PROJECT POST-APPROVAL REQUIREMENTS(Revised P.U.D. Zoning Master And Final)

November 01, 2010 Telephone: 772-288-5501Fax: 772-288-5764

MJS ConstructionAttn: Marc Steinberger19775 Earlwood DriveJupiter, FL 33458

Project number: O022-007Project name: OLD CYPRESS PUD REV. MASTER/FINAL AND 1ST

AMENDApplication number: D062 201000135Deadline date: Dec 25, 2010

Dear Applicant:

Enclosed is the list of post-approval requirements for the above project. The post-approval documents list was included in Section U of the Staff Report. The items required for post-approval must be submitted as one (1) complete original packet accompanied by the required copies as additional packets. Please arrange the items in the packet in the same order as the list.

You have 60 days to submit the documents and fees. After all required documents, plans, and fees are received and approved, you will be sent a post-approval completion letter.

You may check the post-approval status on-line at http://kivanet.co.martin.fl.us. SelectView Applications and Permits; select Project Number; type the Project Number above and select Search. If you need assistance, please contact me.

Sincerely,

Joseph Banfi, Principal PlannerProject Coordinator

cc: Old Cypress Pointe, LLCFrank Skelly1044 US Highway One, Suite 201Jupiter, FL 33477

MARTIN COUNTYBOARD OF COUNTY COMMISSIONERS

2401 S.E. MONTEREY ROAD STUART, FL 34996

DOUG SMITHCommissioner, District 1

SUSAN L. VALLIERECommissioner, District 2

PATRICK HAYESCommissioner, District 3

SARAH HEARDCommissioner, District 4

EDWARD CIAMPICommissioner, District 5

TARYN KRYZDA Acting County Administrator

STEPHEN FRYCounty Attorney

TELEPHONE772-288-5434

WEB ADDRESShttp://www.martin.fl.us

Page 2: MARTIN COUNTY S.E. MONTEREY ROAD STUART, FL 34996 DOUG SMITH Commissioner, District 1 SUSAN L. VALLIERE Commissioner, District 2 PATRICK HAYES Commissioner, District 3 SARAH HEARD

gmd2011L68.docx

PROJECT POST-APPROVAL REQUIREMENTS LISTProject number: O022-007 Application: D062 201000135Project name: OLD CYPRESS PUD REV. MASTER/FINAL AND 1ST AMEND

Item # 1:Post Approval Requirements List: After approval the applicant will receive a letter and a Post Approval Requirements List that identifies the documents and fees required. The applicant will return the Post Approval Requirements List along with the required documents in a packet with the documents arranged in the order shown on the list.

Item # 2:Post Approval Fees: The applicant is required to pay all remaining fees when submitting the post approval packet. If an extension is granted, the fees must be paid within 60 days from the date of the development order. Checks should be made payable to Martin County Board of County Commissioners.

$2,873.00 (balance of the application review fee).

Item # 3:Recording Costs: The applicant is responsible for all recording costs. The Growth Management Department will calculate the recording costs and contact the applicant with the payment amount required. Checks should be made payable to the Martin County Clerk of Court.

Item # 4:One (1) copy of the recorded warranty deed if a property title transfer has occurred since the site plan approval. If there has not been a property title transfer since the approval, provide a letter stating that no title transfer has occurred.

Item # 5:Ten (10) 24" x 36" copies of the approved construction plans signed and sealed by the Engineer of Record licensed in the State of Florida. Fold to 8 by 12 inches.

Item # 6:Ten (10) copies 24" x 36" of the approved site plan.

Item # 7:Original approved site plan on Mylar or other plastic, stable material.

Item # 8:Ten (10) 24" x 36" copies of the approved landscape plan signed and sealed by a landscape architect licensed in the State of Florida. Please note that the previously approved landscape plans for Old Cypress as prepared by A.B. Cook, LA, were provided with the revised Final Site Plan. These plans were not signed and sealed concurrently with the new submittal.

Page 3: MARTIN COUNTY S.E. MONTEREY ROAD STUART, FL 34996 DOUG SMITH Commissioner, District 1 SUSAN L. VALLIERE Commissioner, District 2 PATRICK HAYES Commissioner, District 3 SARAH HEARD

gmd2011L68.docx

The Landscape Plans provided during post-approval must be signed and sealed by a Landscape Architect. It shall be noted that the upland preserve & wetland buffer restoration provided on the landscape plan has been superseded by the restoration plans and criteria as established in the revised PAMP for Old Cypress.

Item # 9:One (1) digital copy of site plan in AutoCad 2006 or 2007 drawing format (.dwg). The digital version of the site plan must match the hardcopy version as submitted.

Item # 10:Original and one (1) copy of the executed approved PUD zoning amendment.

Item # 11:The approved construction plans are reviewed by the Engineering Department during post approval.

Item # 12:Original of the construction schedule.

Item # 13:Two (2) originals of the Cost Estimate, on the County format which is available on the Martin County website, signed and sealed by the Engineer of Record licensed in the State of Florida.

Item # 14:Original of the Engineer's Design Certification, on the County format which is available on the Martin County website, signed and sealed by the Engineer of Record licensed in the State of Florida.

Item # 15:Pursuant to Section 4.843.G., LDR, Martin County Code, in lieu of constructing a sidewalk, the applicant shall pay the cost of construction within sixty (60) calendar days of the project approval. The cost shall be based on $25 per linear foot of frontage along SE Country Club Drive.