media production risk management plan - city of adelaide · media production risk management plan...
TRANSCRIPT
SAMPLE
Media Production
Risk Management Plan
Date Prepared:
SAMPLE
This document is a sample only and is provided to customers of Adelaide City Council as guide when required to supply ACC with a Risk Management Plan. Distributed to: Name Position Organisation Process: This Risk Assessment was carried out by: Name: Position: Organisation: In consultation with; Name: Position: Organisation: And the following companies and organisations; 1) 2)
SAMPLE
Media Production Brief: Company: Contact Details: Date: Venue/s: Description: Program: Set Up from: Pull Down by: Number of people involved: Road Closures: Other Traffic Control Measures: Fireworks/Stunts: Security: Catering: Parking: Further Information: List of Contacts Definitions and Classifications to be read in conjunction with Risk Assessment Qualitative Measures of likelihood Level Descriptor Description A Almost Certain Is expected to occur in most circumstances B Likely Will probably occur in most circumstances C Moderate Might occur at some time D Unlikely Could occur at some time E Rare May occur only in exceptional circumstances
SAMPLE
Qualitative Measures of Consequence or Impact Level Descriptor Example Detail Description 1 Insignificant No injuries/non treatment injuries, insignificant
damage, no disruption 2 Minor First Aid treatment, minimal damage, minimal
disruption 3 Moderate Medical treatment on and/or off site, significant
damage, moderate disruption 4 Major Extensive injuries requiring hospitalization,
extensive damage, major disruption 5 Catastrophic Death, massive injuries and damage Qualitative Risk Analysis Matrix – Level of Risk Likelihood Consequences
1 2 3 4 5 A H H E E E B M H H E E C L M H E E D L L M H E E L L M H H
E Extreme Risk, immediate action required H High Risk, senior management attention required M Moderate Risk, management responsibilities must be specified L Low Risk, manage by routine procedures
SAMPLE
Example: Activity Risk Matrix
The Risk (What can
happen and how it can happen)
The consequences of an incident
Likelihood Rating
Consequence Rating
Level of Risk
Agency Action Plan No.
Likelihood Consequences Pre-emptive Response
e.gElectrical Incidents
Unlikely Minor/Moderate D 2-3 L-M Electrician Site Manager
Film Crew Security St Johns
Al1
SAMPLE
Example: Risk Action Plan Risk Category: Identified Hazard: Responsible Agencies Pre-emptive: Response: Pre-emptive Actions Proposed Response Resource Requirements Timeframe Complied by Date Reviewed by Date Print Name/Organisation