Meeting at Sonya Kilkenny’s office re Bonbeach Primary Building Maintenance 24 th January 2018 4:05pm – 4:50pm Attendees Sonya Kilkenny’s office Sonya Kilkenny, Dylan Steed Victorian School Building Authority Greg Russell (VSBA Program Manager), Darren, Sonja School Council Anita McKenzie (SC President), Jonathan Granger (via conference call), Narelle Legg School staff Ken Jones, Elise Ioviero, Emily Malone, Martyn Waters, Patrick Walsh Parents Stacey Smith, Andrea Garwood, Andreea Sfarlea Minutes: Patrick Walsh and Anita McKenzie Purpose of meeting To discuss the emergency maintenance works currently being undertaken at Bonbeach Primary School and Pre-school. This was also to provide an opportunity for interested School Council members, parents and staff to hear directly from the VSBA and to ask questions. The Meeting Sonya Kilkenny explained that she wanted to call the meeting because the fencing is still up and from a visual perspective it looks like nothing has happened in relation to the building maintenance. It was also important that all parties heard the same message. Greg (Program Manager from VSBA) gave an overview of the status of the works. He made it clear that, currently, they have been tasked with providing a ‘Reinstatement Program’. The primary purpose of a reinstatement program is to make the building safe and operational. This is not a school upgrade at this stage. The works will be undertaken to address the termite damage and the resulting structural failure to the roofing and cladding. Three engineering reports have been completed on 15/11/17, 22/11/17 and 29/11/17. He emphasised that the termite treatment will continue for 12 months to make sure they are fully eradicated. An overview of the works from the VSBA: (Answers to questions that arose from the overview of works have been added here) A significant termite issue across the front of the school and student toilets that has affected the walls, window frames, substructure (flooring) and roof Engineering reports from November 2017 have indicated the termite damage is primarily across the front of the school The scope of the works was discussed and handed out - included in Appendix 1. However, this is now incomplete as more works have been added, e.g., carpet replacement, additional windows, gates outside toilets will be considered to be included in the scope Windows will be replaced in the girls and boys toilets and the other worst affected areas. The VSBA and builders will work with school and seek input regarding styling of the replacement windows, colour bond cladding façade and other options where possible.

Upload: others

Post on 12-Sep-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Meeting at Sonya Kilkenny’s office re Bonbeach Primary Building … · 2018. 1. 30. · Meeting at Sonya Kilkenny’s office re Bonbeach Primary Building Maintenance 24th January

MeetingatSonyaKilkenny’sofficereBonbeachPrimaryBuildingMaintenance

24thJanuary20184:05pm–4:50pm

Attendees

SonyaKilkenny’soffice SonyaKilkenny,DylanSteed

Victorian SchoolBuildingAuthority

GregRussell(VSBAProgramManager),Darren,Sonja

SchoolCouncil AnitaMcKenzie(SCPresident),JonathanGranger(viaconferencecall),NarelleLegg

Schoolstaff KenJones,EliseIoviero,EmilyMalone,MartynWaters,PatrickWalsh

Parents StaceySmith,AndreaGarwood,AndreeaSfarlea

Minutes:PatrickWalshandAnitaMcKenzie

Purposeofmeeting

TodiscusstheemergencymaintenanceworkscurrentlybeingundertakenatBonbeachPrimarySchoolandPre-school.ThiswasalsotoprovideanopportunityforinterestedSchoolCouncilmembers,parentsandstafftoheardirectlyfromtheVSBAandtoaskquestions.

TheMeeting

SonyaKilkennyexplainedthatshewantedtocallthemeetingbecausethefencingisstillupandfromavisualperspectiveitlookslikenothinghashappenedinrelationtothebuildingmaintenance.Itwasalsoimportantthatallpartiesheardthesamemessage.

Greg (ProgramManager fromVSBA)gaveanoverviewof the statusof theworks.Hemade it clear that,currently, they have been tasked with providing a ‘Reinstatement Program’. The primary purpose of areinstatementprogramistomakethebuildingsafeandoperational.Thisisnotaschoolupgradeatthisstage.

Theworkswillbeundertakentoaddressthetermitedamageandtheresultingstructuralfailuretotheroofingand cladding. Threeengineering reports havebeen completedon15/11/17, 22/11/17and29/11/17.Heemphasisedthatthetermitetreatmentwillcontinuefor12monthstomakesuretheyarefullyeradicated.

AnoverviewoftheworksfromtheVSBA:(Answerstoquestionsthatarosefromtheoverviewofworkshavebeenaddedhere)

• Asignificanttermite issueacrossthefrontoftheschoolandstudenttoiletsthathasaffectedthewalls,windowframes,substructure(flooring)androof

• EngineeringreportsfromNovember2017haveindicatedthetermitedamageisprimarilyacrossthefrontoftheschool

• Thescopeoftheworkswasdiscussedandhandedout-includedinAppendix1.However,thisisnowincompleteasmoreworkshavebeenadded,e.g.,carpet replacement,additionalwindows,gatesoutsidetoiletswillbeconsideredtobeincludedinthescope

• Windowswillbereplacedinthegirlsandboystoiletsandtheotherworstaffectedareas.• The VSBA and builders will work with school and seek input regarding styling of the

replacementwindows,colourbondcladdingfaçadeandotheroptionswherepossible.

Page 2: Meeting at Sonya Kilkenny’s office re Bonbeach Primary Building … · 2018. 1. 30. · Meeting at Sonya Kilkenny’s office re Bonbeach Primary Building Maintenance 24th January

• Gatesoutsidethetoiletswerehighlightedasasafetyhazard.Asolutionisbeingconsideredtobeincludedinthescope.

• Hehighlightedthattheschoolhadfoundasuitableareatomovetheothertwoclasses.Kenagreed.• Termite treatmentshavebegunanddozensof termite trapshavebeenplacedaroundthewhole

school(seeimagesoftrapsinAppendix2)• Morefencingwillbeputup.Therewasadiscussionabouthowfencingdoesnotinstilasenseofpride

inourschoolcommunity.OptionsdiscussedweresignagefromVSBAthatgivesanoverviewoftheworks,artificialplants/images,studentartwork/beautificationproject,localbusinesssignageetc.ItwasdecidedthatcommunicationfromVSBAregardingtheprogramofworkswouldbeessential

• TherewillberegularcommunicationfromVSBA.ThesewillbeplacedontheschoolFacebookpage,newsletterandontheschoolwebsite

• ThenextmeetingtodiscussthebuildingworkswithparentsandSchoolCouncilwillbeheldattheschool.

Timingofthemaintenanceworks

• TheVSBAemphasisedthatnoworkswillcommenceuntilthetermiteshavebeeneradicated

• Thenexttermitetrapinspectionisscheduledforthe19thFebruary.Theseinspectionswillcontinuemonthlyuntilthetermiteexpertsaresatisfied.Heexplainedthatonothersimilarjobsithastaken3-6monthsfortermitestobeeradicated.Hesuggesteditcouldtake3months.Thismeansmaintenanceworkmaynotcommencefor3-6months.

• Oncemaintenanceworksbeginitestimateditwilltakeapproximately4weekstocompletethework.

Thefuture

SonyaadvisedthatshehasbeenadvocatingforBonbeachsinceMaylastyeartoreceiveMasterplanandupgradefunding.ShesaidshewillworkwithKenandPatrickonthis.

Page 3: Meeting at Sonya Kilkenny’s office re Bonbeach Primary Building … · 2018. 1. 30. · Meeting at Sonya Kilkenny’s office re Bonbeach Primary Building Maintenance 24th January

Otherquestions:1. Theschoolisgrowing,whywastethemoneyandjustupgradetheschoolnow?DET:The last timea fullConditionReport (buildingstructure/safety/futureenrolmentsetc.)wasdoneatBonbeachPSwas2012.ThecurrentVictoriangovernmenthas recentlyputaprogram inplacewhereallschoolbuildingsarefullyaudited(ConditionReport)every5years.BonbeachPSisdueforthisin2020.Theinitialscopeofthecurrentprojectistomakethebuildingssafeandoperational.

Thereare1500schoolsinVictoriawiththousandsofbuildingsand10softhousandsofclassrooms.TherearemanybuildingsinamuchworsestatethanBonbeachthatneedtobeprioritised.TheDepartmentcurrentlyhas1,100jobsonthego.

2. TheschoolhasstudentsinthestaffroomandthenewroomintheHall.Whycan’twegetaportable?VSBA: The planning for a portable building takes over amonth to plan and action. It is hoped (termitedependent) that theworkswillbecompleted in less timethanwhat itwouldtaketogetaportable.Theschoolhasindicatedthatintheshorttermtheschoolissatisfiedwiththeareasforthetemporarytransferoftheseclasses.

Ken:Whilenotidealforthestudentsorthestaff,thestaffroomwillnotbeusedasastaffroomwhilebeingusedfortheclass.Thecurrentstaffroomisaconvertedclassroomandwasnotpurposebuiltforastaffroom.HavingtheclasstheremeanstheGrade1/2teachersandstudentsareintheonespaceclosetoeachother.ThestaffwillusethenewkitchenintheBERintheshortterm.

3. Thereisarumourthattheschoolwillbecloseddowninthefutureandthisiswhynoworkhasbeendoneormoneyspent.

SonyaKilkenny:Thisisnottrue.SonyahasmetwiththeMinisterforEducationandhasdiscussedthefutureoftheschoolandfundingafuturemasterplanandupgradetotheschool.

Actions:

VSBACommunication• VSBA to provide regular updates. The next major communication will be issued by VSBA

CommunicationsUnitafterthenexttermiteinspectionon19/2/18• VSBA Communications Unit to provide signage to put on the fence outlining the extent and

timeframeoftheworks.

VSBAProgramManger• Program Manager to include additional items in scope of works (including carpet, additional

windows, gates outside the toilets) and update timeline for communication with the schoolcommunity.

• ProgramManagertodiscussthefencingplanwithKenandtheschoolcommunity

School• Kentoorganiseameetingwithparentsandschoolcounciltodiscussthebuildingaftertheoutcome

ofthenextinspectionon19/2/18withtheVSBA.• Ken/Patricktoconsiderhowtogetstudents involvedinenhancingprideandhowto improvethe

lookofthefencingintheinterim.• SchooltoadviseSonyaifanythingisneeded.• Ken/PatricktoissueregularcommunicationfromVSBAwhichwillbeplacedontheschoolFacebook

page,newsletterandontheschoolwebsite

Sonya• ToworkwithKenandPatrickonmasterplan/upgradefunding.

DocumentsreceivedScopedocumentdated23/1/18(Appendix1)VSBAMaintenanceWorksupdatedated22/1/18(availableonschoolwebsite)

Page 4: Meeting at Sonya Kilkenny’s office re Bonbeach Primary Building … · 2018. 1. 30. · Meeting at Sonya Kilkenny’s office re Bonbeach Primary Building Maintenance 24th January

APPENDIX1Edit**from Patrick 25 Jan – the highlighted sections on the image for the Scope of Works are an indication only. Please read below for more detail.

The main school building is single storey, timber framed construction with thin block cladding battened onto the timber frame. The building has a timber floor supported by concrete stumps and a metal sheeting roof supported by open web steel roof trusses. It was indicated that the building is approximately 60 years old.

There is extensive termite damage that has caused structural failure to predominantly the western wall of the main building (LTC Building, Pre-School room 27 and (Male Toilets and female toilets on the SAMS)

Preliminary works

- Asbestos removal to western wall of main building where cladding is failing - Termite treatment program prior to works commencing:

Main Building Scope (Western Wall)

- Demolish existing rotten windows, frames and mullions - Demolish joists & flooring where rotten - Demolish existing framing & batons - Demolish existing blockwork façade - Demolish and replace all flashing and guttering where required - Install new colour bond cladding façade - Install new window frames and windows - Replace floor boards - Underpinning and stumping as required - New external gutters and drainage - Replace veranda beams

Female toilets

- Demolish& replace existing window frames & mullions - Demolish & replace termite damaged load bearing walls, studs and battening - Demolish and replace external façade where necessary

Male toilets

- Demolish& replace existing window frames & mullions - Demolish & replace termite damaged load bearing walls, studs and battening - Demolish and replace external façade where necessary

Page 5: Meeting at Sonya Kilkenny’s office re Bonbeach Primary Building … · 2018. 1. 30. · Meeting at Sonya Kilkenny’s office re Bonbeach Primary Building Maintenance 24th January

APPENDIX2Termitetrapingardenbed

Termitetraponasphalt

Termitetrapstructure