    Er. Kashmir Dass M.E. (Hons.) Civil

    Sr. Lecturer in Civil Engineering,Sant Baba Attar Singh Govt. Polytechnic

    College, Badbar, Barnala

    Measurements in Estimating

  • 8/10/2019 Measurements in Estimating & Costing

    2/43

    PROFORMAS USED INESTIMATE

    1. Measurement form

    The details of measurements of eachitem of work are taken outand quantities of each and every

    item is computed in a prescribedform known as measurement form as under :-

    Cont.

  • 8/10/2019 Measurements in Estimating & Costing

    3/43

    Item No. Description No. Length Breadth Height Quantity

    Measurement Form:

  • 8/10/2019 Measurements in Estimating & Costing

    4/43

    2. Abstract of cost form

    The cost under each item of the work isdetermined from the quantities and total cost isworked out in a prescribed form called abstractof cost form as shown on next slide

    Cont.

  • 8/10/2019 Measurements in Estimating & Costing

    5/43

    Cont.

    item no Description quantity unit of payment Rate Amount

    Cost Form :

  • 8/10/2019 Measurements in Estimating & Costing

    6/43

    3. Material Statement formWhen materials are issued direct tothe work or purchased directly fromthe market, there cost are eithercharged direct to the work ordebited to be suspense head materials

    Cont .

  • 8/10/2019 Measurements in Estimating & Costing

    7/43

    in the account of work andwhen the cost is debited to

    the suspense head Materials, the account is called Material at site

    account M.A.S. accountis maintainedmonthwise in form 35 as under

  • 8/10/2019 Measurements in Estimating & Costing

    8/43

  • 8/10/2019 Measurements in Estimating & Costing

    9/43

    Units of measurement & Unitsof payment

    The unit of different works depend

    on their nature, size & shape.In general,the units of differentitem of work are based onthe principals mentioned further :-

    Cont.

  • 8/10/2019 Measurements in Estimating & Costing

    10/43

    1. Mass,voluminous and thick works shall be taken in cubic unit orvolume. the measurements of length,width and height or depth shall

    be taken to compute the volumeor cubic contents

    Cont .

  • 8/10/2019 Measurements in Estimating & Costing

    11/43

    2. Shallow,thin and surface works shall be taken in square unit orin area. the measurement of lengthand width or height shall be

    taken to compute the area.

  • 8/10/2019 Measurements in Estimating & Costing

    12/43

    3. Long and thin work is taken in running unit.

    4. piece work, job work is taken in number.

  • 8/10/2019 Measurements in Estimating & Costing

    13/43

    UNITS OF MEASUREMENT & PAYMENT

    Earth Work

    PARTICULARS OF ITEMS Measure Payment

    Earth filling under floors cu.m % cu.m

    Rock excavation cu.m %cu.m

    Puddle clay core cu.m %cu.m

  • 8/10/2019 Measurements in Estimating & Costing

    14/43

    PARTICULARS OF ITEMS Measure Payment

    Surface dressing and leveling,etc. Sq. m per sq. m

    cutting of trees no per no.

    Sand filling cu m per cu m

  • 8/10/2019 Measurements in Estimating & Costing

    15/43

    CONCRETE

    PARTICULARS OF ITEMS measure payments

    Cement concrete 1:4:8 in

    foundation cu m per cu m

    Plain cement concrete 1:2:4 cu m per cu m

    R.C.C chajja and sun shade cu m per cu m

  • 8/10/2019 Measurements in Estimating & Costing

    16/43

    PARTICULAR OF ITEMS measure payments

    Precast cement concrete cu m per cu m

    Cement concrete jali work sq. m per sq. m

    Cement concrete bed plates cu m per cu m

  • 8/10/2019 Measurements in Estimating & Costing

    17/43

  • 8/10/2019 Measurements in Estimating & Costing

    18/43

    PARTICULARS OF ITEMS measure payment First class B.B in cement mortar 1:5

    in foundation and plinth cu m per cu m

    First class B.Bin cement mortar 1:5 in

    superstructure cu m per cu m

    First class B.B in cement mortar 1:6 in

    foundation and plinth cu m per cu m

  • 8/10/2019 Measurements in Estimating & Costing

    19/43

    STONE WORK

    PARTICULARS OF ITEMS measure payment

    Coursed rubble masonry in mud

    mortar in foundation and plinth cu m per cu m

    Coursed rubble masonry in mud

    mortar in super structure cu m per cu m

  • 8/10/2019 Measurements in Estimating & Costing

    20/43

  • 8/10/2019 Measurements in Estimating & Costing

    21/43

    ROOFING

    PARTICULARS OF ITEMS measure payment

    R.C.C slab roofing cu m per cu m

    R.B slab roofing cu m per cu m

    First class mud roofing sq m per sq m

    Second class mud roofing sq m per sq m

  • 8/10/2019 Measurements in Estimating & Costing

    22/43

    PARTICULARS OF ITEMS measure payment

    Third class mud roofing sq m per sq m

    Expension joint metre per m

    Allahabad tile roofing sq m per sq m

    Eave board sq m per sq m

  • 8/10/2019 Measurements in Estimating & Costing

    23/43

    FLOORING

    PARTICULARS OF ITEMS measure payment

    Conglomerate floor 2.5 cm thick of

    cement concrete 1:2:4 over 7.5 cm lime

    concrete sq m per sq m

  • 8/10/2019 Measurements in Estimating & Costing

    24/43

    PARTICULARS OF ITEMS measure payment

    Flate brick flooring in cement over

    10cm thick cement concrete 1:6 :18over 10 cm thick sand filling sq m per sq m

    Brick on edge flooring over 10 cm

    thick line concrete over 10 cm sand

    filling sq m per sq m

  • 8/10/2019 Measurements in Estimating & Costing

    25/43

    PARTICULARS OF ITEMS measure payment

    Dry brick on edge flooring with

    sand grouting over consolidating

    earth sq m per sq m

    Toping of cement concrete 1:2:4 sq m per sq m

    Terrazo flooring over 10 cm thickcement concrete 1:2:4 over sand sq m per sq m

  • 8/10/2019 Measurements in Estimating & Costing

    26/43

    PARTICULARS OF ITEM measure payment

    Mud plaster 12.5 mm thick sq m per sq m

    Cement plaster 12.5 mm thick 1:4 sq m per sq m

    Cement plaster 12 mm thick 1:5 sq m per sq m

    Lime plaster 12.5 mm thick sq m per sq m

    FINISHING

  • 8/10/2019 Measurements in Estimating & Costing

    27/43

    PARTICULARS OF ITEMS measure payment

    Gobri leeping sq m per sq m

    Cement pointing 1:2 (deep) sq m per sq m

    Cement pointing 1:2 (flush) sq m per sq m

    Cement pointing 1:3 (flush) sq m per sq m

  • 8/10/2019 Measurements in Estimating & Costing

    28/43

    PAINTING

    PARTICULARS OF ITEMS measure payment

    Painting doors and windows (3 coat) sq m per sq m

    Painting doors and windows (2 coat) sq m per sq m

    Varnishing 2 coats sq m per sq m

    Solignum painting 2 coats sq m per sq m

  • 8/10/2019 Measurements in Estimating & Costing

    29/43

    PARTICULARS OF ITEMS measure payment

    Coal tarring (no. of coats specified sq. m per sq. m

    Removing of paint or varnish sq. m per sq. m

  • 8/10/2019 Measurements in Estimating & Costing

    30/43

    WOOD WORK

    PARTICULARS OF ITEMS measure payment

    Deodar wood wrought framed in

    beams and battened and fixed in

    position sq m per sq m

    Doors, windows and almirah of

    any type sq m per sq m

  • 8/10/2019 Measurements in Estimating & Costing

    31/43

    PARTICULARS OF ITEMS measure payment

    Sawing of timber sq m per sq m

    Ballies(dia. Specified) metre per m

    Deodar wood panelled and glazed

    doors or windows complete and

    fixed in position sq m per sq m

  • 8/10/2019 Measurements in Estimating & Costing

    32/43

    STEEL WORK

    PARTICULARS OF ITEMS measure payment

    Expended metal (size specified) sq m per sq m

    Iron work in trusses quintal per quintal

    Threading in iron cm per cm

  • 8/10/2019 Measurements in Estimating & Costing

    33/43

    PARTICULARS OF ITEMS measure payment

    Welding cm per cm

    Rivets, bolts and nuts quintal per quintal

    Boring holes in iron no. per no.

    Barbed wire fencing metre per m

  • 8/10/2019 Measurements in Estimating & Costing

    34/43

    PARTICULARS OF ITEMS measure payment

    Ornamental cornice metre per m

    Jungle clearance sq m per sq m

    Silt clearance cu m per cu m

    Glazing sq m per sq m

    MISCELLANEOUS

  • 8/10/2019 Measurements in Estimating & Costing

    35/43

    PARTICULAR OF ITEMS measure payment

    Glazed panes (supply) sq m per sq m

    Renewing glass panes no. Per no.

    Fixing of glass panes no. Per no.

  • 8/10/2019 Measurements in Estimating & Costing

    36/43

  • 8/10/2019 Measurements in Estimating & Costing

    37/43

    PARTICULARS OF ITEMS measure payment

    Supply of surkhi cu m per cu m

    Supply of brick ballast cu m per cu m

    Supply of steel quintal per quintal

    Supply of bitumen tonne per tonne

  • 8/10/2019 Measurements in Estimating & Costing

    38/43

  • 8/10/2019 Measurements in Estimating & Costing

    39/43

  • 8/10/2019 Measurements in Estimating & Costing

    40/43

    PUBLIC HEALTH ENGG.

    PARTICULAR OF ITEMS measure payment

    Supply of water closet no. per no.

    Supply of intercepting trap no. per no.

    Supply of wash hand basin no. per no.

  • 8/10/2019 Measurements in Estimating & Costing

    41/43

    ARTICULARS OF ITEMS measure payment

    Supply of bib cock no. Per no.

    Supply of stop cock no. Per no.

    Supply of water metre no. Per no.

    Supply of C.I pipes metre per m

  • 8/10/2019 Measurements in Estimating & Costing

    42/43

  • 8/10/2019 Measurements in Estimating & Costing

    43/43

    PARTICULARS OF ITEMS measure payment

    Brick on end edging on both sides

    with bricks and labour complete rm rm

    Collection of bajri screened and

    stacked cu m cu m