mary-cruz fouz ciemat-madrid muon week bologna apr03 madrid status report

9
Mary-Cruz Fouz CIEMAT-Madrid Muon Week Bologna Apr03 Madrid Status Report

Upload: melvin-norton

Post on 02-Jan-2016

214 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Mary-Cruz Fouz CIEMAT-Madrid Muon Week Bologna Apr03 Madrid Status Report

Mary-Cruz Fouz

CIEMAT-Madrid

Muon Week Bologna Apr03

Madrid Status Report

Page 2: Mary-Cruz Fouz CIEMAT-Madrid Muon Week Bologna Apr03 Madrid Status Report

COMPLETED

CERN CIEMATSLs

testedSLs

being tested

SLs mechanicall

y assembled

SLsbeing

assembled

#1 to

#24#25 #26 #27

#28#29#30

#31

Chamber construction StatusChamber construction StatusChamber construction StatusChamber construction Status

CHAMBER

Serial

Number

Page 3: Mary-Cruz Fouz CIEMAT-Madrid Muon Week Bologna Apr03 Madrid Status Report

Superlayers

Chambers

Production RateProduction RateProduction RateProduction Rate

Page 4: Mary-Cruz Fouz CIEMAT-Madrid Muon Week Bologna Apr03 Madrid Status Report

SL QC-TESTSSL QC-TESTSSL QC-TESTSSL QC-TESTS

Page 5: Mary-Cruz Fouz CIEMAT-Madrid Muon Week Bologna Apr03 Madrid Status Report

SL QC-TESTSSL QC-TESTSSL QC-TESTSSL QC-TESTS

Page 6: Mary-Cruz Fouz CIEMAT-Madrid Muon Week Bologna Apr03 Madrid Status Report

CHAMBER 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19

Positive or Negative ++++++++- - - - - - - - +++

To be recycled(consider

it as Spare)

X

RPC padsto be glued

X X X X X X X X X X

Big leaks XBad HV Boards (16 Ch)

X X X X X X ? ? ?HC gluing mistake X

MB2 Chambers at CERN (last CMS Week - Feb 2003)

Page 7: Mary-Cruz Fouz CIEMAT-Madrid Muon Week Bologna Apr03 Madrid Status Report

CHAMBER 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Positive or Negative ++++++++- - - - - - - - ++++++++

To be recycled(consider

it as Spare)

X

RPC padsto be glued

X

Big leaks XBad HV Boards (16 Ch)

X X X X X X ? ? ?HC gluing mistake X

MB2 Chambers at CERN(April 2003)

Page 8: Mary-Cruz Fouz CIEMAT-Madrid Muon Week Bologna Apr03 Madrid Status Report

MB2 MB2 ChamberChamberss at CERNat CERNMB2 MB2 ChamberChamberss at CERNat CERN

5 more MB2 Chambers (20–24) since 5th March Tested at CERN (HV) from 6th to 16th March and all found O.K , except one sparking strip (chamber 23). Strip and Wire disconnected, now all O.K A new mobile stand-alone chamber testing system setup at ISR:

HV: CAEN SY127 for test 1 SL. (Current Resolution:10nA)DAQ: One V767 TDC for test 1/2SL. TestPulse + Noise

It should be improved at the near future.

CIEMAT Tecnicians spent several days at ISR for gluing RPC pads

Replacement of HVB’s in chambers 7,8,9,11,12,13Depending on availability of boards and manpower

Chambers with pending HV problems at March 1st to be fixed 3,4,10,12,15 Chamber 10 repaired on March

Problems due to HVBoards.

3HVB(1 per SL) new ones (yellow type first batch) 3HVB(1 per SL) new ones (yellow type first batch)

Page 9: Mary-Cruz Fouz CIEMAT-Madrid Muon Week Bologna Apr03 Madrid Status Report

5 MB2 + & 2 MB4/10 YB+25 MB2 + & 2 MB4/10 YB+12 MB2 - YB-1

TOTAL 10 MB2+ (Serial numb. 17,18,19,20,21,22,23,24,25,26)4 MB4/10 To be made2 MB2- (Serial numb. 10,16)

Next Chambers to be produced at CIEMAT:Next Chambers to be produced at CIEMAT:(expected to arrive at CERN before the end of 2003)

MB2- : 27,28,29 (for YB0)MB4/10: 30,31,32,33,34,35 (Need HC panels)MB2+: 36,37,38,39

First shipment in 2004First shipment in 2004MB2- : 40,41,42,43,44 (to complete YB0 and YB-2)

MB2 MB2 ChamberChamberss needed for installation in 2003needed for installation in 2003