Presented by Arhis and EDF
MDM PROJECT BEST PRACTICEINFORMATICA DAY 4TH JUNE 2014
| 2©www.arhis.com 2014
AGENDA
1. Presenting Arhis
1. Arhis presentation and value proposition
2. Arhis MDM projects approach.
3. Arhis MDM Factory
4. Energy domain MDM implementation
2. Presenting EDF Business case
1. Presenting EDF
2. EDF Hydro Generation
3. PRERHY Project
4. Project scope and achievements
3. Q&A
| 3©www.arhis.com 2014
ARHIS VALUE PROPOSITION A SWISS LEADER IN THE MDM FIELD !
Our focus is Master Data Management
Arhis is a clear leader in the MDM implementation space since its creation with more than 30 success stories
Capitalizing on Best Vendors solutions
A unique expertise on key vendors solutions (Informatica)
A value-added offering with a team of highly qualified MDM Hub engineers
Implementation best practices combined with a proven MDM project methodology.
Our value proposition : Customer Satisfaction at a reasonable Total Cost of Ownership
Speed of execution
Reliability in quality and delivery
Strong commitment
Flexibility and adaptability : Agile methodology
| 4©www.arhis.com 2014
ARHIS : A STRONG MDM EXPERTISERECOGNIZED WORLDWIDE
| 5©www.arhis.com 2014
ARHIS : MDM PROJECT APPROACHPHASED, ITERATIVE APPROACH USING INFORMATICA AND ARHIS TOOLS
“Agile” Iterations
ARHISFactory Tools
| 6©www.arhis.com 2014
ARHIS MDM FACTORYBEST PRACTICES AND ACCELERATOR TOOLS
Methodology and Skills :
Factory Concepts have proven to work in large projectsArhis has delivered MDM Vanilla in less than 2 months
100 screens , 80 base objects
Tools :Schemagen concepts adopted by EDF and large customers as Arhis methodology
Datagen intensivelly used for data generation (Tests)
SiFTester WebService Framework deployment accelerator
Reusable Components shapes : IDD User exits, Security Modules, GIS IDD Components, ….
| 7©www.arhis.com 2014
MDM IMPLEMENTATIONS OPTIONSMULTI-DOMAIN / MULTI-STYLES
| 8©www.arhis.com 2014
ARHIS : MDM IN THE ENERGY SECTORVERY CENTRALISED HYBRID STYLE MDM IMPLEMENTATIONS
System live (Q2 2014)
Live by Q4 2014
Zurich Informatica day 2013“GRT Gaz owns and operatesthe largest High PressureNatural Gaz network inEurope”
This year we present :“A world leader in electricity”
Hybrid
Very Centralized
“Assets” MDM
EDF PRERHY
Informatica DayJune 2014
| 10
EDF: A GLOBAL LEADERIN ELECTRICITY
We are a world leader in electricityCovering all activities: generation (from nuclear to renewables), networks, sales and trading
We are an international groupWith roots in Europe and long-term partnerships and cooperation agreements in high-growth countries
Key Figures :
€72.7 billion in sales
39.3 million customers
159,740 employees worldwide
84.7% of generation does not emit CO2
EDF PRERHY - Informatica Day - june 2014
| 11
EDF: AN INTERNATIONAL GROUP
EDF PRERHY - Informatica Day - june 2014
| 12
EDF: ELECTRICITY GENERATION IN FRANCE
EDF PRERHY - Informatica Day - june 2014
Generation : Nuclear: safety reinforced, Flamanville EPR to generate its first TWh in 2016 Hydropower: SuperHydro renovation program 73% (2012 results) completed and
RenouvEau project being deployed
CO2: 95.9% carbon-free
| 13
EDF: HYDRO GENERATION IN FRANCE
EDF PRERHY - Informatica Day - june 2014
2 700MW
7 600MW
2 500MW
2 600MW
4 600MW
DPIH (Direction of HydroPower Engineering & Generation) : 4 800 employees 5 Generation Units (Est, Alpes, …) 2 Engineering Units (CIH, DTG)
447 power plants , 1 200 generators From 100 kW to 1 800 MW
• 10% > 100 MW (50% of total)• 50% < 12 MW (10% of total)
640 dams , 3 500 valves
1 500 km galleries
270 km penstocks
Among them 100 are operated remotely
14 000 MW can be available in 20 min
| 14
PRERHY PROJECT : CONTEXT & STAKES PRERHY : « Projet de REnovation du Référentiel des moyens de production de
L'HYdraulique »
Renovation of the Hydropower Generation Assets Frame of Reference
CONTEXT : Several changes have significant impacts on DPIH organization :
Deployment of the RenouvEau renovation program :• Strong evolution of hydropower generation business processes• Supported by a big effort to modernize the information system
Increase of regulatory constraints (safety)
A lot of hydro concessions to be renewed during the next years
STAKES : Governance of Master Data identified as a key success factor
To keep a strong knowledge of the generation portfolio
To validate and share master reference data among all stakeholders, from engineering to generation teams
EDF PRERHY - Informatica Day - june 2014
| 15
PRERHY: OBJECTIVES & MDM PROJECT OBJECTIVES :
Overhaul of the repository of hydropower generation assets description• Extension of the depth of assets description• Evolution to become master of data on its scope of data
Initialize master data values with a quality level sufficient to be recognized as the truth
Set up the master data governance organization at the DPIH level
MDM Project :
New « DoReMHy v3 » application will be based on a MDM solution :• In March 2013 , EDF has selected Informatica MDM Hub with BPM ActiveVOS option• Use of ETL PowerCenter and Informatica Data Quality
Project plan has an iterative roadmap to implement business objects, services and interfaces
On going : 1st iteration, (version) to be deployed in production end of 2014
3 iterations scheduled until end of 2015
EDF PRERHY - Informatica Day - june 2014
| 16
PRERHY: ESTIMATE OF KEY FIGURES
31 Business Objects , classified into 19 « Categories »
290 Attributes , up to 45 attributes per Business Object
21 DataBases as source or / and target
<= 100 000 records with an estimate of 10% renewal per year
Potential Declared Users at the end of the project : 10 Administrators (business) 50 Data Stewards 1 000 Users with ability to create, modify, validate master data Up to 4 500 Users in consultation
EDF PRERHY - Informatica Day - june 2014
| 17
PRERHY : ITERATIVE MDM IMPLEMENTATION
EDF PRERHY - Informatica Day - june 2014
| 18EDF PRERHY - Informatica Day - june 2014
PRERHY : TECHNICAL ARCHITECTURE
| 19
ACHIEVEMENTS : P1 DELIVERED IN DUE TIME !ITERATION 1 = P1 + P2
EDF PRERHY - Informatica Day - june 2014
Bugs Fixing
P1 Documenta
tion delivery
Take
Ove
r
Business RulesMatch and Merge Rules
TestsPrep
HU
B M
odel
TechnicalAcceptance
Périmètre 1
IDD
M
odel
TestsPrep
Input / Output Flows
Tests Prep
MDM HUB UI FLOWS
Nov 1 Nov 2 Dec 1 Dec 2 Jan 1 Jan 2 Fev 1 Fev 2 Mars12013 Année 2014
Project Management
Architecture and technical coordination
STA
RT
End 2 End
End 2 End
End 2 End
IDD ConfigurationCustomization
Presentation of « Vanilla»
IT acceptancetests
EDF Package Installation
Installation Packages
Mars22014
End of March
P2 StartP1
| 20
ACHIEVEMENTS ITERATION 1 – PART 1
EDF PRERHY - Informatica Day - june 2014
DV3P1
Around sixty base objects tables
More than sixty rules to implement between the ETL (Powercenter) and MDM HUB
Complexity of datastewardship controls, cardinalities, cleansing,
A rich User Interface
Incoming flows from seven source systems : Init, import, export
| 21
NEXT STEPS
EDF PRERHY - Informatica Day - june 2014
1. FINISH P2 - ITERATION 1 CONSTRUCTION
2. GET IT ACCEPTANCE FOR P2 (END OF Q2)
3. GET USER ACCEPTANCE (Q3)
4. GO LIVE (Q4 2014)
5. ITERATION 2, 3 , … (2014, 2015…)
6. GO NUCLEAR ????
| 22
Q&A
EDF PRERHY - Informatica Day - june 2014