mdot research services fy 2018 at-a-glancefiscal year (fy) 2018. the tables on pages 2 through 7...

8
www.Michigan.gov/MDOTResearch FY 2018 SP&R Part II Expenditures by Funding Source State Research Funds $ 521,020.62 Federal Research Funds $ 4,985,499.04 TOTAL $ 5,506,519.66 9.5% State 90.5% Federal FY 2018 SP&R Part II Expenditures by Type FY 2018 Research Project Expenditures by Focus Area Individual Research Projects $ 2,605,103.08 Multi-State Pooled Fund Studies a: Participation in Pooled Fund Studies $ 569,500.00 Led by Other States b: Participation in MDOT-Led Pooled Fund $ 95,366.00 Studies UTC Projects $ 188,901.58 Research Project Expenditures $ 3,458,870.66 NCHRP and TRB Contributions $ 1,384,649.00 AASHTO Programs $ 663,000.00 TOTAL $ 5,506,519.66 Research Administration STATE PLANNING & RESEARCH PART II PROGRAM This publication presents a summary of Research and Library funding statistics and project progress for Fiscal Year (FY) 2018. The tables on pages 2 through 7 list all MDOT-funded research projects by topic area that were active or completed during 2018. These listings include both individual Michigan research projects and multi-state pooled fund projects. FY 2018 At-A-Glance OCT. 1, 2017 - SEPT. 30, 2018 Administration $ 43,120.86 Asset Management $ 60,105.56 Bridges and Structures $ 1,120,316.33 Environmnent and Water Resources $ 8,367.89 Intelligent Transportation Systems $ 95,000.00 Maintenance $ 292,084.59 Mobility, Systems and Signal Operations $ 430,768.27 Nonmotorized Planning and Development $ 95,052.03 Pavements and Materials $ 585,056.84 Rest Areas, Utilities and Landscaping $ 218,430.99 Surveys and Automated Design $ 121,701.17 Transportation Safety $ 388,866.13 TOTAL $ 3,458,870.66 8.4% 12.5% 16.9% 3.5% 1.2% 1.7% 2.7% 6.3% 2.7% 0.2% 32.4% 11.2% UTC Projects 3.4% a: 10.3% Other State-Led Pooled Fund Studies AASHTO Programs b: 1.7% MDOT-Led Pooled Fund Studies Individual Research Projects 47.3% NCHRP and TRB Contributions 25.1% 12.0% field services

Upload: others

Post on 06-Oct-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: MDOT Research Services FY 2018 At-A-GlanceFiscal Year (FY) 2018. The tables on pages 2 through 7 list all MDOT-funded research projects by topic area that were active or completed

wwwMichigangovMDOTResearch

FY 2018 SPampR Part II Expenditures

by Funding Source

State Research Funds $ 52102062Federal Research Funds $ 498549904

TOTAL $ 550651966

95 State

905 Federal

FY 2018 SPampR Part II Expenditures by Type

FY 2018 Research Project Expenditures by Focus Area

Individual Research Projects $ 260510308Multi-State Pooled Fund Studies a Participation in Pooled Fund Studies $ 56950000

Led by Other Statesb Participation in MDOT-Led Pooled Fund $ 9536600

StudiesUTC Projects $ 18890158

Research Project Expenditures $ 345887066 NCHRP and TRB Contributions $ 138464900AASHTO Programs $ 66300000

TOTAL $ 550651966

Research Administration S TAT E P L A N N I N G amp R E S E A R C H P A R T I I P R O G R A M

This publication presents a summary of Research and Library funding statistics and project progress for

Fiscal Year (FY) 2018 The tables on pages 2 through 7 list all MDOT-funded research projects by topic area

that were active or completed during 2018 These listings include both individual Michigan research projects

and multi-state pooled fund projects

FY 2018 At-A-Glance OCT 1 2017 - SEPT 30 2018

Administration $ 4312086Asset Management $ 6010556Bridges and Structures $ 112031633Environmnent and Water Resources $ 836789Intelligent Transportation Systems $ 9500000Maintenance $ 29208459Mobility Systems and Signal Operations $ 43076827Nonmotorized Planning and Development $ 9505203Pavements and Materials $ 58505684Rest Areas Utilities and Landscaping $ 21843099Surveys and Automated Design $ 12170117Transportation Safety $ 38886613

TOTAL $ 345887066

84125

169

35

12 17

27

63

27

02

324

112UTC

Projects

34

a 103Other State-Led

Pooled Fund Studies

AASHTO Programs

b 17 MDOT-Led Pooled

Fund Studies

Individual Research Projects

473 NCHRP and TRB Contributions

251

120

f ield services

2 continued

MDOT 2018 ResearchTHESE TABLES ARE ORGANIZED BY FOCUS AREA

RESEARCH PROJECTSCompleted research reports that were released in FY 2018 October 2017 to September 2018

Research contracts that were active during FY 2018

POOLED FUND PROJECTSMulti-state transportation pooled fund studies led by MDOT

Other multi-state transportation pooled fund studies in which MDOT participates either through a FY 2018 contribution or through past contributions that are still producing value for Michigan

A complete FY 2018 annual report can be found at wwwMichigangovMDOTResearch

Completed project reports are available at wwwMichigangovMDOTResearch

A mark in the ldquoSpotlightrdquo column indicates that a Research Spotlight for this project can be found at wwwMichigangovMDOTResearch

ldquo of Participating Statesrdquo for some pooled funds includes Canadian provinces and agencies such as the Federal Highway Administration (FHWA)

ABBREVIATIONS FAM Focus Area Manager

RM Research Manager

Report Number Title Contractor Investigator Project Manager Start Date End Date Total Budget

Complete

FY 18 Expenditures

Spotlight

SPR-1640 DevelopingRepresentativeMichiganTruckConfigurationsforBridgeLoadRating

WSU Eamon McMunn 3116 22818 $17868815 100 $1020198 X

SRP-1647 Developmentof3-Dand4-DBridgeModelsandPlans WSP Mitchell Belill 3116 53118 $28561449 100 $9064894 X

SPR-1669 EvaluationofCostBenefitsofStandardizationofSecondaryRouteBridges WSU Eamon Cooper 3116 53118 $23647238 100 $7080059 X

SPR-1673 BridgeScourTechnologyTransfer MTU Brooks Curtis 4117 63018 $4122166 100 $3082099 X

SPR-1617 EvaluationofBridgeDecksUsingNon-DestructiveEvaluation(NDE)atNearHighwaySpeedsforEffectiveAssetManagement

MTU Dobson Boatman 11112 93018 $47336233 99 $7015568

ApplyingMulti-BeamSonarforInspectionforBridgeScourandPerformanceofBridgeScourMitigationMethods

AyersAssociates Schroeder Skrocki 10116 123118 $60164337 42 $19279377

CommercialProductionofNon-ProprietaryUltra-HighPerformanceConcrete

UM El-Tawil Kahl 4117 123118 $18707967 98 $16046448

Report Number Title Contractor Investigator Project Manager Start Date End Date Total Budget

Complete

FY 18 Expenditures

Spotlight

SPR-1671 AnEvaluationofMichiganrsquosContinuousCountStation(CCS)Distribution WMU Oh Krzeminski 4116 43018 $14388186 100 $6010556 X

Bridges and Structures FAMBradWagnerandJasonDeRuyverRMMichaelTownley

Asset Management FAMWendiBurtonRMMarkPolsdofer

Report Number Title Contractor Investigator Project Manager Start Date End Date Total Budget

Complete

FY 18 Expenditures

Spotlight

BestPracticesforModernizingMDOTBridgeDesignManualGuidesandPolicyDocumentation

WSU Aktan Wagner 11818 43019 $24802528 13 $3224160

AssetManagementofRetainingWalls UM Athanasopoulous-Zekkos

Burns 10116 53119 $32567512 65 $9821662

SPR-1642 BridgeDesignSystemAnalysisandModernization MTU Colling Guerrazzi 11113 93019 $54919949 100 $000 X

BridgeStructuralAnalysesforStagedConstructionandConstructabilityReview

WSU Aktan Jansson 7117 93019 $25759512 36 $8909099

EvaluatingLong-TermCapacityandDuctilityofCarbonFiberReinforcedPolymerPrestressingandPost-TensioningStrands

LTU Grace Chynoweth 10113 93019 $88550152 82 $5020464

EffectsofConcreteCureTimeonEpoxyOverlayandSealantPerformance WMU Attanayake Belcher 7118 123119 $25041113 3 $844836

AcceleratedBridgePreservationTechnologies MSU Corley-Lay Burns 12918 12920 $13657110 17 $2293877

StatewideOverallCarbonFiberCompositeCableBridgeMonitoring LTU Grace Chynoweth 121713 93020 $52069700 50 $7296292

Bridges and Structures continued FAMBradWagnerandJasonDeRuyverRMMichaelTownley

3 continued

Bridges and Structures Pooled Fund Studies

Study Number TitleMDOT

Project ManagerLead State or Agency

of Participating States

MI 2018 Expenditures

Expenditures Prior to 2018

Total MI Commitment

Start Date End Date

TPF-5(281) CenterfortheAgingInfrastructureSteelBridgeResearchInspectionTrainingandEducationEngineeringCenter-SBRITE

Curtis INDOT 9 $5000000 $000 $12500000 10117 63021

TPF-5(308) TheUseofBridgeManagementSoftwareintheNetworkAnalysisofBigBridges

Curtis MIDOT 7 $000 $9500000 $9500000 111015 123117

TPF-5(363) Evaluationof07-Inch-DiameterCarbonFiberReinforcedPolymer(CFRP)PretensioningStrandsinPrestressedBeams

Kahl MIDOT 4 $5036600 $3600000 $13673300 12517 93020

TPF-5(372) BuildingInformationModeling(BIM)forBridgesandStructures Wagner IADOT 16 $2000000 $000 $10000000 11817 93022

Report Number Title Contractor Investigator Project Manager Start Date End Date Total Budget

Complete

FY 18 Expenditures

Spotlight

ReductionofpHLevelsfromUnderdrainOutlets LTU Bandara Zweng 5118 33120 $18201019 5 $836789

Environment and Water Resources FAMHalZwengRMMichaelTownley

Maintenance Pooled Fund Studies

Study Number TitleMDOT

Project ManagerLead State or Agency

of Participating States

MI 2018 Expenditures

Expenditures Prior to 2018

Total MI Commitment

Start Date End Date

TPF-5(290) AuroraProgram Longworth IADOT 18 $2500000 $10000000 $12500000 8114 53119

TPF-5(330) NoBoundariesRoadwayMaintenancePractices Croze OHDOT 18 $1000000 $3000000 $4000000 52915 63019

TPF-5(353) ClearRoadsWinterHighwayOperationsPooledFund Longworth MNDOT 36 $2500000 $2500000 $12500000 10116 123021

Report Number Title Contractor Investigator Project Manager Start Date End Date Total Budget

Complete

FY 18 Expenditures

Spotlight

SPR-1677 EvaluationReportforCollisionAvoidanceandMitigationSystem(CAMS)onWinterMaintenanceTrucks(WMT)

MSU Zockaie Cook 10117 93018 $18026553 100 $18026553

DevelopandImplementaFreeze-ThawModelBasedSeasonalLoadRestrictionDecisionSupportTool

MTU Liu Longworth 4117 33119 $16265391 49 $5185489

Maintenance FAMTimCrozeRMAndreacuteClover

4 continued

Intelligent Transportation Systems Pooled Fund Studies

Study Number TitleMDOT

Project ManagerLead State or Agency

of Participating States

MI 2018 Expenditures

Expenditures Prior to 2018

Total MI Commitment

Start Date End Date

TPF-5(206) ResearchProgramtoSupporttheResearchDevelopmentandDeploymentofSystemOperationsApplicationsofVehicleInfrastructureIntegration(VII)

Castle VADOT 23 $5000000 $35000000 $45000000 10112 63020

TPF-5(359) EvaluatingNewTechnologiesforRoadsProgramInitiativesinSafetyandEfficiency(ENTERPRISE)PhaseII

Feldpausch MIDOT 8 $4500000 $3500000 $11500000 1218 113020

Report Number Title Contractor Investigator Project Manager Start Date End Date Total Budget

Complete

FY 18 Expenditures

Spotlight

SPR-1654 AdvancedApplicationsofIntelliDriveDataUseAnalysisandProcessing2(DUAP2)

MixonHill Mixon Castle 8911 7118 $372363465 100 $000

ConnectedAutomatedVehicleandInfrastructureResearch UM Sayer Ajegba 10113 93019 $305002481 82 $000

Intelligent Transportation Systems FAMColinCastleRMAndreacuteClover

5 continued

Mobility Systems and Signal Operations Pooled Fund Studies

Study Number TitleMDOT

Project ManagerLead State or Agency

of Participating States

MI 2018 Expenditures

Expenditures Prior to 2018

Total MI Commitment

Start Date End Date

TPF-5(319) TransportationManagementCenter(TMC)PooledFundStudy Peplinski FHWA 21 $2500000 $7500000 $12500000 41715 41620

TPF-5(347) DevelopmentofMaintenanceDecisionSupportSystem Longworth SDDOT 14 $2500000 $000 $12500000 10116 93021

TPF-5(351) Self-DeicingLEDSignals Smalley KSDOT 7 $2000000 $4000000 $6000000 32516 31420

Report Number Title Contractor Investigator Project Manager Start Date End Date Total Budget

Complete

FY 18 Expenditures

Spotlight

SPR-1655 FurtherAssessmentofQuickClearanceStrategiesPhaseII GannettFlemming Rensel Kremer 5116 33118 $24160970 100 $5737733 X

SPR-1674 ImplementationofUnmannedAerialVehicles(UAVs)forAssessmentofTransportationInfrastructurePhaseII

MTU Brooks Cook 5116 53118 $59967034 99 $22350611 X

SignalPerformanceMeasuresPilotImplementation AECOM Remias Adelman 11116 123118 $25394964 78 $7988483

Mobility Systems and Signal Operations FAMSteveCookRMAndreacuteClover

Report Number Title Contractor Investigator Project Manager Start Date End Date Total Budget

Complete

FY 18 Expenditures

Spotlight

SPR-1635 PerformanceEvaluationofSubgradeStabilizationwithRecycledMaterials

LTU Bandara Grazioli 10113 13116 $21481909 100 $2553700 X

SPR-1666 IdentifyBestPracticesinPavementDesignMaterialsConstructionandMaintenanceinWetFreezeClimatesSimilartoMichigan

MTU You Bleech 11116 22818 $18465373 100 $9982017 X

SPR-1678 UpdatedAnalysisofMichiganTrafficInputsforPavementMEDesign MSU Haider Schenkel 10116 83118 $25356311 100 $12266907 X

Report Number Title Contractor Investigator Project Manager Start Date End Date Total Budget

Complete

FY 18 Expenditures

Spotlight

SPR-1675 DevelopmentofDifferentialCriteriaforDeterminingAppropriatenessofSidepathApplicationsforBicycleUse

TooleDesignGroup Sanders DeBruyn 6116 63018 $32250644 100 $9505203 X

Pavements and Materials FAMsCurtisBleechandJohnStatonRMAndreacuteClover

Nonmotorized Planning and Development FAMDebAlfonsoRMMarkPolsdofer

Rest Areas Utilities and Landscaping Pooled Fund StudyStudy Number Title

MDOT Project Manager

Lead State or Agency

of Participating States

MI 2018 Expenditures

Expenditures Prior to 2018

Total MI Commitment

Start Date End Date

TPF-5(346) RegionalRoadsideTurfgrassPerformanceTestingProgram Stonebrook MNDOT 5 $2000000 $4000000 $8000000 32516 93019

6 continued

Report Number Title Contractor Investigator Project Manager Start Date End Date Total Budget

Complete

FY 18 Expenditures

Spotlight

SlopeRestorationonUrbanFreeways MSU Cregg Alton 4117 73119 $33930771 62 $19843099

Report Number Title Contractor Investigator Project Manager Start Date End Date Total Budget

Complete

FY 18 Expenditures

Spotlight

3-DHighwayDesignModelCostBenefitAnalysis WSP Mitchell Wilkerson 7117 22819 $20578547 68 $12170117

Rest Areas Utilities and Landscaping FAMBillStonebrookRMMichaelTownley

Surveys and Automated Design FAMTaylorSnowRMMichaelTownley

Pavements and Materials Pooled Fund StudiesStudy Number Title

MDOT Project Manager

Lead State or Agency

of Participating States

MI 2018 Expenditures

Expenditures Prior to 2018

Total MI Commitment

Start Date End Date

OR17-102 EstablishingPercentEmbedmentLimitstoImproveChipSealPerformanceUTC

Green MSU NA $10753060 $1246986 $12000046 5117 81518

TPF-5(267) AcceleratedPerformanceTestingfortheNCATPavementTestTrack Bleech ALDOT 19 $000 $99000000 $99000000 41515 93019

TPF-5(269) DevelopmentofanImprovedDesignProcedureforUnbondedConcreteOverlays

Krom MNDOT 8 $000 $6000000 $6000000 41312 43019

TPF-5(297) ImprovingSpecificationstoResistFrostDamageinModernConcreteMixtures

Stallard OKDOT 19 $1750000 $5250000 $7000000 11014 9119

TPF-5(305) RegionalandNationalImplementationandCoordinationofMechanistic-Empirical(ME)Design

Eacker FHWA 23 $1000000 $1000000 $2000000 10116 93019

TPF-5(313) TechnologyTransferConcreteConsortium Staton IADOT 35 $1200000 $3600000 $6000000 41015 83120

TPF-5(320) BaseFundingfortheNorthCentralSuperpaveCenter Kennedy INDOT 7 $2500000 $7500000 $12500000 2315 93022

TPF-5(341) NationalRoadResearchAlliance Bleech MNDOT 7 $15000000 $30000000 $45000000 22216 22221

TPF-5(368) PerformanceEngineeredConcretePavingMixtures Staton IADOT 17 $1500000 $1500000 $7500000 1117 123121

7

AdministrationReport Number Title Contractor Investigator Project Manager Start Date End Date Total Budget

Complete

FY 18 Expenditures

Spotlight

ResearchProgramServices CTC Casey Polsdofer 1116 93019 $44312441 29 $4312086

National InitiativesStudy Number Title

MDOT Project Manager

Lead State or Agency

of Participating States

MI 2018 Expenditures

Expenditures Prior to 2018

Total MI Commitment

Start Date End Date

OR16-003 AASHTO301-ConstructionMaterialsModuleEnhancementImplementationandStaffTraining

Burns AASHTO NA $51300000 $37800000 $126220000 10116 93019

SPR1284(019) AASHTOEngineeringTechnicalServicePrograms Clover AASHTOFHWA

NA $15000000 $000 $15000000 10117 93018

TPF-5(378) TRBCoreProgramActivitiesPeriodCoveringFY2018(TRBFY2019) Clover FHWA 29 $18605900 $000 $18500000 10117 93018

TPF-5(418) NationalCooperativeHighwayResearchProgram(NCHRP)forFY2018 Clover FHWA 51 $119859000 $000 $120000000 10117 93018

Report Number Title Contractor Investigator Project Manager Start Date End Date Total Budget

Complete

FY 18 Expenditures

Spotlight

SPR-1648 EvaluatingtheImpactsofSpeedLimitIncreasesonIdentifiedCaseStudies WMU Kwigizile Bott 3116 123117 $16180247 100 $3250467

SPR-1645 MichiganRuralSegmentsSafetyPerformanceFunctions(SPFs)DevelopmentandSupport

MSU Gates Kanitz 10115 33118 $31535545 100 $8643206 X

AssessmentofCountermeasureGapsPredictiveCrashAnalysisandEngineeringSafetyProgramsinMichigan

MSU Gates Shaughnessy 6116 33119 $28978182 55 $9342953

SponsorshipoftheTRBRoundtableonPreparingforAutomatedVehiclesandSharedMobilityServices

TRB NA Clover 10117 93019 $5000000 50 $2500000

MeasuretheOperationalCostandBenefitofSpeedFeedbackSigns MSU Gates Uzcategui 7118 63020 $22070474 0 $12889

Transportation Safety FAMMarkBottRMMichaelTownley

Transportation Safety Pooled Fund StudiesStudy Number Title

MDOT Project Manager

Lead State or Agency

of Participating States

MI 2018 Expenditures

Expenditures Prior to 2018

Total MI Commitment

Start Date End Date

OR15-189 DevelopingMichiganPedestrianandBicycleSafetyModelsUTC McQuiston UMTRI NA $789276 $24210635 $24999931 3116 53118

OR17-801 IdentifyingPotentialWorkZoneCountermeasuresUsingConnected-VehicleandDrivingDataUTC

Gorman UM NA $7347822 $8629559 $17699951 11116 53118

TPF-5(255) HighwaySafetyManualImplementation Shaughnessy FHWA 23 $2000000 $4000000 $8000000 11915 123119

TPF-5(343) RoadsideSafetyandResearchforMASHImplementation Torres WADOT 24 $5000000 $5000000 $10000000 10116 123119

7

The Research Administration Team

EXECUTIVE

Carol Aldrich EngineerofResearch517-636-7777AldrichCMichigangov

Lisa Branch AdministrativeAssistant 517-636-4555 BranchL2Michigangov

PROGRAM MANAGEMENT

Andreacute Clover ProgramManager517-636-6053CloverAMichigangov

Mark Polsdofer ProgramSpecialist517-636-0552PolsdoferMMichigangov

PROJECT ADMINISTRATION

Michael Townley SupervisorProjectAdministration517-636-0144TownleyMMichigangov

Faith Rodriguez ProgramAnalyst 517-636-0033 RodriguezF1Michigangov

Rebecca Petri ProjectAnalyst517-636-6146PetriR1Michigangov

Joshua Hatfield StudentAssistant517-636-4270HatfieldJ2Michigangov

LIBRARY SERVICES

Jennifer Herron Librarian517-373-8548HerronJ1Michigangov

CONTACT US MDOT Research Administration

Phone 517-636-4555 E-mailMDOT-ResearchMichigangov WebsitewwwMichigangovMDOTResearchgov

1

15780

15

233 334

5 34

84

30

671

Amendments

Total circulation

New individual research projects

Reference services

Closed individual research projects

New materials

Individual research projects

Interlibrary loans

Pooled fund studies and

other national research

initiatives

MDOT Library Website Users

MISSIONPromoting innovative

research for economic benefit and improved quality of life

VALUESQuality bull Customer Orientation

Teamwork bull Integrity bull Pride

RESEARCH SERVICES STATISTICS (FY 2018)

LIBRARY SERVICES STATISTICS (FY 2018)

Page 2: MDOT Research Services FY 2018 At-A-GlanceFiscal Year (FY) 2018. The tables on pages 2 through 7 list all MDOT-funded research projects by topic area that were active or completed

2 continued

MDOT 2018 ResearchTHESE TABLES ARE ORGANIZED BY FOCUS AREA

RESEARCH PROJECTSCompleted research reports that were released in FY 2018 October 2017 to September 2018

Research contracts that were active during FY 2018

POOLED FUND PROJECTSMulti-state transportation pooled fund studies led by MDOT

Other multi-state transportation pooled fund studies in which MDOT participates either through a FY 2018 contribution or through past contributions that are still producing value for Michigan

A complete FY 2018 annual report can be found at wwwMichigangovMDOTResearch

Completed project reports are available at wwwMichigangovMDOTResearch

A mark in the ldquoSpotlightrdquo column indicates that a Research Spotlight for this project can be found at wwwMichigangovMDOTResearch

ldquo of Participating Statesrdquo for some pooled funds includes Canadian provinces and agencies such as the Federal Highway Administration (FHWA)

ABBREVIATIONS FAM Focus Area Manager

RM Research Manager

Report Number Title Contractor Investigator Project Manager Start Date End Date Total Budget

Complete

FY 18 Expenditures

Spotlight

SPR-1640 DevelopingRepresentativeMichiganTruckConfigurationsforBridgeLoadRating

WSU Eamon McMunn 3116 22818 $17868815 100 $1020198 X

SRP-1647 Developmentof3-Dand4-DBridgeModelsandPlans WSP Mitchell Belill 3116 53118 $28561449 100 $9064894 X

SPR-1669 EvaluationofCostBenefitsofStandardizationofSecondaryRouteBridges WSU Eamon Cooper 3116 53118 $23647238 100 $7080059 X

SPR-1673 BridgeScourTechnologyTransfer MTU Brooks Curtis 4117 63018 $4122166 100 $3082099 X

SPR-1617 EvaluationofBridgeDecksUsingNon-DestructiveEvaluation(NDE)atNearHighwaySpeedsforEffectiveAssetManagement

MTU Dobson Boatman 11112 93018 $47336233 99 $7015568

ApplyingMulti-BeamSonarforInspectionforBridgeScourandPerformanceofBridgeScourMitigationMethods

AyersAssociates Schroeder Skrocki 10116 123118 $60164337 42 $19279377

CommercialProductionofNon-ProprietaryUltra-HighPerformanceConcrete

UM El-Tawil Kahl 4117 123118 $18707967 98 $16046448

Report Number Title Contractor Investigator Project Manager Start Date End Date Total Budget

Complete

FY 18 Expenditures

Spotlight

SPR-1671 AnEvaluationofMichiganrsquosContinuousCountStation(CCS)Distribution WMU Oh Krzeminski 4116 43018 $14388186 100 $6010556 X

Bridges and Structures FAMBradWagnerandJasonDeRuyverRMMichaelTownley

Asset Management FAMWendiBurtonRMMarkPolsdofer

Report Number Title Contractor Investigator Project Manager Start Date End Date Total Budget

Complete

FY 18 Expenditures

Spotlight

BestPracticesforModernizingMDOTBridgeDesignManualGuidesandPolicyDocumentation

WSU Aktan Wagner 11818 43019 $24802528 13 $3224160

AssetManagementofRetainingWalls UM Athanasopoulous-Zekkos

Burns 10116 53119 $32567512 65 $9821662

SPR-1642 BridgeDesignSystemAnalysisandModernization MTU Colling Guerrazzi 11113 93019 $54919949 100 $000 X

BridgeStructuralAnalysesforStagedConstructionandConstructabilityReview

WSU Aktan Jansson 7117 93019 $25759512 36 $8909099

EvaluatingLong-TermCapacityandDuctilityofCarbonFiberReinforcedPolymerPrestressingandPost-TensioningStrands

LTU Grace Chynoweth 10113 93019 $88550152 82 $5020464

EffectsofConcreteCureTimeonEpoxyOverlayandSealantPerformance WMU Attanayake Belcher 7118 123119 $25041113 3 $844836

AcceleratedBridgePreservationTechnologies MSU Corley-Lay Burns 12918 12920 $13657110 17 $2293877

StatewideOverallCarbonFiberCompositeCableBridgeMonitoring LTU Grace Chynoweth 121713 93020 $52069700 50 $7296292

Bridges and Structures continued FAMBradWagnerandJasonDeRuyverRMMichaelTownley

3 continued

Bridges and Structures Pooled Fund Studies

Study Number TitleMDOT

Project ManagerLead State or Agency

of Participating States

MI 2018 Expenditures

Expenditures Prior to 2018

Total MI Commitment

Start Date End Date

TPF-5(281) CenterfortheAgingInfrastructureSteelBridgeResearchInspectionTrainingandEducationEngineeringCenter-SBRITE

Curtis INDOT 9 $5000000 $000 $12500000 10117 63021

TPF-5(308) TheUseofBridgeManagementSoftwareintheNetworkAnalysisofBigBridges

Curtis MIDOT 7 $000 $9500000 $9500000 111015 123117

TPF-5(363) Evaluationof07-Inch-DiameterCarbonFiberReinforcedPolymer(CFRP)PretensioningStrandsinPrestressedBeams

Kahl MIDOT 4 $5036600 $3600000 $13673300 12517 93020

TPF-5(372) BuildingInformationModeling(BIM)forBridgesandStructures Wagner IADOT 16 $2000000 $000 $10000000 11817 93022

Report Number Title Contractor Investigator Project Manager Start Date End Date Total Budget

Complete

FY 18 Expenditures

Spotlight

ReductionofpHLevelsfromUnderdrainOutlets LTU Bandara Zweng 5118 33120 $18201019 5 $836789

Environment and Water Resources FAMHalZwengRMMichaelTownley

Maintenance Pooled Fund Studies

Study Number TitleMDOT

Project ManagerLead State or Agency

of Participating States

MI 2018 Expenditures

Expenditures Prior to 2018

Total MI Commitment

Start Date End Date

TPF-5(290) AuroraProgram Longworth IADOT 18 $2500000 $10000000 $12500000 8114 53119

TPF-5(330) NoBoundariesRoadwayMaintenancePractices Croze OHDOT 18 $1000000 $3000000 $4000000 52915 63019

TPF-5(353) ClearRoadsWinterHighwayOperationsPooledFund Longworth MNDOT 36 $2500000 $2500000 $12500000 10116 123021

Report Number Title Contractor Investigator Project Manager Start Date End Date Total Budget

Complete

FY 18 Expenditures

Spotlight

SPR-1677 EvaluationReportforCollisionAvoidanceandMitigationSystem(CAMS)onWinterMaintenanceTrucks(WMT)

MSU Zockaie Cook 10117 93018 $18026553 100 $18026553

DevelopandImplementaFreeze-ThawModelBasedSeasonalLoadRestrictionDecisionSupportTool

MTU Liu Longworth 4117 33119 $16265391 49 $5185489

Maintenance FAMTimCrozeRMAndreacuteClover

4 continued

Intelligent Transportation Systems Pooled Fund Studies

Study Number TitleMDOT

Project ManagerLead State or Agency

of Participating States

MI 2018 Expenditures

Expenditures Prior to 2018

Total MI Commitment

Start Date End Date

TPF-5(206) ResearchProgramtoSupporttheResearchDevelopmentandDeploymentofSystemOperationsApplicationsofVehicleInfrastructureIntegration(VII)

Castle VADOT 23 $5000000 $35000000 $45000000 10112 63020

TPF-5(359) EvaluatingNewTechnologiesforRoadsProgramInitiativesinSafetyandEfficiency(ENTERPRISE)PhaseII

Feldpausch MIDOT 8 $4500000 $3500000 $11500000 1218 113020

Report Number Title Contractor Investigator Project Manager Start Date End Date Total Budget

Complete

FY 18 Expenditures

Spotlight

SPR-1654 AdvancedApplicationsofIntelliDriveDataUseAnalysisandProcessing2(DUAP2)

MixonHill Mixon Castle 8911 7118 $372363465 100 $000

ConnectedAutomatedVehicleandInfrastructureResearch UM Sayer Ajegba 10113 93019 $305002481 82 $000

Intelligent Transportation Systems FAMColinCastleRMAndreacuteClover

5 continued

Mobility Systems and Signal Operations Pooled Fund Studies

Study Number TitleMDOT

Project ManagerLead State or Agency

of Participating States

MI 2018 Expenditures

Expenditures Prior to 2018

Total MI Commitment

Start Date End Date

TPF-5(319) TransportationManagementCenter(TMC)PooledFundStudy Peplinski FHWA 21 $2500000 $7500000 $12500000 41715 41620

TPF-5(347) DevelopmentofMaintenanceDecisionSupportSystem Longworth SDDOT 14 $2500000 $000 $12500000 10116 93021

TPF-5(351) Self-DeicingLEDSignals Smalley KSDOT 7 $2000000 $4000000 $6000000 32516 31420

Report Number Title Contractor Investigator Project Manager Start Date End Date Total Budget

Complete

FY 18 Expenditures

Spotlight

SPR-1655 FurtherAssessmentofQuickClearanceStrategiesPhaseII GannettFlemming Rensel Kremer 5116 33118 $24160970 100 $5737733 X

SPR-1674 ImplementationofUnmannedAerialVehicles(UAVs)forAssessmentofTransportationInfrastructurePhaseII

MTU Brooks Cook 5116 53118 $59967034 99 $22350611 X

SignalPerformanceMeasuresPilotImplementation AECOM Remias Adelman 11116 123118 $25394964 78 $7988483

Mobility Systems and Signal Operations FAMSteveCookRMAndreacuteClover

Report Number Title Contractor Investigator Project Manager Start Date End Date Total Budget

Complete

FY 18 Expenditures

Spotlight

SPR-1635 PerformanceEvaluationofSubgradeStabilizationwithRecycledMaterials

LTU Bandara Grazioli 10113 13116 $21481909 100 $2553700 X

SPR-1666 IdentifyBestPracticesinPavementDesignMaterialsConstructionandMaintenanceinWetFreezeClimatesSimilartoMichigan

MTU You Bleech 11116 22818 $18465373 100 $9982017 X

SPR-1678 UpdatedAnalysisofMichiganTrafficInputsforPavementMEDesign MSU Haider Schenkel 10116 83118 $25356311 100 $12266907 X

Report Number Title Contractor Investigator Project Manager Start Date End Date Total Budget

Complete

FY 18 Expenditures

Spotlight

SPR-1675 DevelopmentofDifferentialCriteriaforDeterminingAppropriatenessofSidepathApplicationsforBicycleUse

TooleDesignGroup Sanders DeBruyn 6116 63018 $32250644 100 $9505203 X

Pavements and Materials FAMsCurtisBleechandJohnStatonRMAndreacuteClover

Nonmotorized Planning and Development FAMDebAlfonsoRMMarkPolsdofer

Rest Areas Utilities and Landscaping Pooled Fund StudyStudy Number Title

MDOT Project Manager

Lead State or Agency

of Participating States

MI 2018 Expenditures

Expenditures Prior to 2018

Total MI Commitment

Start Date End Date

TPF-5(346) RegionalRoadsideTurfgrassPerformanceTestingProgram Stonebrook MNDOT 5 $2000000 $4000000 $8000000 32516 93019

6 continued

Report Number Title Contractor Investigator Project Manager Start Date End Date Total Budget

Complete

FY 18 Expenditures

Spotlight

SlopeRestorationonUrbanFreeways MSU Cregg Alton 4117 73119 $33930771 62 $19843099

Report Number Title Contractor Investigator Project Manager Start Date End Date Total Budget

Complete

FY 18 Expenditures

Spotlight

3-DHighwayDesignModelCostBenefitAnalysis WSP Mitchell Wilkerson 7117 22819 $20578547 68 $12170117

Rest Areas Utilities and Landscaping FAMBillStonebrookRMMichaelTownley

Surveys and Automated Design FAMTaylorSnowRMMichaelTownley

Pavements and Materials Pooled Fund StudiesStudy Number Title

MDOT Project Manager

Lead State or Agency

of Participating States

MI 2018 Expenditures

Expenditures Prior to 2018

Total MI Commitment

Start Date End Date

OR17-102 EstablishingPercentEmbedmentLimitstoImproveChipSealPerformanceUTC

Green MSU NA $10753060 $1246986 $12000046 5117 81518

TPF-5(267) AcceleratedPerformanceTestingfortheNCATPavementTestTrack Bleech ALDOT 19 $000 $99000000 $99000000 41515 93019

TPF-5(269) DevelopmentofanImprovedDesignProcedureforUnbondedConcreteOverlays

Krom MNDOT 8 $000 $6000000 $6000000 41312 43019

TPF-5(297) ImprovingSpecificationstoResistFrostDamageinModernConcreteMixtures

Stallard OKDOT 19 $1750000 $5250000 $7000000 11014 9119

TPF-5(305) RegionalandNationalImplementationandCoordinationofMechanistic-Empirical(ME)Design

Eacker FHWA 23 $1000000 $1000000 $2000000 10116 93019

TPF-5(313) TechnologyTransferConcreteConsortium Staton IADOT 35 $1200000 $3600000 $6000000 41015 83120

TPF-5(320) BaseFundingfortheNorthCentralSuperpaveCenter Kennedy INDOT 7 $2500000 $7500000 $12500000 2315 93022

TPF-5(341) NationalRoadResearchAlliance Bleech MNDOT 7 $15000000 $30000000 $45000000 22216 22221

TPF-5(368) PerformanceEngineeredConcretePavingMixtures Staton IADOT 17 $1500000 $1500000 $7500000 1117 123121

7

AdministrationReport Number Title Contractor Investigator Project Manager Start Date End Date Total Budget

Complete

FY 18 Expenditures

Spotlight

ResearchProgramServices CTC Casey Polsdofer 1116 93019 $44312441 29 $4312086

National InitiativesStudy Number Title

MDOT Project Manager

Lead State or Agency

of Participating States

MI 2018 Expenditures

Expenditures Prior to 2018

Total MI Commitment

Start Date End Date

OR16-003 AASHTO301-ConstructionMaterialsModuleEnhancementImplementationandStaffTraining

Burns AASHTO NA $51300000 $37800000 $126220000 10116 93019

SPR1284(019) AASHTOEngineeringTechnicalServicePrograms Clover AASHTOFHWA

NA $15000000 $000 $15000000 10117 93018

TPF-5(378) TRBCoreProgramActivitiesPeriodCoveringFY2018(TRBFY2019) Clover FHWA 29 $18605900 $000 $18500000 10117 93018

TPF-5(418) NationalCooperativeHighwayResearchProgram(NCHRP)forFY2018 Clover FHWA 51 $119859000 $000 $120000000 10117 93018

Report Number Title Contractor Investigator Project Manager Start Date End Date Total Budget

Complete

FY 18 Expenditures

Spotlight

SPR-1648 EvaluatingtheImpactsofSpeedLimitIncreasesonIdentifiedCaseStudies WMU Kwigizile Bott 3116 123117 $16180247 100 $3250467

SPR-1645 MichiganRuralSegmentsSafetyPerformanceFunctions(SPFs)DevelopmentandSupport

MSU Gates Kanitz 10115 33118 $31535545 100 $8643206 X

AssessmentofCountermeasureGapsPredictiveCrashAnalysisandEngineeringSafetyProgramsinMichigan

MSU Gates Shaughnessy 6116 33119 $28978182 55 $9342953

SponsorshipoftheTRBRoundtableonPreparingforAutomatedVehiclesandSharedMobilityServices

TRB NA Clover 10117 93019 $5000000 50 $2500000

MeasuretheOperationalCostandBenefitofSpeedFeedbackSigns MSU Gates Uzcategui 7118 63020 $22070474 0 $12889

Transportation Safety FAMMarkBottRMMichaelTownley

Transportation Safety Pooled Fund StudiesStudy Number Title

MDOT Project Manager

Lead State or Agency

of Participating States

MI 2018 Expenditures

Expenditures Prior to 2018

Total MI Commitment

Start Date End Date

OR15-189 DevelopingMichiganPedestrianandBicycleSafetyModelsUTC McQuiston UMTRI NA $789276 $24210635 $24999931 3116 53118

OR17-801 IdentifyingPotentialWorkZoneCountermeasuresUsingConnected-VehicleandDrivingDataUTC

Gorman UM NA $7347822 $8629559 $17699951 11116 53118

TPF-5(255) HighwaySafetyManualImplementation Shaughnessy FHWA 23 $2000000 $4000000 $8000000 11915 123119

TPF-5(343) RoadsideSafetyandResearchforMASHImplementation Torres WADOT 24 $5000000 $5000000 $10000000 10116 123119

7

The Research Administration Team

EXECUTIVE

Carol Aldrich EngineerofResearch517-636-7777AldrichCMichigangov

Lisa Branch AdministrativeAssistant 517-636-4555 BranchL2Michigangov

PROGRAM MANAGEMENT

Andreacute Clover ProgramManager517-636-6053CloverAMichigangov

Mark Polsdofer ProgramSpecialist517-636-0552PolsdoferMMichigangov

PROJECT ADMINISTRATION

Michael Townley SupervisorProjectAdministration517-636-0144TownleyMMichigangov

Faith Rodriguez ProgramAnalyst 517-636-0033 RodriguezF1Michigangov

Rebecca Petri ProjectAnalyst517-636-6146PetriR1Michigangov

Joshua Hatfield StudentAssistant517-636-4270HatfieldJ2Michigangov

LIBRARY SERVICES

Jennifer Herron Librarian517-373-8548HerronJ1Michigangov

CONTACT US MDOT Research Administration

Phone 517-636-4555 E-mailMDOT-ResearchMichigangov WebsitewwwMichigangovMDOTResearchgov

1

15780

15

233 334

5 34

84

30

671

Amendments

Total circulation

New individual research projects

Reference services

Closed individual research projects

New materials

Individual research projects

Interlibrary loans

Pooled fund studies and

other national research

initiatives

MDOT Library Website Users

MISSIONPromoting innovative

research for economic benefit and improved quality of life

VALUESQuality bull Customer Orientation

Teamwork bull Integrity bull Pride

RESEARCH SERVICES STATISTICS (FY 2018)

LIBRARY SERVICES STATISTICS (FY 2018)

Page 3: MDOT Research Services FY 2018 At-A-GlanceFiscal Year (FY) 2018. The tables on pages 2 through 7 list all MDOT-funded research projects by topic area that were active or completed

Report Number Title Contractor Investigator Project Manager Start Date End Date Total Budget

Complete

FY 18 Expenditures

Spotlight

BestPracticesforModernizingMDOTBridgeDesignManualGuidesandPolicyDocumentation

WSU Aktan Wagner 11818 43019 $24802528 13 $3224160

AssetManagementofRetainingWalls UM Athanasopoulous-Zekkos

Burns 10116 53119 $32567512 65 $9821662

SPR-1642 BridgeDesignSystemAnalysisandModernization MTU Colling Guerrazzi 11113 93019 $54919949 100 $000 X

BridgeStructuralAnalysesforStagedConstructionandConstructabilityReview

WSU Aktan Jansson 7117 93019 $25759512 36 $8909099

EvaluatingLong-TermCapacityandDuctilityofCarbonFiberReinforcedPolymerPrestressingandPost-TensioningStrands

LTU Grace Chynoweth 10113 93019 $88550152 82 $5020464

EffectsofConcreteCureTimeonEpoxyOverlayandSealantPerformance WMU Attanayake Belcher 7118 123119 $25041113 3 $844836

AcceleratedBridgePreservationTechnologies MSU Corley-Lay Burns 12918 12920 $13657110 17 $2293877

StatewideOverallCarbonFiberCompositeCableBridgeMonitoring LTU Grace Chynoweth 121713 93020 $52069700 50 $7296292

Bridges and Structures continued FAMBradWagnerandJasonDeRuyverRMMichaelTownley

3 continued

Bridges and Structures Pooled Fund Studies

Study Number TitleMDOT

Project ManagerLead State or Agency

of Participating States

MI 2018 Expenditures

Expenditures Prior to 2018

Total MI Commitment

Start Date End Date

TPF-5(281) CenterfortheAgingInfrastructureSteelBridgeResearchInspectionTrainingandEducationEngineeringCenter-SBRITE

Curtis INDOT 9 $5000000 $000 $12500000 10117 63021

TPF-5(308) TheUseofBridgeManagementSoftwareintheNetworkAnalysisofBigBridges

Curtis MIDOT 7 $000 $9500000 $9500000 111015 123117

TPF-5(363) Evaluationof07-Inch-DiameterCarbonFiberReinforcedPolymer(CFRP)PretensioningStrandsinPrestressedBeams

Kahl MIDOT 4 $5036600 $3600000 $13673300 12517 93020

TPF-5(372) BuildingInformationModeling(BIM)forBridgesandStructures Wagner IADOT 16 $2000000 $000 $10000000 11817 93022

Report Number Title Contractor Investigator Project Manager Start Date End Date Total Budget

Complete

FY 18 Expenditures

Spotlight

ReductionofpHLevelsfromUnderdrainOutlets LTU Bandara Zweng 5118 33120 $18201019 5 $836789

Environment and Water Resources FAMHalZwengRMMichaelTownley

Maintenance Pooled Fund Studies

Study Number TitleMDOT

Project ManagerLead State or Agency

of Participating States

MI 2018 Expenditures

Expenditures Prior to 2018

Total MI Commitment

Start Date End Date

TPF-5(290) AuroraProgram Longworth IADOT 18 $2500000 $10000000 $12500000 8114 53119

TPF-5(330) NoBoundariesRoadwayMaintenancePractices Croze OHDOT 18 $1000000 $3000000 $4000000 52915 63019

TPF-5(353) ClearRoadsWinterHighwayOperationsPooledFund Longworth MNDOT 36 $2500000 $2500000 $12500000 10116 123021

Report Number Title Contractor Investigator Project Manager Start Date End Date Total Budget

Complete

FY 18 Expenditures

Spotlight

SPR-1677 EvaluationReportforCollisionAvoidanceandMitigationSystem(CAMS)onWinterMaintenanceTrucks(WMT)

MSU Zockaie Cook 10117 93018 $18026553 100 $18026553

DevelopandImplementaFreeze-ThawModelBasedSeasonalLoadRestrictionDecisionSupportTool

MTU Liu Longworth 4117 33119 $16265391 49 $5185489

Maintenance FAMTimCrozeRMAndreacuteClover

4 continued

Intelligent Transportation Systems Pooled Fund Studies

Study Number TitleMDOT

Project ManagerLead State or Agency

of Participating States

MI 2018 Expenditures

Expenditures Prior to 2018

Total MI Commitment

Start Date End Date

TPF-5(206) ResearchProgramtoSupporttheResearchDevelopmentandDeploymentofSystemOperationsApplicationsofVehicleInfrastructureIntegration(VII)

Castle VADOT 23 $5000000 $35000000 $45000000 10112 63020

TPF-5(359) EvaluatingNewTechnologiesforRoadsProgramInitiativesinSafetyandEfficiency(ENTERPRISE)PhaseII

Feldpausch MIDOT 8 $4500000 $3500000 $11500000 1218 113020

Report Number Title Contractor Investigator Project Manager Start Date End Date Total Budget

Complete

FY 18 Expenditures

Spotlight

SPR-1654 AdvancedApplicationsofIntelliDriveDataUseAnalysisandProcessing2(DUAP2)

MixonHill Mixon Castle 8911 7118 $372363465 100 $000

ConnectedAutomatedVehicleandInfrastructureResearch UM Sayer Ajegba 10113 93019 $305002481 82 $000

Intelligent Transportation Systems FAMColinCastleRMAndreacuteClover

5 continued

Mobility Systems and Signal Operations Pooled Fund Studies

Study Number TitleMDOT

Project ManagerLead State or Agency

of Participating States

MI 2018 Expenditures

Expenditures Prior to 2018

Total MI Commitment

Start Date End Date

TPF-5(319) TransportationManagementCenter(TMC)PooledFundStudy Peplinski FHWA 21 $2500000 $7500000 $12500000 41715 41620

TPF-5(347) DevelopmentofMaintenanceDecisionSupportSystem Longworth SDDOT 14 $2500000 $000 $12500000 10116 93021

TPF-5(351) Self-DeicingLEDSignals Smalley KSDOT 7 $2000000 $4000000 $6000000 32516 31420

Report Number Title Contractor Investigator Project Manager Start Date End Date Total Budget

Complete

FY 18 Expenditures

Spotlight

SPR-1655 FurtherAssessmentofQuickClearanceStrategiesPhaseII GannettFlemming Rensel Kremer 5116 33118 $24160970 100 $5737733 X

SPR-1674 ImplementationofUnmannedAerialVehicles(UAVs)forAssessmentofTransportationInfrastructurePhaseII

MTU Brooks Cook 5116 53118 $59967034 99 $22350611 X

SignalPerformanceMeasuresPilotImplementation AECOM Remias Adelman 11116 123118 $25394964 78 $7988483

Mobility Systems and Signal Operations FAMSteveCookRMAndreacuteClover

Report Number Title Contractor Investigator Project Manager Start Date End Date Total Budget

Complete

FY 18 Expenditures

Spotlight

SPR-1635 PerformanceEvaluationofSubgradeStabilizationwithRecycledMaterials

LTU Bandara Grazioli 10113 13116 $21481909 100 $2553700 X

SPR-1666 IdentifyBestPracticesinPavementDesignMaterialsConstructionandMaintenanceinWetFreezeClimatesSimilartoMichigan

MTU You Bleech 11116 22818 $18465373 100 $9982017 X

SPR-1678 UpdatedAnalysisofMichiganTrafficInputsforPavementMEDesign MSU Haider Schenkel 10116 83118 $25356311 100 $12266907 X

Report Number Title Contractor Investigator Project Manager Start Date End Date Total Budget

Complete

FY 18 Expenditures

Spotlight

SPR-1675 DevelopmentofDifferentialCriteriaforDeterminingAppropriatenessofSidepathApplicationsforBicycleUse

TooleDesignGroup Sanders DeBruyn 6116 63018 $32250644 100 $9505203 X

Pavements and Materials FAMsCurtisBleechandJohnStatonRMAndreacuteClover

Nonmotorized Planning and Development FAMDebAlfonsoRMMarkPolsdofer

Rest Areas Utilities and Landscaping Pooled Fund StudyStudy Number Title

MDOT Project Manager

Lead State or Agency

of Participating States

MI 2018 Expenditures

Expenditures Prior to 2018

Total MI Commitment

Start Date End Date

TPF-5(346) RegionalRoadsideTurfgrassPerformanceTestingProgram Stonebrook MNDOT 5 $2000000 $4000000 $8000000 32516 93019

6 continued

Report Number Title Contractor Investigator Project Manager Start Date End Date Total Budget

Complete

FY 18 Expenditures

Spotlight

SlopeRestorationonUrbanFreeways MSU Cregg Alton 4117 73119 $33930771 62 $19843099

Report Number Title Contractor Investigator Project Manager Start Date End Date Total Budget

Complete

FY 18 Expenditures

Spotlight

3-DHighwayDesignModelCostBenefitAnalysis WSP Mitchell Wilkerson 7117 22819 $20578547 68 $12170117

Rest Areas Utilities and Landscaping FAMBillStonebrookRMMichaelTownley

Surveys and Automated Design FAMTaylorSnowRMMichaelTownley

Pavements and Materials Pooled Fund StudiesStudy Number Title

MDOT Project Manager

Lead State or Agency

of Participating States

MI 2018 Expenditures

Expenditures Prior to 2018

Total MI Commitment

Start Date End Date

OR17-102 EstablishingPercentEmbedmentLimitstoImproveChipSealPerformanceUTC

Green MSU NA $10753060 $1246986 $12000046 5117 81518

TPF-5(267) AcceleratedPerformanceTestingfortheNCATPavementTestTrack Bleech ALDOT 19 $000 $99000000 $99000000 41515 93019

TPF-5(269) DevelopmentofanImprovedDesignProcedureforUnbondedConcreteOverlays

Krom MNDOT 8 $000 $6000000 $6000000 41312 43019

TPF-5(297) ImprovingSpecificationstoResistFrostDamageinModernConcreteMixtures

Stallard OKDOT 19 $1750000 $5250000 $7000000 11014 9119

TPF-5(305) RegionalandNationalImplementationandCoordinationofMechanistic-Empirical(ME)Design

Eacker FHWA 23 $1000000 $1000000 $2000000 10116 93019

TPF-5(313) TechnologyTransferConcreteConsortium Staton IADOT 35 $1200000 $3600000 $6000000 41015 83120

TPF-5(320) BaseFundingfortheNorthCentralSuperpaveCenter Kennedy INDOT 7 $2500000 $7500000 $12500000 2315 93022

TPF-5(341) NationalRoadResearchAlliance Bleech MNDOT 7 $15000000 $30000000 $45000000 22216 22221

TPF-5(368) PerformanceEngineeredConcretePavingMixtures Staton IADOT 17 $1500000 $1500000 $7500000 1117 123121

7

AdministrationReport Number Title Contractor Investigator Project Manager Start Date End Date Total Budget

Complete

FY 18 Expenditures

Spotlight

ResearchProgramServices CTC Casey Polsdofer 1116 93019 $44312441 29 $4312086

National InitiativesStudy Number Title

MDOT Project Manager

Lead State or Agency

of Participating States

MI 2018 Expenditures

Expenditures Prior to 2018

Total MI Commitment

Start Date End Date

OR16-003 AASHTO301-ConstructionMaterialsModuleEnhancementImplementationandStaffTraining

Burns AASHTO NA $51300000 $37800000 $126220000 10116 93019

SPR1284(019) AASHTOEngineeringTechnicalServicePrograms Clover AASHTOFHWA

NA $15000000 $000 $15000000 10117 93018

TPF-5(378) TRBCoreProgramActivitiesPeriodCoveringFY2018(TRBFY2019) Clover FHWA 29 $18605900 $000 $18500000 10117 93018

TPF-5(418) NationalCooperativeHighwayResearchProgram(NCHRP)forFY2018 Clover FHWA 51 $119859000 $000 $120000000 10117 93018

Report Number Title Contractor Investigator Project Manager Start Date End Date Total Budget

Complete

FY 18 Expenditures

Spotlight

SPR-1648 EvaluatingtheImpactsofSpeedLimitIncreasesonIdentifiedCaseStudies WMU Kwigizile Bott 3116 123117 $16180247 100 $3250467

SPR-1645 MichiganRuralSegmentsSafetyPerformanceFunctions(SPFs)DevelopmentandSupport

MSU Gates Kanitz 10115 33118 $31535545 100 $8643206 X

AssessmentofCountermeasureGapsPredictiveCrashAnalysisandEngineeringSafetyProgramsinMichigan

MSU Gates Shaughnessy 6116 33119 $28978182 55 $9342953

SponsorshipoftheTRBRoundtableonPreparingforAutomatedVehiclesandSharedMobilityServices

TRB NA Clover 10117 93019 $5000000 50 $2500000

MeasuretheOperationalCostandBenefitofSpeedFeedbackSigns MSU Gates Uzcategui 7118 63020 $22070474 0 $12889

Transportation Safety FAMMarkBottRMMichaelTownley

Transportation Safety Pooled Fund StudiesStudy Number Title

MDOT Project Manager

Lead State or Agency

of Participating States

MI 2018 Expenditures

Expenditures Prior to 2018

Total MI Commitment

Start Date End Date

OR15-189 DevelopingMichiganPedestrianandBicycleSafetyModelsUTC McQuiston UMTRI NA $789276 $24210635 $24999931 3116 53118

OR17-801 IdentifyingPotentialWorkZoneCountermeasuresUsingConnected-VehicleandDrivingDataUTC

Gorman UM NA $7347822 $8629559 $17699951 11116 53118

TPF-5(255) HighwaySafetyManualImplementation Shaughnessy FHWA 23 $2000000 $4000000 $8000000 11915 123119

TPF-5(343) RoadsideSafetyandResearchforMASHImplementation Torres WADOT 24 $5000000 $5000000 $10000000 10116 123119

7

The Research Administration Team

EXECUTIVE

Carol Aldrich EngineerofResearch517-636-7777AldrichCMichigangov

Lisa Branch AdministrativeAssistant 517-636-4555 BranchL2Michigangov

PROGRAM MANAGEMENT

Andreacute Clover ProgramManager517-636-6053CloverAMichigangov

Mark Polsdofer ProgramSpecialist517-636-0552PolsdoferMMichigangov

PROJECT ADMINISTRATION

Michael Townley SupervisorProjectAdministration517-636-0144TownleyMMichigangov

Faith Rodriguez ProgramAnalyst 517-636-0033 RodriguezF1Michigangov

Rebecca Petri ProjectAnalyst517-636-6146PetriR1Michigangov

Joshua Hatfield StudentAssistant517-636-4270HatfieldJ2Michigangov

LIBRARY SERVICES

Jennifer Herron Librarian517-373-8548HerronJ1Michigangov

CONTACT US MDOT Research Administration

Phone 517-636-4555 E-mailMDOT-ResearchMichigangov WebsitewwwMichigangovMDOTResearchgov

1

15780

15

233 334

5 34

84

30

671

Amendments

Total circulation

New individual research projects

Reference services

Closed individual research projects

New materials

Individual research projects

Interlibrary loans

Pooled fund studies and

other national research

initiatives

MDOT Library Website Users

MISSIONPromoting innovative

research for economic benefit and improved quality of life

VALUESQuality bull Customer Orientation

Teamwork bull Integrity bull Pride

RESEARCH SERVICES STATISTICS (FY 2018)

LIBRARY SERVICES STATISTICS (FY 2018)

Page 4: MDOT Research Services FY 2018 At-A-GlanceFiscal Year (FY) 2018. The tables on pages 2 through 7 list all MDOT-funded research projects by topic area that were active or completed

Maintenance Pooled Fund Studies

Study Number TitleMDOT

Project ManagerLead State or Agency

of Participating States

MI 2018 Expenditures

Expenditures Prior to 2018

Total MI Commitment

Start Date End Date

TPF-5(290) AuroraProgram Longworth IADOT 18 $2500000 $10000000 $12500000 8114 53119

TPF-5(330) NoBoundariesRoadwayMaintenancePractices Croze OHDOT 18 $1000000 $3000000 $4000000 52915 63019

TPF-5(353) ClearRoadsWinterHighwayOperationsPooledFund Longworth MNDOT 36 $2500000 $2500000 $12500000 10116 123021

Report Number Title Contractor Investigator Project Manager Start Date End Date Total Budget

Complete

FY 18 Expenditures

Spotlight

SPR-1677 EvaluationReportforCollisionAvoidanceandMitigationSystem(CAMS)onWinterMaintenanceTrucks(WMT)

MSU Zockaie Cook 10117 93018 $18026553 100 $18026553

DevelopandImplementaFreeze-ThawModelBasedSeasonalLoadRestrictionDecisionSupportTool

MTU Liu Longworth 4117 33119 $16265391 49 $5185489

Maintenance FAMTimCrozeRMAndreacuteClover

4 continued

Intelligent Transportation Systems Pooled Fund Studies

Study Number TitleMDOT

Project ManagerLead State or Agency

of Participating States

MI 2018 Expenditures

Expenditures Prior to 2018

Total MI Commitment

Start Date End Date

TPF-5(206) ResearchProgramtoSupporttheResearchDevelopmentandDeploymentofSystemOperationsApplicationsofVehicleInfrastructureIntegration(VII)

Castle VADOT 23 $5000000 $35000000 $45000000 10112 63020

TPF-5(359) EvaluatingNewTechnologiesforRoadsProgramInitiativesinSafetyandEfficiency(ENTERPRISE)PhaseII

Feldpausch MIDOT 8 $4500000 $3500000 $11500000 1218 113020

Report Number Title Contractor Investigator Project Manager Start Date End Date Total Budget

Complete

FY 18 Expenditures

Spotlight

SPR-1654 AdvancedApplicationsofIntelliDriveDataUseAnalysisandProcessing2(DUAP2)

MixonHill Mixon Castle 8911 7118 $372363465 100 $000

ConnectedAutomatedVehicleandInfrastructureResearch UM Sayer Ajegba 10113 93019 $305002481 82 $000

Intelligent Transportation Systems FAMColinCastleRMAndreacuteClover

5 continued

Mobility Systems and Signal Operations Pooled Fund Studies

Study Number TitleMDOT

Project ManagerLead State or Agency

of Participating States

MI 2018 Expenditures

Expenditures Prior to 2018

Total MI Commitment

Start Date End Date

TPF-5(319) TransportationManagementCenter(TMC)PooledFundStudy Peplinski FHWA 21 $2500000 $7500000 $12500000 41715 41620

TPF-5(347) DevelopmentofMaintenanceDecisionSupportSystem Longworth SDDOT 14 $2500000 $000 $12500000 10116 93021

TPF-5(351) Self-DeicingLEDSignals Smalley KSDOT 7 $2000000 $4000000 $6000000 32516 31420

Report Number Title Contractor Investigator Project Manager Start Date End Date Total Budget

Complete

FY 18 Expenditures

Spotlight

SPR-1655 FurtherAssessmentofQuickClearanceStrategiesPhaseII GannettFlemming Rensel Kremer 5116 33118 $24160970 100 $5737733 X

SPR-1674 ImplementationofUnmannedAerialVehicles(UAVs)forAssessmentofTransportationInfrastructurePhaseII

MTU Brooks Cook 5116 53118 $59967034 99 $22350611 X

SignalPerformanceMeasuresPilotImplementation AECOM Remias Adelman 11116 123118 $25394964 78 $7988483

Mobility Systems and Signal Operations FAMSteveCookRMAndreacuteClover

Report Number Title Contractor Investigator Project Manager Start Date End Date Total Budget

Complete

FY 18 Expenditures

Spotlight

SPR-1635 PerformanceEvaluationofSubgradeStabilizationwithRecycledMaterials

LTU Bandara Grazioli 10113 13116 $21481909 100 $2553700 X

SPR-1666 IdentifyBestPracticesinPavementDesignMaterialsConstructionandMaintenanceinWetFreezeClimatesSimilartoMichigan

MTU You Bleech 11116 22818 $18465373 100 $9982017 X

SPR-1678 UpdatedAnalysisofMichiganTrafficInputsforPavementMEDesign MSU Haider Schenkel 10116 83118 $25356311 100 $12266907 X

Report Number Title Contractor Investigator Project Manager Start Date End Date Total Budget

Complete

FY 18 Expenditures

Spotlight

SPR-1675 DevelopmentofDifferentialCriteriaforDeterminingAppropriatenessofSidepathApplicationsforBicycleUse

TooleDesignGroup Sanders DeBruyn 6116 63018 $32250644 100 $9505203 X

Pavements and Materials FAMsCurtisBleechandJohnStatonRMAndreacuteClover

Nonmotorized Planning and Development FAMDebAlfonsoRMMarkPolsdofer

Rest Areas Utilities and Landscaping Pooled Fund StudyStudy Number Title

MDOT Project Manager

Lead State or Agency

of Participating States

MI 2018 Expenditures

Expenditures Prior to 2018

Total MI Commitment

Start Date End Date

TPF-5(346) RegionalRoadsideTurfgrassPerformanceTestingProgram Stonebrook MNDOT 5 $2000000 $4000000 $8000000 32516 93019

6 continued

Report Number Title Contractor Investigator Project Manager Start Date End Date Total Budget

Complete

FY 18 Expenditures

Spotlight

SlopeRestorationonUrbanFreeways MSU Cregg Alton 4117 73119 $33930771 62 $19843099

Report Number Title Contractor Investigator Project Manager Start Date End Date Total Budget

Complete

FY 18 Expenditures

Spotlight

3-DHighwayDesignModelCostBenefitAnalysis WSP Mitchell Wilkerson 7117 22819 $20578547 68 $12170117

Rest Areas Utilities and Landscaping FAMBillStonebrookRMMichaelTownley

Surveys and Automated Design FAMTaylorSnowRMMichaelTownley

Pavements and Materials Pooled Fund StudiesStudy Number Title

MDOT Project Manager

Lead State or Agency

of Participating States

MI 2018 Expenditures

Expenditures Prior to 2018

Total MI Commitment

Start Date End Date

OR17-102 EstablishingPercentEmbedmentLimitstoImproveChipSealPerformanceUTC

Green MSU NA $10753060 $1246986 $12000046 5117 81518

TPF-5(267) AcceleratedPerformanceTestingfortheNCATPavementTestTrack Bleech ALDOT 19 $000 $99000000 $99000000 41515 93019

TPF-5(269) DevelopmentofanImprovedDesignProcedureforUnbondedConcreteOverlays

Krom MNDOT 8 $000 $6000000 $6000000 41312 43019

TPF-5(297) ImprovingSpecificationstoResistFrostDamageinModernConcreteMixtures

Stallard OKDOT 19 $1750000 $5250000 $7000000 11014 9119

TPF-5(305) RegionalandNationalImplementationandCoordinationofMechanistic-Empirical(ME)Design

Eacker FHWA 23 $1000000 $1000000 $2000000 10116 93019

TPF-5(313) TechnologyTransferConcreteConsortium Staton IADOT 35 $1200000 $3600000 $6000000 41015 83120

TPF-5(320) BaseFundingfortheNorthCentralSuperpaveCenter Kennedy INDOT 7 $2500000 $7500000 $12500000 2315 93022

TPF-5(341) NationalRoadResearchAlliance Bleech MNDOT 7 $15000000 $30000000 $45000000 22216 22221

TPF-5(368) PerformanceEngineeredConcretePavingMixtures Staton IADOT 17 $1500000 $1500000 $7500000 1117 123121

7

AdministrationReport Number Title Contractor Investigator Project Manager Start Date End Date Total Budget

Complete

FY 18 Expenditures

Spotlight

ResearchProgramServices CTC Casey Polsdofer 1116 93019 $44312441 29 $4312086

National InitiativesStudy Number Title

MDOT Project Manager

Lead State or Agency

of Participating States

MI 2018 Expenditures

Expenditures Prior to 2018

Total MI Commitment

Start Date End Date

OR16-003 AASHTO301-ConstructionMaterialsModuleEnhancementImplementationandStaffTraining

Burns AASHTO NA $51300000 $37800000 $126220000 10116 93019

SPR1284(019) AASHTOEngineeringTechnicalServicePrograms Clover AASHTOFHWA

NA $15000000 $000 $15000000 10117 93018

TPF-5(378) TRBCoreProgramActivitiesPeriodCoveringFY2018(TRBFY2019) Clover FHWA 29 $18605900 $000 $18500000 10117 93018

TPF-5(418) NationalCooperativeHighwayResearchProgram(NCHRP)forFY2018 Clover FHWA 51 $119859000 $000 $120000000 10117 93018

Report Number Title Contractor Investigator Project Manager Start Date End Date Total Budget

Complete

FY 18 Expenditures

Spotlight

SPR-1648 EvaluatingtheImpactsofSpeedLimitIncreasesonIdentifiedCaseStudies WMU Kwigizile Bott 3116 123117 $16180247 100 $3250467

SPR-1645 MichiganRuralSegmentsSafetyPerformanceFunctions(SPFs)DevelopmentandSupport

MSU Gates Kanitz 10115 33118 $31535545 100 $8643206 X

AssessmentofCountermeasureGapsPredictiveCrashAnalysisandEngineeringSafetyProgramsinMichigan

MSU Gates Shaughnessy 6116 33119 $28978182 55 $9342953

SponsorshipoftheTRBRoundtableonPreparingforAutomatedVehiclesandSharedMobilityServices

TRB NA Clover 10117 93019 $5000000 50 $2500000

MeasuretheOperationalCostandBenefitofSpeedFeedbackSigns MSU Gates Uzcategui 7118 63020 $22070474 0 $12889

Transportation Safety FAMMarkBottRMMichaelTownley

Transportation Safety Pooled Fund StudiesStudy Number Title

MDOT Project Manager

Lead State or Agency

of Participating States

MI 2018 Expenditures

Expenditures Prior to 2018

Total MI Commitment

Start Date End Date

OR15-189 DevelopingMichiganPedestrianandBicycleSafetyModelsUTC McQuiston UMTRI NA $789276 $24210635 $24999931 3116 53118

OR17-801 IdentifyingPotentialWorkZoneCountermeasuresUsingConnected-VehicleandDrivingDataUTC

Gorman UM NA $7347822 $8629559 $17699951 11116 53118

TPF-5(255) HighwaySafetyManualImplementation Shaughnessy FHWA 23 $2000000 $4000000 $8000000 11915 123119

TPF-5(343) RoadsideSafetyandResearchforMASHImplementation Torres WADOT 24 $5000000 $5000000 $10000000 10116 123119

7

The Research Administration Team

EXECUTIVE

Carol Aldrich EngineerofResearch517-636-7777AldrichCMichigangov

Lisa Branch AdministrativeAssistant 517-636-4555 BranchL2Michigangov

PROGRAM MANAGEMENT

Andreacute Clover ProgramManager517-636-6053CloverAMichigangov

Mark Polsdofer ProgramSpecialist517-636-0552PolsdoferMMichigangov

PROJECT ADMINISTRATION

Michael Townley SupervisorProjectAdministration517-636-0144TownleyMMichigangov

Faith Rodriguez ProgramAnalyst 517-636-0033 RodriguezF1Michigangov

Rebecca Petri ProjectAnalyst517-636-6146PetriR1Michigangov

Joshua Hatfield StudentAssistant517-636-4270HatfieldJ2Michigangov

LIBRARY SERVICES

Jennifer Herron Librarian517-373-8548HerronJ1Michigangov

CONTACT US MDOT Research Administration

Phone 517-636-4555 E-mailMDOT-ResearchMichigangov WebsitewwwMichigangovMDOTResearchgov

1

15780

15

233 334

5 34

84

30

671

Amendments

Total circulation

New individual research projects

Reference services

Closed individual research projects

New materials

Individual research projects

Interlibrary loans

Pooled fund studies and

other national research

initiatives

MDOT Library Website Users

MISSIONPromoting innovative

research for economic benefit and improved quality of life

VALUESQuality bull Customer Orientation

Teamwork bull Integrity bull Pride

RESEARCH SERVICES STATISTICS (FY 2018)

LIBRARY SERVICES STATISTICS (FY 2018)

Page 5: MDOT Research Services FY 2018 At-A-GlanceFiscal Year (FY) 2018. The tables on pages 2 through 7 list all MDOT-funded research projects by topic area that were active or completed

5 continued

Mobility Systems and Signal Operations Pooled Fund Studies

Study Number TitleMDOT

Project ManagerLead State or Agency

of Participating States

MI 2018 Expenditures

Expenditures Prior to 2018

Total MI Commitment

Start Date End Date

TPF-5(319) TransportationManagementCenter(TMC)PooledFundStudy Peplinski FHWA 21 $2500000 $7500000 $12500000 41715 41620

TPF-5(347) DevelopmentofMaintenanceDecisionSupportSystem Longworth SDDOT 14 $2500000 $000 $12500000 10116 93021

TPF-5(351) Self-DeicingLEDSignals Smalley KSDOT 7 $2000000 $4000000 $6000000 32516 31420

Report Number Title Contractor Investigator Project Manager Start Date End Date Total Budget

Complete

FY 18 Expenditures

Spotlight

SPR-1655 FurtherAssessmentofQuickClearanceStrategiesPhaseII GannettFlemming Rensel Kremer 5116 33118 $24160970 100 $5737733 X

SPR-1674 ImplementationofUnmannedAerialVehicles(UAVs)forAssessmentofTransportationInfrastructurePhaseII

MTU Brooks Cook 5116 53118 $59967034 99 $22350611 X

SignalPerformanceMeasuresPilotImplementation AECOM Remias Adelman 11116 123118 $25394964 78 $7988483

Mobility Systems and Signal Operations FAMSteveCookRMAndreacuteClover

Report Number Title Contractor Investigator Project Manager Start Date End Date Total Budget

Complete

FY 18 Expenditures

Spotlight

SPR-1635 PerformanceEvaluationofSubgradeStabilizationwithRecycledMaterials

LTU Bandara Grazioli 10113 13116 $21481909 100 $2553700 X

SPR-1666 IdentifyBestPracticesinPavementDesignMaterialsConstructionandMaintenanceinWetFreezeClimatesSimilartoMichigan

MTU You Bleech 11116 22818 $18465373 100 $9982017 X

SPR-1678 UpdatedAnalysisofMichiganTrafficInputsforPavementMEDesign MSU Haider Schenkel 10116 83118 $25356311 100 $12266907 X

Report Number Title Contractor Investigator Project Manager Start Date End Date Total Budget

Complete

FY 18 Expenditures

Spotlight

SPR-1675 DevelopmentofDifferentialCriteriaforDeterminingAppropriatenessofSidepathApplicationsforBicycleUse

TooleDesignGroup Sanders DeBruyn 6116 63018 $32250644 100 $9505203 X

Pavements and Materials FAMsCurtisBleechandJohnStatonRMAndreacuteClover

Nonmotorized Planning and Development FAMDebAlfonsoRMMarkPolsdofer

Rest Areas Utilities and Landscaping Pooled Fund StudyStudy Number Title

MDOT Project Manager

Lead State or Agency

of Participating States

MI 2018 Expenditures

Expenditures Prior to 2018

Total MI Commitment

Start Date End Date

TPF-5(346) RegionalRoadsideTurfgrassPerformanceTestingProgram Stonebrook MNDOT 5 $2000000 $4000000 $8000000 32516 93019

6 continued

Report Number Title Contractor Investigator Project Manager Start Date End Date Total Budget

Complete

FY 18 Expenditures

Spotlight

SlopeRestorationonUrbanFreeways MSU Cregg Alton 4117 73119 $33930771 62 $19843099

Report Number Title Contractor Investigator Project Manager Start Date End Date Total Budget

Complete

FY 18 Expenditures

Spotlight

3-DHighwayDesignModelCostBenefitAnalysis WSP Mitchell Wilkerson 7117 22819 $20578547 68 $12170117

Rest Areas Utilities and Landscaping FAMBillStonebrookRMMichaelTownley

Surveys and Automated Design FAMTaylorSnowRMMichaelTownley

Pavements and Materials Pooled Fund StudiesStudy Number Title

MDOT Project Manager

Lead State or Agency

of Participating States

MI 2018 Expenditures

Expenditures Prior to 2018

Total MI Commitment

Start Date End Date

OR17-102 EstablishingPercentEmbedmentLimitstoImproveChipSealPerformanceUTC

Green MSU NA $10753060 $1246986 $12000046 5117 81518

TPF-5(267) AcceleratedPerformanceTestingfortheNCATPavementTestTrack Bleech ALDOT 19 $000 $99000000 $99000000 41515 93019

TPF-5(269) DevelopmentofanImprovedDesignProcedureforUnbondedConcreteOverlays

Krom MNDOT 8 $000 $6000000 $6000000 41312 43019

TPF-5(297) ImprovingSpecificationstoResistFrostDamageinModernConcreteMixtures

Stallard OKDOT 19 $1750000 $5250000 $7000000 11014 9119

TPF-5(305) RegionalandNationalImplementationandCoordinationofMechanistic-Empirical(ME)Design

Eacker FHWA 23 $1000000 $1000000 $2000000 10116 93019

TPF-5(313) TechnologyTransferConcreteConsortium Staton IADOT 35 $1200000 $3600000 $6000000 41015 83120

TPF-5(320) BaseFundingfortheNorthCentralSuperpaveCenter Kennedy INDOT 7 $2500000 $7500000 $12500000 2315 93022

TPF-5(341) NationalRoadResearchAlliance Bleech MNDOT 7 $15000000 $30000000 $45000000 22216 22221

TPF-5(368) PerformanceEngineeredConcretePavingMixtures Staton IADOT 17 $1500000 $1500000 $7500000 1117 123121

7

AdministrationReport Number Title Contractor Investigator Project Manager Start Date End Date Total Budget

Complete

FY 18 Expenditures

Spotlight

ResearchProgramServices CTC Casey Polsdofer 1116 93019 $44312441 29 $4312086

National InitiativesStudy Number Title

MDOT Project Manager

Lead State or Agency

of Participating States

MI 2018 Expenditures

Expenditures Prior to 2018

Total MI Commitment

Start Date End Date

OR16-003 AASHTO301-ConstructionMaterialsModuleEnhancementImplementationandStaffTraining

Burns AASHTO NA $51300000 $37800000 $126220000 10116 93019

SPR1284(019) AASHTOEngineeringTechnicalServicePrograms Clover AASHTOFHWA

NA $15000000 $000 $15000000 10117 93018

TPF-5(378) TRBCoreProgramActivitiesPeriodCoveringFY2018(TRBFY2019) Clover FHWA 29 $18605900 $000 $18500000 10117 93018

TPF-5(418) NationalCooperativeHighwayResearchProgram(NCHRP)forFY2018 Clover FHWA 51 $119859000 $000 $120000000 10117 93018

Report Number Title Contractor Investigator Project Manager Start Date End Date Total Budget

Complete

FY 18 Expenditures

Spotlight

SPR-1648 EvaluatingtheImpactsofSpeedLimitIncreasesonIdentifiedCaseStudies WMU Kwigizile Bott 3116 123117 $16180247 100 $3250467

SPR-1645 MichiganRuralSegmentsSafetyPerformanceFunctions(SPFs)DevelopmentandSupport

MSU Gates Kanitz 10115 33118 $31535545 100 $8643206 X

AssessmentofCountermeasureGapsPredictiveCrashAnalysisandEngineeringSafetyProgramsinMichigan

MSU Gates Shaughnessy 6116 33119 $28978182 55 $9342953

SponsorshipoftheTRBRoundtableonPreparingforAutomatedVehiclesandSharedMobilityServices

TRB NA Clover 10117 93019 $5000000 50 $2500000

MeasuretheOperationalCostandBenefitofSpeedFeedbackSigns MSU Gates Uzcategui 7118 63020 $22070474 0 $12889

Transportation Safety FAMMarkBottRMMichaelTownley

Transportation Safety Pooled Fund StudiesStudy Number Title

MDOT Project Manager

Lead State or Agency

of Participating States

MI 2018 Expenditures

Expenditures Prior to 2018

Total MI Commitment

Start Date End Date

OR15-189 DevelopingMichiganPedestrianandBicycleSafetyModelsUTC McQuiston UMTRI NA $789276 $24210635 $24999931 3116 53118

OR17-801 IdentifyingPotentialWorkZoneCountermeasuresUsingConnected-VehicleandDrivingDataUTC

Gorman UM NA $7347822 $8629559 $17699951 11116 53118

TPF-5(255) HighwaySafetyManualImplementation Shaughnessy FHWA 23 $2000000 $4000000 $8000000 11915 123119

TPF-5(343) RoadsideSafetyandResearchforMASHImplementation Torres WADOT 24 $5000000 $5000000 $10000000 10116 123119

7

The Research Administration Team

EXECUTIVE

Carol Aldrich EngineerofResearch517-636-7777AldrichCMichigangov

Lisa Branch AdministrativeAssistant 517-636-4555 BranchL2Michigangov

PROGRAM MANAGEMENT

Andreacute Clover ProgramManager517-636-6053CloverAMichigangov

Mark Polsdofer ProgramSpecialist517-636-0552PolsdoferMMichigangov

PROJECT ADMINISTRATION

Michael Townley SupervisorProjectAdministration517-636-0144TownleyMMichigangov

Faith Rodriguez ProgramAnalyst 517-636-0033 RodriguezF1Michigangov

Rebecca Petri ProjectAnalyst517-636-6146PetriR1Michigangov

Joshua Hatfield StudentAssistant517-636-4270HatfieldJ2Michigangov

LIBRARY SERVICES

Jennifer Herron Librarian517-373-8548HerronJ1Michigangov

CONTACT US MDOT Research Administration

Phone 517-636-4555 E-mailMDOT-ResearchMichigangov WebsitewwwMichigangovMDOTResearchgov

1

15780

15

233 334

5 34

84

30

671

Amendments

Total circulation

New individual research projects

Reference services

Closed individual research projects

New materials

Individual research projects

Interlibrary loans

Pooled fund studies and

other national research

initiatives

MDOT Library Website Users

MISSIONPromoting innovative

research for economic benefit and improved quality of life

VALUESQuality bull Customer Orientation

Teamwork bull Integrity bull Pride

RESEARCH SERVICES STATISTICS (FY 2018)

LIBRARY SERVICES STATISTICS (FY 2018)

Page 6: MDOT Research Services FY 2018 At-A-GlanceFiscal Year (FY) 2018. The tables on pages 2 through 7 list all MDOT-funded research projects by topic area that were active or completed

Rest Areas Utilities and Landscaping Pooled Fund StudyStudy Number Title

MDOT Project Manager

Lead State or Agency

of Participating States

MI 2018 Expenditures

Expenditures Prior to 2018

Total MI Commitment

Start Date End Date

TPF-5(346) RegionalRoadsideTurfgrassPerformanceTestingProgram Stonebrook MNDOT 5 $2000000 $4000000 $8000000 32516 93019

6 continued

Report Number Title Contractor Investigator Project Manager Start Date End Date Total Budget

Complete

FY 18 Expenditures

Spotlight

SlopeRestorationonUrbanFreeways MSU Cregg Alton 4117 73119 $33930771 62 $19843099

Report Number Title Contractor Investigator Project Manager Start Date End Date Total Budget

Complete

FY 18 Expenditures

Spotlight

3-DHighwayDesignModelCostBenefitAnalysis WSP Mitchell Wilkerson 7117 22819 $20578547 68 $12170117

Rest Areas Utilities and Landscaping FAMBillStonebrookRMMichaelTownley

Surveys and Automated Design FAMTaylorSnowRMMichaelTownley

Pavements and Materials Pooled Fund StudiesStudy Number Title

MDOT Project Manager

Lead State or Agency

of Participating States

MI 2018 Expenditures

Expenditures Prior to 2018

Total MI Commitment

Start Date End Date

OR17-102 EstablishingPercentEmbedmentLimitstoImproveChipSealPerformanceUTC

Green MSU NA $10753060 $1246986 $12000046 5117 81518

TPF-5(267) AcceleratedPerformanceTestingfortheNCATPavementTestTrack Bleech ALDOT 19 $000 $99000000 $99000000 41515 93019

TPF-5(269) DevelopmentofanImprovedDesignProcedureforUnbondedConcreteOverlays

Krom MNDOT 8 $000 $6000000 $6000000 41312 43019

TPF-5(297) ImprovingSpecificationstoResistFrostDamageinModernConcreteMixtures

Stallard OKDOT 19 $1750000 $5250000 $7000000 11014 9119

TPF-5(305) RegionalandNationalImplementationandCoordinationofMechanistic-Empirical(ME)Design

Eacker FHWA 23 $1000000 $1000000 $2000000 10116 93019

TPF-5(313) TechnologyTransferConcreteConsortium Staton IADOT 35 $1200000 $3600000 $6000000 41015 83120

TPF-5(320) BaseFundingfortheNorthCentralSuperpaveCenter Kennedy INDOT 7 $2500000 $7500000 $12500000 2315 93022

TPF-5(341) NationalRoadResearchAlliance Bleech MNDOT 7 $15000000 $30000000 $45000000 22216 22221

TPF-5(368) PerformanceEngineeredConcretePavingMixtures Staton IADOT 17 $1500000 $1500000 $7500000 1117 123121

7

AdministrationReport Number Title Contractor Investigator Project Manager Start Date End Date Total Budget

Complete

FY 18 Expenditures

Spotlight

ResearchProgramServices CTC Casey Polsdofer 1116 93019 $44312441 29 $4312086

National InitiativesStudy Number Title

MDOT Project Manager

Lead State or Agency

of Participating States

MI 2018 Expenditures

Expenditures Prior to 2018

Total MI Commitment

Start Date End Date

OR16-003 AASHTO301-ConstructionMaterialsModuleEnhancementImplementationandStaffTraining

Burns AASHTO NA $51300000 $37800000 $126220000 10116 93019

SPR1284(019) AASHTOEngineeringTechnicalServicePrograms Clover AASHTOFHWA

NA $15000000 $000 $15000000 10117 93018

TPF-5(378) TRBCoreProgramActivitiesPeriodCoveringFY2018(TRBFY2019) Clover FHWA 29 $18605900 $000 $18500000 10117 93018

TPF-5(418) NationalCooperativeHighwayResearchProgram(NCHRP)forFY2018 Clover FHWA 51 $119859000 $000 $120000000 10117 93018

Report Number Title Contractor Investigator Project Manager Start Date End Date Total Budget

Complete

FY 18 Expenditures

Spotlight

SPR-1648 EvaluatingtheImpactsofSpeedLimitIncreasesonIdentifiedCaseStudies WMU Kwigizile Bott 3116 123117 $16180247 100 $3250467

SPR-1645 MichiganRuralSegmentsSafetyPerformanceFunctions(SPFs)DevelopmentandSupport

MSU Gates Kanitz 10115 33118 $31535545 100 $8643206 X

AssessmentofCountermeasureGapsPredictiveCrashAnalysisandEngineeringSafetyProgramsinMichigan

MSU Gates Shaughnessy 6116 33119 $28978182 55 $9342953

SponsorshipoftheTRBRoundtableonPreparingforAutomatedVehiclesandSharedMobilityServices

TRB NA Clover 10117 93019 $5000000 50 $2500000

MeasuretheOperationalCostandBenefitofSpeedFeedbackSigns MSU Gates Uzcategui 7118 63020 $22070474 0 $12889

Transportation Safety FAMMarkBottRMMichaelTownley

Transportation Safety Pooled Fund StudiesStudy Number Title

MDOT Project Manager

Lead State or Agency

of Participating States

MI 2018 Expenditures

Expenditures Prior to 2018

Total MI Commitment

Start Date End Date

OR15-189 DevelopingMichiganPedestrianandBicycleSafetyModelsUTC McQuiston UMTRI NA $789276 $24210635 $24999931 3116 53118

OR17-801 IdentifyingPotentialWorkZoneCountermeasuresUsingConnected-VehicleandDrivingDataUTC

Gorman UM NA $7347822 $8629559 $17699951 11116 53118

TPF-5(255) HighwaySafetyManualImplementation Shaughnessy FHWA 23 $2000000 $4000000 $8000000 11915 123119

TPF-5(343) RoadsideSafetyandResearchforMASHImplementation Torres WADOT 24 $5000000 $5000000 $10000000 10116 123119

7

The Research Administration Team

EXECUTIVE

Carol Aldrich EngineerofResearch517-636-7777AldrichCMichigangov

Lisa Branch AdministrativeAssistant 517-636-4555 BranchL2Michigangov

PROGRAM MANAGEMENT

Andreacute Clover ProgramManager517-636-6053CloverAMichigangov

Mark Polsdofer ProgramSpecialist517-636-0552PolsdoferMMichigangov

PROJECT ADMINISTRATION

Michael Townley SupervisorProjectAdministration517-636-0144TownleyMMichigangov

Faith Rodriguez ProgramAnalyst 517-636-0033 RodriguezF1Michigangov

Rebecca Petri ProjectAnalyst517-636-6146PetriR1Michigangov

Joshua Hatfield StudentAssistant517-636-4270HatfieldJ2Michigangov

LIBRARY SERVICES

Jennifer Herron Librarian517-373-8548HerronJ1Michigangov

CONTACT US MDOT Research Administration

Phone 517-636-4555 E-mailMDOT-ResearchMichigangov WebsitewwwMichigangovMDOTResearchgov

1

15780

15

233 334

5 34

84

30

671

Amendments

Total circulation

New individual research projects

Reference services

Closed individual research projects

New materials

Individual research projects

Interlibrary loans

Pooled fund studies and

other national research

initiatives

MDOT Library Website Users

MISSIONPromoting innovative

research for economic benefit and improved quality of life

VALUESQuality bull Customer Orientation

Teamwork bull Integrity bull Pride

RESEARCH SERVICES STATISTICS (FY 2018)

LIBRARY SERVICES STATISTICS (FY 2018)

Page 7: MDOT Research Services FY 2018 At-A-GlanceFiscal Year (FY) 2018. The tables on pages 2 through 7 list all MDOT-funded research projects by topic area that were active or completed

7

AdministrationReport Number Title Contractor Investigator Project Manager Start Date End Date Total Budget

Complete

FY 18 Expenditures

Spotlight

ResearchProgramServices CTC Casey Polsdofer 1116 93019 $44312441 29 $4312086

National InitiativesStudy Number Title

MDOT Project Manager

Lead State or Agency

of Participating States

MI 2018 Expenditures

Expenditures Prior to 2018

Total MI Commitment

Start Date End Date

OR16-003 AASHTO301-ConstructionMaterialsModuleEnhancementImplementationandStaffTraining

Burns AASHTO NA $51300000 $37800000 $126220000 10116 93019

SPR1284(019) AASHTOEngineeringTechnicalServicePrograms Clover AASHTOFHWA

NA $15000000 $000 $15000000 10117 93018

TPF-5(378) TRBCoreProgramActivitiesPeriodCoveringFY2018(TRBFY2019) Clover FHWA 29 $18605900 $000 $18500000 10117 93018

TPF-5(418) NationalCooperativeHighwayResearchProgram(NCHRP)forFY2018 Clover FHWA 51 $119859000 $000 $120000000 10117 93018

Report Number Title Contractor Investigator Project Manager Start Date End Date Total Budget

Complete

FY 18 Expenditures

Spotlight

SPR-1648 EvaluatingtheImpactsofSpeedLimitIncreasesonIdentifiedCaseStudies WMU Kwigizile Bott 3116 123117 $16180247 100 $3250467

SPR-1645 MichiganRuralSegmentsSafetyPerformanceFunctions(SPFs)DevelopmentandSupport

MSU Gates Kanitz 10115 33118 $31535545 100 $8643206 X

AssessmentofCountermeasureGapsPredictiveCrashAnalysisandEngineeringSafetyProgramsinMichigan

MSU Gates Shaughnessy 6116 33119 $28978182 55 $9342953

SponsorshipoftheTRBRoundtableonPreparingforAutomatedVehiclesandSharedMobilityServices

TRB NA Clover 10117 93019 $5000000 50 $2500000

MeasuretheOperationalCostandBenefitofSpeedFeedbackSigns MSU Gates Uzcategui 7118 63020 $22070474 0 $12889

Transportation Safety FAMMarkBottRMMichaelTownley

Transportation Safety Pooled Fund StudiesStudy Number Title

MDOT Project Manager

Lead State or Agency

of Participating States

MI 2018 Expenditures

Expenditures Prior to 2018

Total MI Commitment

Start Date End Date

OR15-189 DevelopingMichiganPedestrianandBicycleSafetyModelsUTC McQuiston UMTRI NA $789276 $24210635 $24999931 3116 53118

OR17-801 IdentifyingPotentialWorkZoneCountermeasuresUsingConnected-VehicleandDrivingDataUTC

Gorman UM NA $7347822 $8629559 $17699951 11116 53118

TPF-5(255) HighwaySafetyManualImplementation Shaughnessy FHWA 23 $2000000 $4000000 $8000000 11915 123119

TPF-5(343) RoadsideSafetyandResearchforMASHImplementation Torres WADOT 24 $5000000 $5000000 $10000000 10116 123119

7

The Research Administration Team

EXECUTIVE

Carol Aldrich EngineerofResearch517-636-7777AldrichCMichigangov

Lisa Branch AdministrativeAssistant 517-636-4555 BranchL2Michigangov

PROGRAM MANAGEMENT

Andreacute Clover ProgramManager517-636-6053CloverAMichigangov

Mark Polsdofer ProgramSpecialist517-636-0552PolsdoferMMichigangov

PROJECT ADMINISTRATION

Michael Townley SupervisorProjectAdministration517-636-0144TownleyMMichigangov

Faith Rodriguez ProgramAnalyst 517-636-0033 RodriguezF1Michigangov

Rebecca Petri ProjectAnalyst517-636-6146PetriR1Michigangov

Joshua Hatfield StudentAssistant517-636-4270HatfieldJ2Michigangov

LIBRARY SERVICES

Jennifer Herron Librarian517-373-8548HerronJ1Michigangov

CONTACT US MDOT Research Administration

Phone 517-636-4555 E-mailMDOT-ResearchMichigangov WebsitewwwMichigangovMDOTResearchgov

1

15780

15

233 334

5 34

84

30

671

Amendments

Total circulation

New individual research projects

Reference services

Closed individual research projects

New materials

Individual research projects

Interlibrary loans

Pooled fund studies and

other national research

initiatives

MDOT Library Website Users

MISSIONPromoting innovative

research for economic benefit and improved quality of life

VALUESQuality bull Customer Orientation

Teamwork bull Integrity bull Pride

RESEARCH SERVICES STATISTICS (FY 2018)

LIBRARY SERVICES STATISTICS (FY 2018)

Page 8: MDOT Research Services FY 2018 At-A-GlanceFiscal Year (FY) 2018. The tables on pages 2 through 7 list all MDOT-funded research projects by topic area that were active or completed

The Research Administration Team

EXECUTIVE

Carol Aldrich EngineerofResearch517-636-7777AldrichCMichigangov

Lisa Branch AdministrativeAssistant 517-636-4555 BranchL2Michigangov

PROGRAM MANAGEMENT

Andreacute Clover ProgramManager517-636-6053CloverAMichigangov

Mark Polsdofer ProgramSpecialist517-636-0552PolsdoferMMichigangov

PROJECT ADMINISTRATION

Michael Townley SupervisorProjectAdministration517-636-0144TownleyMMichigangov

Faith Rodriguez ProgramAnalyst 517-636-0033 RodriguezF1Michigangov

Rebecca Petri ProjectAnalyst517-636-6146PetriR1Michigangov

Joshua Hatfield StudentAssistant517-636-4270HatfieldJ2Michigangov

LIBRARY SERVICES

Jennifer Herron Librarian517-373-8548HerronJ1Michigangov

CONTACT US MDOT Research Administration

Phone 517-636-4555 E-mailMDOT-ResearchMichigangov WebsitewwwMichigangovMDOTResearchgov

1

15780

15

233 334

5 34

84

30

671

Amendments

Total circulation

New individual research projects

Reference services

Closed individual research projects

New materials

Individual research projects

Interlibrary loans

Pooled fund studies and

other national research

initiatives

MDOT Library Website Users

MISSIONPromoting innovative

research for economic benefit and improved quality of life

VALUESQuality bull Customer Orientation

Teamwork bull Integrity bull Pride

RESEARCH SERVICES STATISTICS (FY 2018)

LIBRARY SERVICES STATISTICS (FY 2018)