master template ees company...
TRANSCRIPT
![Page 1: Master Template EES Company Profileeesolution.com.my/uploads/1/2/7/6/127677804/_ees_company_profile_2020.pdfElectrical Consultancy Services for the 10 KM Way-leave Electrical Infrastructure](https://reader033.vdocuments.mx/reader033/viewer/2022060705/6071445f8a4ea7677f6f0836/html5/thumbnails/1.jpg)
Copyright © 2020 EeSolution Engineering. All rights reserved
EeS COMPANY PROFILE
1
![Page 2: Master Template EES Company Profileeesolution.com.my/uploads/1/2/7/6/127677804/_ees_company_profile_2020.pdfElectrical Consultancy Services for the 10 KM Way-leave Electrical Infrastructure](https://reader033.vdocuments.mx/reader033/viewer/2022060705/6071445f8a4ea7677f6f0836/html5/thumbnails/2.jpg)
Copyright © 2020 EeSolution Engineering. All rights reserved
VISION Tagline Tailored Engineering Solutions that Create a Difference
MISSION Statement Expertise in engineering services for Electrical & energy in
Reliability Engineering Cost Benefit Optimisation Maintenance Modern Solutions Safety Integrity Assessment
2
![Page 3: Master Template EES Company Profileeesolution.com.my/uploads/1/2/7/6/127677804/_ees_company_profile_2020.pdfElectrical Consultancy Services for the 10 KM Way-leave Electrical Infrastructure](https://reader033.vdocuments.mx/reader033/viewer/2022060705/6071445f8a4ea7677f6f0836/html5/thumbnails/3.jpg)
Copyright © 2020 EeSolution Engineering. All rights reserved 3
Engineering Service Offers Expertise Specialise in
ISO 55001:2014 - Asset Management Consultancy
‘Ex’ inspection and training providers
Electrical Asset Service Lifecycle (ASL) Analysis
Industrial Electrical Asset Integrity & Safety Audit
Electrical Equipment - Performance Benchmarking Audit
Electrical Maintenance Strategies Management
Electrical Energy Management Assessment
ISO 50001 & 50002 - Energy Management (EnMS) GAPs Assessment
Power Quality Audit & Assessment Study
Electrical Reliability Engineering Specialist Services
Technical Skill Gap Competency Assessment
![Page 4: Master Template EES Company Profileeesolution.com.my/uploads/1/2/7/6/127677804/_ees_company_profile_2020.pdfElectrical Consultancy Services for the 10 KM Way-leave Electrical Infrastructure](https://reader033.vdocuments.mx/reader033/viewer/2022060705/6071445f8a4ea7677f6f0836/html5/thumbnails/4.jpg)
Copyright © 2020 EeSolution Engineering. All rights reserved 4
Engineering Technical Director
(Ir. Lam Sing Yew)
Risk Based Inspection (RBI)
Dept (2 x Technician/ Field Engineer)
(on call basis)
Field Service & Installation (FIS)
Dept (associate partners system integrator
engineering)
Engineering Retrofit (ER)
Dept (2 x Electrical Specialist)
(sub contract basis)
EeSolution Engineering Organisation Chart
![Page 5: Master Template EES Company Profileeesolution.com.my/uploads/1/2/7/6/127677804/_ees_company_profile_2020.pdfElectrical Consultancy Services for the 10 KM Way-leave Electrical Infrastructure](https://reader033.vdocuments.mx/reader033/viewer/2022060705/6071445f8a4ea7677f6f0836/html5/thumbnails/5.jpg)
Copyright © 2018 EeSolution Engineering. All rights reserved 5
On Going Project - Electrical Engineering Project:
PETRON Malaysia Refining & Marketing Bhd - PO:4510105719 /15.07.2019 - 25% Progress
Electrical Consultancy Services for the 10 KM Way-leave Electrical Infrastructure fro PMU to SSU 33kV Substation for ULSADO Project, Petron Port Dickson Refinery
PETRON Malaysia Refining & Marketing Bhd - PO:4510104903 /04.04.2019 - 50% Progress
Engineering Management Services for the New 18 MVA 33kV/ 11kV SSU TNB Substation for ULSADO Project, Petron Port Dickson Refinery
![Page 6: Master Template EES Company Profileeesolution.com.my/uploads/1/2/7/6/127677804/_ees_company_profile_2020.pdfElectrical Consultancy Services for the 10 KM Way-leave Electrical Infrastructure](https://reader033.vdocuments.mx/reader033/viewer/2022060705/6071445f8a4ea7677f6f0836/html5/thumbnails/6.jpg)
Copyright © 2018 EeSolution Engineering. All rights reserved 6
On Going Project - Electrical Engineering Project:
GE Engine Service Malaysia Sdn Bhd - PO:42002035 /26.09.2019
— In Progress
Electrical Supervising and Bi-Monthly Visiting for the GE plant 11kV system
REFERENCE - Provision of Third Party Electrical Supervising Contract as per Akta Bekalan Elektrik 1990 - Oct 2019 to Sept 2020 (Under my sub electrical specialist - GH Liew Engineering Sdn Bhd)
![Page 7: Master Template EES Company Profileeesolution.com.my/uploads/1/2/7/6/127677804/_ees_company_profile_2020.pdfElectrical Consultancy Services for the 10 KM Way-leave Electrical Infrastructure](https://reader033.vdocuments.mx/reader033/viewer/2022060705/6071445f8a4ea7677f6f0836/html5/thumbnails/7.jpg)
Copyright © 2018 EeSolution Engineering. All rights reserved 7
Project Delivered - Electrical Engineering Project
! JOTUN Coatings (ZJG) Co Ltd, Zhangjiaggang, Jiangsu Province, China
Delivery date: 28 July to 06 August 2019
Project title: Electrical Survey (ES) & Electrical Risk Based Inspection (RBI) InfraRed Thermography (IRT) and Detail Inspection (DI) for ‘Ex’ asset installation Reference: Mr.Mike Wu ( Maintenance Manager) e: [email protected]
GE Engine Service Malaysia Sdn Bhd - PO:42001855 /28.08.2019 — Completed
To design, supply and testing and commissioning 11KV smart energy meter as check meter for primary meter. (Model :Landis + Gyr Model: ZMD405CT44.007.S4, Class 0.5s) Reference: Buyer: Mr.Sulaiman Suhaimi / Tel: 03-50394546
![Page 8: Master Template EES Company Profileeesolution.com.my/uploads/1/2/7/6/127677804/_ees_company_profile_2020.pdfElectrical Consultancy Services for the 10 KM Way-leave Electrical Infrastructure](https://reader033.vdocuments.mx/reader033/viewer/2022060705/6071445f8a4ea7677f6f0836/html5/thumbnails/8.jpg)
Copyright © 2018 EeSolution Engineering. All rights reserved 8
JABIL Penang Plant 1 - PO:4101064179 / 20.08.2018
Delivery date: 25 to 29 September 2018
Project Title: Facilities Energy Audit (FEA) for Energy Efficiency (EE) and Conservation Measures (CM) under ISO 50002 Energy Audit Guidelines
Reference: Mr.Sekar Kasi (Maintenance Manager) e: [email protected]
! JOTUN COSCO Marine Coatings (Qingdao) Co.Ltd, Shandong Province, China
Delivery date: 17 to 21 September 2018
Project title: Electrical Risk Based Inspection (RBI) InfraRed Thermography (IRT) and Detail Inspection (DI) for ‘Ex’ asset installation Reference: Mr.Shelby Li ( Project & Maintenance Manager) e: [email protected]
Project Delivered - Electrical Engineering Project
![Page 9: Master Template EES Company Profileeesolution.com.my/uploads/1/2/7/6/127677804/_ees_company_profile_2020.pdfElectrical Consultancy Services for the 10 KM Way-leave Electrical Infrastructure](https://reader033.vdocuments.mx/reader033/viewer/2022060705/6071445f8a4ea7677f6f0836/html5/thumbnails/9.jpg)
Copyright © 2018 EeSolution Engineering. All rights reserved 9
GE Engine Service Malaysia Sdn Bhd - PO:420011126 /13.10/2017— 85% Progress
Electrical Supervising and Visiting for the GE plant 11kV system
REFERENCE - Provision of Third Party Electrical Supervising Contract as per Akta Bekalan Elektrik 1990 - Oct 2019 to Sept 2020 (Under my sub electrical specialist - GH Liew Engineering Sdn Bhd)
Reference: Buyer: Mr.Sulaiman Suhaimi / Tel: 03-50394546
PETRON Malaysia Refining & Marketing Bhd - PO:4510101998 /13.04.2018 - 100% Progress
Electrical Consultant - Electrical Design Specification (EDS) Support
REFERENCE - Provision of Third Party Electrical Engineering Technical Services for ULSADO
Project Delivered - Electrical Engineering Project
![Page 10: Master Template EES Company Profileeesolution.com.my/uploads/1/2/7/6/127677804/_ees_company_profile_2020.pdfElectrical Consultancy Services for the 10 KM Way-leave Electrical Infrastructure](https://reader033.vdocuments.mx/reader033/viewer/2022060705/6071445f8a4ea7677f6f0836/html5/thumbnails/10.jpg)
Copyright © 2018 EeSolution Engineering. All rights reserved 10
! BASF Petronas Chemicals Sdn Bhd - Retrofitting HMI ‘Ex’ Panel Enclosure with Engineering Design
100% Completed - PO: 4944400334 dated 25.05.2018
Project Delivered - Electrical Engineering Project
![Page 11: Master Template EES Company Profileeesolution.com.my/uploads/1/2/7/6/127677804/_ees_company_profile_2020.pdfElectrical Consultancy Services for the 10 KM Way-leave Electrical Infrastructure](https://reader033.vdocuments.mx/reader033/viewer/2022060705/6071445f8a4ea7677f6f0836/html5/thumbnails/11.jpg)
Copyright © 2018 EeSolution Engineering. All rights reserved 11
! Electrical Risk Inspection for Menara IMC ( Under contract of GH Liew Engineering Sdn Bhd)
To carry out Building Electrical Risk Assessment (ERA) on 21 to 25 June 2017
! JOTUN Southeast Asia Pacific Region (SEAP) for Myanmar and Philippines under Regional JOTUN
To carry out Electrical Risk Assessment (ERA) under HSQE Jotun Policy - 100 % Completed in Jan and Feb 2018
Project Delivered - Electrical Engineering Project
![Page 12: Master Template EES Company Profileeesolution.com.my/uploads/1/2/7/6/127677804/_ees_company_profile_2020.pdfElectrical Consultancy Services for the 10 KM Way-leave Electrical Infrastructure](https://reader033.vdocuments.mx/reader033/viewer/2022060705/6071445f8a4ea7677f6f0836/html5/thumbnails/12.jpg)
Copyright © 2018 EeSolution Engineering. All rights reserved 12
! JOTUN Southeast Asia Pacific Region (SEAP) for Thailand, Indonesia, Vietnam and Malaysia under Regional JOTUN
To carry out Electrical Risk Assessment (ERA) under HSQE Jotun Policy 100 % Completed in April & May 2017
! Appointed UNDP Electrical Energy Consultant for Economic Planning Unit (EPU)
To prepare the Demand Side Management (DSM) for electrical energy policy for Malaysia
Duration: 18 July 2016 to 31 July 2017
Project Delivered - Electrical Engineering Project
![Page 13: Master Template EES Company Profileeesolution.com.my/uploads/1/2/7/6/127677804/_ees_company_profile_2020.pdfElectrical Consultancy Services for the 10 KM Way-leave Electrical Infrastructure](https://reader033.vdocuments.mx/reader033/viewer/2022060705/6071445f8a4ea7677f6f0836/html5/thumbnails/13.jpg)
Copyright © 2018 EeSolution Engineering. All rights reserved 13
! JOTUN Coatings (ZJG) Co Ltd, Zhangjiaggang, Jiangsu Province, China
To carry out Machine Risk Assessment (MRA) under HSQE Jotun Policy 100% Completed in October 2016
Reference: Mr.Mike Wu ( Maintenance Manager) e: [email protected]
!Chokwang JOTUN, Busan, South Korea
To carry out Electrical Risk Assessment (ERA) under HSQE Jotun Policy 100% Completed in November 2016
Reference: Mr.Hyun-Seok CHO e: [email protected]
! JOTUN Australia Pty Ltd, Melbourne, Australia
To carry out Electrical Risk Assessment (ERA) under HSQE Jotun Policy 100 % Completed in April 2017 Reference: Miss Leanne Taylor (HSE Coordinator)
Project Delivered - Electrical Engineering Project
![Page 14: Master Template EES Company Profileeesolution.com.my/uploads/1/2/7/6/127677804/_ees_company_profile_2020.pdfElectrical Consultancy Services for the 10 KM Way-leave Electrical Infrastructure](https://reader033.vdocuments.mx/reader033/viewer/2022060705/6071445f8a4ea7677f6f0836/html5/thumbnails/14.jpg)
Copyright © 2018 EeSolution Engineering. All rights reserved 14
PETRON Malaysia Refining & Marketing Bhd - PO:4510097947 /01.08.2016 - 100% Completed
To Provide Technical Professional Service for Protection Relaying System
Reference: Mr.Adrian Heng (Electrical Engineer); e: [email protected]
! JOTUN Coatings (ZJG) Co Ltd, Zhangjiaggang, Jiangsu Province, China
To carry out Electrical Risk Assessment (ERA) under HSQE Jotun Policy 100% Completed in August 2016
Reference: Mr.Mike Wu ( Maintenance Manager) e: [email protected]
Sensata Technologies Malaysia Sdn Bhd - 100% Completed
To provide technical professional investigation service for Low Voltage (LV) Essential Cable Failure in July 2016 Reference: Mr.NG Jen Yeow ( Facilities Manager)
Project Delivered - Electrical Engineering Project
![Page 15: Master Template EES Company Profileeesolution.com.my/uploads/1/2/7/6/127677804/_ees_company_profile_2020.pdfElectrical Consultancy Services for the 10 KM Way-leave Electrical Infrastructure](https://reader033.vdocuments.mx/reader033/viewer/2022060705/6071445f8a4ea7677f6f0836/html5/thumbnails/15.jpg)
Copyright © 2018 EeSolution Engineering. All rights reserved 15
PETRON Malaysia Refining & Marketing Bhd - PO:4510096806 /05.01.2016 - 100% Completed
To provide technical professional investigation service for capacitor bank SS3 incident Reference: Mr.Adrian Heng (Electrical Engineer); e:[email protected]
PETRON Malaysia Refining & Marketing Bhd - PO:4510096894 /21.01.2016 - 100% Completed
To carry out Cold Eye Review (CER) of Plant Trip on 28 Nov 2015 Reference: Mr.Adrian Heng (Electrical Engineer); e:[email protected]
Project Delivered - Electrical Engineering Project
![Page 16: Master Template EES Company Profileeesolution.com.my/uploads/1/2/7/6/127677804/_ees_company_profile_2020.pdfElectrical Consultancy Services for the 10 KM Way-leave Electrical Infrastructure](https://reader033.vdocuments.mx/reader033/viewer/2022060705/6071445f8a4ea7677f6f0836/html5/thumbnails/16.jpg)
Copyright © 2018 EeSolution Engineering. All rights reserved 16
Market Study for Opportunities for High Efficiency Motors (HEMs) in Malaysia Industries Sector - 100% Completion
Project Research Study Leader
Reference: Mr.KC Wong, e: [email protected]
PETRON Malaysia Refining & Marketing Bhd - PO:4510093801 /08.07.2014 - 100% Completed
Consultancy Service for Technical Specification Preparation of VFD system for PF2 Compressor, C7001 Reference: Mr.Max Gan Chee Seng (Electrical Project Manager); e<[email protected]>
Project Delivered - Electrical Engineering Project
![Page 17: Master Template EES Company Profileeesolution.com.my/uploads/1/2/7/6/127677804/_ees_company_profile_2020.pdfElectrical Consultancy Services for the 10 KM Way-leave Electrical Infrastructure](https://reader033.vdocuments.mx/reader033/viewer/2022060705/6071445f8a4ea7677f6f0836/html5/thumbnails/17.jpg)
Copyright © 2018 EeSolution Engineering. All rights reserved 17
! BASF Petronas Chemicals Sdn Bhd - Technical Investigation Service (RFCA) for T61 Transformer Incident on 07 October 2013
100% Completed on 01 November 2013 - PO Issuance
Reference: Dato’ Ir. Jeffrey Khor Chooi Beng ; e: [email protected]/ m: 012-393 6126
! Bassendean Electrical System Reliability and Asset Integrity Review- Operation, Maintenance and Engineering Management, Perth Australia, 100% Completed on 30 July 2014
LRS Electrical Specialist with Consultancy Group, Lifetime Reliability
Reference: Mr.Mike Sondalini, e: [email protected]
Project Delivered - Electrical Engineering Project
![Page 18: Master Template EES Company Profileeesolution.com.my/uploads/1/2/7/6/127677804/_ees_company_profile_2020.pdfElectrical Consultancy Services for the 10 KM Way-leave Electrical Infrastructure](https://reader033.vdocuments.mx/reader033/viewer/2022060705/6071445f8a4ea7677f6f0836/html5/thumbnails/18.jpg)
Copyright © 2018 EeSolution Engineering. All rights reserved 18
! JOTUN
Electrical Safety Group Project ‘Electrical Asset Safety Integrity Audit for Korea, China & Melbourne plant - End of August to end of September 2013 - 100 % Completed Reference: Mr.Odd Petter Jakobsen (Group Safety Officer); e: [email protected]
PETRON Malaysia Refining & Marketing Bhd - PO:41510092162 /10.07.2013 - 100% Completed
Front End Engineering Design (FEED) for electrical facilities for Euro4M onsite projects Reference: Mr.Max Gan Chee Seng (Electrical Project Manager); e<[email protected]>
Project Delivered - Electrical Engineering Project
![Page 19: Master Template EES Company Profileeesolution.com.my/uploads/1/2/7/6/127677804/_ees_company_profile_2020.pdfElectrical Consultancy Services for the 10 KM Way-leave Electrical Infrastructure](https://reader033.vdocuments.mx/reader033/viewer/2022060705/6071445f8a4ea7677f6f0836/html5/thumbnails/19.jpg)
Copyright © 2018 EeSolution Engineering. All rights reserved 19
! JOTUN
Electrical Safety Group Project ‘Electrical Asset Safety Integrity Audit for SouthEast Asia (SEA) Region’ in Thailand, Vietnam, Indonesia & Malaysia - Duration: February to May 2012 (4 months) - 100% completed ! Reference: Mr.Odd Petter Jakobsen (Group Safety Officer); e: [email protected]
Project Delivered - Electrical Engineering Project
![Page 20: Master Template EES Company Profileeesolution.com.my/uploads/1/2/7/6/127677804/_ees_company_profile_2020.pdfElectrical Consultancy Services for the 10 KM Way-leave Electrical Infrastructure](https://reader033.vdocuments.mx/reader033/viewer/2022060705/6071445f8a4ea7677f6f0836/html5/thumbnails/20.jpg)
Copyright © 2018 EeSolution Engineering. All rights reserved 20
! BASF Petronas Chemicals Sdn Bhd - PO:4906902423/16.01.2013
Cold Eye Review (CER) of RCFA for Voltage Dip Incident on 24.12.2012 - 100% Completed Reference: En.Azmawi Mohamad (Senior Manager); e: [email protected] (tel: 09-585 5000)
! BASF Petronas Chemicals Sdn Bhd - PO:4548067259 /15.08.2012
Technical Consultancy Project for ‘Electrical Management System Assessment - Operation & Maintenance, Engineering Management - 100% Completed ! Reference: En.Azmawi Mohamad (Senior Manager); e: [email protected]
(tel: 09-585 5000)
Project Delivered - Electrical Engineering Project
![Page 21: Master Template EES Company Profileeesolution.com.my/uploads/1/2/7/6/127677804/_ees_company_profile_2020.pdfElectrical Consultancy Services for the 10 KM Way-leave Electrical Infrastructure](https://reader033.vdocuments.mx/reader033/viewer/2022060705/6071445f8a4ea7677f6f0836/html5/thumbnails/21.jpg)
Copyright © 2018 EeSolution Engineering. All rights reserved 21
a) PO- MX057860: Incident Report Investigation - Root Cause Failure Analysis (RCFA) for MCC Flashover Incident - Completed
b) PO - MX063889: Power Quality Technical Consultancy Services for Non Linear Load Drive Analysis - Completed
c) PO - MX065567: Developing the electrical motors maintenance strategy policy and implementing guidelines - Completed
Malaysian NewsPrint Industries Sdn Bhd
Project Delivered - Electrical Engineering Project
![Page 22: Master Template EES Company Profileeesolution.com.my/uploads/1/2/7/6/127677804/_ees_company_profile_2020.pdfElectrical Consultancy Services for the 10 KM Way-leave Electrical Infrastructure](https://reader033.vdocuments.mx/reader033/viewer/2022060705/6071445f8a4ea7677f6f0836/html5/thumbnails/22.jpg)
Copyright © 2018 EeSolution Engineering. All rights reserved
Past Project Electrical Engineering Experiences: Technical Competency Skill Matrix Assessment
Completed on 19 January 2011 Malaysian NewsPrint Industries Sdn Bhd
Electrical Manager - Skill Competency Assessment (Internal Candidate)
22
Reference: Mr.Kenneth Chang V.T (Mill Maintenance Manager); e:[email protected] ,
tel: 09 2715300)
Technical Report Investigation - Root Cause Failure Analysis (RCFA) for 11kV Cable Fault Investigation
Completed on 23 May 2011 Reference: Mr.Jimmy Lim (Director); e:[email protected], m: 016 379 2377
![Page 23: Master Template EES Company Profileeesolution.com.my/uploads/1/2/7/6/127677804/_ees_company_profile_2020.pdfElectrical Consultancy Services for the 10 KM Way-leave Electrical Infrastructure](https://reader033.vdocuments.mx/reader033/viewer/2022060705/6071445f8a4ea7677f6f0836/html5/thumbnails/23.jpg)
Copyright © 2018 EeSolution Engineering. All rights reserved
Project Management (M&E) Services
23
! SimeDarby HealthCare Ara Damasara (AD) - Specialist Medical Tertiary Hospital
Part time - Technical (M&E) specialist coordinator for Interior Main Contractor (Jan to end of July 2011) - End of Contract Service
Past Electrical Engineering Project:
![Page 24: Master Template EES Company Profileeesolution.com.my/uploads/1/2/7/6/127677804/_ees_company_profile_2020.pdfElectrical Consultancy Services for the 10 KM Way-leave Electrical Infrastructure](https://reader033.vdocuments.mx/reader033/viewer/2022060705/6071445f8a4ea7677f6f0836/html5/thumbnails/24.jpg)
Copyright © 2018 EeSolution Engineering. All rights reserved 24
Past Electrical Energy - REEM Project:
Electrical Energy Management Macro Assessment !Sunway Medical Centre Bhd - Letter in Intent /16.08.2013 -
Completed
Quarterly visit in progress supervision:
Reference: Mr.Balwant Singh(Director of Service); e:<[email protected]>
Electrical Energy Management Macro Assessment ! Aliran Utara Sdn Bhd - PO: 0346 /03.05.2013 -Completed
Quarterly visit in progress supervision: Reference: Mr.Hohd Hanafiah Zamri (General Manager); e:<[email protected]> m:019 3909113
![Page 25: Master Template EES Company Profileeesolution.com.my/uploads/1/2/7/6/127677804/_ees_company_profile_2020.pdfElectrical Consultancy Services for the 10 KM Way-leave Electrical Infrastructure](https://reader033.vdocuments.mx/reader033/viewer/2022060705/6071445f8a4ea7677f6f0836/html5/thumbnails/25.jpg)
Copyright © 2018 EeSolution Engineering. All rights reserved 25
Electrical Energy Management Macro Assessment ! Poly Plastic Asia Pacific Sdn Bhd - PI-13720 PROD/11.12.2012 -
Completed
Quarterly visit in progress supervision: Reference: Mr.Chong Kean Meng (NPP Production Manager); e: [email protected], t: 09 585 8281
Electrical Energy Management Macro Assessment ! PETRON Malaysia Refining & Marketing Bhd - PO:4510091796 /
30.04.2013 -Completed
Quarterly visit in progress supervision: Reference: Miss Ng Yen Yee (Electrical Reliability Engineer) ; e: "Yen Yee, Ng" <[email protected]> t: 06 646 6019
Past Electrical Energy - REEM Project:
![Page 26: Master Template EES Company Profileeesolution.com.my/uploads/1/2/7/6/127677804/_ees_company_profile_2020.pdfElectrical Consultancy Services for the 10 KM Way-leave Electrical Infrastructure](https://reader033.vdocuments.mx/reader033/viewer/2022060705/6071445f8a4ea7677f6f0836/html5/thumbnails/26.jpg)
Copyright © 2018 EeSolution Engineering. All rights reserved
Electrical Energy Management Macro Assessment
26
! GS Paper & Packaging Sdn Bhd - PO:5100190096 dated 22 March 2012 - Completed
Quarterly visit in progress supervision: ! Mr.Tan Chin Keong (Manager- Capital Project) ; e: [email protected] (tel: 03 3182 5070)
! Southern Water Corporation Sdn Bhd - PO:1240 dated 14 September 2012 - Completed
Quarterly visit in progress supervision: ! En.Hasni (HEAD OF OPERATIONS & TECHNICAL/MAINTENANCE), e:[email protected]
Past Electrical Energy - REEM Project:
![Page 27: Master Template EES Company Profileeesolution.com.my/uploads/1/2/7/6/127677804/_ees_company_profile_2020.pdfElectrical Consultancy Services for the 10 KM Way-leave Electrical Infrastructure](https://reader033.vdocuments.mx/reader033/viewer/2022060705/6071445f8a4ea7677f6f0836/html5/thumbnails/27.jpg)
Copyright © 2018 EeSolution Engineering. All rights reserved
Electrical Energy Management Macro Assessment
27
! BlueScope Steel (Malaysia) Sdn Bhd - PO dated 12 January 2011 Completed - Non Supervision
Reference: Mr.Teh Tiong Ming (Engineering Manager); e: [email protected] (tel: 03 3361 6888)
! BASF Petronas Chemicals Sdn Bhd - PO dated 01 February 2011 Completed
Quarterly visit in progress supervision: ! Reference: En.Azmawi Mohamad (Senior Manager); e: [email protected]
(tel: 09-585 5000)
! BP Chemicals (Malaysia) Sdn Bhd - PO dated September 2011, Completed
Quarterly visit in progress supervision:
Mr.Lim Su Seng (E&I Superintendant) ; e: [email protected] (tel: 09 582 5648)
Past Electrical Energy - REEM Project:
![Page 28: Master Template EES Company Profileeesolution.com.my/uploads/1/2/7/6/127677804/_ees_company_profile_2020.pdfElectrical Consultancy Services for the 10 KM Way-leave Electrical Infrastructure](https://reader033.vdocuments.mx/reader033/viewer/2022060705/6071445f8a4ea7677f6f0836/html5/thumbnails/28.jpg)
Copyright © 2018 EeSolution Engineering. All rights reserved
! Tencate Geosynthetics Asia Sdn Bhd - Completed in October 2010
Quarterly visit in progress supervision: � Reference: Mr.Chew Tat Sen (Maintenance Manager); e: [email protected] (tel:
03 5198 5373) Customer Feedback: “Overall meeting the company expectation and satisfactory facilitation process by our appointed energy facilitator”
! Shell Refining (FOM) Berhad : Completed in December 2010,
Quarterly visit in progress supervision: � Reference: Ir.Tony Chong Zye Leong (Head of Electrical); e: [email protected]
(tel: 06 640 4930) Customer Feedback: “Great collaboration, a fit for purpose systematic approach and professionally delivered”
28
Electrical Energy Management Macro Assessment
Past Electrical Energy - REEM Project:
![Page 29: Master Template EES Company Profileeesolution.com.my/uploads/1/2/7/6/127677804/_ees_company_profile_2020.pdfElectrical Consultancy Services for the 10 KM Way-leave Electrical Infrastructure](https://reader033.vdocuments.mx/reader033/viewer/2022060705/6071445f8a4ea7677f6f0836/html5/thumbnails/29.jpg)
Copyright © 2020 EeSolution Engineering. All rights reserved 29
Engineering Technical Director Profile
Ir. Lam Sing Yew @ LammieBEng(Hons), MSc, PEng (PCE), FIEM, CEng, MIET, C.E.A
Ir. Lam is a principal electrical specialist and trainer on his own niche consultancy practice in the electrical
specialist field of reliability management, asset service life cycle (ASL) integrity, ‘ex’ equipment safety auditor,
electrical incident investigator, asset maintenance management, power quality practitioner and energy
optimisation management. Had carried out energy review in their energy bill consumption by analysing the
maximum demand, electrical load factor, power factor management, electric motor efficiencies and pump &
fan performance with variable speed drive energy analysis.
He has acquired vast practical experience in project construction management in building aviation support
facilities, managing mechanical and electrical (M&E) turnkey services, oil & gas, petrochemical, manufacturing
and pulp & paper industries. In addition, he has carried out many electrical safety incident investigations due
to maintenance and/or equipment faults by facilitating the Root Cause Failure Analysis (RCFA) methodology
approach.
He is specialised in electrical energy management and power quality field from his postgraduate study from
University of Putra Malaysia (UPM) by graduating with MSc (Electrical Power Engineering) in 2003. He also
graduated with his first bachelor’s degree qualification from University of Leicester, United Kingdom in BEng
(Hons) Electrical and Electronics in year 1995. He is a registered Professional Engineer (Electrical) with
Practising Certificate Engineer with Board of Engineers Malaysia and also attained his Charted Engineer
(CEng) with Engineering Council (UK).
![Page 30: Master Template EES Company Profileeesolution.com.my/uploads/1/2/7/6/127677804/_ees_company_profile_2020.pdfElectrical Consultancy Services for the 10 KM Way-leave Electrical Infrastructure](https://reader033.vdocuments.mx/reader033/viewer/2022060705/6071445f8a4ea7677f6f0836/html5/thumbnails/30.jpg)
Copyright © 2020 EeSolution Engineering. All rights reserved 30
ENGINEERING PRACTICAL COURSES
Please send enquiries to me for the course listing as the trainer has delivered more than 50 practical training lectures/workshops throughout 10 years in capacity knowledge development for young engineers.
PRINCIPAL’S PAST PUBLICATIONS, TECHNICAL TALKS & COURSES
![Page 31: Master Template EES Company Profileeesolution.com.my/uploads/1/2/7/6/127677804/_ees_company_profile_2020.pdfElectrical Consultancy Services for the 10 KM Way-leave Electrical Infrastructure](https://reader033.vdocuments.mx/reader033/viewer/2022060705/6071445f8a4ea7677f6f0836/html5/thumbnails/31.jpg)
Copyright © 2020 EeSolution Engineering. All rights reserved 31
TECHNICAL TALKS
06 OCTOBER 2009 - Technical Talk ‘Extension of Electrical Equipment Asset Life Cycle Through Reliability Methodologies and Recommended Maintenance Strategies”, Institution Engineers Malaysia
08 December 2009 - Repeated Short Talk ‘Extension of Electrical Equipment Asset Life Cycle Through Reliability Methodologies and Recommended Maintenance Strategies”, Institution Engineering & Technology, IET Malaysia Branch
22 December 2009 - Technical Talk ‘Managing Electricity Expenditure via electrical energy management for electrical equipment asset class’, Institution Engineers Malaysia
06 October 2010 - Technical Talk ‘Qualitative & Quantitative Approach for Modern Electrical Reliability Maintenance’, Institution Engineers Malaysia
22 June 2011- Technical Talk on “Power Quality Phenomena: Affecting Electrical Equipment Performance” , Presenter, Institution Engineers Malaysia (IEM)
PRINCIPAL’S PAST PUBLICATIONS, TECHNICAL TALKS & COURSES
![Page 32: Master Template EES Company Profileeesolution.com.my/uploads/1/2/7/6/127677804/_ees_company_profile_2020.pdfElectrical Consultancy Services for the 10 KM Way-leave Electrical Infrastructure](https://reader033.vdocuments.mx/reader033/viewer/2022060705/6071445f8a4ea7677f6f0836/html5/thumbnails/32.jpg)
Copyright © 2020 EeSolution Engineering. All rights reserved 32
TECHNICAL BUSINESS TALK
25 May 2012 - Talk ‘Connecting Industrial Energy Management to Business Performance”, Malaysia International Chamber of Commerce and Industry (MICCI), www.micci.com
19 July 2012 - Talk ‘Connecting Industrial Energy Management to Business Per formance” , Federat ion Of Malays ian Manufacturers (FMM), www.fmm.org.my
PRINCIPAL’S PAST PUBLICATIONS, TECHNICAL TALKS & COURSES
![Page 33: Master Template EES Company Profileeesolution.com.my/uploads/1/2/7/6/127677804/_ees_company_profile_2020.pdfElectrical Consultancy Services for the 10 KM Way-leave Electrical Infrastructure](https://reader033.vdocuments.mx/reader033/viewer/2022060705/6071445f8a4ea7677f6f0836/html5/thumbnails/33.jpg)
Copyright © 2020 EeSolution Engineering. All rights reserved 33
PAST COURSES
25 May 2010 - One Day Course on “Electrical Energy Efficiency Regulations and Applications”, Institution Engineers Malaysia, One of the presenter for topic “Electrical Energy Audit Process”
12 January 2011 - One Day Course of Energy Series 1 of 3: Electrical Energy Manager (EEM): Challenges and Barriers, Presenter, Institution Engineers Malaysia
10 March 2011 - One Day Workshop on ‘An Overview of PAS 55: Asset Management’, Course Trainer, TNB ILSAS
25-26 May 2011 - Two-Day Energy Series Course on Part 2 of 3: Registered Electrical Energy Manager (REEM) - An Overview of Electrical Energy Equipment Management & Application, Trainer, Institution Engineers Malaysia (IEM)
14 -15 November 2011 - Practical Application for Energy Management & Efficiency in Electrical Equipment, Trainer, Asia iKnowledge Sdn Bhd
PRINCIPAL’S PAST PUBLICATIONS, TECHNICAL TALKS & COURSES
![Page 34: Master Template EES Company Profileeesolution.com.my/uploads/1/2/7/6/127677804/_ees_company_profile_2020.pdfElectrical Consultancy Services for the 10 KM Way-leave Electrical Infrastructure](https://reader033.vdocuments.mx/reader033/viewer/2022060705/6071445f8a4ea7677f6f0836/html5/thumbnails/34.jpg)
Copyright © 2020 EeSolution Engineering. All rights reserved 34
PAST COURSES
21- 23 February 2012 - Registered Electrical Energy Manager (REEM) - Management of Challenges and Barriers and Practical Application for Energy Efficiency & Conservation Management in Electrical Equipment, Trainer, IEM Penang Branch
28 -29 February 2012 - Practical Application for Energy Efficiency & Conservation Management in Electrical Equipment, Trainer, Asia iKnowledge Sdn Bhd
17 July 2012 - Practical Application of Maintenance Strategies for Electrical Motors, Trainer, Institution Engineers Malaysia
26 -27 July 2012 - Practical Application for Energy Efficiency & Conservation Management in Electrical Equipment, Trainer, Asia iKnowledge Sdn Bhd
29-30 August 2012 - Two Day Fundamental & Syndication Workshop in Practical Application of Electrical Energy Efficiency Management, In House YTL Cement Industries, Trainer
PRINCIPAL’S PAST PUBLICATIONS, TECHNICAL TALKS & COURSES
![Page 35: Master Template EES Company Profileeesolution.com.my/uploads/1/2/7/6/127677804/_ees_company_profile_2020.pdfElectrical Consultancy Services for the 10 KM Way-leave Electrical Infrastructure](https://reader033.vdocuments.mx/reader033/viewer/2022060705/6071445f8a4ea7677f6f0836/html5/thumbnails/35.jpg)
Copyright © 2020 EeSolution Engineering. All rights reserved 35
PAST COURSES
25 to 27 September 2012 - Practical Session for Organisation and Implementation Towards MS ISO 50001 (Energy Management System), Coach Trainer, HallMark Access
17&18 October 2012 - Introduction of Energy Management with Practical Understanding of Electrical Energy Efficiency & Conservation Techniques,Trainer, IEM Southern Branch
24&25 January 2013 - Practical of Reliability Centred Maintenance (RCM) Application,Trainer, Shanghai, China - Completed
PRINCIPAL’S PAST PUBLICATIONS, TECHNICAL TALKS & COURSES
![Page 36: Master Template EES Company Profileeesolution.com.my/uploads/1/2/7/6/127677804/_ees_company_profile_2020.pdfElectrical Consultancy Services for the 10 KM Way-leave Electrical Infrastructure](https://reader033.vdocuments.mx/reader033/viewer/2022060705/6071445f8a4ea7677f6f0836/html5/thumbnails/36.jpg)
Copyright © 2020 EeSolution Engineering. All rights reserved 36
INTERNATIONAL CONFERENCE
20-22 Oct 2010, Conference Paper “Electrical Reliability: A Benchmarking Case Study”, Bronze Prize Best Paper Winner, International Applied Reliability Symposium, Singapore
PUBLICATION
IEM (Jurutera) Magazine, February 2011, Feature Article “Electrical Asset Management: A Guide to Benchmark Methodology & Case Studies”, (KDN PP 1050/12/2011(026928) ISSN 0126-9909
PRINCIPAL’S PAST PUBLICATIONS, TECHNICAL TALKS & COURSES
![Page 37: Master Template EES Company Profileeesolution.com.my/uploads/1/2/7/6/127677804/_ees_company_profile_2020.pdfElectrical Consultancy Services for the 10 KM Way-leave Electrical Infrastructure](https://reader033.vdocuments.mx/reader033/viewer/2022060705/6071445f8a4ea7677f6f0836/html5/thumbnails/37.jpg)
Copyright © 2020 EeSolution Engineering. All rights reserved
Company Information 1. Company Name : EESolution Engineering
2. Company Registration: SA0166579-V dated 22 September 2010
3. Registered Electrical Energy Manager No: PTE-0018-2009 (Expiry:12-12-2020)
4. Office Operation Address: 59, Jalan BK 5/11, Bandar Kinrara, 47180 Puchong, Selangor, Malaysia (SOHO)
5. Authorised Capital : RM100,000.00
6. Paid Up Capital : RM50,000.00
7. Scope of Business: To provide engineering specialist services for modern electrical maintenance solutions and energy management strategies
8. Business Owner: Lam Sing Yew (Sole Proprietorship)
9. Banker: Maybank Kinrara, Lot LG-01,LG-02. LG-03 & LG03A, Lower Ground, Eight Kinrara, Jalan BK 5A/1, Bandar Kinrara, 47180 Puchong, Selangor
37
![Page 38: Master Template EES Company Profileeesolution.com.my/uploads/1/2/7/6/127677804/_ees_company_profile_2020.pdfElectrical Consultancy Services for the 10 KM Way-leave Electrical Infrastructure](https://reader033.vdocuments.mx/reader033/viewer/2022060705/6071445f8a4ea7677f6f0836/html5/thumbnails/38.jpg)
Copyright © 2010 EeSolution Engineering. All rights reserved
CONTACT
Tailored Engineering Solutions that Create a Difference
EeSolution Engineering (SA0166579-V)
Ir. Lam Sing Yew @ Lammie Engineering Technical Director m: +6.011.2020 6628 e: [email protected] / Alt e: [email protected] w: eesolution.com.my LinkedIn: Sing Yew, Ir.Lam@Lammie Sykpe: singyewlam