly Load Forecast

• Operating year is Oct 1st through Sep 30th

• 77 Temperature profiles (1929-2005, to match wind data)Year Month Day Hour 1929 1930 • • • 20052014 10 1 1 15059 15108 • • • 149612014 10 1 2 14750 14797 • • • 146542014 10 1 3 14595 14642 • • • 14500•••2015 9 30 22 19014 19075 • • • 188892015 9 30 23 17337 17393 • • • 172242015 9 30 24 15943 15995 • • • 15840

18

Page 21: MEMORANDUM TO: Power Committee Members SUBJECT: … · 2019. 12. 18. · 851 S.W. Sixth Avenue, Suite 1100 Steve Crow 503-222-5161 Portland, Oregon 97204-1348 Executive Director 800452-

Sample Hourly Loads

Page 22: MEMORANDUM TO: Power Committee Members SUBJECT: … · 2019. 12. 18. · 851 S.W. Sixth Avenue, Suite 1100 Steve Crow 503-222-5161 Portland, Oregon 97204-1348 Executive Director 800452-

Sample Wind Generation Data

• Hourly factor times total site wind nameplate = generation• 77 Temperature profiles (1929-2005, to match load data)Year Month Day Hour 1929 1930 • • • 20052014 10 1 1 .25 .23 • • • .312014 10 1 2 .28 .24 • • • .332014 10 1 3 .28 .24 • • • .38•••2015 9 30 22 .15 .15 • • • .952015 9 30 23 .05 .10 • • • .922015 9 30 24 .04 .12 • • • .81

20

Page 23: MEMORANDUM TO: Power Committee Members SUBJECT: … · 2019. 12. 18. · 851 S.W. Sixth Avenue, Suite 1100 Steve Crow 503-222-5161 Portland, Oregon 97204-1348 Executive Director 800452-

Gorge Wind Capacity Factors

Page 24: MEMORANDUM TO: Power Committee Members SUBJECT: … · 2019. 12. 18. · 851 S.W. Sixth Avenue, Suite 1100 Steve Crow 503-222-5161 Portland, Oregon 97204-1348 Executive Director 800452-

Thermal Resource DataFrom Council’s Generating Resource Database

22

FOR: 0.059Maintenance: 21 days winterMean Repair Time: 32 daysStochastic Outage: TRUECost Set: CCCT - PNW E.Operating Life: 30Gen vs. Temp: NULLEmissions: NULLMust Run Level: NO

Name: Langley GulchNode: PNW EastSource D Type: ThermalSource P Type: CCCTCapacity: 300 MWOnline Date: 2012-06-01Retire Date: 2051-01-01Avg Heat Rate: 6900Fuel Type: PNW E. gas

Sample Data:

Page 25: MEMORANDUM TO: Power Committee Members SUBJECT: … · 2019. 12. 18. · 851 S.W. Sixth Avenue, Suite 1100 Steve Crow 503-222-5161 Portland, Oregon 97204-1348 Executive Director 800452-

Non-Time Dependent Hydro Data

• Physical top and bottom

• Min and Max turbine flow

• Plant data tables• Max flow vs. storage• Max generation vs. head• Elevation vs. storage• Tail water elevation vs. outflow• Power factor vs. head

Page 26: MEMORANDUM TO: Power Committee Members SUBJECT: … · 2019. 12. 18. · 851 S.W. Sixth Avenue, Suite 1100 Steve Crow 503-222-5161 Portland, Oregon 97204-1348 Executive Director 800452-

Time Dependent Hydro Data By Water Year, by Month, by Plant

• Natural stream flows• Rule Curves• Min and max outflow• Min and max elevation• Bypass spill

Page 27: MEMORANDUM TO: Power Committee Members SUBJECT: … · 2019. 12. 18. · 851 S.W. Sixth Avenue, Suite 1100 Steve Crow 503-222-5161 Portland, Oregon 97204-1348 Executive Director 800452-

Rule Curves• Upper Rule Curve (URC)

Max elevation to avoid flooding, varies by water year

• Critical Rule Curve (CRC) Min elevation during critical water year for firm energy

• Variable Energy Content Curve (VECC) Min elevation to ensure refill, varies by water year

• Assured Energy Regulation (AER)Sets target elevation (proportional draft point) and includes fish recovery operations, varies by water year

25

Page 28: MEMORANDUM TO: Power Committee Members SUBJECT: … · 2019. 12. 18. · 851 S.W. Sixth Avenue, Suite 1100 Steve Crow 503-222-5161 Portland, Oregon 97204-1348 Executive Director 800452-

Illustration of Rule Curves(Hungry Horse Dam)

800

1000

1200

1400

1600

1800

Con

tent

(ksf

d)

URC '35VECC '35CRC '29AER '35

Page 29: MEMORANDUM TO: Power Committee Members SUBJECT: … · 2019. 12. 18. · 851 S.W. Sixth Avenue, Suite 1100 Steve Crow 503-222-5161 Portland, Oregon 97204-1348 Executive Director 800452-

Genesys OverviewFor each game

For each year

Select random variables

For each window

For each month

Water year

Temperature Year

Forced Outages

Do hourly dispatch

Get hydro block sizesBuild resource stackBuild load stackDo monthly dispatchGet hydro energy for month

Wind Year

27

For each hour

Check for sufficient energySet hydro dispatch price

For each day

Use peak vs. energy curves to getHydro availability for next 24 hours

Page 30: MEMORANDUM TO: Power Committee Members SUBJECT: … · 2019. 12. 18. · 851 S.W. Sixth Avenue, Suite 1100 Steve Crow 503-222-5161 Portland, Oregon 97204-1348 Executive Director 800452-

For Each Month1. Get size of hydro blocks in energy

• Draft/fill from starting elevation to URC• Draft/fill from starting elevation to VECC• Draft/fill from starting elevation to AER• Draft/fill from starting elevation to empty

2. Price hydro blocks relative to specific thermal units

3. Add hydro blocks to resource stack Adds resources from cheapest to most expensive

4. Compare resource stack to load

5. Determine monthly hydro energy

Page 31: MEMORANDUM TO: Power Committee Members SUBJECT: … · 2019. 12. 18. · 851 S.W. Sixth Avenue, Suite 1100 Steve Crow 503-222-5161 Portland, Oregon 97204-1348 Executive Director 800452-

Get Hydro Block Size

Flood

RefillTarget

Critical

Empty

Page 32: MEMORANDUM TO: Power Committee Members SUBJECT: … · 2019. 12. 18. · 851 S.W. Sixth Avenue, Suite 1100 Steve Crow 503-222-5161 Portland, Oregon 97204-1348 Executive Director 800452-

For Each Month1. Get size of hydro blocks in energy

• Draft/fill from starting elevation to URC• Draft/fill from starting elevation to VECC• Draft/fill from starting elevation to AER• Draft/fill from starting elevation to empty

2. Price hydro blocks relative to specific thermal units

3. Add hydro blocks to resource stack Adds resources from cheapest to most expensive

4. Compare resource stack to load

5. Determine monthly hydro energy

Page 33: MEMORANDUM TO: Power Committee Members SUBJECT: … · 2019. 12. 18. · 851 S.W. Sixth Avenue, Suite 1100 Steve Crow 503-222-5161 Portland, Oregon 97204-1348 Executive Director 800452-

Hydro Blocks – Based on Value of Water

Very Cheap

Moderate

Expensive

Very Expensive

Emergency Only

Flood Control Curve

Assured Refill Curve

Actual Energy Regulation

Critical Rule Curve

Empty

31

Water behind the dam

Elev

atio

n

Page 34: MEMORANDUM TO: Power Committee Members SUBJECT: … · 2019. 12. 18. · 851 S.W. Sixth Avenue, Suite 1100 Steve Crow 503-222-5161 Portland, Oregon 97204-1348 Executive Director 800452-

For Each Month1. Get size of hydro blocks in energy

• Draft/fill from starting elevation to URC• Draft/fill from starting elevation to VECC• Draft/fill from starting elevation to AER• Draft/fill from starting elevation to empty

2. Price hydro blocks relative to specific thermal units

3. Add hydro blocks to resource stack Adds resources from cheapest to most expensive

4. Compare resource stack to load

5. Determine monthly hydro energy

Page 35: MEMORANDUM TO: Power Committee Members SUBJECT: … · 2019. 12. 18. · 851 S.W. Sixth Avenue, Suite 1100 Steve Crow 503-222-5161 Portland, Oregon 97204-1348 Executive Director 800452-

Sample Resource Stack

Wind, 1658

Nuclear, 1000

Hydro, 6397

Gas CCCT, 4629

Coal Centralia, 380Gas GT More Efficient, 454Coal More efficient, 1851

Gas GT Less efficient, 683

Coal Less efficient, 1942

Mixed Low efficiency, 3326

Market , 3000

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

Hydro priced higher than Nuclear but lower than Gas

CCCT

Page 36: MEMORANDUM TO: Power Committee Members SUBJECT: … · 2019. 12. 18. · 851 S.W. Sixth Avenue, Suite 1100 Steve Crow 503-222-5161 Portland, Oregon 97204-1348 Executive Director 800452-

For Each Month1. Get size of hydro blocks in energy

• Draft/fill from starting elevation to URC• Draft/fill from starting elevation to VECC• Draft/fill from starting elevation to AER• Draft/fill from starting elevation to empty

2. Price hydro blocks relative to specific thermal units

3. Add hydro blocks to resource stack Adds resources from cheapest to most expensive

4. Compare resource stack to load

5. Determine monthly hydro energy

Page 37: MEMORANDUM TO: Power Committee Members SUBJECT: … · 2019. 12. 18. · 851 S.W. Sixth Avenue, Suite 1100 Steve Crow 503-222-5161 Portland, Oregon 97204-1348 Executive Director 800452-

For Each Day1. Allocate daily hydro energy to match the

shape of hourly loads (24 hours)

2. Hydro shaping is constrained by sustained peaking limits (see next slide)• As peak duration increases,

sustained peaking capability decreases• Peaking capability flattens out at high energies

3. If hydro does not meet load, attempt to make the deficit uniform over all hours

Page 38: MEMORANDUM TO: Power Committee Members SUBJECT: … · 2019. 12. 18. · 851 S.W. Sixth Avenue, Suite 1100 Steve Crow 503-222-5161 Portland, Oregon 97204-1348 Executive Director 800452-

Hydro Sustained Peaking vs. Monthly Energy

18000

20000

22000

24000

26000

28000

10000 12000 14000 16000 18000

Cap

acity

(MW

)

Monthly Energy (MWa)

2-Hour Peak 4-Hour Peak 10-Hour Peak

As duration increases,Peaking decreases

Peaking flattens out at higher energies

Page 39: MEMORANDUM TO: Power Committee Members SUBJECT: … · 2019. 12. 18. · 851 S.W. Sixth Avenue, Suite 1100 Steve Crow 503-222-5161 Portland, Oregon 97204-1348 Executive Director 800452-

Allocating Hourly Hydro• Calculate hourly load factors for 24 hours:

Hour(1) LF = Hour(1) load /day average load

• Calculate hourly hydro availability:Hour(1) hydro = Daily hydro energy/Hour(1) LF

• Make sure hydro doesn’t exceed peaking capability• 2 consecutive hour gen can’t exceed 2-hour peaking max• 4 consecutive hour gen can’t exceed 4-hour peaking max• 10 consecutive hour gen can’t exceed 10-hour peaking max

Page 40: MEMORANDUM TO: Power Committee Members SUBJECT: … · 2019. 12. 18. · 851 S.W. Sixth Avenue, Suite 1100 Steve Crow 503-222-5161 Portland, Oregon 97204-1348 Executive Director 800452-

Example of Hydro Shaping

0

5000

10000

15000

20000

25000

30000

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Meg

awat

ts

Hour of Day

Load Daily Hydro Energy Shaped Hydro