Our Program: Key Elements for Success
2011 20132012 2014 2015 2016
Key elements:
• Define service levels and monitor performance
• Lifecycle approach
• Manage risks
• Long term financial planning
conservationengineers.org
Our Program: Discovery Phase
2011 20132012 2014 2015 2016
Discovery project:
• Evaluate Regulatory Requirements
• Benchmark Industry Best Practices
• Tailor Best Practices for MDC Unique Mission
• Coordinate with new Enterprise GIS and Lands Systems
• Tracking System Requirements
• Evaluate Potential Software Systems
conservationengineers.org
Deliverables:• Developed Best Practices & Guidelines for
Organizational Asset Management• Standardized Data Organizational Structure and
Service Definitions• Identified 262 asset types & Detailed Data
Requirements• Developed Condition Rating Models• Developed Asset Decay curves• Developed Replacement cost models
Our Program: Building a Framework
2011 20132012 2014 2015 2016
conservationengineers.org
5
Our Program: Best Management Practices
conservationengineers.org
What is an infrastructure asset?• Constructed or manufactured• Life span > 1 year• Stationary• Not computer related equipment• Value > $5,000, or• Essential to service delivery, or• Special interest to the Department, or• Special maintenance required, or• Required for state or federal compliance
conservationengineers.org
Asset Hierarchy
Mis
sour
i Dep
artm
ent
of
Cons
erva
tion
Administrative Facilities
Lost Valley Fish Hatchery
Communications Tower Facility
Site Communication Structures Grounding Grid
Educational Facilities
Fish Propagation Lost Valley Fish Hatchery Fish Production Non-Potable Water Pump – Non-
Potable Water
Intensively Managed Wetlands
General Conservation /
Resource Management
Lost Valley General Conservation
Building (Forestry Shop) HVAC Chiller – HVAC
Network Tier 2 Major Subsystem
Tier 4 Component
Tier 3 Minor Subsystem
Tier 1 System
conservationengineers.org
Networks as a Classification System
Administrative Facilities
Educational Facilities
Fish Propagation
Intensively Managed Wetlands
General Conservation /
Resource Management
Missouri Department of ConservationInfrastructure Networks
A Network is a grouping of infrastructure assets that collectively
provide a major service for MDC.
conservationengineers.org
Asset Hierarchy
Mis
sour
i Dep
artm
ent
of
Cons
erva
tion
Administrative Facilities
Lost Valley Fish Hatchery
Communications Tower Facility
Site Communication Structures Grounding Grid
Educational Facilities
Fish Propagation Lost Valley Fish Hatchery Fish Production Non-Potable Water Pump – Non-
Potable Water
Intensively Managed Wetlands
General Conservation /
Resource Management
Lost Valley General Conservation
Building (Forestry Shop) HVAC Chiller – HVAC
Network Tier 2 Major Subsystem
Tier 4 Component
Tier 3 Minor Subsystem
Tier 1 System
conservationengineers.org
Network Hierarchy Example
Lost Valley General
Conservation
Administrative Facilities
General Conservation / Resource
Management
Missouri Department of Conservation
Lost Valley Fish Hatchery
Communications Tower Facility
Educational Facilities Fish
Propagation
Lost Valley Fish Hatchery
Fish Production
Aquaculture Features
Site
Pedestrian Access Features
Intensively Managed Wetlands
Kettle Sidewalk
Tier 2 Tier 2
Tier 3 Tier 3
Tier 4Tier 4
Tier 1
conservationengineers.org
Asset & Attribute Details
11
An attribute is a characteristic of an asset
conservationengineers.org
Condition Assessment
1 – 5 Condition Rating
conservationengineers.org
0
1
2
3
4
5
0 5 10 15 20
Rati
ng S
cale
Expected Life (Years)
Heat Pump Decay Curve
Replacement Needed
Installation Year 2001
New Asset
Increased Maintenance and Repairs
Current Year 2020
conservationengineers.org
Valuation Models & Replacement Cost
14
conservationengineers.org
Initiation & Discovery
Planning & Requirements
Gather
Vendor Evaluation
Vendor Selection
System Selection
15
conservationengineers.org
VUEWorks Asset Management System
conservationengineers.org
conservationengineers.org
18
conservationengineers.org
The Next Challenge
The Department must know what we have, to accurately account for the cost and timing to maintain and replace infrastructure assets.
conservationengineers.org
Commission Retreat – March 2017
PROPOSED MANY YEARS
NEED INFORMATION SOONER!2
YEARSINFRASTRUCTURE
INVENTORY
STRATEGIC PLAN 2.1Develop a complete accounting of infrastructure by FY21
conservationengineers.org
Hybrid Approach2 YEARS
ZONE 1CONSULTANT
ZONE 2CONSULTANT
ZONE 3CONSULTANT
ZONE 4CONSULTANT
INFRASTRUCTURE ASSET
PROGRAM TEAM
HOURLY STAFFLOGISTICS/QA
STRIKE TEAM4 MDC STAFF
FROM EACH REGION
conservationengineers.org
So did we meet the challenge?
22
conservationengineers.org
Condition Rating per Network
Establish Policy on Condition Rating for Department to Maintain/Network
23
conservationengineers.org
Capital Planning
24
• Identify At-Risk Infrastructure– Assets Nearing End of Expected Life
– Low Condition Ratings
– Replacement Cost
conservationengineers.org