mcc report on pph shoreline erosion and dredging

6
1 WestShorelineTrail- 700-3erodingsegment Princetonshoreline --eroding Surfers Beach --eroding PillarPointHarbor--Proposedloca?onsforplacementofharbordredgematerial. IH WL Sitespr oposedbyHarborDistrict: IH=Innerharborbeachatkayakstand, aka“Perched”Beach WL=Wetlands/Mudathabitat--noteroding. 6/12/1MCCpresenta?on

Upload: sabrina-brennan

Post on 03-Apr-2018

220 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: MCC Report on PPH Shoreline Erosion and Dredging

7/28/2019 MCC Report on PPH Shoreline Erosion and Dredging

http://slidepdf.com/reader/full/mcc-report-on-pph-shoreline-erosion-and-dredging 1/6

1

WestShorelineTrail-

700-3erodingsegment

Princetonshoreline

--eroding

Surfers

Beach

--eroding

PillarPointHarbor--Proposedloca?onsforplacementofharbordredgematerial.

IHWL

SitesproposedbyHarborDistrict:

IH=Innerharborbeachatkayakstand,

aka“Perched”BeachWL=Wetlands/Mudflathabitat--noteroding.

6/12/1MCCpresenta?on

Page 2: MCC Report on PPH Shoreline Erosion and Dredging

7/28/2019 MCC Report on PPH Shoreline Erosion and Dredging

http://slidepdf.com/reader/full/mcc-report-on-pph-shoreline-erosion-and-dredging 2/6

WestShorelineTrail--Popularpubliccoastalaccess

--Cri?calemergencyvehicleaccess--700-3sec?onthreatenedby

wave-ac?onerosion

2

--TrailownedbyHarborDistrict

--$65,000repairalreadybudgeted

--WatersnotinMarineSanctuary

--Aqua?cdisposalpermitrequired

Page 3: MCC Report on PPH Shoreline Erosion and Dredging

7/28/2019 MCC Report on PPH Shoreline Erosion and Dredging

http://slidepdf.com/reader/full/mcc-report-on-pph-shoreline-erosion-and-dredging 3/6

PrincetonShoreline

County’sPrincetonPlanningUpdate,201-2015,willincludea

PrincetonShorelineManagementPlan.

• Preliminarystudies(2001)recommendacombina?onofrevetment,

stabilizedbeachnourishment,andpublicaccessimprovements.

• Finalplanwillincludedetailssuchasloca?onofauniformstringline,

consistentdesignsec?onrequirements,andmaintenanceobliga?ons.

• Erodedbystormwindwaves;starvedforsandreplenishmentduetobreakwater.

• HarborDistricthasjurisdic?ononlyuptomean-high-?deline.

• WatersnotinMarineSanctuary.

Page 4: MCC Report on PPH Shoreline Erosion and Dredging

7/28/2019 MCC Report on PPH Shoreline Erosion and Dredging

http://slidepdf.com/reader/full/mcc-report-on-pph-shoreline-erosion-and-dredging 4/6

4

NorthernHalfMoonBayShorelineImprovementProject:

•  ArmyCorpsofEngineersisleadagency;HarborDistrictislocalsponsor.•  Studiesbeganin2009--s?llinfeasibilityphase.

•  Projectcouldconsiderrangeofsolu?onsincludingdredgingharborsand,

andcrea?ngopeningsinthejeyforsandoulow.

•  Permissionforbeachnourishmentwouldhavetobeobtainedfrom

MontereyBayNa?onalMarineSanctuary.

Surfers’Beach

Erosiongreatly

accelerateda3er

breakwater

construc?on

inlate50’sbyArmyCorps.

Page 5: MCC Report on PPH Shoreline Erosion and Dredging

7/28/2019 MCC Report on PPH Shoreline Erosion and Dredging

http://slidepdf.com/reader/full/mcc-report-on-pph-shoreline-erosion-and-dredging 5/6

5

InnerHarborBeachatKayakStand,aka“Perched”Beach,uplanddredgedisposalsitesince1980’s

Beachaccesshasbeenimpairedbyincremental“pre-developmentdredgedisposal”

leavingraisedflatvegetatedareawithsteepdropofftonarrowremainingsandybeach.

HarborDistrictplansfortheareaincludebulkhead/pave/develop.

Page 6: MCC Report on PPH Shoreline Erosion and Dredging

7/28/2019 MCC Report on PPH Shoreline Erosion and Dredging

http://slidepdf.com/reader/full/mcc-report-on-pph-shoreline-erosion-and-dredging 6/6

6

InnerHarborWetlands/Mudflathabitatwaspar?almi?ga?onforhabitatlost

duringlaunchrampconstruc?onin1990.Thisareaisnoteroding.

HarborDistrictGeneralManagersuggestsburyingthiswetlandhabitat

withdredgematerial.