    rd McKenna, BGC Engineering

    Grouted-ininstallation of

    piezometers in boreholes:

    Lessons from thefirst 20 years

    Gord McKenna PhD, PEng, PGeolSenior Geotechnical Engineer

    BGC Engineering Inc, Vancouver

    Adjun ct Prof essor , U of Saskat chew anMarch 22, 2010

    (With some pictures and data from the Internet)

    Outline

    Background / history

    How it works

    How it fails

    Enhancements andopportunities

    Being a geotechnical

    instrumentation purist Efficacy and advocacy

  • 8/12/2019 McKenna Grouted Piezo 20 Year Update Mar 22 2010f

    2/17

    rd McKenna, BGC Engineering

    Background / history

    A paper by Vaughan1969, largely overlooked

    Ian Brown at Syncrudestarted experimenting in1988

    McKenna experimentsand papers 1988-1995

    Cautious adoption, workby Sinco, a few papers,better l ab testing

    Gaining wideracceptance,but still novel

    Vaughan 1969

    A Note on Sealing Piezometersin Boreholes, P. R. Vaughan,Gotechnique, Volume 19,Issue 3, pages 405 413, 1969.

    a piezometer is installed in aborehole which i s sealed with agrout of greater permeabilitythan the soil surrounding thepiezometer. It is shown that thegrout must have a permeabilityconsiderably higher than thatof the ground for thepiezometer reading to have asignificant error.

    It is shown that in certaincircums tances the filtermaterial commonly used tosurround the piezometer tipmay be omitted

  • 8/12/2019 McKenna Grouted Piezo 20 Year Update Mar 22 2010f

    3/17

    rd McKenna, BGC Engineering

    How it works

    The key to the success of the grouted-ininstallation method is that modern diaphragm-typepiezometer tips require only a very small fluidvolume change for pressure equalization, and thegrout can transmit this volume over the shortdistance from the formation to the tip quickly.

    Some numbers help illustrate this. Suppose thereis a one psi i ncrease in water pressure in theformation. With a 3/4-inch standpipe, it would takean inflow o f 240 ml of w ater before this changecould be measured. However, with a VW piezometer,the same change could be measured with an inflowof only 0.00002 ml, approximately 12 million timesless.

    Good performance

  • 8/12/2019 McKenna Grouted Piezo 20 Year Update Mar 22 2010f

    4/17

    rd McKenna, BGC Engineering

    Poor performance(dont forget the bentonite!)

    More good performance

  • 8/12/2019 McKenna Grouted Piezo 20 Year Update Mar 22 2010f

    5/17

    rd McKenna, BGC Engineering

    But will it work in the lab?

    New lab experiments

  • 8/12/2019 McKenna Grouted Piezo 20 Year Update Mar 22 2010f

    6/17

    rd McKenna, BGC Engineering

    But will i t work in theory?Time lag calculation

    Hydrodynamic t ime lag

    Piezometer type

    Installationmethod

    Typicalintakelength

    (cm)

    Typicalintake

    diameter

    (cm)

    Approximateequalization

    volume per 100 cm

    water head (cm 3)

    Approximate99% pressureequalization

    time

    Sinco pneumatic piezometer

    Conventional 30 17 10 -4

  • 8/12/2019 McKenna Grouted Piezo 20 Year Update Mar 22 2010f

    7/17

    rd McKenna, BGC Engineering

    Grout Mixes for Piezometers

    Grout Mix for Hard and Medium Soils

    Materials Weight Ratio by Weight

    Portland cement 94 lb (1 bag) 1

    Water 30 gallons 2.5

    Bentonite 25 lb (as required) 0.3

    Mix cement with water first. Then mix in the bentonite. Adjust the amount ofbentonite to produce a grout with the consistency of heavy cream. If the grout is toothin, the solids and the water will separate. If the grout is too thick, it will be difficultto pump.

    Grout Mix for Soft Soils

    Materials Weight Ratio by Weight

    Portland cement 94 lb (1 bag) 1

    Water 75 gallons 6.6

    Bentonite 39 lb (as required) 0.4

    Drillers and grout

    Drillers areaccustomed tomixing w ater andbentonite first, butthis will not allowyou to control thewater-cementratio. Mix waterand cement first.Then addbentonite.

    The quantity o fthe bentonite to

    be added mus t beadjusted to obtaina suitableconsistency.

    Do not leave toowatery.

  • 8/12/2019 McKenna Grouted Piezo 20 Year Update Mar 22 2010f

    8/17

    rd McKenna, BGC Engineering

    Limitations(McKenna 1995)

    The permeability of t he grout must be at equal toor lower than the formation permeability foralmost all situations.

    The grouted-in installation may not be practicalfor a very high permeability soils whereexcessive grout may be lost in th e voids.

    Stress transfer along stiff grout column in soft,consolidating soils may cause a piezometricerror.

    Grout may crack due to groun d movements,which could lead to higher macro-permeability.

    For installati ons in remot e areas, it may beeasier to transport sand and bentonit e sealingchips instead of a grout reservoir and pump.

    Groundwater sampling using this method isimpractical because of the use of diaphragm-type piezometer tips and the low permeability ofthe grout.

    Chemical contaminants in the soils (or extremelysaline pore water) may interfere with the long-term mechanical properties of grouts

    Need to d evelop more docu mented experienceworldwide.

    Why bother?(Change is hard)

    It is a lot easier and morereliable than trying toestablish bentonite seals100ft down a borehole at -20C

    Less training, lessexperience

    Allows mult iple piezos ina sing le borehole (>3?)

    Allows installationalongside a slopeinclinometer

    $$

    BUT YOU HAVE TO DO ITRIGHT!

  • 8/12/2019 McKenna Grouted Piezo 20 Year Update Mar 22 2010f

    9/17

    rd McKenna, BGC Engineering

    Greater adoption

    Vaughan, P. R , "A Note on Sealing Piezometers inBoreholes", Geotechnique 19, No 3, p405-413, 1969.

    Laing et al Geotechnical Instrumentation of the AOSTRA Mine-ass ist ed Underg round Steaming Trial,Fourth Unitar/UNDP Conference on Heavy Crude andTar Sands, #112-3, p17-32. 1988

    McKenna, G.T, "Grouted-in Installati on of Piezometersin Bo reholes," Geotechnical Journ al 32, pp 355-363,1995.

    Mikkelsen, P. Erik. 2002, Cement-Bentoni te GroutBackfill for Borehole Instruments, Geotechnical News,December 2002.

    Mikkelsen, PE and Green, E.G. 2003. "Piezometers inFully-Grouted Boreholes." International Symposium onGeomechanics, Oslo, Norway. September 2003.

    Contreras, Grosser, Ver Strate, "The Use of t he Fully-grouted Method for Piezometer Installation, "Geotechnical News, pp 30 - 37, Vol 26, June 2008 .

    Promoted by supplierswww.slopeindicator.com

  • 8/12/2019 McKenna Grouted Piezo 20 Year Update Mar 22 2010f

    10/17

    rd McKenna, BGC Engineering

    New technology often takes 25 years

    1 9 8 0 s 1

    9 9 0 s

    2 0 0 0 s

    ? ? ?

    Time lag too long

    Grouter higher thanformation

    Very low k ground

    Forgot bentonite

    Cross-aquifercontamination

    Cracking due tomoving ground

    Grout in the sinterstone

    How does it fail?

  • 8/12/2019 McKenna Grouted Piezo 20 Year Update Mar 22 2010f

    11/17

  • 8/12/2019 McKenna Grouted Piezo 20 Year Update Mar 22 2010f

    12/17

    rd McKenna, BGC Engineering

    Beware some of the analysis may havenot considered the most severe cases

    Frank Patton wo uld ask

    Just how well do you know yourhydros tratigraphy anyway?

  • 8/12/2019 McKenna Grouted Piezo 20 Year Update Mar 22 2010f

    13/17

    rd McKenna, BGC Engineering

    Adjust grout to mimic ground st iffness

  • 8/12/2019 McKenna Grouted Piezo 20 Year Update Mar 22 2010f

    14/17

    rd McKenna, BGC Engineering

    Grout in the sinter stone

    Sinter stones o ften 50micron Cement is submic ron

    Seems to lock in theformation pressu re attime of installation

    May not appear asproblem in lab (mayoccur under higher groutcolumn pressures)

    Does not always happen

    Easily so lved with a sandsock

    Enhancements?

    Preplug of bentonitecement

    Unsaturated readings intimate contact

    Mandatorypermeability orstrength test

  • 8/12/2019 McKenna Grouted Piezo 20 Year Update Mar 22 2010f

    15/17

    rd McKenna, BGC Engineering

    Gords recommendations

    If you think the ground might belower permeability than yourgrout

    When in doubt, chick en out Go traditional with bentonit e

    seals and sand packs Use cement bentonit e grout

    elsewhere in ho le

    Use a sand sock because itworks. Why not?

    Take extra care to make sure yourgrout mix is r ight. Trust no one.

    Lets look at seeing how we mightuse the method for measuring insitu suctions

    Be a geotechnical ins trumentationmaven, maybe even a purist.Publish in Geotechnical News.

    Good practice in completingyour installation

  • 8/12/2019 McKenna Grouted Piezo 20 Year Update Mar 22 2010f

    16/17

    rd McKenna, BGC Engineering

    Philosophy / Advocacy

    Philosophy Dont put something in the ground you do nt understand Dont put something in the ground that may give you the wrong

    reading (unless yo u can tell) For a new technology to replace the old one, the benefits have to

    outweigh the risks (efficacy = the achievement of desired results)

    Advocacy active support of an idea or cause etc.; especially the act of

    pleading or arguing for som ething Promoting / Over promoting? Responsibility?

    Community

    EXTRAat no extra charge

  • 8/12/2019 McKenna Grouted Piezo 20 Year Update Mar 22 2010f

    17/17

    Some references

    Chapuis, R.P. and Sabourin, L., 1989. Effects of installation of piezometers and wells on groundwater characteristics andmeasurements . Canadian Geotechnical Jour nal, 26, pp 604-613.

    Cioffi, R., Marroc coli, M, and Mascol o, 1989. On permeation effects of aqueous solutions through non-mature pastes of Portland-pozzolana cement , Cement and Concrete Research, 19, pp 189-193.

    Dunnicliff , J., 1988. Geotechnical Instrumentation for Monitoring Field Performance , John Wiley and Sons, New York, 577p.

    Filho, P.R., 1976. Laboratory tests o n a new borehole seal for piezometers , Ground Engin eering, 9, pp 16-18.

    Honda, A., Mashima, M., and Kunito, T., 1988. Influencing factors for impermeability of soil cement , Memoirs of the Faculty ofEngineering, Osaka City University, 29, pp 205-212.

    Hvorslev, M.J., 1951. Time lag and soil permeability in ground-water observations , Bulletin Number 36, Waterways ExperimentStation, Corps of Engin eers, U.S. Army, Vicksburg, Missi ssippi, USA.

    Kurt, C.E., and Johnso n, R.C. Jr., 1982. Permeability of Grout Seals Surrounding Thermoplastic Well Casing , Ground Water, 20, No.4, p415-419.

    Laing, J.M., Scott, J.D., Stokes, A.W., Suggett, J.C., and Wood, D.F., 1988 Geotechnical Instrumentation of the AOSTRA Mine-assisted Underground Steaming Trial , Fourth Unitar/UNDP Conference on Heavy Crude and Tar Sands, Paper No. 112, 3, pp 17-32.

    Morgenstern, N.R., Fair, A.E. and McRoberts, E.C., 1988. Geotechnical engineering beyond soil mechanics - a case study , CanadianGeotechnical Journ al, 25, pp 637-661.

    Mossop, G.D., 1980. Geology of the Athabasca Oil Sands , Science, 207, pp 145-152.

    Senger, J.A., and Perpich, W.M., 1983. An alt ernati ve well seal in high ly mi nerali zed gro und w ater. 3rd Nation al Sympo sium on Aqui fer Rest orati on and Groun d-water Monit ori ng , Columbus, Ohio.

    Vaughan, P.R., 1969. A not e on seali ng pi ezometers in b oreho les , Geotechnique, 19, No. 3, pp 405-413.