memco profile
DESCRIPTION
Company ProfileTRANSCRIPT
-
`
-
`
Contents
Company Profile & Philosophy
Locations
About Memco
Experience
Managing and Planning Projects
Health & Safety
Certificate of Registration
Management Chart
Equipment and Machinery
Clients and Consultants
Projects (executed)
-
`
Company Profile & Philosophy
Company Profile
Founded in 1990 MEMCO is an electrical, mechanical and contracting group with offices in Dubai, Abu Dhabi, Sharjah, Ajman and Al Ain. Through this network we service our clients regionally. We specialize in the design and planning of facilities for commercial offices, corporate, aviation, health, education, transport, retail, residential, hospitality, sport and leisure, telecommunications and commercial clients in the private and public sectors. Our Philosophy
MEMCO clients expect clever, innovative design and planning solutions. Our mission is to exceed that expectation. We achieve this through developing long- term relationships with our clients, through teamwork and through maintaining leadership in the application of technology to our business. Wherever we operate, we offer personal and locally integrated products and services, which respect local culture, tradition and law. Our services are supported by specialization, financial strength and human technical resourcing, afforded by our professional
network.
-
`
MEMCO Group . . Locations
Abu Dhabi / Al Ain
P.O. Box 80074 Tel: + 971 3 765 9470 Fax: + 971 3 751 1470
Dubai
P.O. Box 86955 Tel: + 971 4 Fax: +971 4
E-mail for the MEMCO Group: [email protected]
Website for the MEMCO Group:
www.memcogruop.net
-
`
About
MEMCO is an electrical / mechanical contracting group, based in the Middle East. The quality of our service products and their reliable delivery are fundamental to the projection of a culture of excellence and the sustainability of our company. The objective of this management system is to provide a basis for quality and for continuing improvement in our standards of performance, levels of service and our products. The implementation and ongoing development of the system is the responsibility of all partners, managers and staff.
This experience has been documented within our formal and informal procedures and provides a key contribution to our reputation for achieving quality design and high professional standards. The objectives of our formal management system form an integral part of our business plan. Our aims are:
To critically assess invitation and tenders for suitability.
To establish the project correctly on day one with the right team on the right project with infrastructure clearly identified and planned.
To formally review projects at key stages and to confirm that our designs and services meet the project brief whilst ensuring that changes are identified and addressed quickly and effectively.
To bring the project to a successful conclusion and critically appraise the project against the cliethose of our own.
To build and project a culture of consistently high quality.
To have our professional services seen as being world class.
-
`
Experience
expansive portfolio of
completed and current projects records the achievements of a professional practice in its many years of operation.
Since 1990, MEMCO has acquired a history of significant commercial, institutional, government al and industrial projects. These illustrate our diversity and ability to specialize under all conditions, which has made us a unique design force. Importantly, we recognize that our future depends on giving to each of our clients a commitment to long -term personal and professional involvement. Accordingly, we get to know our clients, their organizations and their operating environment, and work with them to create innovative and value-added solutions to their facility needs. We have executed projects like five star hotel, hospitals, residential & commercial complexes, high rise buildings, industrial facilities, helipad lighting, 11KV H.V networking with switching stations & ring main substations. Also, low current systems like building management systems, structured cabling, fire alarm systems, CCTV systems, access doors, P.A systems
& queue management
-
`
Managing and Planning Projects
Managing and Planning Projects
management system is
critical to the ultimate satisfaction of
to balancing project objectives. Quality
team building, training, monitori ng, and supervision, and above all, commitment to consistently high quality. We have been managing for many years and we have built up an enormous amount of experience including the best way of getting the job done simply and effectively. This experience has been documented within our formal and informal procedures and is a key contribution to our reputation for achieving quality design and high professional
standards.
The objectives of our formal management system form an integral part of our bus iness plan. Our aims are:
To critically assess invitation and tenders for suitability.
To establish the project correctly on day one with the right team on the right project with infrastructure clearly identified and planned.
To formally review projects at key stages and to confirm that our designs and services meet the project brief whilst ensuring that changes are identified and addressed quickly and effectively.
To bring the project to a successful conclusion and critically appraise the project
expectations as well as those of our own.
To build and project a culture of consistently high quality.
To have our professional services seen as being world class.
-
`
Health & Safety
MEMCO Group.. considers health and safety at work to be of fundamental importance. We have always endeavoured to create a humane organization, where people matter. This clearly applies to our employees, but it also affects those with whom we collaborate and for whom we provide our professional skills. We do not think that safety should be considered an imposition, but rather it should be part of our design and management process. It is our policy to take into account in all our activities the requirements of safety, health and welfare at work. In particular it is our policy to:
Ensure, so far as it is reasonably practicable, the health, safety and welfare at work of all employees and other persons affected by our actions.
Provide and maintain a safe working environment which has adequate facilities and arrangement for the health, safety and welfare of employees.
Provide such health, safety and welfare training, information, instruction
and supervision as may be necessary for personnel at all levels.
Have in place a designated person responsible for safety in the company who is competent to ensure arrangements specified in this safety statement are in place.
Provide plant, systems of work, and arrangements for the use, handling, storage and transport of the articles and substances we use in our work that are safe and without risk to our health.
Provide all employees with personnel protection and clothing suitable for
the task to which they are assigned.
Provide and maintain safe access to and egress from any place of work under our control and ensure emergency plans are in place for each place of work.
Inform employees of their duties and obligations in respect to safety, health
and welfare.
Promote personal responsibility and effort by employees at all levels to minimise health and safety hazards to themselves, other employees and other persons who may be affected by their acts or omissions.
Maintain a safety statement, provide each employee with a copy of the
safety statement and keep the measures taken to promote safety, health and welfare under review.
-
`
Cert ificate of Registration of the Company
-
`
Management Chart
-
`
Equipment and Machiner y
Cable Trolleys, (16 ton) Cable winch Crane (20 ton) J.C.B Rock Breaker Fork Lift Dumper Electrical Groove Cutting Machine for Pipes Electrical Threading Machine Pressure Testing Pump Hydraulic Cable Cutting & Crimping Machine Megger 5000 v
-
`
Clients & Consultant s Clients
o Dubai Holding o Tecom o DEWA o Works Department, Al Ain, Abu Dhabi o Al Ain Municipality & Abu Dhabi Municipality o Private Department o ADDC o AADC o ADWEA o ADNOC o Department of Military Works o Al Ain University o Department of Social Services o East West International Group o National Projects & Construction (NPC) o ALDAR o Emirates Identity Authority o Emirates Hospital Supplies Co o Abu Dhabi Police HQ o Secure o Command Of Military Works
Consultant s
o W.S Atkins o Taillibert Gulf Environment o Maunsell Consultancy o Architecture Planning Group (A.P.G.) o Eronat Engineering Consultants o EHAF Consulting Engineers o S.D Arch o Jafar Tukan & Partners Architects & Engineers o Al Salam Engineering Consultant o Tayeb Engineering Consultant o Al Maqam Engineering Consultant o Emirates International Consultant o Parc International o Parsons o Secure o I.D.E.A.S Consultant o BEAD Architects & Engineers o Zone Architects
-
`
HOTELS Client : P. W. D., Al Ain Project : Jebel Hafeet Hotel, Al Ain Consultant : Taillibert Gulf Environment Main Contractor : Arab Contractors Date of Execution : 1998 Scope of Works :
Design and Execution of Electrical System BMS System Data Network Audio Visual System C.C.T.V. Camera System Fire Alarm System Sound System Telephone System Electrical Lighting P.A System Garden Lighting Lightening Protection
Design and Execution of Plumbing Work Domestic Water Network Hot Water Network Drainage Network
Design and Execution of HVAC Work Installation of HVAC for Decoration Stage
Power Consumption : 6MW
-
`
Jebel Hafeet Hotel, Al Ain
-
`
Client : Al Tawasoul Property Development Co. L.L.C. Project : Al-Salam Rotana Hotel, Sudan Consultant : A. P. G. Architect & Planning Group Main Contractor : Depa Interiors LLC. Date of Execution : 2007 Scope of Works :
Design and Execution of Electrical System Fire Alarm System Sound System Telephone System Data Network Audio Visual System C.C.T.V. Camera System Electrical Lighting Garden Lighting Stand-by Generator
Design and Execution of Fire Fighting System
Design and Execution of Plumbing & Drainage Domestic Water Network Hot Water Network Drainage Network (external & internal) Laundry Steam System & Compressed air
Design and Execution of Infrastructure Work a. Water supply system b. Drainage system c. Electrical system d. Telephone system
-
`
Al-Salam Rotana Hotel, Sudan
-
`
FACTORIES Client : Department Of The President's Affairs Abu Dhabi UAE Project : Feed Mill Plant Building Al Ain Consultant : BEAD Architects & Engineers Main Contractor : Amana Steel Building Contracting Co. LLC Date of Execution : 2011 Scope of Works :
Execution of Electrical System Electrical System Fire Alarm System P. A. System C.C.T.V. System Telephone System BMS System Stand-by Generator
Execution of Plumbing & Drainage Fire Fighting System Domestic Water Network Drainage Network (external & internal)
Power Consumption : 3.5MW
-
`
Feed Mill Plant Building Al Ain
-
`
GOVERNMENT BUILDINGS Client : Abu Dhabi Police HQ Project : Explosions Section In Baniyas Project Manager : Secure PM, LLC Consultant : Bayati Architects Main Contractor : Darry Gen. Cont. Com. Date of Execution : In Progress Scope of Works :
Design and Execution of Electrical System BMS System Data Network Audio Visual & P.A System C.C.T.V. Camera System Fire Alarm System Sound System Telephone System Electrical Lighting S.M.A.T.V System Street & Garden Lighting Lightening Protection Stand-by Generator UPS System
Design and Execution of Plumbing Work Domestic Water Network Solar Water Network Drainage Network
Design and Execution of Fire Fighting System
Design and Execution of Irrigation System Power Consumption : 6.2 MW
-
`
Client : Abu Dhabi Police HQ Project : Al Ain Police Administration Building Consultant : EHAF Consulting Engineers Main Contractor : Al Tharawat Gen. Cont. Est. Date of Execution : 2009 Scope of Works :
Execution of Electrical System Fire Alarm System Sound System T. V. System Telephone system BMS System Data Network Audio Visual System C.C.T.V. Camera System Street Lighting Garden Lighting P.A System Electrical System Stand-by Generator
Power Consumption : 5.1 MW
-
`
Al Ain Police Administration Building
-
`
Client : Abu Dhabi Police HQ Project : Exemplary School For Police At Al-Ain Project Manager : Secure PM, LLC Consultant : Architectural & Planning Group (APG) Main Contractor : Force10 U.A.E Date of Execution : 2013 Scope of Works :
Execution of Electrical System Fire Alarm System Sound System T. V. System Telephone system BMS System Data Network Audio Visual System C.C.T.V Camera System Street Lighting Garden Lighting P.A System Electrical System Stand-by Generator
Power Consumption : 5.9 MW
-
`
Exemplary School For Police At Al-Ain
-
`
Client : E.I.D.A Project : Population Registration & ID Card Building 4 Buildings (U.A.Q , R.A.K , Ajman , Fujairah) Consultant : Dar Al-Khaleej Main Contractor : Memco Group Date of Execution : (U.A.Q & Ajman 2008 , R.A.K & Fujairah 2009) Scope of Works :
Design and Execution of Electrical System Fire Alarm System Sound System Telephone System Data Network Audio Visual System C. C. T. V. Camera System Electrical Lighting Garden Lighting Queue Management System Access Control System
Design and Execution of Fire Fighting System
Design and Execution of Plumbing & Drainage Domestic Water Network Hot Water Network Drainage Network (external & internal)
Design and Execution of HVAC Work Installation of HVAC System
Design and Execution of Infrastructure Work a. Water supply system b. Drainage system c. Electrical system d. Telephone system
-
`
Population Registration & ID Card Building
-
`
Client : P. W. D., Al Ain Project : Extension of Al Ain Municipality Consultant : Architectural & Planning Group Main Contractor : Rasco Date of Execution : 2004 Scope of Works :
Execution of Electrical System Fire Alarm System Telephone System Data Network T. V. System UPS System P.A System Stand-by Generator
Design and Execution of Plumbing & Drainage Domestic Water Network Hot Water Network Drainage Network (external & internal)
Power Consumption : 2.0MW
-
`
Client : P. W. D., Al Ain Project : Guard Administration Building, Al Ain Consultant : W. S. Atkins & Partners Overseas Main Contractor : Bin Ham Gen. Contracting Co. Date of Execution : 2003 Scope of Works :
Execution of Electrical System Fire Alarm System Sound System T. V. System Telephone system BMS System Data Network Audio Visual System C. C. T. V. System Street Lighting P.A. System Infrastructure ...
F.A. System
P.A. Address
T.V. Network
Electrical Cables
Execution of Plumbing & Drainage Domestic Water Network Hot Water Network Drainage Network (external & internal)
Power Consumption : 6.0MW
-
`
Client : Al Ain Municipality Engineering Section Project : Consultant : Architectural and Planning Group Main Contractor : Rasco Date of Execution : 2002 Scope of Works :
Execution of Electrical System Fire Alarm System Sound System T. V. System Telephone system Audio Visual System C. C. T. V. System Street Lighting Garden Lighting Stand-by Generator
Power Consumption : 3MW
-
`
Client : Town Planning Department Project : Extension of Town Planning Consultant : Tayeb Engineering Consultant Main Contractor : Rasco. Date of Execution : 2001 Scope of Works :
Execution of Electrical System Fire Alarm System Telephone System Data Network Public Address System
Execution of Fire Fighting System
Execution of Plumbing & Drainage Domestic Water Network Hot Water Network Drainage Network (external & internal)
Execution of HVAC Work Installation of HVAC System
Power Consumption : 2.0MW
-
`
Client : Dubai Municipality Project : Offices, Workshop, Accommodation Consultant : Bel Yoahah Architectural & Engineering Consultants Main Contractor : Metac General Contracting Co. Date of Execution : 2007 Scope of Work :
Execution of Electrical System Telephone system T. V. System Intercom System Fire Alarm System P.A. System Lightening Protection Stand-by Generator
Execution of Fire Fighting System
Execution of Plumbing & Drainage Domestic Water Network Hot Water Network Drainage Network (external & internal)
Execution of HVAC Work Installation of HVAC System
Power Consumption : 2 MW
-
`
Offices, Workshop, Accommodation Dubai
-
`
Client : Abu Dhabi Police HQ Project : Data Centre in Al Ain Police Administration Building Consultant : Secure PM, LLC Our Contract Value : Above 0.5 Million Date of Execution : 2012 Scope of Works :
Design and Execution of Electrical System New Power Connection AADC A.T.S System Cabling system Electrical System Earthing System Stand-by Generator
All Work was executed in the data centre while the power supply was ON without any disconnection.
-
`
Client : Al Ain Municipality Project : Municipality Building, Al Hayer Branch Consultant : Dr. Balfour & Sons Date of Execution : 1994 Scope of Works :
Design and Execution of Electrical System Electrical System Telephone system T. V. System Intercom System Fire Alarm System
Execution of Plumbing & Drainage Domestic Water Network Hot Water Network Drainage Network (external & internal)
Execution of HVAC Work Installation of HVAC System
Client : P. W. D., Al Ain Project : Commercial Market, Al Oha Main Contractor : Genco Date of Execution : 1992 Scope of Works :
Execution of Electrical System Electrical System Telephone system Intercom System Fire Alarm System
Execution of Plumbing & Drainage Domestic Water Network Hot Water Network Drainage Network (external & internal)
-
`
HOSPITALS
Client : Emirates Hospital Supplies Co, Dubai Project : Urology Hospital (Dubai Health Care City) Consultant : I.D.E.A.S Consultant Main Contractor : BA BES Contractor Date of Execution : 2012 Scope of Work :
Execution of Electrical System Lighting system Powre System Cable Containment Securite & PA System Nurse Call System Telecom System CATV System MATV System Fire Alarm System FM200 System Lightening Protection BMS System Stand-by Generator
Medical Gas System
Plumbing Work Domestic Water Network Hot Water system Drainage Network (Internal and External)
Power Consumption : 10MW
-
`
Urology Hospital (Dubai Health Care City)
-
`
Client : Works Department, Abu Dhabi Project : Dental Clinic at Tawam Hospital Consultant : Al Salaam Engineering Consultant Main Contractor : Rapid Building For Const., Transport & Gen. Maint. Main Contract Value : 15 Million Our Contract Value : Above 3 Million Date of Execution : 2004 Scope of Work :
Execution of Electrical System Electrical System Telephone system T. V. System Fire Alarm System BMS System CCTV System Lightening Protection Queue Management System Light Management with Door Interlock
Power Consumption : 3MW
-
`
Client : General Health Authority Project : Tawam Hospital Royal Suite Consultant : General Health Authority Main Contractor : Emirates Development Industrial Co. Ltd Date of Execution : 2004 Scope of Works :
Design and Execution of Electrical System Electrical System Fire Alarm System Telephone system BMS System Data Networks Nurse Call System UPS System Clock System
Plumbing Works Domestic Water Network Hot Water Network Drainage Network
HVAC System Supply & Install of HVAC system
-
`
UAE Armed Forces Client : UAE Armed Forces Project : Zayed Secondary College - Al-Ain Project Manager : Command Of Military Works Consultant : Zone Architects Main Contractor : Darry Gen. Cont. Com. Date of Execution : In Progress Scope of Works :
Design and Execution of Electrical System Electrical System Fire Alarm System Telephone system BMS System P.A System Lightening Protection
Plumbing Works Domestic Water Network Hot Water Network Drainage Network
HVAC System Supply & Install of HVAC system
Power Consumption : 1.2 MW
-
`
Hyper Market s Client : Emirates Property Investment Co. Project : LuLu Hyper Market Consultant : Khatib & Alami Consolidated Engineering Company Main Contractor : Bin Harmal General Cont Co. Ltd Date of Execution : 2009 Scope of Works :
Design and Execution of Electrical System Electrical System Fire Alarm System Telephone system Street Lighting Sound System Stand-by Generator
-
`
LuLu Hyper Market Al Ain
-
`
Airports Client : Abu Dhabi International Airports Project : Al-Ain Airports - VVIP Waiting Lounge Consultant : Abu Dhabi Airports Company Main Contractor : United Design International Co. Ltd Date of Execution : 2010 Scope of Works :
Execution of Electrical System Electrical System Fire Alarm System Sound System Telephone System Electrical Lighting Fixing Of Light And Sanitary Wares
Execution of Plumbing & Drainage Domestic Water Network Hot Water Network Drainage Network (external & internal)
Execution of HVAC Work Installation of HVAC System Installation of Fresh Air System
Execution of Fire Fighting System
-
`
SPORTS & CULTURAL CLUBS Client : Abu Dhabi Sports Council Project : Al-Ain Sports & Cultural Club Consultant : Urbanism Planning Architecture Main Contractor : Al-Howar Cont. Est. Date of Execution : 2009 Scope of Works :
Design and Execution of Electrical System Electrical System Fire Alarm System Telephone system
Execution of Plumbing & Drainage Domestic Water Network Hot Water Network Drainage Network (external & internal)
-
`
MEDIUM VOLTAGE PROJECT Client : National Projects and Construction Project : Al Reef Villa Complex, Abu Dhabi Consultant : Sarex International Engineering Consultant Main Contractor : National Projects & constructions LLC Date of Execution : 2004 Scope of Works :
Design and Execution of Electrical System
Supply and Installation of 11 KV Switching Stations Switch Gear and Ring Main Substation Switch Gear
Cabling from Primary Substation to Switching Station
Cabling from Switching Station to Ring Main Substation
Testing and Commissioning Switch Gear
Street Lighting
Feeder Pillar
Low Voltage Cabling
Infrastructure ( 11 KV system & Tel System )
Power Consumption : 10.5MW
-
`
Al Reef Villa Complex, Abu Dhabi
-
`
Client : Dubai Municipality Project : Cold Store at Central Fruit & Vegetable Market Consultant : Al-Turath Engineering Consultant Main Contractor : Metac General Contracting Co. Date of Execution : 2007 Scope of Works :
Execution of Electrical System Electrical System Fire Alarm System Telephone system Data Network Street Lighting
Power Consumption : 28 MW
-
`
Cold Store at Central Fruit & Vegetable Market