Pagbilao Power Station ACORDA LIWAG

Upload: mark-christian-liwag

Post on 12-Jan-2016

227 views

Category:

Documents


0 download

DESCRIPTION

a

TRANSCRIPT

Page 1: ME180 Preliminary Report Pagbilao Power Station

Pagbilao Power StationACORDA

LIWAG

Page 2: ME180 Preliminary Report Pagbilao Power Station

Company Profile Plant Address: Pagbilao Power Station, Isla Grande Ibabang Polo, Pagbilao, Quezon Philippines Cluster: C – Power Plants (Conventional)

Page 3: ME180 Preliminary Report Pagbilao Power Station

Contact Person Ms. Wenda Cosio HR Department 09186339544 [email protected]

Page 4: ME180 Preliminary Report Pagbilao Power Station

The Plant Pagbilao Power Station is a 735-MW coal-fired thermal power plant at Isla Grande in Pagbilao, Quezon. The power plant is capable of producing a maximum of 16.8 million kilowatt hours of electricity daily or over 6 billion kWh annually. The electricity generated is connected to the Luzon Grid via the 230-kV transmission line and the NPC sub-station in Tayabas, Quezon.

Page 5: ME180 Preliminary Report Pagbilao Power Station

Process Flow Diagram

Page 6: ME180 Preliminary Report Pagbilao Power Station

Main Plant Equipment Boiler

Type : Mitsubishi Radiant, Reheat Forced CirculationMax. Continuous Rating : 1,250 t/hSteam Drum Pressure : 196 kg/cmSuperheat Outlet : 176 kg/cmSuperheat Temperature : 541 CFiring System : Pulverized coal firingDraft System : Balanced DraftInstallation : Outdoor

TurbineType : Mitsubishi Single Reheating Condensing, Two cylinder double flow exhaustMax. Continuous Rating : 385 MWSteam Pressure : 169 kg/cmSteam Temperature : 538 CExhaust Pressure : 709 mmHgRotating Speed : 3,600 rpmNo. of feed water heaters : 8

GeneratorType : Westinghouse Horizontally mounted cylindrical rotor, rotating field typeRated Output : 442 MVAPower Factor : 0.85Rated Voltage : 24kV 5%Rated Speed : 3,600 rpm

Page 7: ME180 Preliminary Report Pagbilao Power Station

Map/Route

Page 8: ME180 Preliminary Report Pagbilao Power Station

Transportation Gold Line Coaster 29 seats maximum

Page 9: ME180 Preliminary Report Pagbilao Power Station

Commuting Directions Bus Option To Lucena

- Take a bus en route to Lucena (either from Buendia or Cubao) and get off at Lucena Grand Central Terminal. From the terminal there are vans and jeepneys going to Pagbilao. Manila to Lucena Bus fare is around Php 209.00, one-way fare.

- Second Route is to take a bus going directly to SM Lucena.

From the Lucena Grand Central Terminal

- Take a jeep ride bound for Brgy. Polo for Php 35.00.

- Tell the driver that you are going to Lukang Beach (Lukang Beach is the old name of Kwebang Lampas).

- Once in Brgy Polo, you can hire tricycle going to the Kwebang Lampas Registration area.

Page 10: ME180 Preliminary Report Pagbilao Power Station

Itinerary 4:00 am - Call time

4:30 am - Departure

4:30 am - 8:00 am - Travel to Pagbilao, Quezon

8:00 am - 11:30 am - Lecture and Plant Tour at Pagbilao Power Station

11:30 am - 12:00 pm - Lunch

12:00 pm - 2:00 pm - Travel to Calamba, Laguna

Page 11: ME180 Preliminary Report Pagbilao Power Station

Expenses Vehicle Rent - 12,500

Toll - 500

Token - 500

Certificates - 20

Driver Lunch - 100

Total = Php 13,620

Payment = Php 505/person

Page 12: ME180 Preliminary Report Pagbilao Power Station

Plant Policies 1. All should secure a Visitor’s Authorization Form from their contact person/s in the plant and are subject to inspection prior to entering plant premises.

2. It is prohibited to bring explosives, firearms, weapons and illegal drugs inside the station. Excluded from this are firearms of contracted security employees and uniformed law enforcement officers on official business.

3. All visitors will be issued a visitor’s ID card and are required to properly wear such IDs while on the Station Property. They are not allowed within the Plant Security Zone unless accompanied at all times by an employee.

4. All private, non-company owned vehicles are restricted to enter Main Plant premises and will only be allowed access up to the Administration Building’s parking area.

Page 13: ME180 Preliminary Report Pagbilao Power Station

Safety Policies 1. All visitors are required to wear proper and safe work apparels. Those wearing slippers, sando/sleeveless shirts, shorts and indecent attire will not be allowed entry.

2. All visitors with vehicles should maintain a speed limit of 25 kph.

3. Seatbelts must be worn at all times while traveling.

4. Safety shoes, hard hats and other personal protective equipment are required to be worn inside designated areas.

Page 14: ME180 Preliminary Report Pagbilao Power Station

Environmental Policies 1. Smoke belchers will not be allowed access inside the station.

2. All visitors are required to observe proper solid waste management practices. Wastes should be disposed in proper receptacles:

G R E E N

- biodegradable wastes or "nabubulok na basura"

B L U E

- recyclable wastes such as hard plastics, aluminum cans, cardboard/paper.

B L A C K

- residual wastes such as plastic bags, styrofoam, diapers, sanitary napkins.

O R A N G E

- wastes contaminated with oil found around the plant site.

Page 15: ME180 Preliminary Report Pagbilao Power Station

Questions1. What are the plans for future improvements/changes?

2. How often does the plant conduct maintenance?

3. What happens should the power system fail?

4. What are the problems/difficulties encountered in the plant?

5. What waste products are generated by the plant’s operation?

6. What are ways of disposing the waste generated by the plant?