CITY OF WISCONSIN DELLS MEETING AGENDA Meeting Description DESIGN REVIEW COMMITTEE Date: WEDNESDAY, MARCH 20, 2019 Time: 10:00AM Location: MUNICIPAL BUILDING -300 LA CROSSE STREET, WISCONSIN DELLS, WI
COMMITTEE MEMBERS
ALDER DEFOSSE BEN BORCHER DAN GAVINSKI MARIA ROSHOLT JACQUELINE MORSE
AGENDA
1 Call to order and attendance
2 Discussion / Decision of the February 20, 2019 Meeting Minutes
3 Discussion / Decision on Proposed sign application(s) submitted for review, if any
(a)
4 Discussion / Decision on Building/site plan application(s) submitted for review, if any (a) 744 Eddy - Bella Goose
5 Discussion / Decision on Outdoor seating/dining application(s) submitted for review, if any (a)
6 Discussion / Decision on Proposed Façade Improvement Grant projects, if any
(a) 716 Oak – Keg (update)
7 Discussion / Decision on Proposed changes to the Design Standards, if any (a) Portable message sign
8 Items for referral to future meeting
9 Set date and time of future meeting (April 3)
Open Meetings Notice: If this meeting is attended by one or more members of the Common Council who are not
members of this committee, their attendance may create a quorum of another city commission, board or committee
under the Wisconsin Open Meetings Law; However, no formal action will be taken by any governmental body at the
above stated meeting other than the body, committee, commission, or board identified in this meeting notice.
Please be advised that upon reasonable notice, the City of Wisconsin Dells will furnish appropriate auxiliary aids
and services to afford individuals with disabilities an equal opportunity to participate in meeting activities.
CHAIRPERSON – JESSE DEFOSSE DISTRIBUTED MARCH 15, 2019
Bella Goose 744 Eddy Façade update DRC 032019 The City has just received a rendering for a new façade design at 744 Eddy from Bella Goose. Initial review appears to comply with the Design Standard. There is a comment that the new coffee roaster chimney will be covered with vinyl siding. Vinyl is normally prohibited, and the applicant has stated they will look into a using a preferred material such as engineered wood. Chris Tollaksen City of Wisconsin Dells
1. Paint Upper half of building white2. Patch and paint lower half of building matt black3. Construct set back door with graded cement flooring (no step), install new door and tile on walls in entry4. Second story windows are 48’’ wide by 58’’ tall. They are 2 feet up from the ground.5. The front facade where the windows were, will be filled in with brick and then electrical for the gooseneck lights6. First story window will be black vinyl and 11’ wide by 6’ tall.7. Vinyl siding the roastery vent.
EXTERIOR FACADE PLAN / 744 EDDY STREET / BELLA GOOSE COFFEE
Keg – wine bar 716 Oak DRC 032019 The City has received the final plans and elevations for the Keg project at 716 Oak St. The applicant had attempted to verbally explain some of the design details during previous review. Rolling doors will be used to provide the open air environment. Previous renderings had shown windows where the open doors would be. The rolling doors will be a black steel to match the other doors. The Design Standards only address street facing garage doors, and primarily on Broadway west of Church St. Chris Tollaksen City of Wisconsin Dells
Conditionally
APPROVED DEPT. OF SAFETY AND PROFESSIONAL
SERVICES DIVISION OF INDUSTRY SERVICES
SEE CORRESPONDENCE
3199939Addition/Alteration02/08/2019
FIRST FLR.100' - 0"
T.O. ROOF121' - 7"
MECHANICALMEZZANINE
FLOOR113' - 1"
12
168
4
2
0
5
A5.0
3
A5.0
4
A5.0
1
A5.0
2
A5.0
FIRST FLR.100' - 0"
T.O. ROOF121' - 7"
MECHANICALMEZZANINE
FLOOR113' - 1"
24
3216
8
4
0
2 8'-0"x8'-0" SECTIONAL GALVANIZED STEEL INSULATED ROLLING DOOR. U-VALUE: 0.125
1THERMALLY-BROKEN ANODIZED ALUMINUM STOREFRONT DOOR w/ 1" TINTED, INSULATING, LOW-E, ARGON FILLED GLAZING. U-VALUE: 0.7, SHGC: 0.35
3FIXED THERMALLY-BROKEN ANODIZED ALUMINUM STOREFRONT WINDOWS, w/ INSULATED GLAZING, LOW E & ARGON FILLED. U-VALUE: 0.45, SHGC: 0.35
ELEVATION NOTES
4 CEDAR SIDING
FIRST FLR.100' - 0"
T.O. ROOF121' - 7"
MECHANICALMEZZANINE
FLOOR113' - 1"
4" CONCRETE SLAB
2-PLY 2x10 WOOD HEADER, SEE STRUCTURAL
CEDAR SIDING, BY OWNER
1 1/2" RIGID INSULATION, R-7.5, TYP.
AIR BARRIER
7/16" OSB SHEATHING
2x6 WOOD STUDS @ 16" O.C.
6" FIBERGLASS BATT INSULATION, R-19, TYP.
5/8" GYP BD OVER 6mil VAPOR BARRIER
R.O
.
5' -
8"1'
- 6"
FIXED THERMALLY-BROKEN ANODIZED ALUMINUM STOREFRONT WINDOWS
A5.05
A5.03
A5.01
A5.04
2" RIGID INSULATION
2x4 TRIM TO COVER RIGID INSULATION
2
A5.0
This
docu
ment
cont
ains c
onfid
entia
l or p
ropr
ietar
y info
rmati
on o
f Gen
eral
Engin
eerin
g Co
mpan
y. Ne
ither
this
docu
ment
nor
the
infor
matio
n he
rein
is to
be
repr
oduc
ed, d
istrib
uted
, us
ed o
r disc
losed
eith
er in
who
le or
in p
art e
xcep
t as s
pecif
ically
auth
orize
d by
Gen
eral
Engin
eerin
g Co
mpan
y.
P.O
. Box
340
9
16 S
ilver
Lak
e D
r. P
orta
ge, W
I 53
901
SHEET NO.GEC FILE NO.
ISSUE DATE
REVIEWED BY
Gen
eral
Eng
inee
ring
Com
pany
FULL SIZE SCALE
608-
742-
2169
(Offi
ce)
608
-742
-259
2 (F
ax)
ww
w.g
ener
alen
gine
erin
g.ne
t
DRAWN BY
ISSUED FOR CONSTRUCTION
G:\C
urre
nt F
iles
E-K\
Koe
hler
, Kei
th\2
-121
8-57
0 K
ilbou
rn W
ine
Bar
\CA
D 2
-121
8-57
0\1_
ARC
H\2
-121
8-37
0 K
ilbou
rn W
ine
Bar
- K
LB.rv
t
As indicated
ELEV
ATI
ON
S
KEI
TH K
OH
LER
KIL
BO
UR
N W
INE
BA
R
CIT
Y O
F W
ISC
ON
SIN
DEL
LS
A2.02-1218-370
02/04/2019
GAM
KLB
CO
LUM
BIA
CO
UN
TY, W
I 539
65
SCALE: 1/8" = 1'-0" on 11" x 17" 1/4" = 1'-0" on 22" x 34"
WEST ELEVATION1
SCALE: 1/16" = 1'-0" on 11" x 17" 1/8" = 1'-0" on 22" x 34"
NORTH ELEVATION2
3 31
11 2 2
4
SCALE: 3/8" = 1'-0" on 11" x 17" 3/4" = 1'-0" on 22" x 34"
WALL SECTION - WEST WALL3
REV
ISIO
NS
NO
.BY
DAT
E