me 114 computer aided engineering drawing - ii · 2013. 4. 19. · 3/57 working drawing working...
TRANSCRIPT
![Page 1: ME 114 Computer Aided Engineering Drawing - II · 2013. 4. 19. · 3/57 Working Drawing Working drawings must include all the knowledge for the production of a machine or structure](https://reader036.vdocuments.mx/reader036/viewer/2022071412/61080498052a0109461a37aa/html5/thumbnails/1.jpg)
ME 114
Computer Aided Engineering
Drawing - II
Asst.Prof.Dr.Turgut AKYÜREK
Çankaya University, Ankara
Assembly Drawing Exercises
![Page 2: ME 114 Computer Aided Engineering Drawing - II · 2013. 4. 19. · 3/57 Working Drawing Working drawings must include all the knowledge for the production of a machine or structure](https://reader036.vdocuments.mx/reader036/viewer/2022071412/61080498052a0109461a37aa/html5/thumbnails/2.jpg)
2/57
Working Drawing/Production Drawing
The drawings that are used to give information for
the manufacture or construction of a machine or
structure are called as working drawings or
production drawings.
T.Akyürek ME 114 Computer Aided Engineering Drawing II– Assembly Drawing Exercises
http://www.linmech.co.uk/detail.html
![Page 3: ME 114 Computer Aided Engineering Drawing - II · 2013. 4. 19. · 3/57 Working Drawing Working drawings must include all the knowledge for the production of a machine or structure](https://reader036.vdocuments.mx/reader036/viewer/2022071412/61080498052a0109461a37aa/html5/thumbnails/3.jpg)
3/57
Working Drawing
Working drawings must include all the knowledge for the
production of a machine or structure explicitly so that no
further information is required to complete the production.
T.Akyürek ME 114 Computer Aided Engineering Drawing II– Assembly Drawing Exercises
![Page 4: ME 114 Computer Aided Engineering Drawing - II · 2013. 4. 19. · 3/57 Working Drawing Working drawings must include all the knowledge for the production of a machine or structure](https://reader036.vdocuments.mx/reader036/viewer/2022071412/61080498052a0109461a37aa/html5/thumbnails/4.jpg)
4/57
Working Drawing
Working drawings are specialized engineering
drawings that provide information required to make the
part or assembly of the final design.
•May be more than
one sheet.
•Includes
-Assembly drawing
-Detail drawings of
non-standard parts
-Parts list
T.Akyürek ME 114 Computer Aided Engineering Drawing II– Assembly Drawing Exercises
![Page 5: ME 114 Computer Aided Engineering Drawing - II · 2013. 4. 19. · 3/57 Working Drawing Working drawings must include all the knowledge for the production of a machine or structure](https://reader036.vdocuments.mx/reader036/viewer/2022071412/61080498052a0109461a37aa/html5/thumbnails/5.jpg)
5/57
Assembly Drawing
An assembly drawing shows how each part of a
design is put together.
If the design depicted is only part of the total
assembly, it is referred to as subassembly.
http://www.robspencerdesign.co.uk/13912.html
T.Akyürek ME 114 Computer Aided Engineering Drawing II– Assembly Drawing Exercises
![Page 6: ME 114 Computer Aided Engineering Drawing - II · 2013. 4. 19. · 3/57 Working Drawing Working drawings must include all the knowledge for the production of a machine or structure](https://reader036.vdocuments.mx/reader036/viewer/2022071412/61080498052a0109461a37aa/html5/thumbnails/6.jpg)
6/57
Constructing an Assembly
Constructing an assembly begins with bringing in a
base component. A base component will be
selected because of its central role in defining the
overall assembly.
Each successive component brought in needs to be
oriented and located relative to other components
in the assembly.
Location and orientation is achieved by defining
geometric relations between geometric elements of
a component in the assembly and elements of
components beeing brought in.
T.Akyürek ME 114 Computer Aided Engineering Drawing II– Assembly Drawing Exercises
![Page 7: ME 114 Computer Aided Engineering Drawing - II · 2013. 4. 19. · 3/57 Working Drawing Working drawings must include all the knowledge for the production of a machine or structure](https://reader036.vdocuments.mx/reader036/viewer/2022071412/61080498052a0109461a37aa/html5/thumbnails/7.jpg)
7/57
Content of Working Drawings for an Assembly
An assembly or subassembly drawing showing all the
standard and nonstandard parts in a single drawing,
drawn in their operating position
A parts list or bill of materials, showing
– detail number for each part,
– the quantity needed for a single assembly,
– the description or name of the part,
– catalog number if it is a standard part,
– and the company part number
A title block
Detail drawings of each nonstandard part
T.Akyürek ME 114 Computer Aided Engineering Drawing II– Assembly Drawing Exercises
![Page 8: ME 114 Computer Aided Engineering Drawing - II · 2013. 4. 19. · 3/57 Working Drawing Working drawings must include all the knowledge for the production of a machine or structure](https://reader036.vdocuments.mx/reader036/viewer/2022071412/61080498052a0109461a37aa/html5/thumbnails/8.jpg)
8/57
Assembly Drawing Content All the parts drawn in their operating position
A parts list or bill of materials, showing
– detail number for each part,
– the quantity needed for a single assembly,
– the description or name of the part,
– catalog number if it is a standard part,
– and the company part number
Leader lines with balloons, assigning each part a detail
number, in sequential order and keyed to the list of parts
in the parts list
Machning and assembly operations and critical
dimensions related the functions.
T.Akyürek ME 114 Computer Aided Engineering Drawing II– Assembly Drawing Exercises
![Page 9: ME 114 Computer Aided Engineering Drawing - II · 2013. 4. 19. · 3/57 Working Drawing Working drawings must include all the knowledge for the production of a machine or structure](https://reader036.vdocuments.mx/reader036/viewer/2022071412/61080498052a0109461a37aa/html5/thumbnails/9.jpg)
9/57
Standard Parts
Standards parts are commonly used in
assemblies.
– Threaded fasteners
– Non-threaded fasteners
– Gears
– Keys
T.Akyürek ME 114 Computer Aided Engineering Drawing II– Assembly Drawing Exercises
![Page 10: ME 114 Computer Aided Engineering Drawing - II · 2013. 4. 19. · 3/57 Working Drawing Working drawings must include all the knowledge for the production of a machine or structure](https://reader036.vdocuments.mx/reader036/viewer/2022071412/61080498052a0109461a37aa/html5/thumbnails/10.jpg)
10/57
Kinds of Assembly Drawings
Pictorial assembly drawings
Outline assembly drawings
Sectioned assembly drawings
T.Akyürek ME 114 Computer Aided Engineering Drawing II– Assembly Drawing Exercises
![Page 11: ME 114 Computer Aided Engineering Drawing - II · 2013. 4. 19. · 3/57 Working Drawing Working drawings must include all the knowledge for the production of a machine or structure](https://reader036.vdocuments.mx/reader036/viewer/2022071412/61080498052a0109461a37aa/html5/thumbnails/11.jpg)
11/57
Kinds of Assembly Drawings
Pictorial assembly drawings These drawings are very useful to indicate the method of
assembly, and are often used in technical manuals.
Outline assembly drawings
Sectioned assembly drawings
T.Akyürek ME 114 Computer Aided Engineering Drawing II– Assembly Drawing Exercises
A Model Created as an
Illustration for Maintenance
Handbooks
![Page 12: ME 114 Computer Aided Engineering Drawing - II · 2013. 4. 19. · 3/57 Working Drawing Working drawings must include all the knowledge for the production of a machine or structure](https://reader036.vdocuments.mx/reader036/viewer/2022071412/61080498052a0109461a37aa/html5/thumbnails/12.jpg)
12/57
Pictorial Assembly Drawings
Pictorial assembly
drawings give general
graphic description of each
part and uses center lines
to show how the parts are
assembled.
The pictorial assembly is
normally an isometric view
and is used in installation
and maintenance manuals.
T.Akyürek ME 114 Computer Aided Engineering Drawing II– Assembly Drawing Exercises
![Page 13: ME 114 Computer Aided Engineering Drawing - II · 2013. 4. 19. · 3/57 Working Drawing Working drawings must include all the knowledge for the production of a machine or structure](https://reader036.vdocuments.mx/reader036/viewer/2022071412/61080498052a0109461a37aa/html5/thumbnails/13.jpg)
13/57
Pictorial Assembly Drawings
With 2-D CAD, pictorial
assembly drawings can be
created using traditional
techniques. A 3-D CAD
model also can be used to
render and create pictorial
assemblies by positioning
each part in a pictorial
view.
Center lines and a parts
list are added to complete
the drawing.
T.Akyürek ME 114 Computer Aided Engineering Drawing II– Assembly Drawing Exercises
![Page 14: ME 114 Computer Aided Engineering Drawing - II · 2013. 4. 19. · 3/57 Working Drawing Working drawings must include all the knowledge for the production of a machine or structure](https://reader036.vdocuments.mx/reader036/viewer/2022071412/61080498052a0109461a37aa/html5/thumbnails/14.jpg)
14/57
Kinds of Assembly Drawings Pictorial assembly drawings
Outline assembly drawings
– give general graphic description of the exterior shape.
– are used for parts catalogs and installation manuals, or for production if the assembly is simple.
T.Akyürek ME 114 Computer Aided Engineering Drawing II– Assembly Drawing Exercises
– Therefore, keep number of views minimum necessary to describe the assembly.
– It is common to have a single orthographic assembly view, such as the front view.
Sectioned assembly drawings
![Page 15: ME 114 Computer Aided Engineering Drawing - II · 2013. 4. 19. · 3/57 Working Drawing Working drawings must include all the knowledge for the production of a machine or structure](https://reader036.vdocuments.mx/reader036/viewer/2022071412/61080498052a0109461a37aa/html5/thumbnails/15.jpg)
15/57
Outline Assembly
http://odin.me.memphis.edu/ugs_docs/NX3/draftingeff/drawing_types/inprocess_drawings.html Fixture Assembly
T.Akyürek ME 114 Computer Aided Engineering Drawing II– Assembly Drawing Exercises
![Page 16: ME 114 Computer Aided Engineering Drawing - II · 2013. 4. 19. · 3/57 Working Drawing Working drawings must include all the knowledge for the production of a machine or structure](https://reader036.vdocuments.mx/reader036/viewer/2022071412/61080498052a0109461a37aa/html5/thumbnails/16.jpg)
16/57
Kinds of Assembly Drawings
Pictorial assembly drawings
Outline assembly drawings
Sectioned assembly
drawings
– For determining how complicated devices are assembled,
– For design visualization.
T.Akyürek ME 114 Computer Aided Engineering Drawing II– Assembly Drawing Exercises
![Page 17: ME 114 Computer Aided Engineering Drawing - II · 2013. 4. 19. · 3/57 Working Drawing Working drawings must include all the knowledge for the production of a machine or structure](https://reader036.vdocuments.mx/reader036/viewer/2022071412/61080498052a0109461a37aa/html5/thumbnails/17.jpg)
17/57
Sectioned Assembly Drawings
Sectioned assembly drawings give general
graphic description of the interior shape by
passing a cutting plane through all or part of
the assembly.
The sectioned assembly is usually a
multiview drawing of all the parts, with one
view in full section (or half section, or broken-
out section etc.).
T.Akyürek ME 114 Computer Aided Engineering Drawing II– Assembly Drawing Exercises
![Page 18: ME 114 Computer Aided Engineering Drawing - II · 2013. 4. 19. · 3/57 Working Drawing Working drawings must include all the knowledge for the production of a machine or structure](https://reader036.vdocuments.mx/reader036/viewer/2022071412/61080498052a0109461a37aa/html5/thumbnails/18.jpg)
18/57
Sectioned Assembly Drawings
Reminder on section views:
–Standard parts, such as fasteners, dowels, pins, bearings, and gears, and nonstandard parts, such as shafts, are not sectioned; they are drawn showing all their exterior features.
– Adjacent parts in section are lined at different angles, using the cast iron or other type of symbol.
–Thin parts, such as gaskets, are shown solid black.
T.Akyürek ME 114 Computer Aided Engineering Drawing II– Assembly Drawing Exercises
![Page 19: ME 114 Computer Aided Engineering Drawing - II · 2013. 4. 19. · 3/57 Working Drawing Working drawings must include all the knowledge for the production of a machine or structure](https://reader036.vdocuments.mx/reader036/viewer/2022071412/61080498052a0109461a37aa/html5/thumbnails/19.jpg)
19/57
Sectioned Assembly
Piston http://www.confident-instruments.com/3DModeling.htm
T.Akyürek ME 114 Computer Aided Engineering Drawing II– Assembly Drawing Exercises
![Page 20: ME 114 Computer Aided Engineering Drawing - II · 2013. 4. 19. · 3/57 Working Drawing Working drawings must include all the knowledge for the production of a machine or structure](https://reader036.vdocuments.mx/reader036/viewer/2022071412/61080498052a0109461a37aa/html5/thumbnails/20.jpg)
20/57
Sectioned Assembly
Sprocket http://jpengineering.blogspot.com/2011/04/sprocket-sectioned-assembly.html
T.Akyürek ME 114 Computer Aided Engineering Drawing II– Assembly Drawing Exercises
![Page 21: ME 114 Computer Aided Engineering Drawing - II · 2013. 4. 19. · 3/57 Working Drawing Working drawings must include all the knowledge for the production of a machine or structure](https://reader036.vdocuments.mx/reader036/viewer/2022071412/61080498052a0109461a37aa/html5/thumbnails/21.jpg)
21/57
Exploded Assembly Drawing One common variation on the assembly drawing is the exploded assembly
drawing: This can be either a pictorial or an orthographic assembly drawing
in which the parts are shown exploded apart from each other.
Exploded Compass
Assembly Drawing
T.Akyürek ME 114 Computer Aided Engineering Drawing II– Assembly Drawing Exercises
![Page 22: ME 114 Computer Aided Engineering Drawing - II · 2013. 4. 19. · 3/57 Working Drawing Working drawings must include all the knowledge for the production of a machine or structure](https://reader036.vdocuments.mx/reader036/viewer/2022071412/61080498052a0109461a37aa/html5/thumbnails/22.jpg)
22/57
Creating Assembly Drawings
How to create an assembly drawing?
–An assembly drawing is produced by tracing the needed views from the detail drawings, or by creating the drawing from scratch.
–With 2-D CAD, it is possible to copy detail views, then place them on the assembly drawing.
–With 3-D models, simply assemble all the models, then determine the line of sight to extract the needed assembly view (recall the video at the beginning of the course).
T.Akyürek ME 114 Computer Aided Engineering Drawing II– Assembly Drawing Exercises
![Page 23: ME 114 Computer Aided Engineering Drawing - II · 2013. 4. 19. · 3/57 Working Drawing Working drawings must include all the knowledge for the production of a machine or structure](https://reader036.vdocuments.mx/reader036/viewer/2022071412/61080498052a0109461a37aa/html5/thumbnails/23.jpg)
23/57
Creating Assembly Drawings
Dimensions are not shown on assembly
drawings, unless necessary to provide overall
assembly dimensions, or to assist machining
operations necessary for assembly.
Hidden lines are omitted in assembly
drawings, except when needed for assembly or
clarity.
T.Akyürek ME 114 Computer Aided Engineering Drawing II– Assembly Drawing Exercises
![Page 24: ME 114 Computer Aided Engineering Drawing - II · 2013. 4. 19. · 3/57 Working Drawing Working drawings must include all the knowledge for the production of a machine or structure](https://reader036.vdocuments.mx/reader036/viewer/2022071412/61080498052a0109461a37aa/html5/thumbnails/24.jpg)
24/57
Parts List (Bill of Material)
Parts List should include information
such as:
Item or part number.
Description or name of part.
Quantity required.
Material specification.
Drawing number of detail
drawing if required.
Stores or part reference number,
if applicable.
T.Akyürek ME 114 Computer Aided Engineering Drawing II– Assembly Drawing Exercises
![Page 25: ME 114 Computer Aided Engineering Drawing - II · 2013. 4. 19. · 3/57 Working Drawing Working drawings must include all the knowledge for the production of a machine or structure](https://reader036.vdocuments.mx/reader036/viewer/2022071412/61080498052a0109461a37aa/html5/thumbnails/25.jpg)
25/57
Parts List (Bill of Material)
The parts list runs vertically for as many
rows as are needed to list the parts.
T.Akyürek ME 114 Computer Aided Engineering Drawing II– Assembly Drawing Exercises
Standard parts list
![Page 26: ME 114 Computer Aided Engineering Drawing - II · 2013. 4. 19. · 3/57 Working Drawing Working drawings must include all the knowledge for the production of a machine or structure](https://reader036.vdocuments.mx/reader036/viewer/2022071412/61080498052a0109461a37aa/html5/thumbnails/26.jpg)
26/57
Parts List (Bill of Material)
T.Akyürek ME 114 Computer Aided Engineering Drawing II– Assembly Drawing Exercises
![Page 27: ME 114 Computer Aided Engineering Drawing - II · 2013. 4. 19. · 3/57 Working Drawing Working drawings must include all the knowledge for the production of a machine or structure](https://reader036.vdocuments.mx/reader036/viewer/2022071412/61080498052a0109461a37aa/html5/thumbnails/27.jpg)
27/57
Part Identification
Balloons are used to identify parts by
their assigned number in the assembly.
T.Akyürek ME 114 Computer Aided Engineering Drawing II– Assembly Drawing Exercises
Balloons in an assembly
In detail drawings of an assembly,
the part name and detail number
are located near one of the views
or title block.
Part name in a detail drawing
![Page 28: ME 114 Computer Aided Engineering Drawing - II · 2013. 4. 19. · 3/57 Working Drawing Working drawings must include all the knowledge for the production of a machine or structure](https://reader036.vdocuments.mx/reader036/viewer/2022071412/61080498052a0109461a37aa/html5/thumbnails/28.jpg)
28/57
Tabular Drawings
T.Akyürek ME 114 Computer Aided Engineering Drawing II– Assembly Drawing Exercises
Tabular drawings are used when several similar parts
have common features.
Tabular drawing of an
cylinder, from a Paris catalog
![Page 29: ME 114 Computer Aided Engineering Drawing - II · 2013. 4. 19. · 3/57 Working Drawing Working drawings must include all the knowledge for the production of a machine or structure](https://reader036.vdocuments.mx/reader036/viewer/2022071412/61080498052a0109461a37aa/html5/thumbnails/29.jpg)
29/57
Classic Problem 11.1:Sliding-Door Guide
ME 114 Computer Aided Engineering Drawing II– Assembly Drawing Exercises T.Akyürek
1. Sketch orthographic views of each part, with dimensions.
2. If dimensions are missing, determine what they should be by
their relationship to other parts.
3. Determine tolerances as noted or assigned.
4. Create 3-D models of each part, then extract orthographic
views.
5. Determine finished surfaces and mark them on the sketch.
6. Create dimensioned detail drawings of each non-standard
part in the assembly.
7. Create an orhthographic or exploded pictorial assembly
drawing in section.
8. Label all parts in the assembly drawing, using numbers and
balloons.
9. Create an ASME standard parts list with all relavent
information for the parts in the assembly.
![Page 30: ME 114 Computer Aided Engineering Drawing - II · 2013. 4. 19. · 3/57 Working Drawing Working drawings must include all the knowledge for the production of a machine or structure](https://reader036.vdocuments.mx/reader036/viewer/2022071412/61080498052a0109461a37aa/html5/thumbnails/30.jpg)
30/57
Problem 11.2:Quick-Acting Hold-Down Clamp
ME 114 Computer Aided Engineering Drawing II– Assembly Drawing Exercises T.Akyürek
1. Sketch orthographic views of each part,
with dimensions.
2. If dimensions are missing, determine
what they should be by their
relationship to other parts.
3. Determine tolerances as noted or
assigned.
4. Create 3-D models of each part, then
extract orthographic views.
5. Determine finished surfaces and mark
them on the sketch.
6. Create dimensioned detail drawings of
each non-standard part in the
assembly.
7. Create an orhthographic or exploded
pictorial assembly drawing in section.
8. Label all parts in the assembly drawing,
using numbers and balloons.
9. Create an ASME standard parts list with
all relavent information for the parts in
the assembly.
![Page 31: ME 114 Computer Aided Engineering Drawing - II · 2013. 4. 19. · 3/57 Working Drawing Working drawings must include all the knowledge for the production of a machine or structure](https://reader036.vdocuments.mx/reader036/viewer/2022071412/61080498052a0109461a37aa/html5/thumbnails/31.jpg)
31/57
Problem 11.2:Quick-Acting Hold-Down Clamp
ME 114 Computer Aided Engineering Drawing II– Assembly Drawing Exercises T.Akyürek
![Page 32: ME 114 Computer Aided Engineering Drawing - II · 2013. 4. 19. · 3/57 Working Drawing Working drawings must include all the knowledge for the production of a machine or structure](https://reader036.vdocuments.mx/reader036/viewer/2022071412/61080498052a0109461a37aa/html5/thumbnails/32.jpg)
32/57
Problem 11.2:Quick-Acting Hold-Down Clamp
ME 114 Computer Aided Engineering Drawing II– Assembly Drawing Exercises T.Akyürek
![Page 33: ME 114 Computer Aided Engineering Drawing - II · 2013. 4. 19. · 3/57 Working Drawing Working drawings must include all the knowledge for the production of a machine or structure](https://reader036.vdocuments.mx/reader036/viewer/2022071412/61080498052a0109461a37aa/html5/thumbnails/33.jpg)
33/57
Plate Assembly
ME 114 Computer Aided Engineering Drawing II– Assembly Drawing Exercises T.Akyürek
![Page 34: ME 114 Computer Aided Engineering Drawing - II · 2013. 4. 19. · 3/57 Working Drawing Working drawings must include all the knowledge for the production of a machine or structure](https://reader036.vdocuments.mx/reader036/viewer/2022071412/61080498052a0109461a37aa/html5/thumbnails/34.jpg)
34/57
Plate Assembly
ME 114 Computer Aided Engineering Drawing II– Assembly Drawing Exercises T.Akyürek
![Page 35: ME 114 Computer Aided Engineering Drawing - II · 2013. 4. 19. · 3/57 Working Drawing Working drawings must include all the knowledge for the production of a machine or structure](https://reader036.vdocuments.mx/reader036/viewer/2022071412/61080498052a0109461a37aa/html5/thumbnails/35.jpg)
35/57
Plate Assembly
ME 114 Computer Aided Engineering Drawing II– Assembly Drawing Exercises T.Akyürek
![Page 36: ME 114 Computer Aided Engineering Drawing - II · 2013. 4. 19. · 3/57 Working Drawing Working drawings must include all the knowledge for the production of a machine or structure](https://reader036.vdocuments.mx/reader036/viewer/2022071412/61080498052a0109461a37aa/html5/thumbnails/36.jpg)
36/57
Plate Assembly
ME 114 Computer Aided Engineering Drawing II– Assembly Drawing Exercises T.Akyürek
![Page 37: ME 114 Computer Aided Engineering Drawing - II · 2013. 4. 19. · 3/57 Working Drawing Working drawings must include all the knowledge for the production of a machine or structure](https://reader036.vdocuments.mx/reader036/viewer/2022071412/61080498052a0109461a37aa/html5/thumbnails/37.jpg)
37/57
Trombon Assembly
ME 114 Computer Aided Engineering Drawing II– Assembly Drawing Exercises T.Akyürek
10.3 Exercise 3: Bearing Block
![Page 38: ME 114 Computer Aided Engineering Drawing - II · 2013. 4. 19. · 3/57 Working Drawing Working drawings must include all the knowledge for the production of a machine or structure](https://reader036.vdocuments.mx/reader036/viewer/2022071412/61080498052a0109461a37aa/html5/thumbnails/38.jpg)
38/57
Trombon Assembly
ME 114 Computer Aided Engineering Drawing II– Assembly Drawing Exercises T.Akyürek
10.3 Exercise 3: Bearing Block
![Page 39: ME 114 Computer Aided Engineering Drawing - II · 2013. 4. 19. · 3/57 Working Drawing Working drawings must include all the knowledge for the production of a machine or structure](https://reader036.vdocuments.mx/reader036/viewer/2022071412/61080498052a0109461a37aa/html5/thumbnails/39.jpg)
39/57
Bearing Block
ME 114 Computer Aided Engineering Drawing II– Assembly Drawing Exercises T.Akyürek
10.3 Exercise 3: Bearing Block
![Page 40: ME 114 Computer Aided Engineering Drawing - II · 2013. 4. 19. · 3/57 Working Drawing Working drawings must include all the knowledge for the production of a machine or structure](https://reader036.vdocuments.mx/reader036/viewer/2022071412/61080498052a0109461a37aa/html5/thumbnails/40.jpg)
40/57
Bearing Block
ME 114 Computer Aided Engineering Drawing II– Assembly Drawing Exercises T.Akyürek
10.3 Exercise 3: Bearing Block
![Page 41: ME 114 Computer Aided Engineering Drawing - II · 2013. 4. 19. · 3/57 Working Drawing Working drawings must include all the knowledge for the production of a machine or structure](https://reader036.vdocuments.mx/reader036/viewer/2022071412/61080498052a0109461a37aa/html5/thumbnails/41.jpg)
41/57
Bearing Block
ME 114 Computer Aided Engineering Drawing II– Assembly Drawing Exercises T.Akyürek
10.3 Exercise 3: Bearing Block
![Page 42: ME 114 Computer Aided Engineering Drawing - II · 2013. 4. 19. · 3/57 Working Drawing Working drawings must include all the knowledge for the production of a machine or structure](https://reader036.vdocuments.mx/reader036/viewer/2022071412/61080498052a0109461a37aa/html5/thumbnails/42.jpg)
42/57
Hitch Mount
ME 114 Computer Aided Engineering Drawing II– Assembly Drawing Exercises T.Akyürek
10.3 Exercise 3: Bearing Block
![Page 43: ME 114 Computer Aided Engineering Drawing - II · 2013. 4. 19. · 3/57 Working Drawing Working drawings must include all the knowledge for the production of a machine or structure](https://reader036.vdocuments.mx/reader036/viewer/2022071412/61080498052a0109461a37aa/html5/thumbnails/43.jpg)
43/57
Hitch Mount
ME 114 Computer Aided Engineering Drawing II– Assembly Drawing Exercises T.Akyürek
10.3 Exercise 3: Bearing Block
![Page 44: ME 114 Computer Aided Engineering Drawing - II · 2013. 4. 19. · 3/57 Working Drawing Working drawings must include all the knowledge for the production of a machine or structure](https://reader036.vdocuments.mx/reader036/viewer/2022071412/61080498052a0109461a37aa/html5/thumbnails/44.jpg)
44/57
Hitch Mount
ME 114 Computer Aided Engineering Drawing II– Assembly Drawing Exercises T.Akyürek
10.3 Exercise 3: Bearing Block
![Page 45: ME 114 Computer Aided Engineering Drawing - II · 2013. 4. 19. · 3/57 Working Drawing Working drawings must include all the knowledge for the production of a machine or structure](https://reader036.vdocuments.mx/reader036/viewer/2022071412/61080498052a0109461a37aa/html5/thumbnails/45.jpg)
45/57
Hitch Mount
ME 114 Computer Aided Engineering Drawing II– Assembly Drawing Exercises T.Akyürek
10.3 Exercise 3: Bearing Block
![Page 46: ME 114 Computer Aided Engineering Drawing - II · 2013. 4. 19. · 3/57 Working Drawing Working drawings must include all the knowledge for the production of a machine or structure](https://reader036.vdocuments.mx/reader036/viewer/2022071412/61080498052a0109461a37aa/html5/thumbnails/46.jpg)
46/57
Tower Assembly
ME 114 Computer Aided Engineering Drawing II– Assembly Drawing Exercises T.Akyürek
10.3 Exercise 3: Bearing Block
![Page 47: ME 114 Computer Aided Engineering Drawing - II · 2013. 4. 19. · 3/57 Working Drawing Working drawings must include all the knowledge for the production of a machine or structure](https://reader036.vdocuments.mx/reader036/viewer/2022071412/61080498052a0109461a37aa/html5/thumbnails/47.jpg)
47/57
Tower Assembly
ME 114 Computer Aided Engineering Drawing II– Assembly Drawing Exercises T.Akyürek
10.3 Exercise 3: Bearing Block
![Page 48: ME 114 Computer Aided Engineering Drawing - II · 2013. 4. 19. · 3/57 Working Drawing Working drawings must include all the knowledge for the production of a machine or structure](https://reader036.vdocuments.mx/reader036/viewer/2022071412/61080498052a0109461a37aa/html5/thumbnails/48.jpg)
48/57
Tower Assembly
ME 114 Computer Aided Engineering Drawing II– Assembly Drawing Exercises T.Akyürek
10.3 Exercise 3: Bearing Block
![Page 49: ME 114 Computer Aided Engineering Drawing - II · 2013. 4. 19. · 3/57 Working Drawing Working drawings must include all the knowledge for the production of a machine or structure](https://reader036.vdocuments.mx/reader036/viewer/2022071412/61080498052a0109461a37aa/html5/thumbnails/49.jpg)
49/57
Tower Assembly
ME 114 Computer Aided Engineering Drawing II– Assembly Drawing Exercises T.Akyürek
10.3 Exercise 3: Bearing Block
![Page 50: ME 114 Computer Aided Engineering Drawing - II · 2013. 4. 19. · 3/57 Working Drawing Working drawings must include all the knowledge for the production of a machine or structure](https://reader036.vdocuments.mx/reader036/viewer/2022071412/61080498052a0109461a37aa/html5/thumbnails/50.jpg)
50/57
Tower Assembly
ME 114 Computer Aided Engineering Drawing II– Assembly Drawing Exercises T.Akyürek
10.3 Exercise 3: Bearing Block
![Page 51: ME 114 Computer Aided Engineering Drawing - II · 2013. 4. 19. · 3/57 Working Drawing Working drawings must include all the knowledge for the production of a machine or structure](https://reader036.vdocuments.mx/reader036/viewer/2022071412/61080498052a0109461a37aa/html5/thumbnails/51.jpg)
51/57
Roller Guide Assembly
ME 114 Computer Aided Engineering Drawing II– Assembly Drawing Exercises T.Akyürek
10.3 Exercise 3: Bearing Block
![Page 52: ME 114 Computer Aided Engineering Drawing - II · 2013. 4. 19. · 3/57 Working Drawing Working drawings must include all the knowledge for the production of a machine or structure](https://reader036.vdocuments.mx/reader036/viewer/2022071412/61080498052a0109461a37aa/html5/thumbnails/52.jpg)
52/57
Roller Guide Assembly
ME 114 Computer Aided Engineering Drawing II– Assembly Drawing Exercises T.Akyürek
10.3 Exercise 3: Bearing Block
![Page 53: ME 114 Computer Aided Engineering Drawing - II · 2013. 4. 19. · 3/57 Working Drawing Working drawings must include all the knowledge for the production of a machine or structure](https://reader036.vdocuments.mx/reader036/viewer/2022071412/61080498052a0109461a37aa/html5/thumbnails/53.jpg)
53/57
Roller Guide Assembly
ME 114 Computer Aided Engineering Drawing II– Assembly Drawing Exercises T.Akyürek
10.3 Exercise 3: Bearing Block
![Page 54: ME 114 Computer Aided Engineering Drawing - II · 2013. 4. 19. · 3/57 Working Drawing Working drawings must include all the knowledge for the production of a machine or structure](https://reader036.vdocuments.mx/reader036/viewer/2022071412/61080498052a0109461a37aa/html5/thumbnails/54.jpg)
54/57
Roller Guide Assembly
ME 114 Computer Aided Engineering Drawing II– Assembly Drawing Exercises T.Akyürek
10.3 Exercise 3: Bearing Block
![Page 55: ME 114 Computer Aided Engineering Drawing - II · 2013. 4. 19. · 3/57 Working Drawing Working drawings must include all the knowledge for the production of a machine or structure](https://reader036.vdocuments.mx/reader036/viewer/2022071412/61080498052a0109461a37aa/html5/thumbnails/55.jpg)
55/57
Roller Guide Assembly
ME 114 Computer Aided Engineering Drawing II– Assembly Drawing Exercises T.Akyürek
10.3 Exercise 3: Bearing Block
![Page 56: ME 114 Computer Aided Engineering Drawing - II · 2013. 4. 19. · 3/57 Working Drawing Working drawings must include all the knowledge for the production of a machine or structure](https://reader036.vdocuments.mx/reader036/viewer/2022071412/61080498052a0109461a37aa/html5/thumbnails/56.jpg)
56/57
Roller Guide Assembly
ME 114 Computer Aided Engineering Drawing II– Assembly Drawing Exercises T.Akyürek
10.3 Exercise 3: Bearing Block
![Page 57: ME 114 Computer Aided Engineering Drawing - II · 2013. 4. 19. · 3/57 Working Drawing Working drawings must include all the knowledge for the production of a machine or structure](https://reader036.vdocuments.mx/reader036/viewer/2022071412/61080498052a0109461a37aa/html5/thumbnails/57.jpg)
57/57
English – Turkish Dictionary
Working
drawing
Uygulama çizimi,
ayrıntılı çizim
Production
drawing
İmalat resmi Assembly
drawing
Montaj resmi
specifications şartname blueprint Ozalit baskısı,
ayrıntılı plan
Bill of material Malzeme listesi
Title block İsim bloğu Detail drawing Ayrıntı çizimi,
detay resmi
subassembly Alt montaj
Surface finish Yüzey tesviyesi roller merdane mate eşleme
align hizalama joining birleştirme Degree of
freedom
Serbestlik derecesi
milling frezeleme cutter Keski, kesici fixture Bağlama düzeni
Worm gear Sonsuz vida dişlisi idle avare valve Vana, subap
sprocket Zincir dişlisi, cer
dişlisi
spring yay Clamping unit Kıskaç, kenet
vibration titreşim Hold-down baskılama
ME 114 Computer Aided Engineering Drawing II– Assembly Drawing Exercises T.Akyürek