matching rwanda’s metering demands to the rights ... · the overview of metering in rwanda...
TRANSCRIPT
MATCHING RWANDA’S METERING DEMANDS TO THE RIGHTS TECHNOLOGIES
Presentation : Lucien RUTERANA
Commercial Director
RECO&RWASCO
RWANDA
. The overview of metering in Rwanda
- History
- Objectives
- Current status
. Prepayment vs Post payment metering system in RECO
. From PRIMA to SUPRIMA Management of customers
. Revenue collection strategies( Sales outlets Strategies )
. Split meters for Fraud prevention
. New forthcoming prepayment projects for Electricity and
water.
. Professional prepayment installations on Big buildings
for faire Mgt of Electricity distribution
. Water prepayment projects
. Automatic meter reading performance
. Prepayment customer view (success story )
PRESENTATION HIGHLGHTS
MEETERING OBECTIVES IN RWANDA
� Inceased revenue collection
� Loss reduction oriented �Timely billing �Minimum of billing errors � Cost reflective� Service delivery
� Able to value of service consumed.
� Respond to their needs � Easy access to services �Easy payment �Trustable and high technology � Participation
MEETERING OPERATIONS SHOULD RESPOND TO CUSTOMERS &UTILITY DEMAND
FROM CONVENTIONAL TO PREPAYMENT METERING
�Improved budgeting� Energy accounting: customer now
monitor energy (money) consumed� Convenience of payment� Avoide long queues� Choose when to pay� Confidence in the system� No billing errors�No accumulated arrears� Improved quality of supply� Enjoy technology service� Participation in sales management
� A solution that improves therevenue collection
� Improved financial management� Avoid accumulation of arrears� Improves management of fraud� Better customer services� Better load management�No billing errors
PREPAYMENT
PRIVATE OUTLETPRIVATE OUTLET
RECO OUTLETS
Split meters
SplitCommunication
High current Unit (<250 Amps) equipped with AMR
In February 2008, RECO started the replacement of
conventional meters (1/4 hour integration period) installed to big commercial building and medium industries, in order to increase customer service and revenu collection.
Combo meters are installed in group at an appropriate place for each flow and split meters are installed on ground level and their corresponding UIU (User Interface Unit) are installed in the room/office accessible by to each customer.
RECO installed 250A high current meters associated with Automatic Meter Reading Controller to big consumer; Privates building, Public Institutions, Small Industries to facilitate the mgt of individual electricity load.
One conventional meter was
replaced by 89 prepayment meters on this building
SAMPLE OF AUTOMATION BETWEEN MANY PREPAYMENT METERS & ONE GENERATOR IN THE SAME BUILDING
�Monitor energy consumed
� Confidence in the system� No billing errors�Enjoy technology service� not necessary to enter in his
compound
� Improves the revenue collection � Accuracy of data ( in Billing)
�Monitoring outages � Management of billing and
recovery operations �Better customer services� Better load management�Able to read outside thecompound
The Field Billing System is an Electronic System allowing meter reader to print automaticaly water bills on field.
The system refers to the uses of mobile thermal Printers that interface with the RADIX ultra rugged handheld mobile computer units, and a customized software solution named ROUTEMASTER.
RWASCO has implemented since 2008 an advanced field portable billing system that manages Water Meter Reading operations
Water Field
a. Field Meter Reading system
Benefits of the Field Billing System
The system benefits of a field billing solution are numerous:
⇒ Reduce Billing cycle.
⇒ Customer can immediately compare the readings on
the meter to the reading on the bill.
⇒The problems associated with postal delivery in certain
areas are eliminated.
⇒Substantial improvement in cash flow
⇒ Better customer interaction is maintained with the
personal delivery of bills
⇒Substantial reductions in postal/hand delivery
⇒Reduces consumer queries
⇒Management Reports
Since 2006, RWASCO customer s are able to check their bill history and the amount owed using a telephone mobile.
b. YOUR BILLS AT YOUR Mobile Phone
Key Objectives :
An AMR pilot project has been implemented in RWANDA with the following main objectives:
�To collect data from water meters
remotely
�to increase reading reliability and
significantly reduces reading time cycle.
�makes all meters accessible even if the
customer is absent or in hard-to-read
locations.
�to improve productivity and bring extra
services to customers
AMR pilot project implementation in RWASCO
The water AMR pilot project started December 2010 and include the installation of 100 water meters pre equipped for communication using Radio Frequency CYBLE Module.
Meters size are DN15, DN20, DN32, DN40 using RF technology and for big customer WATERMIND Technology for big diameters DN80, DN100 and DN150.