![Page 1: Materials Reliability Program.MRP OE Evaluation Screening Questionnaire Is there anything about this indication that would suggest it appropriate to re-evaluate any program requirements,](https://reader034.vdocuments.mx/reader034/viewer/2022042106/5e84b0f1b20cec32dc3d78ff/html5/thumbnails/1.jpg)
......ELECTRIC POWERRESEARCH INSTITUTE
Materials Reliability Program
David Czufin, ExelonMRP Executive Sponsor
Industry/NRC Executive Meeting onMaterials Program
i:i
June 21, 2011
![Page 2: Materials Reliability Program.MRP OE Evaluation Screening Questionnaire Is there anything about this indication that would suggest it appropriate to re-evaluate any program requirements,](https://reader034.vdocuments.mx/reader034/viewer/2022042106/5e84b0f1b20cec32dc3d78ff/html5/thumbnails/2.jpg)
Contents
" MRP Organization and Membership
" MRP Strategic Plan, Current Issues and Leveraging" MRP Guidelines Status
" Reactor. Internals Guidelines (MRP-227) Status" Byron 1 OE Summary & TCold Upper Head Action Plan
" Coordinated Reactor Vessel Surveillance Program
" Surface Stress Mitigation Techniques
" 2012 International BWR/PWR Conference
I~ L.ELECTRIC POWER
© 2011 Electric Power Research Institute, Inc. All rights reserved. RESEARCH INSTITUTE
![Page 3: Materials Reliability Program.MRP OE Evaluation Screening Questionnaire Is there anything about this indication that would suggest it appropriate to re-evaluate any program requirements,](https://reader034.vdocuments.mx/reader034/viewer/2022042106/5e84b0f1b20cec32dc3d78ff/html5/thumbnails/3.jpg)
MRP Organization
Materials ReliabilityProgram (IC)
Wells, Southern Nuclear
McDevitt, SCE
Demma, EPRI
Regulatory Interface
Through NEI
Riley, NEI
Technical AdvisoryGroup
McDevitt, SCEDemma, EPRI
i
Technical Support TAC
Dingier, Wolf Creek
McDevitt, SCE
Chu, EPRI
Inspection TAC
Nowakowski, FPL
Doss, Duke Energy rSpanner, EPRI
Mitigation/TestingTAC
Rudell, ConstellationGobell, EntergyCrooker, EPRI
Assessment TAC
Sims, Entergy
TBD
Craig Harrington, EPRI
Reid, EPRI
ELECTRIC POWERafIra2I RESEARCH INSTITUTE© 2011 Electric Power Research Institute, Inc. All rights reserved. 3
![Page 4: Materials Reliability Program.MRP OE Evaluation Screening Questionnaire Is there anything about this indication that would suggest it appropriate to re-evaluate any program requirements,](https://reader034.vdocuments.mx/reader034/viewer/2022042106/5e84b0f1b20cec32dc3d78ff/html5/thumbnails/4.jpg)
MRP Membership2-
Z'A41rfil~ELEC1311111 1111
C'AMerUEf M~A ~ ConstellationýErergy 50UDominioniIt oil starts heroe Ift DukedrEnerff,ý,
eDFTEntergO PTHE POWER OF pEOPLE'"
Exelkn. FirstEnergyRPL.
ELECTrRIC POWER CO-JNC
Os Progress Energjy
CD 1HN
a Rolls-Royce
'WI,,, I Pacific Gas andElectric Company'
MDISON"PSE-
SOUTHERN ACOMPNrn." t Sr•€)'u W-rM,
(4- 0'0
-0Luminant LON"M
31 Organizations representing 169 PWR's- International 100 PWR's- USA 69 PWR's
Taiwan power company
Hokkaido Electric Power Co., Inc.RELECRIC POWER
RESEARCH INSTITUTE
© 2011 Electric Power Research Institute, Inc. All rights reserved. 4
![Page 5: Materials Reliability Program.MRP OE Evaluation Screening Questionnaire Is there anything about this indication that would suggest it appropriate to re-evaluate any program requirements,](https://reader034.vdocuments.mx/reader034/viewer/2022042106/5e84b0f1b20cec32dc3d78ff/html5/thumbnails/5.jpg)
MRP Strategic Plan
" Develop fundamental understanding of degradation mechanismsand identify materials (and locations) of high susceptibility
" Conduct generic operability and safety assessments forsusceptible locations
" Develop Inspection and Evaluation (I&E) guidelines for identifiedlocations
" Evaluate available mitigation options and, if necessary developadditional options.
" Evaluate repair/replace options, where necessary" Monitor, evaluate and feedback plant Operating Experience
" Develop technical bases for regulatory review and supportlicensees on plant-specific applications
© 1 e c e s h t teRESEARCHac P WERINSTITUTE
~l2011 Electric Power Research Institute, Inc. All rights reserved. 5EERHINTTT
![Page 6: Materials Reliability Program.MRP OE Evaluation Screening Questionnaire Is there anything about this indication that would suggest it appropriate to re-evaluate any program requirements,](https://reader034.vdocuments.mx/reader034/viewer/2022042106/5e84b0f1b20cec32dc3d78ff/html5/thumbnails/6.jpg)
!MRP Current Issues/Activities
" Stress Corrosion Cracking (SCC) of nickel-based alloys" Reactor Internals Degradation Management* Testing for Irradiation Assisted Degradation of Reactor Internals" I&E guidelines (e.g. Thermal Fatigue, Reactor Internals)" SCC of stainless steel including CASS" Low Alloy Steel corrosion (upper and bottom RPV Heads)" Non-Destructive Examination (NDE) qualifications (e.g. CRDM, RI
standards)" Fatigue degradation management including Environmental Fatigue" Reactor Pressure Vessel Integrity" Extremely Low Probability of Rupture (xLPR)
" More than 50 tasks defined and funded for 2011
•LECTRIC POWER
201A1 Elcti Power ReerhIstttPn Al rnhts reserved ~ RESEARCH INSTITUTE
![Page 7: Materials Reliability Program.MRP OE Evaluation Screening Questionnaire Is there anything about this indication that would suggest it appropriate to re-evaluate any program requirements,](https://reader034.vdocuments.mx/reader034/viewer/2022042106/5e84b0f1b20cec32dc3d78ff/html5/thumbnails/7.jpg)
MRP Leveraging and Collaborations
" All Reactor Internals testing projects (Zorita, Halden, Gondole)
" Stainless steel SCC research with MAI/EDF & PWROG
* Alloy A690 international collaboration for long-term leveraging onA690/52/152 research
" xLPR (with NRC RES)
" Weld residual stresses (NRC RES)
* Chemical Mitigation (PWROG, FRP, Chemistry)" Surface stress mitigation methods with Hitachi, Toshiba and MHI
" Low K testing with Studsvik and AREVA" Environmental Fatigue (BWRVIP, ANT, NRC RES and others)
" Inspection issues with EPRI NDE Center" Information exchange agreement with Naval Reactors
contractors©0 Ecco R ec nieI AeRESEARCH INSTITUTE
©2011 Electric Power Research Institute, Inc. All rights reserved. 7 o 1 IRSAC INTUE
![Page 8: Materials Reliability Program.MRP OE Evaluation Screening Questionnaire Is there anything about this indication that would suggest it appropriate to re-evaluate any program requirements,](https://reader034.vdocuments.mx/reader034/viewer/2022042106/5e84b0f1b20cec32dc3d78ff/html5/thumbnails/8.jpg)
MRP Guidelines StatusNext GIL Next G/L
ITG/ NEI 03- MIRP Curren G/L Last Pub. Rex Rev PubTSC 08L, Rpt # t Rev # Report # Date Date Rev1Pu
Date Date L"
Mitigation of Thermal Fatigue in Unisolable Piping TSC GP Itii2Connected to PWR Reactor Coolant Systems 29 0 1001017 Dec.2000 2012 2012
Thermal Fatigue Monitoring Guidelines TSC GPt2I,1 32 0 1001016 April 2001 June 2011
Computer-Based NDE Training for Thermal Fatigue TSC 36 1 1016935 Nov.2008 2012Cracking GP
Guidelines for Addressing Fatigue EnvironmentalEffects in a License Renewal Application TSC GP 47 1 1012017 Sept. 2005 2012
Generic Guidance for Alloy 600 Management AST Man. 126 0 1009561 Nov 2004 I
Primary System Piping Butt Welds Inspection and AST Man.Evaluation Guidelines 139 1 1015009 Dec. 2008
Management of Thermal Fatigue in Normally TSC Need 101 1955L• Jne20Stagnant Non-Isolable Reactor Coolant System 146 0 June 2005 June 2011Branch Lines
Management of Thermal Fatigue in Normally TSC NeedStagnant Non-Isolable Reactor Coolant System 146S 0 1018330 January 2012 2013Branch Lines - Supplemental Guidance 2009
Integrated Fatigue Management Guideline TSC GP 148 0 1012018 April 2005 - 2012
Thermal Fatigue Monitoring Guideline TSC GP 149 0 1011957 April 2005 2012 2013
Assessment of RHR Mixing Tee Thermal Fatigue in TSC GP 192 lhP'] 1018395 Dec.2008 - 2012PWR Plants I
Materials Reliability Program: PWR Internals AST Man.Inspection and Evaluation Guidelines 227 1016596 Dec.2008 2011
Materials Reliability Program: Inspection Standard Insp Needfor PWR Intemals 228 1016609 July2009 2012
ELECTRIC POWERaf=1211RESEARCH INSTITUT E© 2011 Electric Power Research Institute, Inc. All rights reserved. 8
![Page 9: Materials Reliability Program.MRP OE Evaluation Screening Questionnaire Is there anything about this indication that would suggest it appropriate to re-evaluate any program requirements,](https://reader034.vdocuments.mx/reader034/viewer/2022042106/5e84b0f1b20cec32dc3d78ff/html5/thumbnails/9.jpg)
MRP-227 Safety Evaluation Schedule
" Draft SE Issued on 28 March" Draft Public Comment Period from 11 April to 10 May" Industry Comments Transmitted on 10 May
- Included Industry-proposed changes to the SEConditions and Action Items for Staff consideration
" Teleconference Held on 26 May to Review Comment withStaff
" Final SE to be Issued on or about 24 June" RIS to be Issued with Final SE
-Anticipated on or about 28 June-Guidance on AMP submittal/revision expectations for
plants in different classifications
ELlCTRIC POWER
S2011 Electric Power Research Institute, Inc. All rights reserved. 9 r0 F 1IRESEARCHINTUE
![Page 10: Materials Reliability Program.MRP OE Evaluation Screening Questionnaire Is there anything about this indication that would suggest it appropriate to re-evaluate any program requirements,](https://reader034.vdocuments.mx/reader034/viewer/2022042106/5e84b0f1b20cec32dc3d78ff/html5/thumbnails/10.jpg)
MRP-227-A
" MRP-227-A will Incorporate Condition in Final SE-Will also include changes submitted with RAI responses
" Proposed Changes to Incorporate Conditions, As Modified,Submitted with Draft SE Comments
" MRP-227-A will be Issued on or before 31 December thisYear
- Publication will start the two-year clock on the Neededrequirement to implement the tables in MRP-227-A.
" Revision to MRP-228 (Reactor Internals Inspection Standard)will be Prepared and Issued Next Year
-Revision for consistency with MRP-227-A and toincorporate operating experience and methodologyupdates
ELECTRIC POWER
©2011 Electric Power Research Institute, Inc. All rights reserved. 1012 RESEARCHINTUE
![Page 11: Materials Reliability Program.MRP OE Evaluation Screening Questionnaire Is there anything about this indication that would suggest it appropriate to re-evaluate any program requirements,](https://reader034.vdocuments.mx/reader034/viewer/2022042106/5e84b0f1b20cec32dc3d78ff/html5/thumbnails/11.jpg)
Byron 1 RV Head Inspection Summary
* CRDM inspections required by CC N-729-1- B1R17 Refuel Outage- UT & PT indications in penetrations 64, 76, 43 & 31- Indications just below & at the J-groove weld- "Low" susceptibility Tcold head -557 0F
* Head fabricated by B&W0 CRDM penetration tubes
- Nominal 4" dia. x 0.625" wall- B&W material heats
0 Previous volumetric inspection in 2005* PWSCC assumed
ELECTRIC POWERri a I RESEARCH INSTITUTE© 2011 Electric Power Research Institute, Inc. All rights reserved. 11
![Page 12: Materials Reliability Program.MRP OE Evaluation Screening Questionnaire Is there anything about this indication that would suggest it appropriate to re-evaluate any program requirements,](https://reader034.vdocuments.mx/reader034/viewer/2022042106/5e84b0f1b20cec32dc3d78ff/html5/thumbnails/12.jpg)
US PWR RV Head Inspections
* Baseline volumetric exams- Completed for US PWR fleet in accordance with NRC
First Revised Order EA-03-009Completed in 2008
* Re-inspections for Tcold RV headsOrder replaced by CC N-729-1Lesser of 2.25 RIY or eight calendar yearsFirst volumetric re-inspections of Tcold RV heads justbeginningTemporal distribution of upcoming inspectionspresented in next slide
© 0 E tc w R ah su I.li vRESEARCH INSTITUTE
@ 2011 Electric Power Research Institute, Inc. All rights reserved. 12 -r a iIRSAC INTUE
![Page 13: Materials Reliability Program.MRP OE Evaluation Screening Questionnaire Is there anything about this indication that would suggest it appropriate to re-evaluate any program requirements,](https://reader034.vdocuments.mx/reader034/viewer/2022042106/5e84b0f1b20cec32dc3d78ff/html5/thumbnails/13.jpg)
Tcold Head Reinspection Plans
Current Reinspection Plans for Tcold RV Heads
(nE(0xuJ
0
EU
0z
7
6
5
4
3
2
1
0
Sp'11 Fa'11 Sp'12 Fa'12 Sp'13 Fa'13 Sp'14 Fa'14 Sp'15
Outage Season
a Tcold Head NDE m Tcold Head Replacement
ELECTRIC POWERi a IRESEARCH INSTITUTE@ 2011 Electric Power Research Institute, Inc. All rights reserved. 13
![Page 14: Materials Reliability Program.MRP OE Evaluation Screening Questionnaire Is there anything about this indication that would suggest it appropriate to re-evaluate any program requirements,](https://reader034.vdocuments.mx/reader034/viewer/2022042106/5e84b0f1b20cec32dc3d78ff/html5/thumbnails/14.jpg)
MRP OE Evaluation ScreeningQuestionnaire
Is there anything about this indication that would suggestit appropriate to re-evaluate any program requirements,previous inspection results, or upcoming inspectionplans?
Initial qualitative assessment indicates that Code CaseN-729-1 remains acceptable.
Although the indications were not safety significant intheir orientation, did not challenge structural integrity ofthe penetration, and did not leak, the timing ofidentification of PWSCC in a Tcoe RV head was soonerthan may have been expected.MRP will review the inspection program technical basisin light of this event.
© 2011 Electric Power Research Institute, Inc. All rights reserved. 14 RESEARCH INSTITUTE
![Page 15: Materials Reliability Program.MRP OE Evaluation Screening Questionnaire Is there anything about this indication that would suggest it appropriate to re-evaluate any program requirements,](https://reader034.vdocuments.mx/reader034/viewer/2022042106/5e84b0f1b20cec32dc3d78ff/html5/thumbnails/15.jpg)
MRP TCoId Upper Head Action Plan
• Complete a review of the technical basis for ASME CCN-729-1
- Address potential impact of OE on underlying analysesand conclusions
- Substantiate the continued validity of Tcold headinspection requirements
" Bottom Mounted Nozzle Implication Evaluation
- The implications of all CRDM conclusions reached will bereviewed relative to the current BMN inspectionrequirements (CC N-722) and susceptibility to PWSCC
©slELECTRIC POWER
©2011 Electric Power Research Institute, Inc. Al rihts reserved.1 RESEARCH INSTITUTE. v ,v
![Page 16: Materials Reliability Program.MRP OE Evaluation Screening Questionnaire Is there anything about this indication that would suggest it appropriate to re-evaluate any program requirements,](https://reader034.vdocuments.mx/reader034/viewer/2022042106/5e84b0f1b20cec32dc3d78ff/html5/thumbnails/16.jpg)
Coordinated Reactor Vessel SurveillanceProgram (CRVSP)
Develop a coordinated PWR capsuleejtive: withdrawal/test plan to increase the high-fluence
PWR surveillance data, to support developmentof a future ETC applicable to the U.S. PWR fleet.
Existing RVSP of each US PWR was reviewed
,- schedules); projected gaps in high-fluence data(>3E+19 n/cm2) were identified. Changes towithdrawal schedules are recommended to obtainhigh fluence surveillance data for the full range ofmaterials across the entire industry.
CRVSP will significantly add to the quantity and"sto Date: quality of high fluence surveillance data by the
year 2025.
Utility comments on Draft #2 are beingaddressed; Draft #3 expected from AREVA inJune 2011; submit for TSC/IIG/PMMP review &approval and publish by end of 2011.
© 0 E t Pw R a Itu I. rgs s1ESEACTRIC POWER
S2011 Electric Power Research Institute, Inc. All rights reserved. 16 f 1 IRSAC INTUE
![Page 17: Materials Reliability Program.MRP OE Evaluation Screening Questionnaire Is there anything about this indication that would suggest it appropriate to re-evaluate any program requirements,](https://reader034.vdocuments.mx/reader034/viewer/2022042106/5e84b0f1b20cec32dc3d78ff/html5/thumbnails/17.jpg)
Preliminary Results
" CRVSP increases amount of high-fluence data acrossbroad spectrum of RPV materials by 2025
" No. of additional capsules to be tested by 2025 at orabove the stated fluence
Capsule Fluence Current Plan Recommended Plan
3x1019 n/cm 2 30 40
6x10 19 n/cm 2 6 17
8x10 19 n/cm 2 0 8
9x1019 n/cm 2 0 2
ELECTRICTPOW ERariai I RESEARCHINTUE© 2011 Electric Power Research Institute, Inc. All rights reserved. 17
![Page 18: Materials Reliability Program.MRP OE Evaluation Screening Questionnaire Is there anything about this indication that would suggest it appropriate to re-evaluate any program requirements,](https://reader034.vdocuments.mx/reader034/viewer/2022042106/5e84b0f1b20cec32dc3d78ff/html5/thumbnails/18.jpg)
Surface Stress Mitigation Techniques-MRP R&D Status
Technical Basis Document for PWSCC Mitigation by Surface Treatments(MRP-267) - Product ID - 1020481 (January 2010)
- Cavitation/Water Jet Peening and Fiber Laser Peening
" Surface Stress Mitigation Technologies" Vendor laboratory testing and data
* MRP laboratory testing and data
" Factor of Improvements
" Definition of effective application
" Plant application and experience
" Experimental Program on the Effects of Surface Condition and Mitigation ofPrimary Water Stress Corrosion Cracking of Alloy 182 Welds (MRP-265) -Product ID - 1019084 (December 2009)
" Addressing remaining technical questions with resolution planned for theend of 2011 with no outstanding issues
ELECTRIC POWER
© 2011 Electric Power Research Institute, Inc. All rights reserved. 18 a RESEARCH INSTITUTE,v
![Page 19: Materials Reliability Program.MRP OE Evaluation Screening Questionnaire Is there anything about this indication that would suggest it appropriate to re-evaluate any program requirements,](https://reader034.vdocuments.mx/reader034/viewer/2022042106/5e84b0f1b20cec32dc3d78ff/html5/thumbnails/19.jpg)
Surface Stress Mitigation TechniquesImplementation and Summary
" Robust technologies- Implemented routinely in LWRs in Japan- Implemented in routinely Safety Critical Applications in Power,
Defense, Aerospace, Automotive and Medical Industries- CRDM repair mitigation used in the U. S. in numerous PWRs
* Abrasive Water Jet Peening part of /2 nozzle repairs
" Proactive mitigation desired
" Utilities are making near-term decisions on implementation for assetprotection
" Warrants inspection credit and currently Code actions have been initiated
" Seek further NRC engagementi 2 1E LECTRIC POWER
© 2011 Electric Power Research Institute, Inc. All rights reserved. 19 RESEARCH INSTITUTE
![Page 20: Materials Reliability Program.MRP OE Evaluation Screening Questionnaire Is there anything about this indication that would suggest it appropriate to re-evaluate any program requirements,](https://reader034.vdocuments.mx/reader034/viewer/2022042106/5e84b0f1b20cec32dc3d78ff/html5/thumbnails/20.jpg)
2012 International BWR/PWR Conference
International Boiling Water Reactor and PressurizedWater Reactor Materials Reliability Conference &
Exhibition 2012
July 16-19, 2012
Gaylord Resort and Convention Center, 201 WaterfrontStreet, National Harbor, MD 20745
RI..,, I ELECTRIC POWERRESEARCH INSTITUTE
© 2011 Electric Power Research Institute, Inc. All rights reserved. 20
![Page 21: Materials Reliability Program.MRP OE Evaluation Screening Questionnaire Is there anything about this indication that would suggest it appropriate to re-evaluate any program requirements,](https://reader034.vdocuments.mx/reader034/viewer/2022042106/5e84b0f1b20cec32dc3d78ff/html5/thumbnails/21.jpg)
MRP Key Contact Information
MRP Executive Sponsor*David Czufin, Exelon- Phone:- E-Mail:
(815) 416-3600david.czufin @exeloncorp.com
l MRP ChairmanTim Wells, Southern Nuclear- Phone:- E-Mail:
(205) 992-7460tgwel ls(@southernco.com
* MRP Program ManagerAnne Demma, EPRI
- Phone:- E-Mail:
(650) 855-2026ademma(@depri.com
I. F..I ,ELECTRIC POWERRESEARCH INSTITUTE
© 2011 Electric Power Research Institute, Inc. All rights reserved. 21
![Page 22: Materials Reliability Program.MRP OE Evaluation Screening Questionnaire Is there anything about this indication that would suggest it appropriate to re-evaluate any program requirements,](https://reader034.vdocuments.mx/reader034/viewer/2022042106/5e84b0f1b20cec32dc3d78ff/html5/thumbnails/22.jpg)
Together...Shaping the Future of Electricity
ELECTRIC POWER