mech project list.docx
TRANSCRIPT
Projects ListEasyElectronics Mobile: +91-9878956626,Website: +91- 9872888416www.easyelectronics.co.in Email: [email protected] Project Title Price(In INR)
Available InMechanical ProjectsM101.
Four Wheel Steering 8,500
4-5 Days
M102.
Button Operated Gear Shifting 8,000
4-5 Days
M103.
Hydraulic And Pneumatic Lift 6,000
4-5 Days
M104.
Hydraulic Break 5,000
4-5 Days
M105.
Hydraulic Bridge 4,000
4-5 Days
M106.
Hydraulic Crane 4,400
4-5 Days
M107.
Hydraulic Power Generation 5,000
4-5 Days
M108.
Magnetic Break 7,000
4-5 Days
M109.
Magnetic Clutch 7,000
4-5 Days
M110 Regeneration Braking System 6,50 4-5 Days
1 Mechanical Projects List |
. 0M111.
Shrimp Robot (Stair Robot) 8,000
4-5 Days
M112.
Six Leg Robot 7,000
4-5 Days
M113.
Six Leg Robot with Crane 9,000
4-5 Days
M114.
Solar Car 3,500
4-5 Days
M115.
Hovercraft 6,000
4-5 Days
M116.
Pipe Inspection Robot 8,500
4-5 Days
M117.
Speed Breaker 3,000
4-5 Days
M118.
Can Crusher ( Motorized) 10,000
4-5 Days
M119.
Can Crusher ( Pneumatic) 18,000
4-5 Days
M120.
Electricity generation From Shoe 6,000
4-5 Days
M122.
Automatic Stand Retrieval 6,000 4-5 Days
M123.
Button Operated Hydraulic Jack 6,000 4-5 Days
M124.
Multiple Nut Bolt Remover (Manual) 6,000 4-5 Days
M125.
Multiple Nut Bolt Remover (Motorized)
8,000 4-5 Days
M126.
Pedal Powered Hacksaw Machine 6,500 4-5 Days
M127.
Pneumatic Break 7,000 4-5 Days
M12 Stair Aid 5,000 4-5 Days
2 Mechanical Projects List |
8.M129.
Unidirectional Gear Box 6,000 4-5 Days
M130.
Vending Machine 6,000 4-5 Days
M131.
Electricity Generation From Footstep 6,500 4-5 Days
M132.
Electric Jack 4,500 4-5 Days
M133.
Grass Cutter Using Solar Energy 9,000 4-5 Days
M134.
Pedal Operated Washing Machine 12,000
4-5 Days
M135.
Self-Start LPG Based Bike Engine 25,000
10-15 Days
M136.
Hydrogen Gas based bike Engine Set-Up
25,000
10-15 Days
M137.
Compressed Air Vehicle 45,000
25-30 Days
M138.
Compressed Air Engine 35,000
10-15 Days
M139.
Duel Fuel Bike Engine Set up (LPG+Petrol)
25,000
10-15 Days
M140.
Duel Fuel Bike Engine Set up (Hydrogen+Petrol)
35,000
15-17 Days
M140.
Four Wheel Steering With Frame And Drive
25,000
7-8 Days
M141.
Gantry Robot XYZ Movement 15,500
7-8 Days
M142.
Chainess Bicycle 13,500
7-8 Days
M144.
Pneumatic Car With 2 Cylinders 22,000
7-8 Days
3 Mechanical Projects List |
M145.
Robo War(War Robot Pushing bot)-20kgs
15000
7-8 Days
M146.
Robo War(War Robot Pushing bot)-60kgs
25000
7-8 Days
M147.
Rocker Bogie Mechanism 15,000
7-8 Days
M148.
Sag Way Project 23,500
7-8 Days
M149.
Solar Based Reciprocating Pump 15,500
7-8 Days
M150.
Hand operated Can Crusher 8,000 7-8 Days
M151.
Road Roller Machine 23,000
7-8 Days
4 Mechanical Projects List |