MAHARASHTRA STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED , MALKAPUR WIP POSITION AS ON 30 SEPT 2009 IN MALKAPUR POINT NO A- 01 SR. BALANCE WIP CLEARANCE BALANCE ADDL FROM CLEARANCE BALANCE OF CLEARANCE BALANCE OF NO AS ON MADE FROM O.B. AS 01.04.09 ADDL ADDL AS ON MADE UP TO 30 SEPT .09 01.04.09 01.04.09 ON 30.09.09 AS ON 30-Sep-09 30 SEPT.09 30.SEPT.09 30 SEPT.09 30 SEPT.09 813.56 384.78 428.78 726.12 317.64 408.48 702.42 837.26 STATEMENT SHOWING THE WCR AS ON 30.09.09 SR. BALANCE WIP CLEARANCE BALANCE ADDL FROM CLEARANCE BALANCE OF CLEARANCE BALANCE OF NO AS ON MADE FROM O.B. AS 01.04.09 ADDL ADDL AS ON MADE UP TO 30 SEPT .09 01.04.09 01.04.09 ON 30.09.09 AS ON 30-Sep-09 30 SEPT.09 30.SEPT.09 30 SEPT.09 30 SEPT.09 NIL NIL NIL 259/702.42 259/702.42 NIL 259/702.42 NIL

Upload: vishdhurde3

Post on 16-Nov-2014

204 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Meeting Folder 21-11-2009

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED , MALKAPUR

WIP POSITION AS ON 30 SEPT 2009 IN MALKAPUR POINT NO A- 01

SR. BALANCE WIPCLEARANCE BALANCE ADDL FROMCLEARANCE BALANCE OF CLEARANCE BALANCE OFNO AS ON MADE FROMO.B. AS 01.04.09 ADDL ADDL AS ON MADE UP TO 30 SEPT .09

01.04.09 01.04.09 ON 30.09.09 AS ON 30-Sep-09 30 SEPT.0930.SEPT.0930 SEPT.09 30 SEPT.09

813.56 384.78 428.78 726.12 317.64 408.48 702.42 837.26

STATEMENT SHOWING THE WCR AS ON 30.09.09

SR. BALANCE WIPCLEARANCE BALANCE ADDL FROMCLEARANCE BALANCE OF CLEARANCE BALANCE OFNO AS ON MADE FROMO.B. AS 01.04.09 ADDL ADDL AS ON MADE UP TO 30 SEPT .09

01.04.09 01.04.09 ON 30.09.09 AS ON 30-Sep-09 30 SEPT.0930.SEPT.0930 SEPT.09 30 SEPT.09

NIL NIL NIL 259/702.42259/702.42 NIL 259/702.42 NIL

Page 2: Meeting Folder 21-11-2009

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED , MALKAPURPoint No A- 2

SR NAME OF NAME OF TOTAL NODTC NO ODTC NO'S BALANCE REASONNO DN S/DN DTC AS O INSTALLA WHICH EAEA NOT DONE

30.09.09 TO DTC A DONE ON OCT.0930.09.09

1 MALKAPU MALKAPU 509 148 148 3 PROBLAME OF THREE DTC2 MALKAPU MOTAL 465 24 24 NIL E.A. IS DISCUSS3 MALKAPU NANDURA 462 61 61 NIL WITH IT & TO BE SOLIVED BY IT4 MALKAPU JAL 523 67 67 NIL

TOTAL 1959 300 300 3

DTC METER INSTALLATION UP TO 30.09.09 --09 300 NOPER METER PRICE @ RS.22400

RS. 6720000185% 1243200

15% H.O 1194480INT 12% 1098921

TOTAL WCR 10256601 IN OCT .2009

Page 3: Meeting Folder 21-11-2009

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED , MALKAPUR

Review meeting on dt 16.11.2009 at 13.00 Hrs. sharp at Zone office Akola

POINT NO 03

PROGRESS OF "TD" OF GOVT. CONNECTIONS / OFFICE BUILDING , BILLING DIISPUT IN

RESPECT OF CONNECTIONS HAVING ARREARS MORE THAN ONE YEAR

Page 4: Meeting Folder 21-11-2009

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED , MALKAPUR

Review meeting on dt 16.11.2009 at 13.00 Hrs. sharp at Zone office Akola

POINT NO 4

COMPUTERISATION OF DCC BANK

NIL

Page 5: Meeting Folder 21-11-2009

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED , MALKAPUR

Review meeting on dt 16.11.2009 at 13.00 Hrs. sharp at Zone office Akola

OPERATION OF DIVISION MODULE FOR COLLECTION CENTRESPOINT NO 05

SUB DN B -60 GEN.

MLK YES

MTL YES

NDR YES

JAL YES

Page 6: Meeting Folder 21-11-2009

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED , MALKAPUR

Review meeting on dt 16.11.2009 at 13.00 Hrs. sharp at Zone office Akola

OPERATION OF DIVISION MODULE FOR COLLECTION CENTRES

Page 7: Meeting Folder 21-11-2009

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED , MALKAPUR

POINT NO 06

Review meeting on dt 16.11.2009 at 13.00 Hrs. sharp at Zone office Akola

ZERO S.D. INFORMATION UP TO 31.10.2009 AND DETALS OF BALANCE CONSUMER'S

Page 8: Meeting Folder 21-11-2009

Review meeting on dt 16.11.2009 at 13.00 Hrs. sharp at Zone office Akola

SUB DIVISION WISE ARREARS CAT WISE WITH CON'S AUG 2009 AND SEPT 2009 [ POINT NO 07 ]

SUB DN RES COMM IP RCI PWW AG [ JUNE .09] ST.LT ALL CAT .TOTALMONTH CON'S ARR CON'S ARR CON'S ARR CON'S ARR CON'S ARR CON'S ARR CON'S ARR CON'S ARR

AUG.09 MLK 10631 78.03 807 20.03 128 4 11566 102.06 65 71.48 5365 854.00 64 17.02 17060 1045.19MTL 5919 21.81 255 2.85 64 1.12 6238 25.81 112 108.63 8855 1677.00 120 18.27 15325 1829.91NDR 8698 34.70 466 7.14 89 1.98 9253 43.82 123 73.20 6808 1599.00 58 29.26 16242 1745.41JAL 11211 81.08 597 14.19 156 6.12 11964 101.39 103 55.31 9791 2444.00 104 11.19 21962 2611.54

TOTAL 36459 215.62 2125 44.21 437 13.22 39021 273.08 403 308.62 30819 6574.00 346 75.74 70589 7232.05

SEPT.09 MLK 10335 62.82 717 16.04 154 4.71 11206 83.57 65 72.91 5365 854.60 64 17.84 16700 1028.95MTL 7141 23.42 250 2.63 76 1.11 7467 27.16 111 110.60 8855 1677.00 120 19.38 16553 1834.34NDR 9043 35.65 389 5.08 88 1.45 9520 42.18 115 75.43 6808 1599.00 60 29.32 16503 1746.06JAL 10995 89.41 595 15.46 163 6.30 11753 111.17 107 57.06 9791 2444.00 107 12.15 21758 2624.06

TOTAL 37514 211.30 1951 39.21 481 13.57 39946 264.08 398 316.00 30819 6574.60 351 78.69 71514 7233.41

Page 9: Meeting Folder 21-11-2009

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED , MALKAPUR

POINT NO 08

Review meeting on dt 16.11.2009 at 13.00 Hrs. sharp at Zone office Akola

STATES OF NORMAL WORKING OF ST.LT. METERS . MAGNTIC / FAULIT / ZREO CONSUMPTION METERS TO BE

REPLACED .DIVISION WISE INFORMATION TO BE BROUGHT.

S/DN CON COMPLIANCEMLK 19 MTR REPLACED [ REDING PROB.]

MTL 6 MTR REPLACED [ REDING PROB.]

NDR 2 MTR REPLACED [ REDING PROB.]

JAL

Page 10: Meeting Folder 21-11-2009

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED , MALKAPUR

Review meeting on dt 16.11.2009 at 13.00 Hrs. sharp at Zone office AkolaPoint No. A-09

GOVT CONNECTION IN ARREARS

PWW ST.LTS/DN

MLK 72.91 17.84

MTL 110.60 19.38

NDR 75.43 29.32

JAL 57.06 12.15

316.00 78.69

Page 11: Meeting Folder 21-11-2009

Review meeting on dt 16.11.2009 at 13.00 Hrs. sharp at Zone office Akola

Page 12: Meeting Folder 21-11-2009

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED , MALKAPUR

Review meeting on dt 16.11.2009 at 13.00 Hrs. sharp at Zone office Akola

REVENUE BUDGET FOR 2009 - 2010 AND ESTEIMATE FOR 2010-11 POINT 10

PROSESS FOR WORK

Page 13: Meeting Folder 21-11-2009

Review meeting on dt 16.11.2009 at 13.00 Hrs. sharp at Zone office Akola

Page 14: Meeting Folder 21-11-2009

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED , MALKAPUR

Point No. A-11

Review meeting on dt 16.11.2009 at 13.00 Hrs. sharp at Zone office Akola

PROPER AGREEMENT WITH PRIVATE AGENCIES OF " A" ACCOUNT /DCC/BANK/CO-OP SOCIETIES

NIL

Page 15: Meeting Folder 21-11-2009

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED , MALKAPUR

Point No. A-12

Review meeting on dt 16.11.2009 at 13.00 Hrs. sharp at Zone office Akola

NO OF INFORMATION OF ACTION TAKEN AGAINST THE CONSUMERS WHO ARE NOT PAID THE BILL FROM " ONE YEAR "

NAME OF CATE NO OF CON ACTION TAKEN S/DN CL IP REPORT BILLING & DN PD GOVT CONN COMPLIENT COURT CASES REMARKS

NO. AMT NO AMT NO AMT NO AMT NO AMT

MLK CL 53 4.09 21 1.6112 CON ARE PD SUB THE DOUCMENT TO IT

IP 11 1.79 5 0.43 2 0.662 CON NOS OF COURT CASES

Page 16: Meeting Folder 21-11-2009

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED , MALKAPUR

Review meeting on dt 16.11.2009 at 13.00 Hrs. sharp at Zone office Akola

POINT NO 13

INDENTIFICATION AND VERFICATION OF CONSUMERS FOR IMPLEMENATION FOR IMPLEMENATION OF PROPER TRAIFF CATEGORY AS PER NEW

TRRFF INFORCE

YES

Page 17: Meeting Folder 21-11-2009

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED , MALKAPUR

Point No A-14

Review meeting on dt 16.11.2009 at 13.00 Hrs. sharp at Zone office Akola

IMPLEMENTATION OF JEEVAN SAJIVANI YOJANA .WIDE PUBLICITY GIVEN AND RESULTIESAND RESULTS ACHIEVED TO BE BROUUGHT

S/DN CON'S TOWN AMOUNT 50%MLK 1 SARPANCH GRAM. NIBHRI 0.7470

2 SARPANCH GRAM. DEVDABHAN 0.75660

MTL 1 SARPANCH GRAM.SHELGAGAON BAZAR 0.239452 SARPANCH GRAM.SHELGAGAON BAZAR 0.2510

NDR 1 0.352 0.353 1.77

JAL NIL

Page 18: Meeting Folder 21-11-2009

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED , MALKAPUR

Review meeting on dt 16.11.2009 at 13.00 Hrs. sharp at Zone office Akola

AND RESULTS ACHIEVED

Page 19: Meeting Folder 21-11-2009

Theft Detection DrivePoint No. : B-1

Date

No. Amt No. Amt No. Amt No. Amt No. Amt No. Amt No. Amt No. Amt

03.11.09 Malkapur 254 3 0.23 3 0.23 3 0.23 3 0.23 71 2.88 102 44 0.99

04.11.09 Malkapur 544 12 0.37 12 0.37 6 0.12 12 0.37 91 1.2 92 64 0.72

05.11.09 Malkapur 534 10 1.55 10 1.55 10 0.84 10 1.55 26 2.28 94 32 0.32

06.11.09 Malkapur 228 4 0.29 4 0.29 3 0.17 4 0.29 36 0.72 54 14 0.14

Total 1560 29 2.4 29 2.44 22 1.36 29 2.44 224 7.08 342 154 2.17

Name of

Division

No of

Installation

Check

Theft

bcase

detecte

d under

135

Amou

nt

Asses

ed

under

135

Amou

nt

Recov

ered

under

135

Compoundi

ng Asses

ed under 135

Compoundi

ng Recovered

under 135

FIR

Logge

d

Under

135

Cases

Recov

ered

under

126

No. of

Hooks

No.of

Meter

Taken

Out

No of

Emplo

yees

Plain

Asses

ment

Page 20: Meeting Folder 21-11-2009

Redressal of Consumer Complaints Point No. B- 2

rØkjnkjkps ukao rØkjhps Lo#i

1

2 … ….

3 …. ….

4

v-Ø-

eq[; vfHk;ark ;kapk lanHkZ Øekad vkf.k fnukad

eq[; vfHk;ark]

eq[; dk;kZy;@

ea=h egksn~; eqacbZ ;

kapk lanHkZ Øekad vkf.k

fnukad

vf/k{kd vfHk;ark ;kap

k lanHkZ Øekad vkf.k

fnukad

vgoky ikBfoY;kpk

lanHkZ Øekad vkf.k

fnukad

CE/AMZ/AKL/T/ 5533 Dt: 14-10-2009

ea=h mtkZ@tujy@ 337

fn- 2009 fn- 20-08-2009

SE/BLD/T/ 6854 Dt: 29-10-2009

Jh- dkSrhdjko jkolkgsc ns'keq[k jk- fuexkao rk- ukanqjk

'ksrkrhy foghjhojhy fo|qr rkj dk<qu ?ksrkauk >kysY;k fidkP;k uqdlkukph

HkjikbZ feG.ksdjhrk vkej.k miks"k.k

ckcr-

E.E./MLK/T/ 9208 Dt: 12-11-2009

SE/BLD/T/ 5020 Dt: 27-09-2007

Jh- lat; f'ko'kadj ikVhy eq-fp[kyh cq-

iks- ykatqM rk- [kkexkao ft-

vkRengu@vkRegR;k@tylek/kh fuosnukr ueqn ekx.kh i=kpk vgoky lknj dj.ks ckcr-E.E./MLK/T/ 9192 Dt: 12-11-2010

SE/BLD/T/ 5839 Dt: 15-09-2009

Jh- izdk'k xqykcjko ikVhy] cqyMk.kk-

vkOgk f'kokjkrhy 'ksrkrhy Qkegkmlpk

dusD'ku okij daiuhps

ufou ;kstusizek.ks xkoBk.k lsijs'kuP;k

E.E./MLK/T/ 9193 Dt: 12-11-2009

CE/AMZ/AKL/T/ 4515 Dt: 20-08-2009

CE/LM/ 24588 Dt: 23-07-2009

SE/BLD/T/ 5838 Dt: 15-09-2009

Jh- euksgj ikaMqjax [kkjksMs eq- dktsxkao iks-

#/kkuk

fo|qr okghuhe/khy vi?kkrxzLr

LFkGkaph nq#Lrh dj.;kckcr

E.E./MLK/T/ 9071 Dt: 09-11-2009

Page 21: Meeting Folder 21-11-2009

rØkjnkjkps ukao rØkjhps Lo#iv-Ø-

eq[; vfHk;ark ;kapk lanHkZ Øekad vkf.k fnukad

eq[; vfHk;ark]

eq[; dk;kZy;@

ea=h egksn~; eqacbZ ;

kapk lanHkZ Øekad vkf.k

fnukad

vf/k{kd vfHk;ark ;kap

k lanHkZ Øekad vkf.k

fnukad

vgoky ikBfoY;kpk

lanHkZ Øekad vkf.k

fnukad

5

6

7 … … …

8

9

10

11 …

CE/AMZ/AKL/T/ 5345 Dt: 03-10-2009

CE/LM/ 30077 Dt: 11-09-2009

SE/BLD/T/ 6841 Dt: 29-10-2009

Jh- lS- ekschu lS- egscqc] eydkiqj

Jh- cqMu[kk lksMsokys ;kaps Fkzh Qst dusD'ku

nqljhdMqu ?

E.E./MLK/T/ 9191 Dt: 12-11-2009

CE/AMZ/AKL/T/ 4193 Dt: 31-07-2009

CE/Dist/24262 Dt: 20-07-2009

SE/BLD/T/ 5752 Dt: 10-09-2009

Jh- vkj- ,u- ikVhy] dqM [kq-

d`f"k iaikyk fot iqjoBk feG.ks ckcr-

A.E./MLK/T/ 1122 Dt: 08-07-2009

Jh- izeksn ukjk;.k [ksaMxGs o brj jk-

fuexkao rk- ukanqjk

15 tkusokjh 2009 nSfud yksder e/khy

folaxrh Hkkjfu;eukckcr

E.E./MLK/T/ Camp/BLD / 01

Dt: 13-11-2009

CE/AMZ/AKL/T/ 660 Dt: 30-01-2009

CE/LM/ 8479 Dt: 20-10-2008

SE/BLD/T/Conf. 019 Dt: 04-01-2009

Jh- ,l- ih- baxGs o brj jk- ok?kqM oMksnk f'kokj

Jh- olarjko foB~By Vkys jk- oMksnk gs d`f"kiaiko#u jsYos

olkgrhyk ik.kh ns.ks

E.E./MLK/T/ 8977 Dt: 04-11-2009

MD/ 1915 & 1917 Dt: 04-05-2009

CE/LM/ 14121 Dt: 11-05-2009

SE/BLD/T/ 3142 Dt: 30-05-2009

Jh- #rqjkt 'kjn ikVhy jk- 'ksyxkao cktkj

cksvjosy yk fot iqjoBk feG.ksckcr-

E.E./MLK/T/ 5821 Dt: 19-09-2009

CE/AMZ/AKL/T/ 1676 Dt: 20-03-2009

CM/ 37721 Dt: 16-09-2008 EM/ 8234 Dt:

20-09-08 MD /3581 Dt: 15-10-08

SE/BLD/T/ 2343 Dt: 07-04-2009

lkS- vk'kk jes'k vghjs ] jk-

fMMksGk ] rk- eksrkGk

fMMksGk cq- rk- eksrkGk ft-

cqyMk.kk gs xkao xkoBk.k fQMj lsijs'ku

izdYikvarxZr ufou VªkUlQkWeZj

E.E./MLK/T/ 3791 Dt: 20-07-2009

CE/AMZ/AKL/T/ 4628 Dt: 26-08-2009

T.M SE/BLD/Dt: 21-08-2009

Jh- larks"k flrkjke rkanqGdj ] jk-

fuik.kk rk- eksrkGk

fuik.kk ;sFkhy deZfoj fHkdeflg

ikVhy fo|ky;kl voS/k fot iqjoB~;k ckcr-

E.E./MLK/T/ 5710 Dt: 14-09-2009

Page 22: Meeting Folder 21-11-2009

rØkjnkjkps ukao rØkjhps Lo#iv-Ø-

eq[; vfHk;ark ;kapk lanHkZ Øekad vkf.k fnukad

eq[; vfHk;ark]

eq[; dk;kZy;@

ea=h egksn~; eqacbZ ;

kapk lanHkZ Øekad vkf.k

fnukad

vf/k{kd vfHk;ark ;kap

k lanHkZ Øekad vkf.k

fnukad

vgoky ikBfoY;kpk

lanHkZ Øekad vkf.k

fnukad

12

13 … …

14 … …

15

16… ….

17…. ….

dk;Zdkjh vfHk;arke-jk-fo-fo-da-e;kZ-

eydkiqj

CE/AMZ/AKL/T/ 3154 Dt: 30-05-2009

dk-l-&3@ukx@v

ifjeaMG@rØkj @304 fn-

03-04-2009

SE/BLD/T/ 2454 Dt: 29-04-2009

Jh- vk- rq- olqydkj] jk- laxzkeiqj

ekpZ 2002 P;k T;k 'ksrdÚ;kauh foghjh

[kksnY;k R;kauk dksVs'ku Hk#u v|ki dusD'ku u feG.ks

E.E./MLK/T/ 5198 Dt: 17-08-2009

SE/BLD/T/ 5757 Dt: 10-09-2009

Jh- uVojyky iquepan rks"k.khoky ] jk-

eydkiqj

ehVj fjMhax u ?ksrk pqdhps fcy ns.;k

ckcr

E.E./MLK/T/ 8957 Dt: 03-11-2009

SE/BLD/T/ 4892 Dt: 05-08-2009

Jh- Jhjke cGhjke cksjls] jk- nso/kkck

d`f"k iaikyk fot dusD'ku u fnY;kl

miks"k.k

E.E./MLK/T/ 5820 Dt: 19-09-2009

HkkO;@,e&2vkj,l@ rØkjh@

5934 fn- 29-02-2009

,e-Mh-@453 fn-

06-02-2008

SE/BLD/T/ 1566 Dt: 29-03-2008

Jh- [ksepan gqanjkt panHkukuh ] jk-

ukanqjk

IykWV leksj fM-ih- u mHkkj.ks ckcr

E.E./MLK/T/ 1593 Dt: 09-04-2008

SE/BLD/T/ 5341 Dt: 26-08-2009

nSfud yksder e/khy fn- 17-08-2009 ph

ckreh

ckHkGh P;k >kMyk vWxy cka/kqu fot

iqjoBk

A.E./Jal J. /T/ 2044 Dt: 04-11-2009

SE/BLD/T/ 6057 Dt: 07-10-2009

nSfud yksder e/khy fn- 15-10-2009 ph ckreh

fo|qr rkj ykscdGY;keqGs vi?

kkrkl fuea=.k

A.E./Jal J. /T/ 2045 Dt: 04-11-2009

Page 23: Meeting Folder 21-11-2009

Action taken report of DTC whose E.A is not done since 6 month and

Point No. B- 03

S.N. Name of divisionno. of DTC's as per IT Data fed to IT No. of DTC whose EA not Data fedv to IT Remarkwhose EA not done (out of col 3) done since one year (out of col.5)

since 6 month1 2 3 4 5 6 7

Malkapur 4288186 Data fed to IT 4288186 Data fed to IT all data is fed to IT But, EA

4288559 Data fed to IT 4288559 Data fed to IT is not generated due to IT

4288392 Data fed to IT Problem, which is discuss with

S.A.

Page 24: Meeting Folder 21-11-2009
Page 25: Meeting Folder 21-11-2009

100 % Energy Audit

Point No. B-04

Sr.No. Name of Div Name of S/DnTotal No of DTC DTC No of Meter installed DTC Nos for which E.A Balance DTC Reasonas on 30.09.09 to DTC as on 30.09.09 done on OCT -09 E.A.Not done

1 Malkapur Malkapur 509 148 145 3Problem of three DTC E.A. is discuss with IT & to be solved by IT

2 Malkapur Motala 465 24 24 Nil

3 Malkapur Nandura 462 61 61 Nil

4 Malkapur Jalgaon 523 67 67 Nil

Total 1959 300 297 3

100 % Energy audit is done in m/o Sep -09 but,Out of 300 Nos DTC , 297 Nos. DTC E.A. is Generated. 3 Nos DTC E.A. is not Generated by IT due Due to IT Problem

Executive EngineerM.S.E.D.Co.Ltd Malkapur

Page 26: Meeting Folder 21-11-2009

ACTION TAKEN REPORT ON -VE LOSS DTC AND FAULTY DTC METER

Point No. :- 05

S.N DTC Code Name Of S/Dn Month Obsertvation Action Taken

1 4288030 Malkapur Aug-09 Faulty Meter Meter Replaced in Month of Nov-09

2 4288031 Malkapur Aug-09 Faulty Meter Meter Replaced in Month of Nov-09

3 4288033 Malkapur Aug-09 Faulty Meter Meter Replaced in Month of Nov-09

4 4288034 Malkapur Aug-09 Faulty Meter To be replaced up to 30-11-2009

5 4288042 Malkapur Aug-09 Faulty Meter Meter Replaced in Month of Nov-09

6 4288044 Malkapur Aug-09 Faulty Meter To be replaced up to 30-11-2009

7 4288047 Malkapur Aug-09 Faulty Meter Meter Replaced in Month of Nov-09

8 4288057 Malkapur Aug-09 Faulty Meter Meter Replaced in Month of Nov-09

9 4288058 Malkapur Aug-09 Faulty Meter Meter Replaced in Month of Nov-09

10 4288188 Malkapur Aug-09 Faulty Meter Meter Replaced in Month of Nov-09

11 4288193 Malkapur Aug-09 Faulty Meter To be replaced up to 30-11-2009

12 4288226 Malkapur Aug-09 Faulty Meter Meter Replaced in Month of Nov-09

13 4288231 Malkapur Aug-09 Faulty Meter To be replaced up to 30-11-2009

14 4288324 Malkapur Aug-09 Faulty Meter Meter Replaced in Month of Nov-09

15 4288343 Malkapur Aug-09 Faulty Meter Meter Replaced in Month of Nov-09

16 4288349 Malkapur Aug-09 Faulty Meter Meter Replaced in Month of Nov-09

17 4288353 Malkapur Aug-09 Faulty Meter To be replaced up to 30-11-2009

18 4288358 Malkapur Aug-09 Faulty Meter Meter Replaced in Month of Nov-09

19 4288368 Malkapur Aug-09 Faulty Meter To be replaced up to 30-11-2009

20 4288369 Malkapur Aug-09 Faulty Meter Meter Replaced in Month of Nov-09

21 4288370 Malkapur Aug-09 Faulty Meter To be replaced up to 30-11-2009

22 4288381 Malkapur Aug-09 Faulty Meter Meter Replaced in Month of Nov-09

23 4288384 Malkapur Aug-09 Faulty Meter Meter Replaced in Month of Nov-09

24 4288393 Malkapur Aug-09 Faulty Meter To be replaced up to 30-11-2009

25 4288406 Malkapur Aug-09 Faulty Meter Meter Replaced in Month of Nov-09

26 4288416 Malkapur Aug-09 Faulty Meter Meter Replaced in Month of Nov-09

27 4288556 Malkapur Aug-09 Faulty Meter To be replaced up to 30-11-2009

28 4288557 Malkapur Aug-09 Faulty Meter Meter Replaced in Month of Nov-09

29 4288608 Malkapur Aug-09 Faulty Meter To be replaced up to 30-11-2009

1 4289030 Motala Aug-09 Exist AG HPT Connection on DTC

Meter installation to HPT conn is in progress2 4289139 Motala Aug-09 Due to water potential water lifting is 3 4289204 Motala Aug-09 not in progress,but due to HPT cons.4 4289205 Motala Aug-09 is recorded5 4289208 Motala Aug-09 Hence -ve6 4289074 Motala Aug-09 Consumer shiofted on gaonthan feeder Consumer Indexing is to done up to 30.11.097 4289079 Motala Aug-09 Consumer shiofted on gaonthan feeder Consumer Indexing is to done up to 30.11.108 4289097 Motala Aug-09 Consumer shiofted on gaonthan feeder Consumer Indexing is to done up to 30.11.119 4289220 Motala Aug-09 Faulty Meter Meter Replaced on 26.08.09

1 4292014 Nandura Aug-09 Faulty Meter Meter Replacedm and feed to IT2 4292424 Nandura Sep-09 Faulty Meter Meter Replacedm and feed to IT

1 4293008 Jalgaon Aug-09 C.T. Burned CT Replacement WIP Complited Up to 30.11.092 4293009 Jalgaon Aug-09 C.T. Burned CT Replacement WIP Complited Up to 30.11.093 4293011 Jalgaon Aug-09 Faulty Meter Meter replacement WIP Complite up to 30.11.094 4293015 Jalgaon Aug-09 Faulty Meter Meter replacement WIP Complite up to 30.11.095 4293017 Jalgaon Aug-09 C.T. Burned CT Replacement WIP Complited Up to 30.11.096 4293023 Jalgaon Aug-09 Faulty Meter Meter replacement WIP Complite up to 30.11.097 4293049 Jalgaon Aug-09 C.T. Burned CT Replacement WIP Complited Up to 30.11.098 4293050 Jalgaon Aug-09 C.T. Burned CT Replacement WIP Complited Up to 30.11.099 4293052 Jalgaon Aug-09 Faulty Meter Meter replacement WIP Complite up to 30.11.0910 4293053 Jalgaon Aug-09 C.T. Burned CT Replacement WIP Complited Up to 30.11.0911 4293056 Jalgaon Aug-09 C.T. Burned CT Replacement WIP Complited Up to 30.11.0912 4293057 Jalgaon Aug-09 Faulty Meter Meter replacement WIP Complite up to 30.11.0913 4293058 Jalgaon Aug-09 Faulty Meter Meter replacement WIP Complite up to 30.11.0914 4293061 Jalgaon Aug-09 Faulty Meter Meter replacement WIP Complite up to 30.11.0915 4293107 Jalgaon Aug-09 C.T. Burned CT Replacement WIP Complited Up to 30.11.09

Page 27: Meeting Folder 21-11-2009

S.N DTC Code Name Of S/Dn Month Obsertvation Action Taken16 4293112 Jalgaon Aug-09 C.T. Burned CT Replacement WIP Complited Up to 30.11.0917 4293180 Jalgaon Aug-09 Faulty Meter Meter replacement WIP Complite up to 30.11.09

Page 28: Meeting Folder 21-11-2009

S.N DTC Code Name Of S/Dn Month Obsertvation Action Taken18 4293181 Jalgaon Aug-09 C.T. Burned CT Replacement WIP Complited Up to 30.11.0919 4293221 Jalgaon Aug-09 C.T. Burned CT Replacement WIP Complited Up to 30.11.0920 4293226 Jalgaon Aug-09 C.T. Burned CT Replacement WIP Complited Up to 30.11.0921 4293245 Jalgaon Aug-09 C.T. Burned CT Replacement WIP Complited Up to 30.11.0922 4293246 Jalgaon Aug-09 C.T. Burned CT Replacement WIP Complited Up to 30.11.0923 4293258 Jalgaon Aug-09 Faulty Meter Meter replacement WIP Complite up to 30.11.0924 4293275 Jalgaon Aug-09 Faulty Meter CT Replacement WIP Complited Up to 30.11.0925 4293276 Jalgaon Aug-09 C.T. Burned Meter replacement WIP Complite up to 30.11.0926 4293282 Jalgaon Aug-09 C.T. Burned CT Replacement WIP Complited Up to 30.11.0927 4293369 Jalgaon Aug-09 Faulty Meter Meter replacement WIP Complite up to 30.11.0928 4293372 Jalgaon Aug-09 C.T. Burned CT Replacement WIP Complited Up to 30.11.0929 4293386 Jalgaon Aug-09 Faulty Meter Meter replacement WIP Complite up to 30.11.0930 4293387 Jalgaon Aug-09 Faulty Meter Meter replacement WIP Complite up to 30.11.0931 4293408 Jalgaon Aug-09 Faulty Meter Meter replacement WIP Complite up to 30.11.0932 4293292 Jalgaon Sep-09

DTC Under Sangrampur S/Dn DTC Under Sangrampur S/Dn33 4293294 Jalgaon Oct-0934 4293295 Jalgaon Nov-0935 4293301 Jalgaon Dec-0936 4293300 Jalgaon Jan-10

Page 29: Meeting Folder 21-11-2009

Sub : Status of Pending Applications of 20 Kw. Point No. B-06

Name of Estimate Dt of A-1 Load LT HT T/F. Remark

1 Malkapur 6/16/2009 6/19/2009 7/16/2009 10/8/2009 100 HP 30 RMT 0.12 100 KVA

2 Motala 7/31/2009 7/30/2009 7/31/2009 11/7/2009 45 HP 0.04 0.5 63 KVA

3 Malkapur 9/14/2009 9/14/2009 9/25/2009 11/10/2009 40 HP 0 0.3 63 KVA 11/10/2009

4 Malkapur 11/12/2009 11/11/2009 11/12/2009 … 67 HP 0 0 0

5 Malkapur 11/12/2009 11/11/2009 11/12/2009 … 67 HP 0 0 0

H. T. Consumer

Name of Estimate Load LT HT T/F. Remark

1 11/11/2009 11/12/2009 187 KW .. … .. … … … …

Sr. No.

Sub-Division

Processing Fee Paid on Dt.

Forwarded to S/Dn.on Date

Estimate Received from S/Dn. Date

Send to Circle on Dt:

Sanction by S.E.

Sanction by E.E.

Date of Connection

Estimate for providing 3 Ph LT 100 HP Connection in R/o. Principal Gov. ITI , At Bahapura Tq. Malkapur

Concent of CC & RF not Received

Estimate for P.S. to 01 no of 3 Ph 45 HP IP Connection in r/o. Raeeskhan Rashidkhan Jamadar at Motala Tq. Motala

NOC of Colector is not attached.

Estimate for 40 HP IP Connection in r/o. Mayur Plastic Industry at Plot No. D-52 MIDC Dasarkhed

Quotation Issued

Estimate for 67 HP Industrial Connection in r/o. Shri. Ganesh Paper Product Plot No. B-20 MIDC Dasarkhed Tq. Malkapur

Estimate not received from S/Dn.

Estimate for 67 HP Industrial Connection in r/o. Shri. Ganesh Paper Product Plot No. B-20 MIDC Dasarkhed Tq. Malkapur

Estimate not received from S/Dn.

Sr. No.

A- I Received From S.E.

A- I Forworded to S/Dn.

Send to Circle on Dt:

Sanction by S.E.

Date of Connection

Application for New H.T. Connection at MIDC Malkapur Tq. Malkapur

Page 30: Meeting Folder 21-11-2009

Sub : Energy Accounting of Station T/F. at 33 KV S/Stn.B-07

Sr. No. Name of S/Stn. DTC Meter Instaled E.A. Done

1 33 KV Malkapur APDRP Meter Not installed No

2 33 KV Datala Meter Not installed No

3 33 KV Dasarkhed Meter Not installed No

4 33 KV Motala Meter Not installed No

5 33 KV Sawargaon Meter Not installed No

6 33 KV Kinhola Meter Not installed No

7 33 KV Nandura Meter Not installed No

8 33 KV Naigaon Meter Not installed No

9 33 KV Chandur Biswa Meter Not installed No

10 33 KV Sujatpur Meter Not installed No

11 33 KV Fuli Meter Not installed No

12 33 KV Jalgaon Meter Not installed No

13 33 KV P. Kale Meter Not installed No

14 33 KV Jamod Meter Not installed No

15 33 KV Madakhed Meter Not installed No

16 132 KV Malkapur Meter Not installed No

Page 31: Meeting Folder 21-11-2009

Sub : Energy Accounting of Station T/F. at 33 KV S/Stn.

Page 32: Meeting Folder 21-11-2009

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.DIVISION OFFICE MALKAPUR

Point No. B-08Sub : Sub-Division wise 1 Ph Meter issued from 21-03-2009 to 19-11-2009

Sr. No. Name of S/Dn.

1 Malkapur 1969 2602 Nandura 1902 03 Motala 1804 1004 Jalgaon J. 1760 200

Division Total 7435 560

1 Phase Meter issued

3Ph Meter issued

Page 33: Meeting Folder 21-11-2009

Sub : Sub-Division wise 1 Ph Meter issued from 21-03-2009 to 19-11-2009

Page 34: Meeting Folder 21-11-2009

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.DIVISION OFFICE MALKAPUR

Point No. B- 08Sub : Information of 1Ph Meter received & Utilisation

Utilisation

RemarkN.S.C. Replacement

1 975 0 0

2 Apr-09 0 334 03 May-09 0 327 374 Jun-09 1000 298 6905 Jul-09 0 248 2486 Aug-09 1000 359 1717 Sep-09 2000 542 2108 Oct-09 1217 269 18959 Nov-09 1430 0 882 MMPS . 1-11-2009 to 18-11-09

10 Total 7622 2377 4133

Executive EngineerM.S.E.D.C.L.

Malkapur

Sr. No.

Opening Balance

Meter received in Month

1 Ph Meter

Received

Last Year Balance

Page 35: Meeting Folder 21-11-2009

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.DIVISION OFFICE MALKAPUR

B- 10Sub : Failure of DTC for Year 2009-2010 upto Oct-2009

Sr. No. Sub-Division Fail DTC % Fail

1 Malkapur 458 58 12.66 4.97

2 Nandura 461 42 9.11 5.41

3 Motala 478 28 5.85 8.81

4 Jalgaon J. 390 37 9.48 7.58

Division Total 1787 165 9.23 6.65

Executive EngineerM.S.E.D.C.L.

Malkapur

Total DTC

Last Year Up to Oct-

09

Page 36: Meeting Folder 21-11-2009

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.DIVISION OFFICE MALKAPUR

Page 37: Meeting Folder 21-11-2009

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.DIVISION OFFICE MALKAPUR

B-10Sub : Action Plan for reduction Technical and commercial losses for year 2009-10

Sr. No.

1 Malkapur 3322 450 1094 332 90 1850 3294 2 20 531 288

2 Nandura 6500 2108 10404 275 52 375 1633 4.5 14 785 363

3 Motala 7000 2703 9308 285 48 729 758 3.5 30 831 375

4 Jalgaon J. 4500 2935 3420 278 165 1154 1722 5.5 18 1895 371

5 Division 21322 8196 24226 1170 355 4108 7407 15.5 82 4042 1397

Name of S/Dn.

Meter to be taken outside

Zero Consuption consumer to be checked

1 to 30 Consumption consumer to be checked

Theft cases to be deducted 135+126

New DTC For Maint HT/LT ratio

Ag. Pump meter to be replaced

HPT to meter

Laying of AB Cable in Km.

NSC to be released for Hook

Faulty meters to be replaced

3 Ph DTC Metering to be done

Page 38: Meeting Folder 21-11-2009

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.DIVISION OFFICE MALKAPUR

25

18

10

34

87

HT Conductor replacement in Km.

Page 39: Meeting Folder 21-11-2009

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.DIVISION OFFICE MALKAPUR

Sub : Energy Accounting/Comparative

Sr. No. % Loss HT/LT % Loss LT

2007-08 2008-09 % rise/Fall 2007-08 2008-09

1 Malkapur 15.26 13.51 -1.75 30.16 28.52

2 Nandura 30.56 36.92 6.36 31.37 37.91

3 Motala 17.34 27.26 9.92 17.36 27.45

4 Jalgaon J. 46.41 31.89 -14.52 48.82 33.41

5 Division 24.87 23.47 -1.4 33.12 32.16

Executive Engineer

Name of Sub-Division

Page 40: Meeting Folder 21-11-2009

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.DIVISION OFFICE MALKAPUR

B- 10

% Loss LT

% rise/Fall

-1.64

6.54

10.09

-15.41

-0.96

Executive EngineerM.S.E.D.C.L.

Malkapur

Page 41: Meeting Folder 21-11-2009

Progress of Feeders selecd for GFSS III Point No. B-11

Agency

Provision Survey Work Done

RemarkLT HT TF. LT HT TF. LT HT TF.

KM Km No. KM Km No. KM Km No.1 7

1 Nimgaon ^ Suyog Elct. Khamgaon 1.2 4.9 5 0.52 Karmoda ^ Suyog Elct. Khamgaon 0.5 0 0 0.53 Asalgaon ^ Suyog Elct. Khamgaon 0.5 2.5 3 Nil Nil Nil4 P'Kale ^ Suyog Elct. Khamgaon 0.6 6.5 6 Nil Nil Nil5 Adol ^ Suyog Elct. Khamgaon 0.3 1 2 Nil Nil Nil6 Deodhaba ^ Suyog Elct. Khamgaon 1 7 4 Nil Nil Nil7 Rantham ^ Suyog Elct. Khamgaon 0.06 2 1 Nil Nil Nil8 Narvel ^ Suyog Elct. Khamgaon 0.06 1 1 Nil Nil Nil9 W.Bakal ^ Suyog Elct. Khamgaon 0.36 1.9 2 Nil Nil Nil

10 Makodi ^ Om NamoShivay Elect. Akola 1.02 8.8 811 Tarapur ^ Om NamoShivay Elect. Akola 0.36 2.5 5 0.36 2.5 512 Nalganga ^ Om NamoShivay Elect. Akola 0.36 6.5 5 0.36 6.5 513 Fuli ^ Global Nandura 0.78 5.9 514 Shemba ^ Global Nandura 0.24 0.8 2 0.24 0.5 115 Wadner ^ Global Nandura 2.62 16.5 616 Chandur ^ Global Nandura 0.12 1 117 Naigaon ^ Global Nandura 0.12 0.6 118 Kolasar ^ Global Nandura 0.12 2 119 Dh.Badhe ^ Boche, Akola 0.42 8 7 0.42 3 3 0.24 1.5 220 Panhera ^ Boche, Akola 0.42 5 6 … … …21 Nipana ^ Boche, Akola 0.5 4 4 … … …22 P'Devi ^ Boche, Akola 0.5 5 5 … … ….23 Motala Town ^ D.K. Elect.Motala 2.34 15.5 20 1 5 5 40 Pole erected

Total 14.5 108.9 100

* 9 Mtr RSJ & PSC Pole Not ReceivedSuyog Elct. Khamgaon : 9422184825 Boche, Akola : 9922702099

Om NamoShivay Elect. Akola : 9922453727 D.K. Elect.Motala : 9881754137 Executive Engineer

SR.NO

.

NAME OF THE 11 KV FEEDER

Original Feeder Not complited

Page 42: Meeting Folder 21-11-2009

Global Nandura : 9423146993 M.S.E.D.C.L.Malkapur

Page 43: Meeting Folder 21-11-2009

Handing over of paid pending cases of RGGVY to contractor with respect to target up to Date 20.11.09

Point No. : B-12

Name of S/Dn A-1 Received Paid Connected Balance conn.

1 Malkapur 2570 1580 1580 1580 1561 549 10122 Motala 6926 3606 3357 3334 3322 424 28983 Nandura 8259 3087 3087 2780 2780 1530 12504 Jalgaon 1818 1127 1123 1007 954 111 843

Total Division 19573 9400 9147 8701 8617 2614 6003Freezing Parameters

Name of S/DnAs per Tender As per servey

Transformer Transformer HT LT 3 Ph LT 1 Ph Transformer Transformer HT LT 3 Ph LT 1 Ph25 KVA 3 Ph 25 Kva 1 Ph 25 KVA 3 Ph 25 Kva 1 Ph

1 Malkapur 20 0 10 4.16 14.15 20 0 9.18 3.86 21.072 Motala 17 2 9.5 1 109.49 14 2 8.2 3.3 60.93 Nandura 15 0 7.5 1.44 36.34 15 0 8.43 1.44 41.114 Jalgaon 12 0 6 0.81 68.63 12 0 6.46 0.81 69.295 Sangrampur 0 2 1 0.4 16.03 0 2 0.7 0.4 15.44

Total 64 4 34 7.81 244.64 61 4 32.97 9.81 207.81

Sr.No

A-1 Distributed

F.Q.Issued

List handed

ove to Agency

Sr.No

Page 44: Meeting Folder 21-11-2009

Point No - B-13

Information of Mahajal Yojna. As on 19.11.09Sr. No. Village Taluka Load HT DTC LT A- 1 San. FQ Paid T.R. Connected Remarks

1 Kothali Paldhag Motala 5 3 63*1 0.3 07.07.08 19.01.09 19.01.09 ARR NON DDF2 Chavarda Dhonkhed Motala 5 0.4 1 0.06 15.07.08 4.12.08 09.02.08 31.3.09 CC&RF3 Lapali Motala 5 0 0 0 02.09.08 06.01.09 6.01.09 13.5.09 4.6.09 4.7.09 Connected4 Bamanda Motala 5 1 63*1 0.06 28.07.08 8.6.09 pie 8.6.09 30.6.09 8.7.09 Supply in Jalna District5 Dhamgangaon BadheMotala 10 0 0 0.3 21.10.08 17.4.09 17.4.09 29.4.09 16.5.09 PIE6 Khedi Motala 5 0.24 63*1 0.06 01.08.08 5.3.09 pie 6.4.09 PIE7 Waruli ( Parda) Motala 5 0 0 0.12 30.09.08 05.01.09 05.01.09 28-02-09 28.3.09 arr Non DDF dd & RF8 Gulbheli Motala 5 0 0 17.11.08 9.4.09 9.4.099 Bhortek (SGP ChichpMotala 5 0 0 0.06 22.12.08 5.3.09 5.3.09 21.5.09 CC &RF

10 Punhai Motala 5 0 0 0.12 27.08.08 1.4.09 6.4.09 8.5.09 CC &RF11 P. Gawali Motala 7.5 0 0 0.06 30.09.08 Water lifting permission not received12 Nipana Motala 7.5 0 0 0.12 01.01.09 29.4.09 30.4.09 6.5.0913 Pofali (Wadi ) Motala 7.5 0.23 63*1 0.06 19.01.09 17.4.09 30.4.09 13.5.0914 Urha Motala 5 0 0 0.12 24.01.09 29.4.0915 Ridhora Wadi Motala 5

0.8 63*1 0.0623.1.09 22.4.09 22.4.09 28.5.09 6.6.09

16 Wadi Ridhora Motala 5 23.1.09 22.4.09 22.4.09 28.5.09 6.6.0917 Mohegaon Motala 5 0 0 0 9.2.09 20.5.09 20.5.09 27.5.09 6.6.09 28.7.09 Connected18 Sastramuli Motala 0 0 0.24 9.2.09 07.08.09 Not Paid19 Ubalkhed Motala 0 0 0.24 24.1.09 07.08.09 Not Paid20 Thad (Rohinkhed SGMotala 5 0 0 0.06 13.1.09 20.5.09 20.5.09 27.5.09 6.6.09 CC &RF21 Malegaon Motala 0 0 0 13.1.09 7/12 Not Submitted22 P. Nath Motala 5 0 0 0.06 25.2.09 1.4.09 1.4.09 27.7.09 7.8.09 cc & RF23 C. Nath Motala 5 0 0 0 12.12.08 30.3.09 20.4.09 29.4.09 7.5.09 15.06.09 Connected

1 Narwel Malkapur Not .. A- 1 Not2 P. Khuta Bk.(Ndr) Malkapur Not .. A- 1 Not

1 Potali Nandura 5 0 0 0 21.06.08 17.01.09 17.01.09 3.2.2009 21.3.09 25.3.09 Connected2 Tarwadi Nandura 5 11.04.08 12.6.09 27.7.09 21.8.09 21.8.09 PIE3 Kandari Nandura 5 0.8 63*1 0.24 22.01.09 12.6.09 28.7.09 21.8.09 21.8.094 Shemba Kd. Nandura 5 05.04.08 13.10.08 13.10.08 15.12.08 18.12.08 20.3.09 Connected5 Takarkhed Nandura 7.5 0 31.01.09 30-03-09 30.3.09 30.4.09 12.5.09 20.5.09 Connected

1 Dadulgaon Jalgaon 5 0 0 0.24 11.12.08 5.3.09 16.3.09 08.04.09 T.R. Not Received2 Mahuli Jalgaon 3 22.4.093 P. Kale Jalgaon 30 0.24 6.5.09 Sent To Circle For San4 Umapur Jalgaon 5 0.06 13.5.09 7/12 not Attached G.No. Not given

Taluka Paid T.R. Connected

Motala 23 23 21 19 15 10 3Malkapur 2 0 0 0 0 0 0Nandura 5 5 5 5 5 5 3

Sr. No.

Total Cases

Total A- 1

Received

Sanction

Fq. Issue

d

Page 45: Meeting Folder 21-11-2009

Jalgaon 5 4 1 1 1 0 0Total 35 32 27 25 21 15 6

Page 46: Meeting Folder 21-11-2009

INFORMATION OF PENDING PUBLIC WATER WORKS As on 19.11.09

Point No. : B-13

Sr No Name of applicant Village AgencyDate of work invalved REMARKS

A-I San F.Q. issue Payment T.R. LT HT T/F

Taluka Malkapur1 SGP Maiswadi ZP. 31.8.06 15.5.07 15.5.07 3 0 0 0 Not Paid2 SGP Datala ZP 11.11.08 29.1.09 5.3.09 20 0 0.9 63*1 Not Paid3 SGP Shiradhon Shridhan zp 12.3.09 12.5.09 12.5.09 18.5.09 6.7.09 7.5 0 0 0 Connected 18.11.094 SGP Tandulwadi Tandulwadi zp Jun.09 55 SGP Bhadgani Bhadgani ZP 17.11.08 9.1.09 9.1.09 9.1.09 7.5 0.06 0.12 63*1 Non DDF CC& RF

Taluka Motala1 S.G.P.Taroda Taroda ZP. 15.6.06 5 0.06 Return to S/Dn For Quiry2 SGP Sarolapir Wadgaon zp 30.3.09 17.4.09 30.4.09 5 0.12 0 0 Not paid 3 SGP Rajur Murti ZP 18.12.08 07.08.09 20.8.09 7.5 Under process4 SGP Takali (Ghadekar) zp 15.5.09 24.07.09 Paid 55 Antri Antri zp 8.7.09 5 0.18 0.5 63*1 Document Incomplite6 Gotmara (sgp HanwatkhGotmara zp 8.7.09 5

Taluka Buldana1 SGP Borkheda Tarapur ZP 1.3.07 5 0.06 1 63*1 Sent for san 2 SGP Borkheda Borkheda ZP 14.6.06 22.7.07 22.7.07 5 0.06 not paid

Taluka Nandura

1 SGP Rasulpur zp 28.3.06 28.5.06 28.5.06 3 0.06 not paid

2 Dy Eng midc Chikhali midc 4.4.06 15.5.06 15.5.06 5 0.00 0 63 not paid3 SGP Dhanora bk Wadgaon ww 28.2.04 2.4.04 2.4.04 27.4.05 3 CON 0.06 L.R. TR can4 SGP Narkhed Rd Nimgaon zp 16.10.08 27.10.08 27.10.08 5 0.06 not paid5 COMC NDR Shiv Ngr 24.8.06 29.3.07 29.3.07 30.3.0.7 3 0.2 con No T.R6 CEO NDR Amboda Naka mc 8.4.07 15.6.07 15.6.07 .. .. 5 0.12 Not Paid

7 S.G.P. Jawala Bz. 20-03-09 7.8.09 13.8.09 21.8.09 21.8.09 5 0.12 WIP

8 SGP Malegaon Gond Malegaon Gond Zp 20-03-2009 7.5 Under process9 Pota (SGP Tarwadi) Kandari dam ZP 29.5.09 12.06.09 5

10 Matoda (SGP Matoda) Kandari dam ZP 3.6.09 17.6.09 17.6.09 24.6.09 25.6.09 7.5 0.00 0 0 WIPTaluka Jalgaon

1 SGP P.Kale G. No 22 Pimpalgaon Kale ZP 9.6.09 15 Under process2 SGP P. Kale G. No 28 Pimpalgaon Kale ZP 9.6.09 15 Under process3 MJP (For Jalgaon) Gorala Dam MJP 9.6.09 11.09.09 5 0.06 Not Paid4 SGP Tiwadi Tiwadi zp 15.6.09 11.09.09 5 Not Paid

Taluka San. Paid TR LR Conn

Malkapur 5 4 2 1 0 1

Motala 6 4 1 0 0

Buldhana 2 1 0 0 0

Nandura 10 9 4 2 1

Jalgaon 4 0 0 0 0

Total 27 18 7 3 1

Load HP

Rasulpur (Helgenagar) )

Jawla Bz. ( Kandari Dam.)

A-1 Rec.

Page 47: Meeting Folder 21-11-2009

Information of Jalswaraj Prakalp As on 19.11.09

Point No. B-13

Name of G.P. load Name of Village Block Date of Provision Remarks

FQ Paid T.R. LT HT DTC

1 Wadi Wadi Nandura 07.11.05 30.01.06 30.01.06 02.02.06 Yes 26.10.0

2 Awadh Bk. Awadh Bk Nandura 16.05.08 26-03-09 31.3.09 13.7.09 17.7.09 0.75 0 0 CC&RF Work Not Complited by Applicant

3 Awadh Kd. Nandura 16.05.08 Yes Yes Shifting Estimate

4 Narayanpur Nandura 16.05.08 Yes Yes Shifting Estimate

5 Patonda Patonda Nandura 08.08.05 Yes Yes Yes Yes 30.11.05

6 Kodarkhed Nandura A-1 Not

1 Kholkhed Kholkhed Khamgaon 30.06.07 Yes 30.06.08 Yes Yes 21.7.08

2 Dondwada Khamgaon 13.12.06 Yes 22.05.07 Yes Yes 16.6.07

1 Palskhed 5 Palaskhed Jalgaon J. 08.11.06 19.09.06 19.06.06 08.11.06 31.01.07 0.06 0 0 30.06.07

2 Borada Bk. 10 Borada Bk. Jalgaon J. 07.05.05 17.06.06 Yes 27.06.06 10.07.06 0.45 0 0 05.06.07

3 Zadegaon 7.5 Zadegaon Jalgaon J. 20.11.06 22.02.07 22.02.07 25.02.07 12.03.07 0.3 0 0 31.03.08

4 Mdakhed Bk 5 Madakhed Bk Jalgaon J. 24.02.06 13.03.06 Yes 27.03.06 Yes 0.18 0 0 30.09.06

5 Madakhed 5 Madakhed Kd Jalgaon J. 3.9.07 ccrf 17.04.09 28.3.09 5.5.09 Yes 0.1 0 0 20.09.09

6 Sungaon 10 Chalthana Jalgaon J. 26.06.06 04.12.06 Yes 06.12.06 18.12.06 0.36 0 0 30.04.07

7 Kaupata Jalgaon J. A-1 not

8 5 Usra Bk.& Kd. Jalgaon J. 29.12.06 yes 18.03.07 31.03.07 21.01.09 0.18 0 0 01.02.09

9 Kuwardeo 5 Sonbardi Jalgaon J. 29.12.06 31.03.07 31.03.07 31.03.07 15.02.08 0.12 0 0 12.03.09

10 Bhingara Bhingara Jalgaon J. A-1 not

11 Chalnstapari Jalgaon J. A-1 not

12 Rasulpur 5 Rasulpur Jalgaon J. 27.10.05 05.01.06 05.01.06 24.01.06 30.01.09 0.06 0 0 27.03.06

13 5 Rajura Bk Jalgaon J. 10.01.06 25.01.06 25.01.06 31.01.06 01.02.06 0.12 0 0 27.03.06

14 5 Nimkhedi Jalgaon J. 06.01.06 04.02.06 Yes 23.03.06 29.03.06 0.18 0 0 11.04.06

15 Umapur 3 Charvan Jalgaon J. 18.02.06 21.04.06 21.04.06 24.04.06 25.04.06 0.24 0 0 12.05.06

16 3 Raipur Jalgaon J. 29.09.08 30.09.08 30.09.08 30.3.09 18.4.09 SL 0 0 Installation not ready

17 Garpeth Jalgaon J. A-1 not

18 Palshi Supo 7.5 Palshi Supo Jalgaon J. 29.04.06 04.12.08 yes 31.03.07 Yes 0.12 0 0 20.3.09 Connected

19 5 Nav Kd. Jalgaon J. 18.01.08 16.02.09 21.01.09 0.33 0 0 Not paid

20 7.5 Mohidipur Jalgaon J. 06.06.08 17.04.09 28.4.09 15.6.09 0.06 0 0 Work Handed over to Contractor M/s Domrshwar

21 Gorada Jalgaon J. A-1 not A -1 Not

22 Khandwi 7.5 Khandwi Jalgaon J. 22.05.08 20.02.09 21.02.09 27.2.09 10.6.09 0.12 0 0 22.6.09 Connected

23 Dhanora 7.5 Dhanora Jalgaon J. 13.04.06 04.05.06 18.05.06 18.05.06 06.08.06 0.12 0 0 23.06.06

24 Wadshingi 7.5 & 12 Wadshingi Jalgaon J. 22.05.07 28.06.06 yes 28.12.06 24.04.08 SL 1.3 63 15.05.08

25 Aasalgaon 3 Takali Khati Jalgaon J. 1.12.06 27.02.06 05.03.06 15.03.06 2.3.09 0.18 0 0 13.4.09 Connected

Sr.

No.

Date of

A-1

Dt. Of

conn.

Sanction

ed

Page 48: Meeting Folder 21-11-2009

Name of G.P. load Name of Village Block Date of Provision Remarks

FQ Paid T.R. LT HT DTC

Sr.

No.

Date of

A-1

Dt. Of

conn.

Sanction

ed

26 3 Wadi Bk & Kd. Jalgaon J. 16.09.08 12.12.08 16.12.08 27.12.08 Yes 0.24 0 0 21.3.09

27 Sawargaon 7.5 & 5 Sawargaon 2 nos Jalgaon J. 05.01.09 5.3.09 5.3.09 21.3.09 yes 0.12 0 0 25.6.09 Two conn released

28 BhendWad Bk. 20 Bhendwad Bk Jalgaon J. 19.05.06 23.05.06 25.03.06 29.05.06 03.05.07 0.24 0 0 05.06.07

29 BhendWad Kd. 7.5 BhendWad Kd. Jalgaon J. 16.10.06 21.11.06 24.12.06 31.03.06 27.02.07 0.1 0 0 01.02.08

30 Kurangad Bk. 3 Kurangad Bk. Jalgaon J. 16.06.06 07.09.06 Yes 09.10.06 15.12.06 0.18 0 0 10.04.08

31 KaJegaon 7.5 Kajegaon Jalgaon J. YES 30.03.07 30.03.07 31.03.07 09.10.07 SL 0 0 16.06.07

32 Borada Kd. 5 Borada Kd. Jalgaon J. YES Yes 31.03.07 31.03.07 19.05.07 0.06 0 0 30.05.08

33 Kurangaon Kd. 5 Taroda Bk Jalgaon J. 14.05.08 24.06.08 Yes 03.07.08 0.12 0 0 L. R. Instalation Not Ready

34 5 Taroda Kd. Jalgaon J. 21.5.07 9.4.09 21.4.09 23.4.09 0.24 0 0 20.09.09

35 Sulej 7.5 Sulej Jalgaon J. 29.12.06 23.03.07 yes 30.04.07 30.04.07 0.12 0 0 07.04.08

36 Wadgaon Paten 5 Wadgaon Patan Jalgaon J. 21.01.09 20.02.09 21.02.09 9.3.09 8.7.09 0.36 0 0 20.09.09 CC & RF

37 5 Patan Jalgaon J. 21.01.09 20.02.09 21.02.09 4.3.09 1.6.09 0.06 0 0 9.6.09 Connected

38 5 Parashrampur Jalgaon J. 22.01.07 31.03.08 yes 02.06.08 Yes 0.3 0 0 13.08.08 1 Ph 2w to 3Ph 4 w

39 Chawra 5 Chawara Jalgaon J. 10.07.06 26.5.09 1.6.09 5.6.09 12.6.09 0.06 0 0 Work Handed over to Contractor M/s Domrshwar

40 5 Yelora Jalgaon J. 25.09.07 23.3.09 23.3.09 26.3.09 2.4.09 0 0 0 9.6.09 Connected

9 3 Shevga bk & Kd Sangrampur 05.04.07 17.04.09 28.4.09 0.12 0 0 Work Handed over to Contractor M/s Domrshwar

1 Advihir Advihir (Talkhed) Motala Yes Yes yes Yes Yes 0 0 Yes Connected

2 Taroda 12.5 Taroda Motala 21.4.09 0.06 0 0

3 Murti Murti Motala Yes Yes yes Yes Yes 0 0 Yes Connected

4 Kohrhala Bz Korhala Motala Not Feasible from S/Dn

5 Sawargaon Jah Sawargaon Jah Motala A-I Not received

6 Shelgaon Bz. Shelgaon Bz. Motala Yes Yes yes Yes Yes 0 0 Yes Connected

S/Dn. Wise Taluka wise AbstractSr. N S/Dn. Taluka Total Cases A-1 Rec. San. F.Q Paid TR Connected

1 Motala MTL 6 4 3 3 3 3 3

2 Nandura NDR 6 5 5 3 5 3 2

3 Nandura KHM 2 2 2 2 2 2 2

4 Jalgaon J. JAL 40 35 35 35 34 30 30

5 Jalgaon J. SANG 1 1 1 1 1 0 0

Total 55 47 46 44 45 38 37

Paid Oct 09

Water lifting permission not attaached, Location/ownership not attached, req SGP for temp supply.A-1 and LS form different names

Page 49: Meeting Folder 21-11-2009

Paid Pending List of LT IP Consumer who have submited test report

Point No : B- 14

NAME OF APPLICANT S/Dn VILLAGE LOAD Date of A1 SANCTION NO &DATE DOP Dt of TR Remark

1 Balkrushna W. Kute Nandura Tarwadi 10 02.01.09 EE/MLK/CC&RF/169 Dt 29.04.09 08.05.09 13.08.09 Land Dispute

2 Durgabai Jaypalsingh Rajput Malkapur Warkhed 10 05.10.07 EE/MLK/ CC&RF/22/Dt:27.11.08. 07.01.09 12.01.09

3 Pratasingh Ganusingh Rajput Malkapur Warkhed 10 18.10.07 EE/MLK/F CC&RF/11/Dt:17.11.08 07.01.09 03.02.09

S.N

cc&rf pending due to applicant delay

cc&rf pending due to applicant delay

Page 50: Meeting Folder 21-11-2009

Target Of DPDC For Year 2009-10 And Acheivement thereof up to Date

Point No. : B- 16

Scheme S/DnDomestic AG IP WW STL HT Km LT 1 Ph LT 3 Ph DTC

Target Achieve. Target Achieve. Target Achieve. Target Achieve. Target Achieve. Target Achieve. Target Achieve. Target Achieve. Target

ND Malkapur 1200 641 0 0 10 2 30 0 0 0 1.5 0 0 0 0

Motala 800 697 0 0 10 0 30 0 0 0 1.5 0 0 0 0

Nandura 1000 1170 0 0 10 0 30 0 0 0 1.5 0 0 0 0

Jalgaon 1000 604 250 0 20 4 30 0 0 0 1.5 0 41.5 0 0

Total 4000 3112 250 0 50 0 6 0 120 0 0 0 6 0 41.5 0 0

SC(P) Malkapur 75 33 5 3 0 0 0 0 0 0 0 0 0.75 0 0.5 0 0

Motala 75 2 10 1 0 0 0 0 0 0 0 0 0.75 0 0.5 0 0

Nandura 75 44 10 7 0 0 0 0 0 0 0.5 0 0.75 0 0.5 0 1

Jalgaon 75 95 10 0 0 0 0 0 0 0 0 0 0.75 0 0.5 0 0

Total 300 174 35 11 0 0 0 0 0 0 0.5 0 3 0 2 0 1

OTSP Malkapur 9 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Motala 9 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Nandura 4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Jalgaon 2 8 5 0 0 0 0 0 0 0 0 0 0 0 0.9 0 0

Total 24 9 5 0 0 0 0 0 0 0 0 0 0 0 0.9 0 0

Page 51: Meeting Folder 21-11-2009

Target Of DPDC For Year 2009-10 And Acheivement thereof up to Date

DTC

Achieve.

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

Page 52: Meeting Folder 21-11-2009

Tenderwise progress report Point No. - B- 17 upto 15.11.2009

Sr.No. Tender Name Name contractor Date of LOA Provision of Work Achievement Remark if any

1T-04 Malkapur Dn. 4.5% Above 12 Months 145.41 0 0 0 0 0 0 0

2

T-06 Motala At Par 16.07.09 12 Months Rs. 40.56 lakh 15.5 2.34 20*63 0

3

T-07 Motala At Par 16.07.09 12 Months Rs. 36.05 Lakh 17.8 1.74 0

4

T-08 Motala At Par 16.07.09 12 Months Rs 44.72 lakh 22 1.84 22*63 0

5

T-09 Nandura At Par 04.07.09 12 Months Rs.45.43 Lakh 26.8 4 0

6

T-10 At Par 03.07.09 12 Months Rs.26.98 Lakhs 14.9 1.54 11*63 0

7

T-11 At Par 03.07.09 12 Months 26.40 Lakh 11.9 2.26 13*63 0

8 T-07 Sp Desighn T/F Malkapur Dn. 25 nos 20 nos SDT ERRECTED

SPP-III tender Work completed in Buldana Circle.

Tender No.

Name of Division/Sub

division

% Rate Quoted

Period of Completion

Contract Amount Rs, In lakhs (Tender

Cost/ Contractor

Cost) H.T. Line in KM

L.T. Line in KM

Dist. T/F.in KVA

Service Connection

H.T. Line in KM

L.T. Line in KM

Dist. T/F.in KVA

Service Connecti

on

DTC Metering under Malkapur Division M/s. Tool Tech

SPM,A'Bad4218 dtd 07.07.09

1559 No. DTC

LOA Issued to concern on dtd 07.07.2009

GFSS-III Extended sope Motala Town (Rajur)

M/s. D.K. Electricals services,Motala

40 poles errected of 11 KV Line. Work Held up due to short of 9 Mtr PSC pole

GFSS-III Extended sope M/s.

Omnamoshivay Elect. Nandura

2*100 16*63

7 Nos DTC Pole Errected ,40 pole of 11 KV line & 8 pole of L.T. Line Errected

GFSS-III Extended sope (Makodi,Tarapur,Nalgangapur)

M/s. Boche Electrical, Akola

5 Nos DTC Pole Errected ,3 Km pole of 11 KV line & 9 pole of L.T. Line Errected

GFSS-III Extended sope ( Panhera,Nipana,P'Devi,D'Badhe)

M/s.Global Electrical,Nandura

5*100 11*63

Pole Errection of 1.05 Km 11 KV line Complited

GFSS-III Extended scope Fuli,Shemba,Wadner,Chandur,naigaon,Kolasar.

Nanura/Malkapur

M/s. Suyog Engineers. Khamgaon

1 No DTC pole Errected and 1.05 Km 11 KV line pole Errected

GFSS-III Extended scope Nimgaon,Deodhaba,Narwel,Rantham.

Jalgaon Jamod

M/s. Suyog Engineers. Khamgaon

Servey complited of 2 Nos DTC

M/S Isotech Khmgaon

Page 53: Meeting Folder 21-11-2009

Point No. - B- 17

Tender Name Name contractor Provision of Work Achievement up to date Remark if any

1 T-32 ``DO`` 3 months 44.56/43.44

11 17 63*12 140 9.73 31.50 12*63 160

2 T-38 9 % Below 3 months

11 21 63*12 175 0.20 18.50 1*63 135

Sr.No.

Tender No.

Name of Division/Subdivision

% Rate Quoted

Date of LOA

Period of Completion

Contract Amount Rs, In lakhs (Tender

Cost/ Contractor

Cost) H.T. Line in KM

L.T. Line in KM

Dist. T/F.in KVA

Service Connection

H.T. Line in KM

L.T. Line in KM

Dist. T/F.in KVA

Service Connecti

on

Malkapur/Motala

M/s. Swarsudha Electricals,Achalpur

2.51 % Below

7559 dtd 26.12.08 & Ext. 3330 dtd 05.06.09

Ag pump Connection in Malkapur,Nandura & Jalgaon Jamod S/Dn.

Malkapur/MLK,Nandura,Jalgaon.Jamod

M/s Rambad Electromagnetic Nagpur & M/s. Someshwar Electrical,Khamgaon

340 dtd 15.01.09 & 339 DTD 15.01.09

48.92/42.98 (50% order to

both the contractor)

Rambad Nagpur

Page 54: Meeting Folder 21-11-2009
Page 55: Meeting Folder 21-11-2009

Point No. - B- 17

Tender Name Name contractor Date of LOA Provision of Work Achievement

1 T-49 1.0% Below 12 Months 46.42/45.96

4 5 5.20 19.77 6*63 116

2 T-50 2 % Below 12 Months 11.31/11.31

1.1 3.1 3*63 0.00 3.96 0 35

3 T-63 6.0 % below 498 20.01.09 12 Months 20.91/19.66

1.4 6.1 0.55 2.07 2*63

4 T-64 7.5 % Nelow 12 Months 48.42/44.79

3 9 1.10 4.00 6*63

5

T-94 0.1 % Below

12 Months

19.35/19.35 1.7 4.8 4*63 17 0.00 1.37 0 0

6 T-108 At par 12 Months

Sr.No.

Tender No.

Name of Division/Sub

division

% Rate Quoted

Period of Completion

Contract Amount Rs, In lakhs (Tender

Cost/ Contractor

Cost)

Remark if any

H.T. Line in KM

L.T. Line in KM

Dist. T/F.in KVA

Service Connection

H.T. Line in KM

L.T. Line in KM

Dist. T/F.in KVA

Service Connecti

on

Electrification under RE Scheme.

Jalgaon Jamod/Malkapur

M/s. Someshwar Electricals Cont.Khamgaon.

612 dtd 22.01.09 1*100 &

8*63

1265 no. RCI ,Ag.& 50 no. St. Light

Electrification work under ND & Other scheme

Jalgaon Jamod/Malkapur

M/s.Deep Electricals Akola

616 dtd 22.01.09

19 no.RCI & AG 10 no. St ligh

Electrification works under ND & Other works

Nandura/Malkapur

M/s.Urja & Associates,Mumbai.

1*100 & 4*63

20 RCI ,Ag & 50 no. st

light

Electrification works under RE works

Nandura/Malkapur

M/s.Urja & Associates,Mumbai.

499 dtd 20.01.09

1*100 & 6*63

1215 no.RCI,Ag &

110 no. St.light

Electrification works under ND & Other works

Malkapur/Malkapur

M/s. Sanjay Kedia Akola

1146 dtd 16.02.09

Electrification under RE& other scheme

Malkapur/Malkapur

M/s. Someshwar Electricals Cont.Khamgaon.

1655 dtd 17.03.09

45.66/45.66 Lakh

Page 56: Meeting Folder 21-11-2009

Point No. - B- 17 upto 15.11.2009

Tender Name Name contractor Provision of Work Achievement Remark if any

1

T-1 4570.733 284.445 0 171 11 72*63

Malkapur Dn 118.6 5.9 57*63

Malkapur Dn M/S IVRCL Kolkata 28 0 3*63

Sr.No.

Tender No.

Name of Division/Sub

division

% Rate Quoted

Date of LOA

Period of Completion

Contract Amount Rs, In lakhs (Tender

Cost/ Contractor

Cost) H.T. Line in KM

L.T. Line in KM

Dist. T/F.in KVA

Service Connection

H.T. Line in KM

L.T. Line in KM

Dist. T/F.in KVA

Service Connecti

on

GFSS-1 Scheme under Buldana Circle.CE/DSPC/GFS/T-11/617/12049 dtd 15,17.05.2006

Buldana Circle

M/s. SPML,Kolkatta

43*100 663*63

M/S SMS INFRA GFSS

3 + 25 km LR 11 kv Zodga feeder

Page 57: Meeting Folder 21-11-2009

Sub : Achivement of Physical Target in PIE SchemePoint No. B--20

Malkapur Division IP W/W. DL St/Light HT DTC LT

Provision 2 38 15 4520 281 10.57 25 26.37Sanction 0 3 10 10 3 2.96 3 4.4Achivement NILBifergution of Sanction Estimate according to Sub-Division

Name of S/Dn. W/W. IP DL St/Light

LT HT DTC LT HT DTC LT HT DTC LT HT DTC

Malkapur 0 0 0 0.3/1 0 63x1/1 0.12/1 0 0 0.36/1 0 0

Motala 1.38/7 2.96/2 63x2 /2 0.67/2 0 0 1.33/7 0 0 0.24/2 0 0

Nandura 0.18/2 0 0 0 0 0 0.15/4 0 0 0 0 0

Jalgaon J. 0.06 0 0 0 0 0 0 0 0 0 0 0 0

HT Connection

Page 58: Meeting Folder 21-11-2009

B- 23Sub : Major Material Balance at Datala Store as on 30-10-2009Sr. No. Name of Material Unit Qty Remarka

1 Distribution T/F. 63 KVA No. 32 Distribution T/F. 100 KVA No. 13 For G.F.S.S. -III3 Distribution T/F. 200 KVA No. 34 Single Phase Meter No. 4885 Three Phase Meter No. 37406 AAC & Conductor Km. 239 Km. / 41 Drum7 AAC 34 Sqmm Km. 218 Km / 22 Drum8 AAC 55 Sqmm Km. 16.4/ 2 Drum9 AAC 100 Sqmm. Km. 8.2

10 ACSR O 3 Km. 2.311 ACSR O 75 Km. 36 Km/ 9 Drum12 ACSR DOG Km. 4.2 Km/ 2 Drum13 RSJ Pole 7x3.5 Nos NIL14 RSJ Pole 5 X 3 Nos 19715 RSJ Pole 4 X 4.4 Nos 116 RSJ Pole 6 X 6 Nos 117 Power Calbe 95 Sqmm Mtr 6018 Power Calbe 185 Sqmm Mtr 16019 PVC Cable 70 Sqmm Mtr 820 PVC Cable 120 Sqmm Mtr 38021 PVC Cable 185 Sqmm Mtr 3.422 PVC Cable 240 Sqmm Mtr 19323 CT Operated Meter 50X5 Nos. 024 Distribution Box 63 KVA No.s 9425 Distribution Box 100 KVA Nos 10926 Distribution Box 200 KVA Nos 2427 HG Fuse Set 18928 11 KV Disc insulator Nos. 150929 11 KV Pin Insulator Nos 1200

Executive EngineerM.S.E.D.C.L.

Malkapur

Page 59: Meeting Folder 21-11-2009

Sub:- List of unelectrified villages as per New DefenationPoint No. :B- 24

Sr No S/Dn Taluka Village1 Malkapur Malkapur Morkhed (Kd.) 00364600

Electrified on L. T. only

2 Malkapur Malkapur Sawali 003654003 Malkapur Malkapur Waghola 003584004 Malkapur Malkapur Mhaiswadi 003589005 Malkapur Malkapur Rantham 003591006 Malkapur Malkapur Chikhali 003590007 Malkapur Malkapur Telkhedi 003599008 Malkapur Malkapur Nimbli 003606009 Malkapur Malkapur Khadki 00362700

10 Malkapur Malkapur Bahapura 0036210011 Malkapur Malkapur Khokodi 0036150012 Malkapur Malkapur Hingna-Nagapur 00358700

1 Motala Motala Dabha Tanda N 003719002 Motala Motala Ghusar Kd. 003726003 Motala Motala P. Pati 003728004 Motala Motala Paldhag 003756005 Motala Motala Longhat 003768006 Motala Motala Sonbarad 003663001 Motala Malkapur Chinchkhed Bk. 00363300

1 Jalgaon Jamod Jalgaon Jamod Sonbardi 003152002 Jalgaon Jamod Jalgaon Jamod Kunvardeo 003153003 Jalgaon Jamod Jalgaon Jamod Raipur 003159004 Jalgaon Jamod Jalgaon Jamod Hanuwant Khed 003160005 Jalgaon Jamod Jalgaon Jamod Rajura (Kd.) 003161006 Jalgaon Jamod Jalgaon Jamod Rajura (Bk.) 003162007 Jalgaon Jamod Jalgaon Jamod Wayal 003163008 Jalgaon Jamod Jalgaon Jamod Kawpatta 003165009 Jalgaon Jamod Jalgaon Jamod Gorala 00316600

10 Jalgaon Jamod Jalgaon Jamod Hardev Wawti 0031750011 Jalgaon Jamod Jalgaon Jamod Wanar 0031790012 Jalgaon Jamod Jalgaon Jamod Taroda 0031800013 Jalgaon Jamod Jalgaon Jamod Sajanpuri 0031820014 Jalgaon Jamod Jalgaon Jamod Dautpur 0031900015 Jalgaon Jamod Jalgaon Jamod Wadi Bk. 0031960016 Jalgaon Jamod Jalgaon Jamod Chinchked 0032060017 Jalgaon Jamod Jalgaon Jamod Borkhed 003290001 Jalgaon Jamod Sangrampur Siwni 003290002 Jalgaon Jamod Sangrampur Malthana 00329400

1 Nandura Nandura Wadgaon 3522002 Nandura Nandura Pota 3554003 Nandura Nandura Rampur 3508004 Nandura Nandura Awadha 3511005 Nandura Nandura Bhuisinga 3512006 Nandura Nandura Kodarkhed 3486007 Nandura Nandura Shanpudi 3533008 Nandura Nandura Kalegaon 3479009 Nandura Nandura Matoda 354100

10 Nandura Nandura Burti 35460011 Nandura Nandura Kandari 35770012 Nandura Nandura Dolkhed 35730013 Nandura Nandura New Yerali 3500001 Nandura Shegaon Dondwada 3400002 Nandura Shegaon Wardh 3399001 Nandura Khamgaon Bhandari 378000

Cencus code 2001

Reason for non electrification

Villages electrified on L.T. But No

Transformer/ H.T. Line in that Villages.

House hold electrification is below

10 %

No H.T. /Xmer and no connection to

community G.P. etc.