mb.delta.bridge.system.2012
TRANSCRIPT
-
7/28/2019 Mb.delta.bridge.system.2012
1/6
Delta
The
BridgeSystem
-
7/28/2019 Mb.delta.bridge.system.2012
2/6
Mabey Bridge Limited, Chepstow, Monmouthshire, NP16 5YL, United Kingdom
+44 (0) 1291 623 801 +44 (0) 1291 625 453 [email protected] www.mabeybridge.co.uk
IntroductionIntroduced in 2003, the Delta bridge system is the latest addition to Mabey Bridges unique range of modular
steel panel bridges.
The Delta bridge system combines
maximum use of o-site fabrication with
high speed of construction to provide
signicant advantages over more traditional
construction techniques.
With a clear spanning capability of up to 90m, improved aesthetics and built-in pre-camber, the Mabey Delta
bridge system is ideal for longer span permanent bridges on main highways and roads in rural areas.
Sula Bridge during erection, Philippines
Bruhm Bridge, Canada
-
7/28/2019 Mb.delta.bridge.system.2012
3/6
Mabey Bridge Limited, Chepstow, Monmouthshire, NP16 5YL, United Kingdom
+44 (0) 1291 623 801 +44 (0) 1291 625 453 [email protected] www.mabeybridge.co.uk
Attributes Modular, pre-engineered,
pre-fabricated bridge system
Aesthetically pleasing
Standard interchangeable components
Highly adaptable, fully reusable and re-locatable
Manufactured using robotic welding
Transported in standard ISO containers
Quick and simple to build using unskilled labour
Fully galvanised for long life and minimummaintenance
High fatigue life
Erection can be carried out using the cantilever launch method or with theuse of a crane, or a combination of both
Two lane highway bridge, USA
-
7/28/2019 Mb.delta.bridge.system.2012
4/6
Mabey Bridge Limited, Chepstow, Monmouthshire, NP16 5YL, United Kingdom
+44 (0) 1291 623 801 +44 (0) 1291 625 453 [email protected] www.mabeybridge.co.uk
Technical Information Clear spans up to 90m 4.5m module length Multi-span congurations 3.15m (single), 4.2m (extra wide), 7.35m
(2 lane) or 10.5m (3 lane) carriageways 0.5m, 1m or 1.5m pedestrian footways Vehicle parapets Full highway load carrying capability Pre-cambered to remove dead load deection Proprietary steel decking system bolted down
with pre-load bolts
Durbar nish or factory applied anti-skidsurfacing
Simple, cost eective foundations
Petrica Bridge during erection
Cotabato City Bridge, Mindanao, Philippines
Mayantoc Bridge, Philippines
-
7/28/2019 Mb.delta.bridge.system.2012
5/6
Mabey Bridge Limited, Chepstow, Monmouthshire, NP16 5YL, United Kingdom
+44 (0) 1291 623 801 +44 (0) 1291 625 453 [email protected] www.mabeybridge.co.uk
Applications Permanent long span applications
Main highway routes
Rural roads
Semi-permanent bridges
Over-bridging for weak or damaged structures
Quezon Aliaga Bridge, Philippines
Lucala Bridge, Angola
Two-lane highway bridge,Philippines
Gammon Bridge during erection,Pakistan
-
7/28/2019 Mb.delta.bridge.system.2012
6/6
ChepstowMonmouthshireNP16 5YL
United Kingdom
T: +44 (0) 1291 623 801F: +44 (0) 1291 625 453
E: [email protected]: www.mabeybridge.co.uk
MB.008.01
Mabey Bridge is committed to delivering high
quality bridging solutions backed by exceptional
service to customers worldwide.
To experience our unrivalled range of products
and services or for any further information, pleasecontact a member of the International team.