melbourne convention and exhibition centre · martin schmid 22 –23 august 2019 and exhibition...

53
Proudly partnered with Melbourne Convention Martin Schmid 22 23 August 2019 and Exhibition Centre Autodesk Product Strategy for MEP

Upload: others

Post on 22-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Melbourne Convention and Exhibition Centre · Martin Schmid 22 –23 August 2019 and Exhibition Centre Autodesk Product Strategy for MEP ... and services. These statements are not

Proudly partnered with

Melbourne Convention

Martin Schmid

22 – 23 August 2019

and Exhibition Centre

Autodesk Product Strategy for MEP

Page 2: Melbourne Convention and Exhibition Centre · Martin Schmid 22 –23 August 2019 and Exhibition Centre Autodesk Product Strategy for MEP ... and services. These statements are not

© 2019 Autodesk

Legal Disclaimer

We may make statements regarding planned or future development efforts for

our existing or new products and services. These statements are not intended

to be a promise or guarantee of future availability of products, services or

features but merely reflect our current plans and based on factors currently

known to us. These planned and future development efforts may change

without notice.

Purchasing decisions should not be made based upon these statements

These statements are being made as of August 2019 and we assume no

obligation to update these forward-looking statements to reflect events that

occur or circumstances that exist or change after the date on which they were

made. If this presentation is reviewed after August 2019, these statements may

no longer contain current or accurate information.

Page 3: Melbourne Convention and Exhibition Centre · Martin Schmid 22 –23 August 2019 and Exhibition Centre Autodesk Product Strategy for MEP ... and services. These statements are not
Page 4: Melbourne Convention and Exhibition Centre · Martin Schmid 22 –23 August 2019 and Exhibition Centre Autodesk Product Strategy for MEP ... and services. These statements are not
Page 5: Melbourne Convention and Exhibition Centre · Martin Schmid 22 –23 August 2019 and Exhibition Centre Autodesk Product Strategy for MEP ... and services. These statements are not
Page 6: Melbourne Convention and Exhibition Centre · Martin Schmid 22 –23 August 2019 and Exhibition Centre Autodesk Product Strategy for MEP ... and services. These statements are not

© 2018 Autodesk

Page 7: Melbourne Convention and Exhibition Centre · Martin Schmid 22 –23 August 2019 and Exhibition Centre Autodesk Product Strategy for MEP ... and services. These statements are not

Data

Page 8: Melbourne Convention and Exhibition Centre · Martin Schmid 22 –23 August 2019 and Exhibition Centre Autodesk Product Strategy for MEP ... and services. These statements are not

Identity

Access

Analytics

Viewing

Metering

Activity Rendering

Search

Data

Page 9: Melbourne Convention and Exhibition Centre · Martin Schmid 22 –23 August 2019 and Exhibition Centre Autodesk Product Strategy for MEP ... and services. These statements are not

© 2018 Autodesk Confidential—Not For External Use© 2018 Autodesk The Martian © 2015 Twentieth Century Fox. All rights reserved.

Page 10: Melbourne Convention and Exhibition Centre · Martin Schmid 22 –23 August 2019 and Exhibition Centre Autodesk Product Strategy for MEP ... and services. These statements are not
Page 11: Melbourne Convention and Exhibition Centre · Martin Schmid 22 –23 August 2019 and Exhibition Centre Autodesk Product Strategy for MEP ... and services. These statements are not

What is Forge?FORGE is a set of web service APIs* that power the future of making things.

*Application Program Interface

Page 12: Melbourne Convention and Exhibition Centre · Martin Schmid 22 –23 August 2019 and Exhibition Centre Autodesk Product Strategy for MEP ... and services. These statements are not

© 2016 Autodesk, Inc. All rights reserved.

Technology.

Forge takes components from Autodesk’s powerful library of software and delivers them as cloud-based building blocks forthe creation of new previously unimagined solutions.

Page 13: Melbourne Convention and Exhibition Centre · Martin Schmid 22 –23 August 2019 and Exhibition Centre Autodesk Product Strategy for MEP ... and services. These statements are not

© 2016 Autodesk, Inc. All rights reserved.

Integrate.

Use these services to extend products or to create entirely new solutions within your existing infrastructure. We provide the blocks, new solutions can be delivered from Autodesk, from partners, or through your own adaptations.

Page 14: Melbourne Convention and Exhibition Centre · Martin Schmid 22 –23 August 2019 and Exhibition Centre Autodesk Product Strategy for MEP ... and services. These statements are not

© 2016 Autodesk, Inc. All rights reserved.

How are they using the APIsUsing Forge APIs to push data between BIM and multiple internal apps. Delivering near real-time cost estimates – thru their SharePoint intranet with custom views for internal teams, external design firms and customers/ owners.

BenefitsA simple way to integrate BIM with internal estimating tools.

“The Forge platform allows us to integrate our virtual models and our cost-related history into a seamless application. This integration enables greater transparency with our external users, and enhances design coordination between architects and owners.”

Customer Showcase

ViewerModel

Derivative APIData

Management API BIM 360 API SharePoint API

Page 15: Melbourne Convention and Exhibition Centre · Martin Schmid 22 –23 August 2019 and Exhibition Centre Autodesk Product Strategy for MEP ... and services. These statements are not
Page 16: Melbourne Convention and Exhibition Centre · Martin Schmid 22 –23 August 2019 and Exhibition Centre Autodesk Product Strategy for MEP ... and services. These statements are not

Design & Analyze

Coordinate & Document

Detailing & Fabrication

Page 17: Melbourne Convention and Exhibition Centre · Martin Schmid 22 –23 August 2019 and Exhibition Centre Autodesk Product Strategy for MEP ... and services. These statements are not

Design & Analyze

Coordinate & Document

Detailing & Fabrication

START

TO DATE

IN PROGRESS

THEFUTURE

Page 18: Melbourne Convention and Exhibition Centre · Martin Schmid 22 –23 August 2019 and Exhibition Centre Autodesk Product Strategy for MEP ... and services. These statements are not

Design & Analyze

Coordinate & Document

Detailing & Fabrication

START

TO DATE

IN PROGRESS

THEFUTURE

MechanicalSystems Analysis

Page 19: Melbourne Convention and Exhibition Centre · Martin Schmid 22 –23 August 2019 and Exhibition Centre Autodesk Product Strategy for MEP ... and services. These statements are not

Just Released

Page 20: Melbourne Convention and Exhibition Centre · Martin Schmid 22 –23 August 2019 and Exhibition Centre Autodesk Product Strategy for MEP ... and services. These statements are not

Revit 2020.1

Systems AnalysisFeatures & Framework

“I find this mind blowing. The idea of having the entire HVAC system intent defined without having a single piece of equipment inside the model. To me this just shifted what Revit is for Mechanical Designers. This is something really exceptional.’

Page 21: Melbourne Convention and Exhibition Centre · Martin Schmid 22 –23 August 2019 and Exhibition Centre Autodesk Product Strategy for MEP ... and services. These statements are not
Page 22: Melbourne Convention and Exhibition Centre · Martin Schmid 22 –23 August 2019 and Exhibition Centre Autodesk Product Strategy for MEP ... and services. These statements are not

Learn about new Revit Systems Analysis Features

and Framework now available in Revit 2020.1. These

powerful new features will dramatically improve

design analysis and modeling workflows for MEP

engineers.

Wednesday, September 11th

11 am PDT, 2 pm EDT

Webinar: See the new features for MEP Engineers

https://autode.sk/revit2020-1

Page 23: Melbourne Convention and Exhibition Centre · Martin Schmid 22 –23 August 2019 and Exhibition Centre Autodesk Product Strategy for MEP ... and services. These statements are not

Design & Analyze

Coordinate & Document

Detailing & Fabrication

START

TO DATE

IN PROGRESS

THEFUTURE

Electrical Improvements& Globalization

Page 24: Melbourne Convention and Exhibition Centre · Martin Schmid 22 –23 August 2019 and Exhibition Centre Autodesk Product Strategy for MEP ... and services. These statements are not

Recent

Updates

Page 25: Melbourne Convention and Exhibition Centre · Martin Schmid 22 –23 August 2019 and Exhibition Centre Autodesk Product Strategy for MEP ... and services. These statements are not

On behalf of all electrical engineers and designers, we appreciate the effort!

-- Arrow(s) for Multi-Circuit Homeruns

Long time electrical engineer Revit user. This just made my day.

-- Feed through lugs

Page 26: Melbourne Convention and Exhibition Centre · Martin Schmid 22 –23 August 2019 and Exhibition Centre Autodesk Product Strategy for MEP ... and services. These statements are not

© 2019 Autodesk

Or Main Circuit Breaker (MCB)

Circuits 1-42

Circuits 43-84

Feed Through Lugs

Previously, could only connect panel through a breaker.

Now, can connect through feed through lugs.

Circuits can be numbered continuously.

To PP-2A

Page 27: Melbourne Convention and Exhibition Centre · Martin Schmid 22 –23 August 2019 and Exhibition Centre Autodesk Product Strategy for MEP ... and services. These statements are not

© 2019 Autodesk

Feed Through Lugs

Connect panel to source panel feed through lugs

Continuous numbering on downstream panels

Panel feed through lugs

Additional parameters and schedule template to show load info.

Page 28: Melbourne Convention and Exhibition Centre · Martin Schmid 22 –23 August 2019 and Exhibition Centre Autodesk Product Strategy for MEP ... and services. These statements are not

© 2019 Autodesk

Homerun Wire Option Improvements

Page 29: Melbourne Convention and Exhibition Centre · Martin Schmid 22 –23 August 2019 and Exhibition Centre Autodesk Product Strategy for MEP ... and services. These statements are not

© 2019 Autodesk

Utilize Built In Elevation Values for Documentation

Utilize elevation in view filters

Tag elevations of MEP elements

Schedule elevation values

Grouped and renamed Level and Offset constraints

Page 30: Melbourne Convention and Exhibition Centre · Martin Schmid 22 –23 August 2019 and Exhibition Centre Autodesk Product Strategy for MEP ... and services. These statements are not

Globalization

Focus

Page 31: Melbourne Convention and Exhibition Centre · Martin Schmid 22 –23 August 2019 and Exhibition Centre Autodesk Product Strategy for MEP ... and services. These statements are not

Global Circuit Numbering ConventionsDistribution System Improvements

1L123, 2L1AV1,1F1,..

1L123, 2L1 10n,20nV,Ph,LC

1A,2A,3B..TGBT-FM02

Wire: Size Units, Conventions, and Sizing

#12, 1/0 AWG 2.5mm, 50mm

(3) #12, #12G 4G2.5

• Single Phase Panels• Multi Bus Equipment

Page 32: Melbourne Convention and Exhibition Centre · Martin Schmid 22 –23 August 2019 and Exhibition Centre Autodesk Product Strategy for MEP ... and services. These statements are not

In Preview

Release

Page 33: Melbourne Convention and Exhibition Centre · Martin Schmid 22 –23 August 2019 and Exhibition Centre Autodesk Product Strategy for MEP ... and services. These statements are not

Ease Of Use

Improved Electrical Logic

A B C

Page 34: Melbourne Convention and Exhibition Centre · Martin Schmid 22 –23 August 2019 and Exhibition Centre Autodesk Product Strategy for MEP ... and services. These statements are not

"In regards to the new ‘circuit naming’, we have just worked on a project where we have needed to have power and lighting circuits on the same board. In this case we would need to have power circuits on the left side of the board and starting at ‘P1’, and on the right side have lighting circuits starting at ‘L1’.”

– customer in Australia

Page 35: Melbourne Convention and Exhibition Centre · Martin Schmid 22 –23 August 2019 and Exhibition Centre Autodesk Product Strategy for MEP ... and services. These statements are not

Design & Analyze

Coordinate & Document

Detailing & Fabrication

START

TO DATE

IN PROGRESS

THEFUTURE

Mech Fab. Data Managementon Forge

Page 36: Melbourne Convention and Exhibition Centre · Martin Schmid 22 –23 August 2019 and Exhibition Centre Autodesk Product Strategy for MEP ... and services. These statements are not

Model Creation

Content and Database

Management

Sheet Metal CAM

Precon & Execution

Estimating

AUTODESK FORGE

PROJECT DATA

Content and Database Management

EstimatingModel

CreationPrecon CAM

MANUFACTURING

Page 37: Melbourne Convention and Exhibition Centre · Martin Schmid 22 –23 August 2019 and Exhibition Centre Autodesk Product Strategy for MEP ... and services. These statements are not

© 2017 Autodesk

Mechanical Contractor

Industry / Trade Organization

Price and Labor Data(e.g.. Membership Required)

Fitting Dimensional Data

Fitting Manufacturer / Content Producer / 3rd Party BIM Manager

Detailing Subcontractor / Outsourcing

Page 38: Melbourne Convention and Exhibition Centre · Martin Schmid 22 –23 August 2019 and Exhibition Centre Autodesk Product Strategy for MEP ... and services. These statements are not
Page 39: Melbourne Convention and Exhibition Centre · Martin Schmid 22 –23 August 2019 and Exhibition Centre Autodesk Product Strategy for MEP ... and services. These statements are not
Page 40: Melbourne Convention and Exhibition Centre · Martin Schmid 22 –23 August 2019 and Exhibition Centre Autodesk Product Strategy for MEP ... and services. These statements are not

Proof of Concept: Sheet Metal Pattern Data from a Service

Page 41: Melbourne Convention and Exhibition Centre · Martin Schmid 22 –23 August 2019 and Exhibition Centre Autodesk Product Strategy for MEP ... and services. These statements are not

Shop image courtesy::

Page 42: Melbourne Convention and Exhibition Centre · Martin Schmid 22 –23 August 2019 and Exhibition Centre Autodesk Product Strategy for MEP ... and services. These statements are not
Page 43: Melbourne Convention and Exhibition Centre · Martin Schmid 22 –23 August 2019 and Exhibition Centre Autodesk Product Strategy for MEP ... and services. These statements are not

e v o l v e m e p . c o m

Page 44: Melbourne Convention and Exhibition Centre · Martin Schmid 22 –23 August 2019 and Exhibition Centre Autodesk Product Strategy for MEP ... and services. These statements are not

e v o l v e m e p . c o m

• Batch Spooling

• Customize View Layout

• Customize BOM

• Auto-Dimensioning

• Customize View Settings

• Auto-Part Tagging

Page 45: Melbourne Convention and Exhibition Centre · Martin Schmid 22 –23 August 2019 and Exhibition Centre Autodesk Product Strategy for MEP ... and services. These statements are not

RALPH SCHOCHMSF124289: Fabrication: The Link Between Revit and the Fab Shop

Partner Tools | FabricationVictaulic | Tools for Revit

• Creating fabrication spools

• Creating fully integrated assemblies

• Automated tagging

• Resizing, rotating and deleting pipe sections

• Intelligent hanger placement tool

Page 46: Melbourne Convention and Exhibition Centre · Martin Schmid 22 –23 August 2019 and Exhibition Centre Autodesk Product Strategy for MEP ... and services. These statements are not

Partner Tools | FabricationGTP | Stratus

• Work Planning

• Tracking Earned Value

• Spool Assemblies

• Cutting and Bending

• Custom Reports

Page 47: Melbourne Convention and Exhibition Centre · Martin Schmid 22 –23 August 2019 and Exhibition Centre Autodesk Product Strategy for MEP ... and services. These statements are not

Design & Analyze

Coordinate & Document

Detailing & Fabrication

START

TO DATE

IN PROGRESS

THEFUTURE

Page 48: Melbourne Convention and Exhibition Centre · Martin Schmid 22 –23 August 2019 and Exhibition Centre Autodesk Product Strategy for MEP ... and services. These statements are not

System Schematic Modeling & Documentation

Images Courtesy of Arup

Page 49: Melbourne Convention and Exhibition Centre · Martin Schmid 22 –23 August 2019 and Exhibition Centre Autodesk Product Strategy for MEP ... and services. These statements are not

Integrated Analytical–Schematic–Physical

Page 50: Melbourne Convention and Exhibition Centre · Martin Schmid 22 –23 August 2019 and Exhibition Centre Autodesk Product Strategy for MEP ... and services. These statements are not

Loads Distribution & Sizing Model Creation

+

Electrical: Integrated Analytical–Schematic–Physical

VSD

Page 51: Melbourne Convention and Exhibition Centre · Martin Schmid 22 –23 August 2019 and Exhibition Centre Autodesk Product Strategy for MEP ... and services. These statements are not

Design & Analyze

Coordinate & Document

Detailing & Fabrication

Fab Data on Forge(Beta)

Fabrication Data on Forge

General ElectricalImprovements

Mechanical Systems Analysis

Analytical-Schematic-PhysicalAutomation & Optimization

Electrical Systems Analysis

M/E Systems Schematics

Insight on Forge (Beta)

Insight on Forge

Distribution System Equipment Improvements

Revit Fab ModelingImprovements

High Level Roadmap | MEP

Page 52: Melbourne Convention and Exhibition Centre · Martin Schmid 22 –23 August 2019 and Exhibition Centre Autodesk Product Strategy for MEP ... and services. These statements are not

http://tiny.cc/MEP2019

Join Our Beta / Customer Panel Opportunities

Page 53: Melbourne Convention and Exhibition Centre · Martin Schmid 22 –23 August 2019 and Exhibition Centre Autodesk Product Strategy for MEP ... and services. These statements are not