m.ashraf

3
Mohammed Ashraf Ali EL Sayed 24Abdel-Hamid Osman St- Ard El Naam Ain Shams -Cairo Egypt [email protected] Tel: (+20) 1111 208 308 (+202) 263 765 20 Personal Information: Nationality: Egyptian Data of Birth : Sep -15- 1989 Military Status : Exempted Education: Bachelor of Engineering Electrical Power and Machines Department: Electrical Power and Machines . University : Higher Institute of Engineering in the Shrouk Academy. Year of graduation: 2013 Cumulative Estimate : Good. Estimate in Last year: Good Graduation Project: Power System Distribution Estimate in Graduation Project: Excellent Work Experience: September-2013 Date, ECG Engineering Consultants Group, Cairo, Egypt; Electrical Design Engineer. Duties include preparation of electrical works design, technical specifications and bill of quantities; preparing drawings and documents of schematic designs; preparing detailed designs, estimates and final load calculations, designs for MV and LV power distribution networks, transformers, generators and cable selections; switchboard sizing; single line diagrams for MV/LV distribution systems; earthing and lighting protection systems and small power systems network and preparing software based lighting designs and low current systems of many projects including: Projects: El Rehab Shopping Center : Location: El Rehab City -Egypt Scope of work: Lighting, small power systems, panel schedule ,cable sizing calculation, earthing , lighting protection systems and BOQ The project's plot area is 29,416 m2 The power consumption 8 MW Note: the project is design by using Revit program Mountain View Hyde Park : Location: New Cairo- Egypt Scope of work: infrastructure design “medium voltage network design, low voltage network design and outdoor lighting design” The project's plot area is (200 feddans ) power consumption 50 MW MASTER PLANNING & INFRASTRUCTURE DESIGN OF 8 SITES IN K.S.A: Location: K.S.A Scope of work: infrastructure design eight land sites “medium voltage network design, low voltage network design and outdoor lighting design” The sites areas range from 100,000m2 to 1000,000m2 power consumption from 20MW TO 40 MW VALCASTEL HOTEL: Location: France Scope of work: Lighting, small power systems, panel schedule ,cable sizing calculation, earthing , lighting protection systems and BOQ For hotel power consumption 7 MW

Upload: mohammed-ashraf

Post on 15-Jan-2017

135 views

Category:

Documents


5 download

TRANSCRIPT

Page 1: M.Ashraf

Mohammed Ashraf Ali EL Sayed 24Abdel-Hamid Osman St- Ard El Naam –Ain Shams -Cairo –Egypt

[email protected]

Tel: (+20) 1111 208 308

(+202) 263 765 20

Personal Information:

Nationality: Egyptian

Data of Birth : Sep -15- 1989

Military Status : Exempted

Education:

Bachelor of Engineering Electrical Power and Machines

Department: Electrical Power and Machines .

University : Higher Institute of Engineering in the Shrouk Academy.

Year of graduation: 2013

Cumulative Estimate : Good.

Estimate in Last year: Good

Graduation Project: Power System Distribution

Estimate in Graduation Project: Excellent

Work Experience:

September-2013 Date, ECG Engineering Consultants Group, Cairo, Egypt; Electrical Design Engineer.

Duties include preparation of electrical works design, technical specifications and bill of quantities;

preparing drawings and documents of schematic designs; preparing detailed designs, estimates and final

load calculations, designs for MV and LV power distribution networks, transformers, generators and cable selections;

switchboard sizing; single line diagrams for MV/LV distribution systems; earthing and lighting protection systems and small

power systems network and preparing software based lighting designs and low current systems of many projects including:

Projects:

El Rehab Shopping Center : Location: El Rehab City -Egypt

Scope of work:

Lighting, small power systems, panel schedule ,cable sizing calculation, earthing , lighting protection systems and BOQ

The project's plot area is 29,416 m2

The power consumption 8 MW

Note: the project is design by using Revit program

Mountain View Hyde Park : Location: New Cairo- Egypt

Scope of work:

infrastructure design “medium voltage network design, low voltage network design and outdoor lighting design”

The project's plot area is (200 feddans )

power consumption 50 MW

MASTER PLANNING & INFRASTRUCTURE DESIGN OF 8 SITES IN K.S.A: Location: K.S.A

Scope of work:

infrastructure design eight land sites “medium voltage network design, low voltage network design and outdoor lighting design”

The sites areas range from 100,000m2 to 1000,000m2

power consumption from 20MW TO 40 MW

VALCASTEL HOTEL: Location: France

Scope of work: Lighting, small power systems, panel schedule ,cable sizing calculation, earthing , lighting protection systems and BOQ

For hotel

power consumption 7 MW

Page 2: M.Ashraf

YANBU GRAIN SILOS: Location: K.S.A

Scope of work:

Grain Silo s Project in the Yanbu Commercial Port which is located on the East Coast of Red Sea. The project consists of two Reinforced

Concrete Grain Storage Silos with capacity each of 60,000 tons for wheat storage.

Lighting, small power systems, panel schedule ,cable sizing calculation, earthing , lighting protection systems and BOQ

power consumption 9 MW

Porto El Sokhna – Caribean Bay Zone : Location: El Sokhna - Egypt

Scope of work:

9 Buildings including 621 apartments

Lighting, small power systems, panel schedule ,cable sizing calculation, earthing , lighting protection systems and BOQ

power consumption 9 MW

Design Consultancy Services For ADNOC Petroleum Institute Infrastructure : Location: U.A.E

Scope of work:

infrastructure design “ medium voltage network design, low voltage network design and outdoor lighting design ”

this site will developed to 2030 for 4 stage in “ 2015, 2020 ,2025 ,2030 “

The sites areas range from 682,430m2

power consumption from 80 MW

CITY GATE: Location: New Cairo- Egypt

Scope of work:

infrastructure design “medium voltage network design, low voltage network design and outdoor lighting design”

The project's plot area is 8.49 million square meter

power consumption for first phase 30 MW

OBEGI chemicals Group plans to establish a new chemical plant for the production of two main product streams;

Poly Vinyl Acetate (PVA) and Styrene Acrylic (SA): Location: Wadi Elnatron - EGYPT,

Scope of work:

Lighting, small power systems, panel schedule ,cable sizing calculation, earthing , lighting protection systems and BOQ

The project's plot area is 38,000m2

The power consumption 4 MW

Beyti Plant Extension : Location: Egypt

Scope of work : The project comprises the design, construction management and supervision of four production buildings and filling area,

each includes ground floor, mezzanine and a roof with a foot print 10,750 m2; 3 buildings for raw material warehouse with foot print area

of 5,650 m2 including all electro-mechanical and infrastructure works.

Technical Internship:

University To Work (UTW) Internship- from Engineering Consultants Groups "ECG”.

o Duration : Nine Month [(started in Oct 2012) (end in Jun 2013)]

o Training Field :Modern Power System Distribution

o Note: I got the award for best member of the program.

Engineering Professional Development Internship – from Engineering Consultants Groups "ECG.

o Duration : One Month [(started in Sep 2012) (end in Oct 2012)]

o Training Field: Modern Automation System “P.L.C / SCADA / BMS”.

Internship in Engineering Consultants Groups "ECG" – Madinaty Project “site training “.

o Duration : Three Month [(started in July 2011) (end in Sep 2011)]

o Training Field: Supervision on construction works.

Internship in Egyptian contraction company – Moktar Ibrahim.

o Duration : One Month [(started in July 2010) (end in Aug 2010)]

o Training Field: construction works.

Page 3: M.Ashraf

Training course:

Revit MEP course -from Auto Desk in 2014.

Programing Logic Controller (P.L.C-S7-300) course -from Silesian Institute" Don Bosco" in 2013.

Programing Logic Controller (P.L.C-S7-200) course -from Silesian Institute" Don Bosco" in 2012.

Power System Protection course-from Jelecom Company in 2012.

Power System Distribution course -from Jelecom Company in 2012.

Automatic Control course-from Silesian Institute" Don Bosco" in 2011.

Micro Controller course –from Future Academy in 2011.

Auto CAD "2D" course –from Armed Forces Institute of Information System in 2011.

Electricity for Civil Installations course - from Silesian Institute" Don Bosco" in 2010.

Skills:

Language Skills:

o Native Language is Arabic.

o Second Language English is "Good".

Computer Skills:

Can be treat MS office is" very good".

Software Experience:

Revit "MEP " ETAP

Auto CAD "2D" Ecodial

DIALux Simaris

ReLux Doc win

MAT LAB

Extracurricular Activities:

Coordinator in Project (University To Work ) for train students from 2014 to now

Trainer and Member of the RESALA Charity Association

Member of the Federation students in Shrouk Academy, and Secretary of the Commission of Science Clubs in 2012-2013.

One of the founders of the El Maidan family in Shrouk Academy in 2012-2013.

One of the founders of Student Activity " LINK Team" in Shrouk Academy in 2010-2011

Membership:

A member of the syndicate of engineers

A member of the Federation of Arab Engineers