Oak Bluffs Pump Station Hazard Mitigation Project

Page 2: Mc kenna great marsh symposium 11-12-14

Town of Oak Bluffs

Wastewater Department

Jim Monteith

Facilities Manager

Page 3: Mc kenna great marsh symposium 11-12-14

Project Locale

Page 4: Mc kenna great marsh symposium 11-12-14

Densely Developed Area

Page 5: Mc kenna great marsh symposium 11-12-14

Oak Bluffs Harbor

Page 6: Mc kenna great marsh symposium 11-12-14

Oak Bluffs

Year round population approximately

4000 people

Summer population exceeds 25,000

Page 7: Mc kenna great marsh symposium 11-12-14

Critical Infrastructure

OB wastewater collection and treatment system serves the heavily populated downtown and commercial areas

Three primary wastewater pump stations serve 90% of the wastewater system, and are located within newly mapped FEMA 100 yr flood plain

Stations have already had flood impacts

Page 8: Mc kenna great marsh symposium 11-12-14

Bath House Pump Station

Page 9: Mc kenna great marsh symposium 11-12-14

Lake Ave Pump Station

Page 10: Mc kenna great marsh symposium 11-12-14

Dukes County Road Pump Station

Page 11: Mc kenna great marsh symposium 11-12-14

The Project

Design and construct modifications to

these pump stations to ensure safe

operation during a 100 year flood event

Elevate all electrical service and control

panels above flood elevations

Construct elevated platforms for emergency

generators

Install protective flood panels around pump

stations

Page 12: Mc kenna great marsh symposium 11-12-14

Sea Level Rise & Project Design

Design will be based upon a SLR

projection of 3.9 feet by Year 2100

(“intermediate-high” scenario)

Pump Station infrastructure has a

design life of 40 years

40 year SLR projection = 1.5 feet

Page 13: Mc kenna great marsh symposium 11-12-14

Budget

Total project cost: $250,000

Match amount: $62,500

Grant award: $187,500

Page 14: Mc kenna great marsh symposium 11-12-14

Tasks & Deliverables

Complete preliminary

designs

Submit design plans for

DEP Wastewater

Treatment Works Plan

Approval

Complete final design

Solicit construction bids

Submit Construction

Plans and Operation &

Maintenance Manual for

DEP approval

Obtain Order of

Conditions

Complete construction

DEP final inspection

Page 15: Mc kenna great marsh symposium 11-12-14

Bath House Pump Station

electric panel

Page 16: Mc kenna great marsh symposium 11-12-14

Dukes County Pump Station and

portable generator

Page 17: Mc kenna great marsh symposium 11-12-14

Lake Ave Pump Station

Page 18: Mc kenna great marsh symposium 11-12-14

Elevate above flood elevation

Page 19: Mc kenna great marsh symposium 11-12-14

Elevate standby generator

Page 20: Mc kenna great marsh symposium 11-12-14

Elevate all electrical controls

Page 21: Mc kenna great marsh symposium 11-12-14

Protect buildings with flood

panels

Page 22: Mc kenna great marsh symposium 11-12-14

Project Schedule

Project is currently underway

Town is working on preliminary designs

Completion date of June 30,2015

Page 23: Mc kenna great marsh symposium 11-12-14

If you are

frustrated and confused

my work here is done

Page 24: Mc kenna great marsh symposium 11-12-14

Stephen McKenna

Cape & Islands Regional Coordinator

Massachusetts Coastal Zone Management

[email protected]

508-375-6856