Page 1: MEH Facilities Ltd
Page 2: MEH Facilities Ltd
Page 3: MEH Facilities Ltd

Specialists in PPMand MTC services

Mechanical, Process & ElectricalBuilding Services Engineers

Whipps Cross HospitalValue: £380,000

Modification to the Plant RoomFebruary 2013

Consulting Engineer: George Glessinger

HEALTHCARECASESTUDY:

Page 4: MEH Facilities Ltd

Modification to the Plant RoomFebruary 2013

Supply and installation of steam generated Plate Heat Exchangers providing LTHW Heating and H&CWS Systems to the roof top AHU’s new maternity and antenatal unit including pump sets and BMS Control Panel for Barts Health NHS Trust.

I had a goodsite inspection today with

your Site Manager Eric Cooper, it looks a very good installation and you should all be well pleased as I am, very

well done.

I look forward to working with you in the future...

George GlessingerConsultant Engineer

Page 5: MEH Facilities Ltd

HEALTHCARECASESTUDY:

Specialists in PPMand MTC services

Mechanical, Process & ElectricalBuilding Services Engineers

UCLH – University CollegeLondon Hospital Value: £417,563

The works were within the Main Hospitals Clinics, Consulting Rooms and Offices around Queen Square and phased (including out of hours working) to enable the buildings to remain operational.

The work included installing a Thorlux platform 2 emergency lighting system.

This system is fully addressable meaning no more manual testing of emergency lighting by shutting down the power and manually checking lights, this system is installed in zones and each zone has a control unit wired into the lights in that zone. The emergency LED lights are then monitored by the zonal report unit so when testing you plug in the hand held PC

to the zonal report unit and it goes through the lights indicating any faulty units, you then look to the drawing where the lights are coded and if the zonal report unit says for example.

Faults on lights 2 & 8 you look where they are situated and can be rectified. The zonal report switch can take up to (30) lights so marking each light is essential. All the LED lights are interlinked so the whole system is addressable, this saves the costly maintenance and inconvenient when manually testing conventional systems. We also did normal 240v electrical works and 3-phase 440v works on air-conditioning and air handling plant.

We have worked withMEH Facilities Ltd on a sensitive refurbishment project for UCLH

throughout the Queens Square Campus. The Works required close condition

between the clients various departmental heads and other contractors. Due to the

nature and continued use of the building as a clinical centre of excellence, which was

not to be disrupted, much of the work was carried out at night and weekends. They

proved a very professional and organised first class installation of mechanical and

electrical services in challenging circumstances.

Andrew Munn – Senior Projects ManagerKind & Co. Ltd

Page 6: MEH Facilities Ltd

HEALTHCARECASESTUDY:

Specialists in PPMand MTC services

Mechanical, Process & ElectricalBuilding Services Engineers

Royal BromptonHospital Value: £513,000

The area’s we worked in were the theatre recovery, ward staff area, reception and clean corridor. 2 theatres plant rooms 3&4 and new plant room for theatres. Due to retaining critical path continuity the work had to be carefully planned with the medical teams, often changing these at short notice.

The electrical work consisted of general power and lighting, installing a fire alarm system interlocked with main system, a nurse call system and installing armoured cables to upgrade the installation. There was specialised electrical work which consisted of a UPS/IPS back up power system which retains power in recovery unit in a power failure situation.

There was also a special lighting system installed in recovery ward so fluorescent lighting could be dimmed.

Mechanical works included installation of air handling units on roof with flow and return pipes work in existing plant rooms, duct and ventilation in recovery ward with air-flow electronically controlled. We installed gases to bed head units in recovery ward and new medical gas supply from basement to 3rd floor to upgrade the supply to cope with extra demand to the ward and theatres. We had to supply hot and cold water services to ward and new theatres and also steam from new plant room above new theatres to theatre. We also installed waste and sanitation pipe work.

Over the yearsI have worked with

MEH Facilities Ltd on manyM&E Projects of all sizes and by their very

nature always carried high levels of difficulty. They have always performed

consistently well in achieving quality and programme through close liaison with the medical teams. Their professionalism from management, trade skills, Record Drawing,

O&M’s through to Commissioning andFinal Account has always

proven exemplary. Mark Lynn – Royal Brompton Hospital

Project Manager

Page 7: MEH Facilities Ltd

HEALTHCARECASESTUDY:

Specialists in PPMand MTC services

Mechanical, Process & ElectricalBuilding Services Engineers

Replacement of Cold Water Mains Pipe work and installation of Water Meters.

The project was to replace plastic pipe work with Copper tube and Brazed Fittings to incorporate new cold water meters on the supply to various cold water storage tanks.

The Cold Water Meters were installed in areas instructed by the client and included an optional BMS Data Connection for future use.

We prefabricated and installed the pipe work and then arranged a shut down via the hospital facilities team to enable a changeover to be carried out and the final sections of copper pipe work installed.

On completion the new pipe work was insulated.

We have usedMEH Facilities for a number of

small quoted Projects in addition tosome Emergency Repairs and have always

found them to provide a responsiveservice at good value.

Philippe Ahtuam - Capital Projects ManagerVinci Facilities

Queen ElizabethHospital Value: £17,000

Page 8: MEH Facilities Ltd

HEALTHCARECASESTUDY:

Specialists in PPMand MTC services

Mechanical, Process & ElectricalBuilding Services Engineers

The Royal London St. Bartholomewsand The London Chest HospitalValue: £638,000

Following a Legionella Risk Assessment by others, the Health Authority in conjunction with Ingleton Wood Consultants prepared a specification for the Remedial Works which we successful tendered.

The works involved the removal of deadlegs, reducing the capacity of storage tanks, replacing tanks, Lining tanks, correcting pipework errors, installing Hot Water Secondary pipework, descaling Calorifers, installing Chlorine Dioxide Dosing Machines, fitting insulation and cleaning taps.

As the sites were operational, much of the work had to be well coordinated and carried out either out of hours or with carefully planned shut downs.

We were able to accelarate a proposed 3 year programme into an 18 month programme of works.

MEH Facilities Limitedcompleted all works to a very high

standard and within budget. They liasedvery closely with Hospital staff andSkanska Project Managers to ensureminimal disruption while progressing

the works to programme.We were very satisfied with the manner in which the works were carried out by MEH

Facilities Limited and would certainly recommend them for future projects.

Alan Hayman - Mechanical Associate / AffiliateCIBSE AIHEEM

Page 9: MEH Facilities Ltd

EDUCATIONCASESTUDY:

Specialists in PPMand MTC services

Mechanical, Process & ElectricalBuilding Services Engineers

The works consisted of Thames Water Regulation works.

1. Removal of all dead legs in the pipe work

2. Installation of cold water break sectional tank providing air to serve laborty taps.

3. Installation of back flow prevention valves (RPZ)

4. Installation of double check valves on most items.

5. Installation of automatic flushing controls.

6. Checking of water flow rates.

7. Replacing defective taps and isolation valves.

8. Cleaning sterilising and chlorination of all installed services.

9. Taking sample analyses of water services, following completion for each building.

10. Any service subject to outside temperatures was trace taped.

University ofEast London Value: £81,325

MEH Facilities Limitedcompleted all works to a very high

standard and within budget. They liaised very closely with University staff to ensure minimal disruption while progressing the works to programme.

We were very satisfied with the manner in which the works were carried out by MEH

Facilities Limited and would certainly recommend them for future projects.

Alan Hayman - Mechanical AssociateCIBSE AIHEEM

Page 10: MEH Facilities Ltd

EDUCATIONCASESTUDY:

Specialists in PPMand MTC services

Mechanical, Process & ElectricalBuilding Services Engineers

St Helen’sRC Primary School Value: £105,476

Mayville Primary SchoolValue: £26,400

Replacement of the existing gas-fired boilers with new condensing boilers, control panel, pumps, flues and upgrading energy controls. Installation of thermostatic radiator valves to all existing radiators.

Work to be carried out whilst maintaining domestic hot water services throughout the building.

• Supply and installation of three new fully modulation-condensing gas fired boilers allowing for all pipe work alteration.

• Installation of new flue suitable for condensing boilers.

• Supply and installation of pressurisation units allowing for all conversion works.

• Supply and installation of a new control panel.

• Supply and installation of new circulating pumps.

• Supply and installation of plate heat exchanger.

• Supply and installation of a new gas safety system.

• Supply and installation of new thermostatic radiator valves.

• Provision of chemical cleaning and sterilisation.

• Provision of commissioning of all systems.

• Provision of record documentation and O&M manuals.

• Provision of scaffolding to install flu liners.

The works consisted of replacing4 boilers.

To maintain service at all times it was necessary to carry out installation works, changing single units to keep central heating and hot water service.

Then completing each boiler so that 3 boilers were online at any time works renewing the boiler modify the flow and return gas condense.

Flue service and reconnecting the electric to the BMS system. The system was partly flushed inhibitor added.

We haveworked with MEH

Facilities on a number of projects including St. Helens

RC Primary School.We have always found them

to be professional and helpful and completeworks to programme.

Cliff Cheeseman

Page 11: MEH Facilities Ltd

Hospital Case Studies

Whipps Cross University Hospital

Specialists in PPM and MTC ServicesMechanical, Process & Electrical Building Services Engineers

Design | Installation | Service | MaintenanceMEH Facilities Ltd

Supply and installation of steam generated Plate Heat Exchangers providing LTHW Heating and H&CWS Systems to the roof top AHU’s new maternity and antenatal unit including pump sets and BMS Control Panel for Barts Health NHS Trust.

“I had a good site inspection today with your Site Manager Eric Cooper, it looks like a very good installation and you should all be well pleased as I am, very well done. I look forward to working with you in the future.”

George Glessinger – Consultant Engineer

What we did Testimonial

• Client Barts & London NHS Trust • Consultants George Glessinger • Value £380,000

East of England Ambulance Service

Colchester Ambulance Service Beccles Ambulance Service Rayleigh Ambulance Service

Works consisted of removal of the old boilers and the installation of new Condensing boilers and controls, new pumps and dosing pots were also installed, together with a gas solenoid valve.

A new control panel was designed to incorporate all new controls.

Having just completed a fourth boiler replacement project with MEH I can con�rm that their proactive a�itude has made these fast track works go smoothly and with minimal impact on the various buildings occupants.

Despite �nding some controls issues during the course of the works MEH worked with us in solving the problems in a very professional manner. In tendering MEH have proven to be good value and I never feel they are just looking for the next variation. I would have no hesitation in recommending MEH as a �rst class mechanical contractor.

Ian Giles - B ENG (hons) C ENG MCIBSE

What we did Testimonial

• Client East of England Ambulance Service • Consultants Encred • Value £35,000

Southend University Hospital

Installation of new boiler’s to 1. �e Renal and Linac plant rooms 2. Installation of Dosing Pots3. Installation of a pressurised HWS to renal Dept 4. Installation of new radiators and P/W modi�cation to the Day Centre.5. Arranging the �ushing of various areas and water treatment.6. Modi�cation of tanks and pipework to conform to Legionella requirements7. Installation of a li�ing beam to facilitate the removal of the large pumps and motors. .

“MEH Facilities has carried out several very successful installations for us. �eir management and engineers have all been extremely professional and given a high quality of work and �exibility towards the hospitals needs and programmes. �eir prices have provided us with economical results and we look forward to a continuous working relationship in the future”.

Tom Dines - Head of Estates

What we did Testimonial

• Client Southend University Hospital• Consultants Ingleton Wood • Value £64,000

Barts & London NHS Trust

East of England AmbulanceService - NHS Trust

Southend UniversityHospital - NHS Trust

Page 12: MEH Facilities Ltd

the cabling into the intake room had to coordinated and carried out on an out of hours basis. �e Project also included load monitoring over a 7 day period to obtain details of the peak load. A new control panel was designed to incorporate all new controls.

Hospital Case Studies

Specialists in PPM and MTC ServicesMechanical, Process & Electrical Building Services Engineers

Design | Installation | Service | MaintenanceMEH Facilities Ltd

Kingston Hospital

A 14 month contract to replace the hot and cold galvanized pipe water services from the main plant room, through 'miles' of undercro�, across roofs and �nally into a 7 storey surgical and ward block containing some 500 beds and replacing it with copper pipe, whilst maintaining supplies to the entire building. Lagging had to be removed from the 159mm raw, boosted and treated water services running in the ducts utilizing supply and extract air services due to dust. within the building plant room 3 large steel steam generated hot water calori�ers had to be cut out in phases and replaced with PHE's and new pumps.

Lateral and riser services were run in ducts and ceiling voids with considerable builders work by our own teams required for inserting hatches, ��ing new ceilings and decorating etc. �e planning and liaison processes were one the most sensitive we have ever undertaken, requiring 'hourly' updates ready to accommodate medical needs at short notice. Quite o�en 24 hour working programmes had to be deployed to achieve these tasks.

MEH were awarded this contract based upon their previous track record and ability 'to deliver' which is certainly the case with this contract. It is a very di�cult project to achieve which they have gone about e�ciently in their organisation and management skills with the clinical teams, providing quality of work under very di�cult circumstances.

Danny Craig - Projects Manager Kingston NHS

What we did Testimonial

• Client Kingston Hospital NHS Trust • Consultants Ingleton Wood• Value £1.6 million

Kingston NHS Trust

John Warburton Building

�e John Warburton Building is located at the John Howard Centre in East London and is a Secure Mental Health Unit.

�e Project was to remove 6 No obsolete boilers and to Supply and Install 5 No Hamworthy Purewell Variheat 125HE Condensing Boilers to the same overall output, together with all necessary alterations to the pipework and �ue system.

Due to the nature of the premises and the requirement for Heating and Hot Water 24 / 7, we had to carry out the works in a phased method to ensure that services were maintained.

MEH Facilities Ltd has consistently provided over a number of years, excellent performance towards PPM, Small Works and Projects that has been achieved through the prompt professionalism of the Company. We have seen �rst hand, MEH’s ability to solve any potential problems and resolve them before they escalate both during normal working hours and out of hours. �is has been achieved by all parties working together and a good working relationship has been built. MEH do the right job, at the right price at a time that is right for us. We are delighted with the service we have received from all of your sta� and would have no hesitation in providing an unquali�ed recommendation for your Company.

John Hill - Director of Estates, Facilities and Capital Development

What we did Testimonial

• Client East London NHS Foundation Trust • Value £67,500 East London - NHS FoundationTrust

Chase Farm Hospital

�e Project was to Supply and Install Two 500Kva Generators at Chase Farm Hospital complete with all necessary installation works including the forming of Concrete Bases for the Generators, Installation of Containment & Cabling to connect from Generators into Electric Intake Room via Sychronised Changeover Switchgear. �e connection of

What we did

• Client Barnet, Enfield & Haringey Mental Health NHS Trust• Client Contact Brian Cusack• Consultant Paul Thomason of Thomason Project Management• Value £148,000

Barnet, Enfield & HaringeyMental Health- NHS Trust

Page 13: MEH Facilities Ltd

School Case Studies

St Joseph’s RC Catholic School

Specialists in PPM and MTC ServicesMechanical, Process & Electrical Building Services Engineers

Design | Installation | Service | MaintenanceMEH Facilities Ltd

Removal of the existing plant.

Installation of 3 Broag Quinta fully condensing boilers and refurbishment heating and hot water services within the boiler room and installation of thermostatic valves to all radiators.

Installation of PHE to separate the old system from the newly installed boiler plant, each section having its own pressurisation units with pressure vessels, new hot water calori�er and of various pumps.

Installation of full controls including B.M.S and thermostatic radiator valves. On completion of the project the heating system was �ushed and dosed together with chlorination of the H.W.S.

“I have worked with MEH over many years in Schools, libraries etc and always found them to be very professional in their Management, Quality of Work and Economical ‘fairness’ providing their projects on time and within budget”.

Dave Berry – Gas Advisory Services

What we did Testimonial

• Client Archdiocese of Southwark • Consultants Gas Advisory Services • Value £150,000

Norwood School

Removal of the existing plant.

Norwood School consisted of the replacement of defective pipework, ��ings, valves, expansion bellows and bracket ranging from 150mm within the district scheme running in ducts from the main plant room, connecting and serving the schools modern design.

�is job required careful management and time e�ciency. On site at the same time as us, asbestos was being cleared ahead of our works and therefore all surveys were unable to be carried out by ourselves and the consultant. When access became available we commenced our works, which had to be phased over the term to enable the full use of the school. �is was very successful. Unfortunately we also discovered a problem with the red oxide paint of hot water pipes causing the

production of toxic fumes. A strict health and safety method statement was implemented involving breathing protection and ventilation air being forced in and out of the duct.

�e discovery of completely ro�en pipework meant a lot of fabrication and longer hours out of School time, to insure these could be replaced without causing disruption to the school. Once all new installations were in place and tested, follow on insulation was applied. �roughout this project not one school day was lost or access denied. �e project was successfully completed within the 6 months programme.

““MEH Facilities Ltd has provided a consistent, highly professional service which has been continued throughout the project at Norwood School. �is was an extremely di�cult project with the works being carried out during term times in service ducts below the corridors of the school, with all services being interrupted to keep all heating and water services operational”.

Trevor Childs - Sir Fredrick Snow & Partners

What we did Testimonial

• Client London Borough of Lambeth • Consultants Sir Fredrick Snow & Partners • Value £232,921

London Borough of

Page 14: MEH Facilities Ltd

School Case Studies

Specialists in PPM and MTC ServicesMechanical, Process & Electrical Building Services Engineers

Design | Installation | Service | MaintenanceMEH Facilities Ltd

Glenbrook Primary School

�is project was working directly for the London Borough of Lambeth as the Main Contractor, on behalf of the school. �e works were split into 2 phases over the school holidays, consisting of a new kitchen canopy, extractor fans and duct work. To also include the removal of asbestos and all existing concealed heating units.

We installed a sill-line '�ermal' heating system, which was customised speci�cally for the school. �is was supplied for one half of the school, consisting of 11 class rooms and corridors.

�e Project was completed within the time frame.

From quote to completion, MEH were professional and courteous. �ey completed the Installation on time and with the minimum disruption and mess to the running of the school.

Anthea Dalton - Head Teacher of Glenbrook Primary School

What we did Testimonial

• Client London Borough of Lambeth• Value £122,000

London Borough of

Chase Bridge Primary School

Chase Bridge Primary School was a refurbishment project, which commenced during the school holidays. �e scope of works consisted of the renewal of heating mains, and radiators and Fan Coil Units fed from outside heating mains on the roof.

We were commissioned as the main contractor to include all building work, painting, decorating and asbestos removal.

�e project ran smoothly and �nished on deadline completion

Ralf Wong - London Borough of Richmond upon �ames

What we did Testimonial

• Client London Borough of Richmond Upon Thames• Value £140,000

Jenny Hammond Primary School

�e Jenny Hammond Primary School is an existing building; the works comprise of a 100m 2 extension block to facilitate the new sta� room, o�ces and reprographics and the refurbishment of part of the existing building.

�e extension block accommodates new bathroom and kitchen facilities with services extended from the existing building. �e refurbishment of the existing building includes the stripping out and installation of new W.C’s and tea stations in new locations and associated works in relocating facilities.

We are responsible for undertaking the mechanical installations; above ground drainage, below ground drainage, domestic hot and cold water, rainwater, gas servicing, heating and ventilation.

We have worked with MEH on various projects in recent years,Including several major works where services were required to be kept operational throughout. Even on particularly di�cult projects this has been achieved, all with a friendly and �exible approach from all involved. �e current project we envisage completion on time as usual’

Forest Gate Construction

What we did Testimonial

• Client London Borough of Waltham Forest• Value £20,567

Page 15: MEH Facilities Ltd
Page 16: MEH Facilities Ltd

Housing Case Studies

Soho Housing Association

Specialists in PPM and MTC ServicesMechanical, Process & Electrical Building Services Engineers

Design | Installation | Service | MaintenanceMEH Facilities Ltd

We have been working with Soho Housing Association since June 2005, initially on a three year Measured Term Contract to carry out Annual Servicing and Reactive Maintenance to Gas Appliances and associated systems in Domestic Properties located in and around central London.

Our e�cient operations have enabled us to gain 100% Compliance in Landlords Gas Safety Certi�cation on behalf of Soho Housing Association.

Our electronic records and web access to our database enable them to view real time information regarding their service and repairs. We now adopt a partnered approach to working with Soho Housing Association.

“MEH Facilities Ltd has consistently provided us with an e�cient and reliable range of services whilst achieving good value for money. �rough their Gas Servicing Division they have helped us a�ain 100% compliance with our Landlord Gas Safety Records and developed both electronic record keeping and internet access”.

Richard Bryan - Reinvestment Coordinator Soho

What we do Testimonial

• Client Soho Housing Association• Consultants Bierce Technical Solutions• Value £226,000 per annum

Hackney Homes

Under Taking PPM, new installations and reactive repair’s to schools, council buildings and approximately 10,000 housing stock units.

We have worked with MEH Facilities Ltd for many years on a range of Domestic and Commercial Measured Term contracts ranging from Ventilation, Electric Heating, Domestic Gas Central Heating, and large District Heating System. We have always been happy with the service provided. In addition to their own contracted areas they also provided a back up service to our own direct labour organisation. �e quality of the workmanship and the professionalism of the sta� were excellent at all times.

Gary Penticost – Hackney Homes

What we do Testimonial

• Client Hackney Homes• Value £2,000,000 per annum

London Quadrant Housing Association

We are very proud of our long term association with London & Quadrant, having worked for them since the start of our initial contract in April 2001.

�e �rst contract was initially for a 3 year period and we were able to negotiate extensions to the contract based on �xed cost and performance. We were very proud to be awarded Contractor of the Year 2005-6 for which we were picked from approximately 200 contractors. �e Certi�cate and plaque take pride of place in our o�ce.

We also received praise for our e�orts in assisting London & Quadrant achieve 100% Compliance in Landlords Gas Safety Certi�cation for our contract area which is a level they have now become accustomed to. �e contracts with London & Quadrant were re-Tendered in 2007-08 and we were successfully awarded a fresh contract in April 2008.

I write to Congratulate you on the excellent performance provided by you company. �is resulted in your contract being a 100% rate service, including properties in the no access procedure. �is is the �rst time the trust has achieved this target, I can only express the Trust’s pleasure and thanks to all of your sta� for this excellent performance.

I am aware that this excellent performance has only been achieved by all parties working closely together and having a harmonious working relationship, which I am sure we will endeavour to maintain. Once again thank you for your e�orts, please pass our thanks on to all of your sta�.

L&Q Group - Nicholas Kyprianou

What we do Testimonial

• Client London Quadrant Housing Association• Value £678,000 per annum

Page 17: MEH Facilities Ltd

Housing Case Studies

Specialists in PPM and MTC ServicesMechanical, Process & Electrical Building Services Engineers

Design | Installation | Service | MaintenanceMEH Facilities Ltd

Poplar HARCA

We have worked with Poplar HARCA for many years, carrying out their annual Gas Appliance Safety Inspection and completion of Gas Safety Certi�cates CP12, Planned and Preventative Maintenance and Servicing, Responsive Repairs and Replacements, Emergency Call out and Repairs, Voids and other works associated with gas �red heating appliances and installations within their properties which span 11 estates; Aberfeldy, Bow Bridge, Coventry Cross, Burde�, Brown�eld, Devons, Lansbury, Lansbury West, Leopold, Lincoln and Teviot.

Our e�cient operations have enabled us to achieve 100% Compliance agreed in the Key Performance Indicators.

“ MEH have provided a consistently good response to Reactive Repairs and Planned Preventative Maintenance which is re�ected in the Key Performance Indicators (KPI's). �ey have also provided competitively priced boiler replacements which they have completed to a good standard”. 

Gary Clarkson - Lead Engineer (Mechanical)

What we do Testimonial

• Client Poplar HARCA• Value £62,000 per annum

Ekaya Housing Association

We have been working with Ekaya Housing Association since October 2008 to carry out their annual Gas Appliance Safety Inspection and completion of Gas Safety Certi�cates CP12, Planned and Preventative Maintenance and Servicing, Responsive Repairs and Replacements, Emergency Call out and Repairs, Voids and other works associated with gas �red heating appliances and installations within their 295 units.

Our e�cient operations have enabled us to achieve 100% Compliance agreed in the Key Performance Indicators.

�e team working approach with common aims and objectives helped improve the management and e�ciency of Ekaya's service to its customers.

“MEH Facilities Ltd took over our Gas Contract in May 2013 and immediately the Complaints from our residents stopped as a result of their excellent performance. MEH provide high levels of customer satisfaction and we are happy to be working with them”. 

Sheronlyn BalfourActing Housing & Property Services Manager

What we do Testimonial

• Client Ekaya Housing Association• Value £57,000 per annum

Page 18: MEH Facilities Ltd

Pubs & Restaurants Case Studies

Mitchell’s & Butlers

Specialists in PPM and MTC ServicesMechanical, Process & Electrical Building Services Engineers

Design | Installation | Service | MaintenanceMEH Facilities Ltd

�is contract involves our oldest client (Bass Charrington) of some 38 years involving approximately 450 restaurants and pub outlets including Harvester restaurants and Toby Carvery over Greater London, the Home Counties, Su�olk, Norfolk and Sussex.

Our core contract is to provide PPM mechanical & electrical supporting services including heating, air conditioning, hot & cold water, commercial kitchen gas and ventilation.

�is service is provided throughout the year including Christmas & Boxing Days (which o�en prove a busy time) o�en requiring us to be on site within 2 hours. Our success in achieving these and other targets winning us a nomination for Contractor of �e Year award from throughout the UK.

“I have worked with MEH since they become an Approved contractor. �ey have retained their position as a leading contractor by their professional and dedicated service of Quality and Dependability ”.

Nigel Shrubsole – Surveyor

What we did Testimonial

• Client Mitchell’s & Butlers • Value £340,000 Per Annum

Oxo Tower

�e OXO Tower Wharf is an award-winning, landmark building situated on the riverside walkway at the heart of London's South Bank. �e OXO Tower Wharf is home to some of the UK’s most innovative and internationally renowned contemporary designers, restaurants, cafes, bars as well as exhibition and event venues, gallery@oxo and Bargehouse.

Over looking the riverside on OXO Tower Wharf ’s top �oor is the impressive OXO Tower Restaurant, Bar and Brasserie and a free public viewing gallery with breathtaking and iconic river views along the �ames to St Paul’s and the city. �e second to 7th �oors contain 78 residential apartments

MEH Facilities Ltd were the chosen mechanical contractor to undertake the works to the �ats and roof top restaurants extending mains from a basement plant room. �e project took 12 months to carry out and achieved programme and budget.

“I was the Main Contractors Mechanical Project Manager and happy to provide a testimonial of MEH Professionalism and their Quality of Work. �ey e�ciently worked with the Site Team to achieve a fast track result on this prestigious building and welcome the opportunity to work with them in the future ”.

Malcolm Goode - Main Contractors Mechanical Project Manager

What we did Testimonial

• Client Coin Street Developments• Value £200,000

Harvester Windsor Lad

�e project involved the replacement of two existing �oor standing boilers with two Wall Mounted Condensing Boilers and alterations to the pipework within the boiler room plus alterations to the controls. We carried out the installation of one boiler at a time in order to maintain service.

What we did

• Client Mitchells & Butlers• Value £16,000

We have carried out a number of reactive repairs and quoted works on behalf of Youngs Pubs, mainly in connection with Kitchen Extract Problems. Our working area includes London and surrounding areas.

What we do

• Client Youngs & Company• Value £100 to £16,000

Various Youngs & Co Brewery Properties

Page 19: MEH Facilities Ltd

Pubs & Restaurants Case Studies

Specialists in PPM and MTC ServicesMechanical, Process & Electrical Building Services Engineers

Design | Installation | Service | MaintenanceMEH Facilities Ltd

Hoop & Grapes - Aldgate

Located in the heart of the City of London you will �nd the Hoop and Grapes in Aldgate within a short stroll of Whitechapel, Aldgate Tube and Mansell Street. Closing the doors to their clients while the old R22 air conditioning systems were being replaced was not an option.

�e low e�ciencies and increased running costs of the ageing systems coupled with the ban of (virgin) R22 refrigerant for servicing were the deciding factors to carry out the replacement

To avoid disruption to both clients and sta�, MEH de-commissioned the redundant systems outside of working hours and installed four upgraded A/C heat pumps all in new locations. All electrical works associated with the project were carried out by us.

What we did

• Client Nicholson’s• Value £27,000

“I have worked with MEH on a number of di�cult Repair & Installation Projects and have always been very pleased with the response and quality of workmanship ”.

Mike Mulkerrin - Area Building Manager

Testimonial

Thames Court Hotel PH - Shepperton

�e project was to replace and upgrade the Heating and Hot Water Boiler within the managers accommodation and to replace the Heating & Hot Water Boiler within plant room which serves the Bar and Restaurant Areas of the premises.

�e pipework in the Plant Room serving the bar and Restaurant areas needed to be recon�gured to incorporate a low loss header and pumps to serve the various zones. �e existing �oor standing boiler was replaced with two wall mounted room sealed �ue, condensing boilers to improve the energy e�ciency of the system.

What we did

• Client Mitchells & Butlers• Value £12,000

�e Heating at the premises had always been a problem and MEH Facilities Ltd were able to accurately diagnose what was required to improve the operation of the Heating System whilst keeping within the budget we had for improvements as part of capital works.

Mandeep Uppal - Graduate Area Building Manager

Testimonial

The Clachan PH, Kingley Street, W1B 5Q

�e works involved the replacement of the Heating & Hot Water Boiler which served all areas of the premises. �e works were essential to make the system reliable yet it was not possible to have the works carried out during normal working hours due to the location of the boiler room and the fact that services needed to be maintained. We carried out the works a�er the pub closed over a series of evenings initially carrying out prefabrication of pipework and low loss header in preparation for the evening when we removed the existing boiler and installed the new boiler and connected to the existing parts of the system. By carrying out the works on an out of hours basis we were able to complete what was seemingly a very complex operation with no problems or loss of service.

What we did

• Client Nicholson’s• Value £8,200

“We held a meeting at the start of this project and discussed the options to get the works completed with the least amount of disruption. MEH suggested the works be undertaken out of hours which worked really well for the oultet ”.

Mike Mulkerrin - Area Building Manager

Testimonial

Page 20: MEH Facilities Ltd

Hotel Case Studies

Royal Chace Hotel

Specialists in PPM and MTC ServicesMechanical, Process & Electrical Building Services Engineers

Design | Installation | Service | MaintenanceMEH Facilities Ltd

MEH have bene��ed from a long standing relationship with Royal Chace Hotel.

We have carried out reactive maintenance and PPM visits. Project works have included the modi�cation in phases of 50 bathrooms replacing sanitary, water and electrical services, tiling and building fabrics �nishes.

“We have had a long standing relationship with MEH who continues to provide a reliable and e�cient service for both Reactive Maintenance and PPM visits. �e sta� are friendly and helpful and always aims to please ".

Brian Nicholas - Royal Chace Hotel En�eld Middlesex

What we did Testimonial

• Client Royal Chace Hotel• Value £15,000 per annum

Hapimag Hotel

�e Hapimag Hotel is a prestigious building located in the West End of London

We are retained by the client to carry out Planned Preventative Maintenance to Heating, Ventilation, Air Conditioning and Cold Water Booster Pumps together with Reactive Repairs and the provision of a 24/7 365 Day Emergency Service.

In addition to working to a PPM Schedule we have carried out quoted works to overcome inherent problems with the original installation, including the installation of a new Hot Water Service bu�er vessel together with pipework alterations & also the upgrading of the Cold Water Booster Set.

All works are carefully programmed to avoid disruption to facilities for the Hotels Guests.

What we did

• Client Hapimag Hotel London• Project Planned Preventative Maintenance & Reactive Repairs• Value £20,000 per annum

Page 21: MEH Facilities Ltd

Royal Chace Hotel

Hotel Case Studies

Specialists in PPM and MTC ServicesMechanical, Process & Electrical Building Services Engineers

Design | Installation | Service | MaintenanceMEH Facilities Ltd

Hapimag Hotel

West Lodge Park Hotel

�e project was to supply and install new Heating Boilers and Plate Heat Exchangers and Bu�er Vessel together with a new BMS / Controls System whilst maintaining services to the Hotel at all times. We worked closely with the client in arranging shut downs to enable changeovers to be carried out. �e works were coordinated to ensure that we would be able to reinstate services within allo�ed timescales. Since carrying out this project we have continued to carry out Planned Preventative Maintenance to the new plant and associated equipment.

What we did

• Client Beales Hotels• Value £89,000 per annum

Page 22: MEH Facilities Ltd

Council Case Studies

Harrow Leisure Centre

Specialists in PPM and MTC ServicesMechanical, Process & Electrical Building Services Engineers

Design | Installation | Service | MaintenanceMEH Facilities Ltd

A tricky task to remove existing 100mm heating circulation pumps and replacing with new dual sets including their isolation valves, electrical supplies and BMS connections.

�e centre operated 7 days a week and our only window was from 11.00 pm – 6.00 am. A major task was to insert new isolation valves onto 200mm Common mains so we could work away from the mains onto individual pump sets.

Working with our appointed freezer partner we had to monitor the rate of temperature decrease in these mains from 11.00 pm so they could calculate the freeze and actual operating time for us to weld the �anges and install the valves before returning the system back to operation before the 6.00 am start up.

Although complicated the work went as ‘sweet as a nut’ without any disruption to the centre which is one of the largest in Europe.

We have worked with MEH Facilities Ltd on a rage of projects which they have secured by competitive tender.

On each occasion we have found them to professionally and diligently undertake the required works some of which have been complex projects.

Mike Perschky – Project Manger

What we did Testimonial

• Client Margaret Rutkowska - Harrow Council • Consultants Ingleton Wood • Value £135,000

IngletonWood

Page 23: MEH Facilities Ltd

Council Case Studies

Waltham Forest Town Hall & Assembly Hall

Specialists in PPM and MTC ServicesMechanical, Process & Electrical Building Services Engineers

Design | Installation | Service | MaintenanceMEH Facilities Ltd

Town Hall Installation of specially modi�ed TRV’s together with a number of electric energy meter’s was installed.

Assembly Hall Run-around coil systems.

2no. large air/to water run-around coil systems were introduced to a modi�ed Duct work system to recuperate any residual heating e�ect from the extract air and then by means of pipe work put back into the main air stream.

�e system incorporated a twin pump, pressurisation system and dosing pot and balancing valves.

�e existing fan and motor drive belts were stripped out and new motors with inverter drives Installed.

What we did

• Client Waltham Forest • Consultants NPS • Value £112,000

Page 24: MEH Facilities Ltd
Page 25: MEH Facilities Ltd