May 31, 2019 TH 60 – 4 th Street NW Weekly Construction Updates – Week 8 The City of Faribault and its project partners intend to send out and publish a weekly construction update on the TH 60/4th Street NW Reconstruction Project. This weekly update will be issued through the City of Faribault Facebook page and the City’s website www.faribault.org on the Project website http://www.ci.faribault.mn.us/549/2019-03-TH-60- Reconstruction. You can sign up to receive an emailed pdf of the newsletter by submitting your email address to [email protected] and requesting to be placed on the weekly TH 60 newsletter distribution list or you can sign up for a text notification that will contain a link to the newsletter via the Faribault chamber of Commerce by texting Faribault Hwy60 to 313131. Questions about the contents of the weekly updates or about the project in general can be directed to Mark DuChene, Faribault City Engineer at either 507.333.0360 or [email protected] or to Glenn Cunningham, Senior Engineering Technician at either 507.333.0366 or [email protected]. Answers too many frequently asked questions (FAQ) about the project can be found at: http://www.ci.faribault.mn.us/DocumentCenter/View/4246/Hwy-60-FAQ---2019-03-21?bidId= . The project is proposed to be completed in 4 main phases, and a copy of a map showing the project detour as well as project phasing and anticipated phasing timelines can be found at: http://www.ci.faribault.mn.us/DocumentCenter/View/4263/DetourMap_v2?bidId= If there is a non-life threatening emergency within the construction limits (such as loss of water) outside of normal business hours please call dispatch at 507.334.4305 and they will contact the appropriate parties. Previous Week Review 5/25/19 to 5/31/19 The mainline watermain and sanitary sewer is installed through Phase 1 to 3 rd Avenue NW and the mainline storm sewer is complete past the 2 nd Avenue NW intersection. All individual property services on the south side of the road in Phase 1 are complete and only a few services remain on the north side. The road crew has subcut the road and placed the drain tile, sand and gravel for the road up to the 1 st Avenue NW intersection. Next Week Look Ahead 5/25/19 to 5/31/19 One underground utility crew is expected to finish the mainline storm sewer for Phase 1. The second utility crew is expected to finish installing sewer and water services to the remaining properties on the north side of the road as well as installing storm sewer lead pipe and catch basins. The contractor will continue subcutting the road and placing the drain tile, sand and gravel with a goal to be through the 2 nd Avenue intersection by the end of the week. A concrete crew is also scheduled to start next week pouring curb at the Central Avenue intersection and along TH 60 up to 1 st Avenue NW.

Upload: others

Post on 28-Jun-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: May 31, 2019 TH 60 – 4 Street NW Weekly Construction ... · May 31, 2019 TH 60 – 4th Street NW Weekly Construction Updates – Week 8 The City of Faribault and its project partners

May 31, 2019

TH 60 – 4th Street NW Weekly Construction Updates – Week 8

The City of Faribault and its project partners intend to send out and publish a weekly construction update on the TH

60/4th Street NW Reconstruction Project. This weekly update will be issued through the City of Faribault Facebook page

and the City’s website www.faribault.org on the Project website http://www.ci.faribault.mn.us/549/2019-03-TH-60-

Reconstruction. You can sign up to receive an emailed pdf of the newsletter by submitting your email address to

[email protected] and requesting to be placed on the weekly TH 60 newsletter distribution list or you can

sign up for a text notification that will contain a link to the newsletter via the Faribault chamber of Commerce by texting

Faribault Hwy60 to 313131. Questions about the contents of the weekly updates or about the project in general can be

directed to Mark DuChene, Faribault City Engineer at either 507.333.0360 or [email protected] or to Glenn

Cunningham, Senior Engineering Technician at either 507.333.0366 or [email protected].

Answers too many frequently asked questions (FAQ) about the project can be found at:

http://www.ci.faribault.mn.us/DocumentCenter/View/4246/Hwy-60-FAQ---2019-03-21?bidId= .

The project is proposed to be completed in 4 main phases, and a copy of a map showing the project detour as well as

project phasing and anticipated phasing timelines can be found at:

http://www.ci.faribault.mn.us/DocumentCenter/View/4263/DetourMap_v2?bidId=

If there is a non-life threatening emergency within the construction limits (such as loss of water) outside of normal

business hours please call dispatch at 507.334.4305 and they will contact the appropriate parties.

Previous Week Review 5/25/19 to 5/31/19

The mainline watermain and sanitary sewer is installed through Phase 1 to 3rd Avenue NW and the mainline storm sewer

is complete past the 2nd Avenue NW intersection. All individual property services on the south side of the road in Phase

1 are complete and only a few services remain on the north side. The road crew has subcut the road and placed the

drain tile, sand and gravel for the road up to the 1st Avenue NW intersection.

Next Week Look Ahead 5/25/19 to 5/31/19

One underground utility crew is expected to finish the mainline storm sewer for Phase 1. The second utility crew is

expected to finish installing sewer and water services to the remaining properties on the north side of the road as well

as installing storm sewer lead pipe and catch basins. The contractor will continue subcutting the road and placing the

drain tile, sand and gravel with a goal to be through the 2nd Avenue intersection by the end of the week. A concrete

crew is also scheduled to start next week pouring curb at the Central Avenue intersection and along TH 60 up to 1st

Avenue NW.

Page 2: May 31, 2019 TH 60 – 4 Street NW Weekly Construction ... · May 31, 2019 TH 60 – 4th Street NW Weekly Construction Updates – Week 8 The City of Faribault and its project partners

On Wednesday, June 5th the contractor is scheduled to begin progressing into Phase 2 starting by milling the existing

bituminous pavement off from 3rd Avenue NW through the 4th Avenue NW intersection. The 4th Avenue NW intersection

will be reopened the day following milling with a gravel surface. Work may also begin next week on Phase 2 sanitary

sewer mainline from 3rd Ave NW to 4th Ave NW.

General Traffic Control/Detour Notes

During the duration of the entire project and through the entire project limits which extend from Lyndale Avenue/TH 21

on the west end to Central Avenue on the east end, thru traffic will be detoured off TH 60 and rerouted along 2nd

Avenue NW, TH 3/20th Street NW and TH 21 (see detour map link above) Portions of TH 60/4th Street NW within the

project limits may be signed “Road Open to Local Traffic or Road Closed to Thru Traffic” or something similar. Please

keep in mind that “local traffic/access” is defined as having direct access on TH 60, or having business with someone or a

business who has direct access on TH 60. If you do not fall into either of these two categories, you should not be on TH

60 within the project limits at any time. Travel on TH 60 within the project limits should take place only when there is no

other possible alternative. Also please be respectful of private property and do not use private property to “short cut”

the detour route.

Pedestrian traffic will be maintained to the maximum extent practical to provide access to businesses and residents who

have access to TH 60, however other portions of sidewalk will be closed to facilitate construction work and those

sidewalks will be detoured along an alternate pedestrian route (typically around the block). Please review the link to the

FAQ above for more information about access during construction.

Phase 1 Access Notes:

Phase 1 is under construction from Central Avenue to 3rd Avenue NW. At this time the intersections of Central Avenue

and 3rd Avenue are open for local access. The intersections of 1st Avenue NW, 2nd Avenue NW and the alleyways

between Central Avenue and 1st Avenue are closed. No unauthorized traffic is to enter the TH 60 roadway at these

closed intersections.

The intersection of TH 60 (4th St NW) and Central Avenue is currently closed to allow for concrete curb, sidewalk and

signal work to start. A reminder that when the intersection is closed, the three or four parking stalls on each side of

Central Avenue closest to 4th Street will be marked no parking and a U-Turn area set up to allow traffic to continue to

utilize parking on both sides of Central Avenue (see page 3 of attached map for more details).

Traffic is permitted on 1st Ave and 2nd Ave on both sides of TH 60 up to the construction project limits. On-street

parking on the avenues is also open. If your business is on or near the project limits and you need assistance with maps

to post at your business or on your business website to direct traffic to/from your business, please contact the City

Engineer.

Phase 2 Access Notes:

The Contractor’s updated schedule indicates that work will begin to progress into Phase 2 on Wednesday, June 5th. The

initial work on Phase 2 will be between 3rd Avenue NW and 4th Avenue NW and TH 60 (4th Street) will be closed to traffic

between 4th Avenue NW and Central Avenue NW. See page 2 of the attached maps for a depiction of closed roads and

accesses. The 4th Avenue NW intersection will be open to traffic with a gravel surface and the stop lights will be set to

flashing red until such time as they are removed. The intersection of 4th Avenue NW and TH 60 will be open as much as

construction operations allow.

Page 3: May 31, 2019 TH 60 – 4 Street NW Weekly Construction ... · May 31, 2019 TH 60 – 4th Street NW Weekly Construction Updates – Week 8 The City of Faribault and its project partners

Construction Photo of the Week

Below is a picture of the intersection of TH 60 and 2nd Avenue NW showing all of the communications lines that needed

to be crossed with the new public utilities and dug around.

Page 4: May 31, 2019 TH 60 – 4 Street NW Weekly Construction ... · May 31, 2019 TH 60 – 4th Street NW Weekly Construction Updates – Week 8 The City of Faribault and its project partners

DD DD

DDDD

DD

DD

DD

DD

60

3RD ST NE

4TH ST NE

5TH ST NE3R

D A

VE

NW

1ST

AV

E N

W

2N

D A

VE

NW

5TH ST NW

4TH ST NW

3RD ST NW

Central Park

County

Offices

L.E.C.

Court House

Shelter

P.D

CE

NT

RA

L A

VE

Cen

tury

Lin

k

Un

ion

Hall

Basil

leo

's

Sty

les o

n 4

th

Gary

Vo

eg

ele

La

w

Faribault

Police Dept.

Sta

te F

arm

Fa

rib

au

lt V

acu

um

& S

ew

ing

Cen

ter

Fareway

Foods

TH 60 - 4th St NW Business Access Map

Alternate Pedestrian Route

DD Roads Closed - No Access Across

Sidewalk Closed

Road Currently Closed

Pedestrian Access Routes

Roads Currently Open Public Parking

Private Parking

0 100 200 300

Feet

**See Sheet 3 forIntersection Details

Page 5: May 31, 2019 TH 60 – 4 Street NW Weekly Construction ... · May 31, 2019 TH 60 – 4th Street NW Weekly Construction Updates – Week 8 The City of Faribault and its project partners

!R!R!R!R

DD

DD

DD

DD

DD

60

3RD

AV

E N

W

5TH

AV

E N

W

4T

H A

VE

NW

2N

D A

VE

NW

5TH ST NW

3RD ST NW

4TH ST NW

Central Park

County

Offices

L.E.C.

Court House

ShelterTH 60 - 4th St NW Business Access Map

Alternate Pedestrian Route

DD Roads Closed - No Access Across

Sidewalk Closed

Road Currently Closed

Pedestrian Access Routes

Roads Currently Open Public Parking

Private Parking

0 100 200 300

Feet

Intersection of 4th St NW and 4th Ave NW scheduled

to close Wednesday, June 5th for milling and reopen June 6th

as a gravel surface. The intersection will remain open as much

as construction allows and the signal system will be turned to

FLASHING RED until such time as it is removed.

Lane Shift

Page 6: May 31, 2019 TH 60 – 4 Street NW Weekly Construction ... · May 31, 2019 TH 60 – 4th Street NW Weekly Construction Updates – Week 8 The City of Faribault and its project partners

DD

DD

DD

!R

!R

!R!R

!R !R

!R

!R

!R

!R

!R !R

604TH ST NW 4TH ST NE

**

CE

NT

RA

L A

VE

Intersection will be closed forthe forseable future to accomodateintersection work.

Intersection may reopen under a

gravel surface as work allows.

TH 60 - 4th St NW / Central AveIntersection

DD No Access

Road Currently Closed

No Parking

!R Construction Barrel

Traffic Route

0 20 40 6010

Feet