marsupial detailed design review
DESCRIPTION
MARSUPIAL Detailed Design Review. Carnegie Robotics LLC. #10 40th Street Pittsburgh, PA 15201. Jared Raby Nico Gallardo Chris Griffin Sean Greenslade Wesly Rice. Agenda. Introduction Systems Design Tracks/Suspension Wireless Node Payload Wireless Node Deployment Electrical Systems - PowerPoint PPT PresentationTRANSCRIPT
Use or disclosure of document data is subject to the restrictions on the title page Page 1© 2014 Carnegie Robotics LLC.
MARSUPIALDetailed Design Review
Carnegie Robotics LLC.#10 40th Street
Pittsburgh, PA 15201
Jared RabyNico Gallardo
Chris GriffinSean Greenslade
Wesly Rice
Use or disclosure of document data is subject to the restrictions on the title page Page 2© 2014 Carnegie Robotics LLC.
Agenda
• Introduction• Systems Design
® Tracks/Suspension® Wireless Node Payload® Wireless Node Deployment® Electrical Systems
• Risks• MSD II Schedule• Questions
Use or disclosure of document data is subject to the restrictions on the title page Page 3© 2014 Carnegie Robotics LLC.
Introduction
• MARSUPIAL Tracked Rover for CRL• Scope
® Suspended Track System® Wireless Node System ® Electrical Systems
• Deliverables® Suspended Track System® Mesh Network Payload
Use or disclosure of document data is subject to the restrictions on the title page Page 4© 2014 Carnegie Robotics LLC.
TRACKS AND SUSPENSIONWes
Use or disclosure of document data is subject to the restrictions on the title page Page 5© 2014 Carnegie Robotics LLC.
Tracked Suspension System• Suspension
® Rugged against impact shock® Various environmental areas® Climb obstacles® Self Contained
– IP Rated seals
• Drive-Train® Off the shelf motors® Meet speed and torque requirements
– Simple gearing® Integrated electronics
– Odometry
Use or disclosure of document data is subject to the restrictions on the title page Page 6© 2014 Carnegie Robotics LLC.
Tracked Suspension System• Suspension Design
® Improved Christie® Volute Idea
Use or disclosure of document data is subject to the restrictions on the title page Page 7© 2014 Carnegie Robotics LLC.
Tracked Suspension System
Use or disclosure of document data is subject to the restrictions on the title page Page 8© 2014 Carnegie Robotics LLC.
Tracked Suspension System
Use or disclosure of document data is subject to the restrictions on the title page Page 9© 2014 Carnegie Robotics LLC.
Tracked Suspension System• Drive-Train
® Required Speed– Min of 5mph on level
ground® Require Torque
– To move 150 lbs of robot and payload
® Off the Shelf Motor– Reduce overall price
® Realistic Gear Train– 8.0:1 – 12.0:1– Planetary
Use or disclosure of document data is subject to the restrictions on the title page Page 10© 2014 Carnegie Robotics LLC.
Tracked Suspension System• Upper Christie Arm
® Bronze Bearings® Retaining Rings® Ballend Spring Joints
Use or disclosure of document data is subject to the restrictions on the title page Page 11© 2014 Carnegie Robotics LLC.
Tracked Suspension System• Lower Christie Arm
® Bronze Bearings® Press Fit Axel® Ball Bearings for Tensioning Wheels® Ballend Spring Joints
Use or disclosure of document data is subject to the restrictions on the title page Page 12© 2014 Carnegie Robotics LLC.
Tracked Suspension System• Dedicated Tensioner
® Bronze Bearings® Press Fit Axel® Ball Bearings for Tensioning Wheels® Clock Spring For Preload
Use or disclosure of document data is subject to the restrictions on the title page Page 13© 2014 Carnegie Robotics LLC.
Tracked Suspension System• Undriven Wheel Top Assy
® Ball Bearings– Preload
® Grease Seal® O-Rings® Stock Pulley® Magnetic Encoder
– Odometry
Use or disclosure of document data is subject to the restrictions on the title page Page 14© 2014 Carnegie Robotics LLC.
Tracked Suspension System• Motor Assembly
® Sealed® Planetary Gearbox® Parking Brake
Use or disclosure of document data is subject to the restrictions on the title page Page 15© 2014 Carnegie Robotics LLC.
Tracked Suspension System• Tracks
® Proper materials– Coef of friction– Material stretch
® Outdoor resistant– Chemical and physical ruggedness
® Ease to install and remove
Use or disclosure of document data is subject to the restrictions on the title page Page 16© 2014 Carnegie Robotics LLC.
Tracked Suspension System BOM
Index Component Indv Price EstQty System Price Est1 TENSIONER BASE 150.00$ 4 UPPER TENSIONING ASSY 600.00$ 2 TENSIONER ARM 50.00$ 4 UPPER TENSIONING ASSY 200.00$ 3 UPPER TENSION SHAFT 30.00$ 4 UPPER TENSIONING ASSY 120.00$ 4 UPPER TENSIONING WHEEL 75.00$ 4 UPPER TENSIONING ASSY 300.00$ 5 BEARING, ZFM_1214 10.00$ 8 UPPER TENSIONING ASSY 80.00$ 6 WASHER, FLAT, M12 0.50$ 8 UPPER TENSIONING ASSY 4.00$ 7 WASHER,FLAT,M10 0.50$ 4 UPPER TENSIONING ASSY 2.00$ 8 WASHER,BELVILE 10MM 2.00$ 4 UPPER TENSIONING ASSY 8.00$ 9 WASHER,BELVILE 18.5MM 2.00$ 4 UPPER TENSIONING ASSY 8.00$
10 RETAINING RING,SMALLEY,VSM-14 2.00$ 4 UPPER TENSIONING ASSY 8.00$ 11 RETAINING RING,SMALLEY,VSM-12 2.00$ 8 UPPER TENSIONING ASSY 16.00$ 12 RETAINING RING,SMALLEY,VSM-6 2.00$ 4 UPPER TENSIONING ASSY 8.00$ 13 RETAINING RING,SMALLEY,VSM-10 2.00$ 4 UPPER TENSIONING ASSY 8.00$ 14 CLOCK TORSION SPRING 30.00$ 4 UPPER TENSIONING ASSY 120.00$ 15 M5-0.8X16MM 0.50$ 4 UPPER TENSIONING ASSY 2.00$ 16 BALLBEARING,SEALED,10MMID 8.00$ 8 UPPER TENSIONING ASSY 64.00$ 17 CHRISTIE ARM LOWER 75.00$ 4 LOWER ARM ASSY 300.00$ 18 BALLBEARING SEALED, 8MMID 10.00$ 8 LOWER ARM ASSY 80.00$ 19 BALLJOING ROD END 5.00$ 4 LOWER ARM ASSY 20.00$ 20 NUT NYLOC M5-0.8 0.50$ 4 LOWER ARM ASSY 2.00$ 21 LOWER CHRISTIE AXEL 20.00$ 4 LOWER ARM ASSY 80.00$ 22 M5-0.8X25MM 0.50$ 4 LOWER ARM ASSY 2.00$ 23 TENION WHEEL SHAFT 20.00$ 8 TENSIONWHEEL ASSY 160.00$ 24 TENSIONING WHEEL 65.00$ 16 TENSIONWHEEL ASSY 1,040.00$
Preliminary Mechanical BOM
Use or disclosure of document data is subject to the restrictions on the title page Page 17© 2014 Carnegie Robotics LLC.
Tracked Suspension System BOM 225 RETAINING RING SMALLEY VSM-8 3.00$ 16 TENSIONWHEEL ASSY 48.00$ 26 WASHER, FLAT, M8 0.50$ 16 TENSIONWHEEL ASSY 8.00$ 27 WASHER, BELVILLE M8 2.00$ 8 TENSIONWHEEL ASSY 16.00$ 28 CHRISTIE ARM, UPPER 150.00$ 2 CHRISTIE ARM,UPPER ASSY 300.00$ 29 BALLBEARING SEALED, 8MMID 10.00$ 4 CHRISTIE ARM,UPPER ASSY 40.00$ 30 BALLJOING ROD END 5.00$ 4 CHRISTIE ARM,UPPER ASSY 20.00$ 31 BEARING,ZFM_1214 10.00$ 2 CHRISTIE ARM,UPPER ASSY 20.00$ 32 BEARING,ZFM_2023 10.00$ 4 CHRISTIE ARM,UPPER ASSY 40.00$ 33 AIR SPRING, TGF-8-20-150 40.00$ 2 CHRISTIE ARM,UPPER ASSY 80.00$ 34 M5-0.8X35MM 0.50$ 4 CHRISTIE ARM,UPPER ASSY 2.00$ 35 NUT NYLOC M5-0.8 0.50$ 4 CHRISTIE ARM,UPPER ASSY 2.00$ 36 UPPER ARM TO CHASSIS MOUNT 150.00$ 4 SUSPENSION MOUNT TO CHASSIS 600.00$ 37 RETAINING RING SMALLEY FS020 10.00$ 4 SUSPENSION MOUNT TO CHASSIS 40.00$ 38 FLAT WASHER, M20 0.50$ 8 SUSPENSION MOUNT TO CHASSIS 4.00$ 39 WASHER,BELVILLE M20 2.00$ 4 SUSPENSION MOUNT TO CHASSIS 8.00$ 40 CHRISTIE ARM UPPER REVERSE 150.00$ 2 CHRISTIE ARM,UPPER REVERSE ASSY 300.00$ 41 BALLBEARING SEALED, 8MMID 10.00$ 4 CHRISTIE ARM,UPPER REVERSE ASSY 40.00$ 42 BALLJOING ROD END 5.00$ 4 CHRISTIE ARM,UPPER REVERSE ASSY 20.00$ 43 BEARING,ZFM_1214 10.00$ 2 CHRISTIE ARM,UPPER REVERSE ASSY 20.00$ 44 BEARING,ZFM_2023 10.00$ 4 CHRISTIE ARM,UPPER REVERSE ASSY 40.00$ 45 AIR SPRING, TGF-8-20-150 40.00$ 2 CHRISTIE ARM,UPPER REVERSE ASSY 80.00$ 46 AIR SPRING, TGF-8-20-500 40.00$ 2 CHRISTIE ARM,UPPER REVERSE ASSY 80.00$ 47 M5-0.8X35MM 0.50$ 4 CHRISTIE ARM,UPPER REVERSE ASSY 2.00$
Use or disclosure of document data is subject to the restrictions on the title page Page 18© 2014 Carnegie Robotics LLC.
Tracked Suspension System BOM 348 NUT NYLOC M5-0.8 0.50$ 4 CHRISTIE ARM,UPPER REVERSE ASSY 2.00$ 49 FRONT UNDRIVEN BASE 95.00$ 2 UNDRIVEN WHEEL TOP ASSY 190.00$ 50 BALLBEARING,SEALED,35MMID 10.00$ 4 UNDRIVEN WHEEL TOP ASSY 40.00$ 51 ENCODER SHAFT HOLDER 75.00$ 2 UNDRIVEN WHEEL TOP ASSY 150.00$ 52 USGIDITAL MAE3-X-197-220-7-X 35.00$ 2 UNDRIVEN WHEEL TOP ASSY 70.00$ 53 UNDRIVEN WHEEL BEARING CAP 95.00$ 2 UNDRIVEN WHEEL TOP ASSY 190.00$ 54 GREASE SEAL, 40MMID 20.00$ 2 UNDRIVEN WHEEL TOP ASSY 40.00$ 55 FRONT UNDRIVEN, AL 70 TK20K13-20250.00$ 2 UNDRIVEN WHEEL TOP ASSY 500.00$ 56 WASHER BELVILLE 35.5MMID 5.00$ 2 UNDRIVEN WHEEL TOP ASSY 10.00$ 57 M4-0.7X12MM 0.50$ 8 UNDRIVEN WHEEL TOP ASSY 4.00$ 58 M5-0.8X12MM 0.50$ 10 UNDRIVEN WHEEL TOP ASSY 5.00$ 59 BEARING CAP, LOWER, LEFT 50.00$ 2 CHRISTIE UPPER BEARING ASSY 100.00$ 60 BEARING,ZFM_1214 10.00$ 2 CHRISTIE UPPER BEARING ASSY 20.00$ 61 BEARING CAP, LOWER, RIGHT 50.00$ 2 CHRISTIE UPPER BEARING REVERSE ASSY 100.00$ 62 BEARING,ZFM_1214 10.00$ 2 CHRISTIE UPPER BEARING REVERSE ASSY 20.00$ 63 CHASIS LEFT SIDE 750.00$ 1 LEFTSIDE SUSPENSION_TOP ASSY 750.00$ 64 M5 THREADED INSERTS 1.00$ 36 LEFTSIDE SUSPENSION_TOP ASSY 36.00$ 65 M5-0.7X12MM 0.50$ 12 LEFTSIDE SUSPENSION_TOP ASSY 6.00$ 66 M5-0.7X14MM 0.50$ 42 LEFTSIDE SUSPENSION_TOP ASSY 21.00$ 67 CHASIS RIGHT SIDE 750.00$ 1 RIGHTSIDE SUSPENSION_TOP ASSY 750.00$ 68 M5 THREADED INSERTS 1.00$ 36 RIGHTSIDE SUSPENSION_TOP ASSY 36.00$ 69 M5-0.7X12MM 0.50$ 12 RIGHTSIDE SUSPENSION_TOP ASSY 6.00$ 70 M5-0.7X14MM 0.50$ 42 RIGHTSIDE SUSPENSION_TOP ASSY 21.00$ 71 MAXON EC60 FLAT 280.00$ 2 MOTOR TOP ASSY 560.00$ 72 SEPAC BRAKE SEB-175 150.00$ 2 MOTOR TOP ASSY 300.00$ 73 MOTOR,BRAKE,MOUNTING FLANGE 150.00$ 2 MOTOR TOP ASSY 300.00$ 74 MOTOR CHASSIS CASE 100.00$ 2 MOTOR TOP ASSY 200.00$ 75 REAR DRIVE WHEEL 250.00$ 2 MOTOR TOP ASSY 500.00$ 76 M4-0.7X10MM 0.50$ 22 MOTOR TOP ASSY 11.00$
Est Total 9,980.00$
Use or disclosure of document data is subject to the restrictions on the title page Page 19© 2014 Carnegie Robotics LLC.
WIRELESS NODE PAYLOADSean
Use or disclosure of document data is subject to the restrictions on the title page Page 20© 2014 Carnegie Robotics LLC.
Wireless Node Payload
• Droppable Node® OLinuXino – 575 MHz ARM Core
– Running Arch Linux with B.A.T.M.A.N. wireless mesh protocol– USB Wi/Fi adapter– Buck converter– Li-on battery providing upwards of 6 hours of runtime
• Current Prototype® 3D printed shell® Off-the-shelf antenna
Use or disclosure of document data is subject to the restrictions on the title page Page 21© 2014 Carnegie Robotics LLC.
Wireless Node Payload Block Diagram
Use or disclosure of document data is subject to the restrictions on the title page Page 22© 2014 Carnegie Robotics LLC.
Wireless Mesh Node BOM
Component Cost Distributor Manufacturer Manufacturer Part Number Qty. SystemPrice Est.
5 Volt Buck Converter $6.71Mouser RECOM Power R-785.0-0.5 8Puck $53.68Single Board Computer $32.95Mouser Olimex Ltd. IMX233-OLINUXINO-NANO 8Puck $263.60
WLAN USB Adapter $14.33Amazon LLC TP-Link TP-LINK TL-WN722N 8Puck $114.64
Li-Ion Battery $3.39Battery Space Battery Space PL-402248-2C 24Puck $81.36
Battery Protection Board $5.87Battery Space Battery Space PCB-LiS3A4 8Puck $46.96
Total $560.24
Use or disclosure of document data is subject to the restrictions on the title page Page 23© 2014 Carnegie Robotics LLC.
WIRELESS NODE DEPLOYMENT
Jared
Use or disclosure of document data is subject to the restrictions on the title page Page 24© 2014 Carnegie Robotics LLC.
Wireless Node Deployment System
• Needs to readily deploy the node while keeping in place during high impact moments
® High holding strength® Ability to drop the puck easily
• Deployment system should be isolated from the outside to comply with IP standards
® Dust / water prevention® Short circuit protection
• Magnetic holding system developed ® Magnetic slide in the track
Use or disclosure of document data is subject to the restrictions on the title page Page 25© 2014 Carnegie Robotics LLC.
Wireless Node Deployment System CAD
Use or disclosure of document data is subject to the restrictions on the title page Page 26© 2014 Carnegie Robotics LLC.
Wireless Node Deployment System Wiring Diagram
Use or disclosure of document data is subject to the restrictions on the title page Page 27© 2014 Carnegie Robotics LLC.
Wireless Node Deployment System PCB
Use or disclosure of document data is subject to the restrictions on the title page Page 28© 2014 Carnegie Robotics LLC.
Wireless Node Deployment System BOM
Index Component Cost Distributor ManufacturerManufacturer Part Number Qty.
Price Est.
1 ALEL 1uF 50V $0.23Mouser Nichicon UVR1H010MDD1TD 3 $0.69
2 MLCC 0.1uF 50V X7R $0.10Mouser Kemet C0603C104K5RACTU 1 $0.10
3ISP Connection Headers $0.54Mouser Molex 10-89-7061 1 $0.54
4 Servo Connections $0.19Mouser Molex 87891-0306 10 $1.88
5 Payload Microcontoller $1.30Mouser Atmel ATTINY2313A-SUR 1 $1.30
6TTL to RS232 Converter $3.84Mouser
Maxim Integrated MAX232ACSE+ 1 $3.84
7 12 MHz Crystal $0.49Mouser Vishay XT9SNLANA12M 1 $0.49
8 22 pF capacitor $0.20Digikey Yageo CC0402JRNPO9BN220 2 $0.40
Total $9.24
Use or disclosure of document data is subject to the restrictions on the title page Page 29© 2014 Carnegie Robotics LLC.
POWER MANAGEMENT AND DISTRIBUTION
Nico and Chris
Use or disclosure of document data is subject to the restrictions on the title page Page 30© 2014 Carnegie Robotics LLC.
Electrical Diagram
Use or disclosure of document data is subject to the restrictions on the title page Page 31© 2014 Carnegie Robotics LLC.
Electrical Diagram – Batteries
Use or disclosure of document data is subject to the restrictions on the title page Page 32© 2014 Carnegie Robotics LLC.
Electrical Diagram – Power Train
Use or disclosure of document data is subject to the restrictions on the title page Page 33© 2014 Carnegie Robotics LLC.
Electrical Diagram – Peripherals
Use or disclosure of document data is subject to the restrictions on the title page Page 34© 2014 Carnegie Robotics LLC.
Power Budget
DeviceRail Voltage
Power (W)
Efficiency (converters, drivers, etc)
Motor #1 24 100Motor #2 24 100Motor Controller #1 24 15 0.85Motor Controller #2 24 15 0.85Main Computer 5 10Power Management uC 5 5.00E-02Payload (Pucks) 24 1.68Payload (Dispenser) 5 10Lighting 24 40Camera 5 1.2Ethernet Switch 5 5Level Shifter 5 1.44E-Stop Comm Reciever 24 10IMU 5 1WLAN Radio 5 55V DC-DC 24 5.11725 0.853.3V DC-DC 5 0.425 0.66
Rail Power Current
24V286.7972
511.94988
5425V 34.115 6.8233.3V 0.825 0.25
Use or disclosure of document data is subject to the restrictions on the title page Page 35© 2014 Carnegie Robotics LLC.
Electrical Systems
Use or disclosure of document data is subject to the restrictions on the title page Page 36© 2014 Carnegie Robotics LLC.
RISKS
Use or disclosure of document data is subject to the restrictions on the title page Page 37© 2014 Carnegie Robotics LLC.
System Risks
Risk Severity Occurance Probability Mitigation Owner
1 Staffing/engineering ability 4 1Consultation with advisor/customerScale back of scope Nico
2 Budget 5 1Consultation with advisor/customerScale back of scope Wes
3 Machine setbacks 3 1 Plenty of lead time Wes
4 Shipping setbacks 3 1 Plenty of lead time Nico
5 Part setbacks 3 1 Plenty of lead time Jared
6 Incorrect Engineering Analysis 2 3 Thourough verification of analysis Per subsystem
7 Ordering errors 3 3 Thourough verification of BOM Nico
8 Catostrophic prototype failure 5 1Proof of conceptsSmall scale tests befor large scale tests Chris
9 Time constraints 2 4Consultation with advisor/customerScale back of scope Jared
10 Hardware failure 3 4Thorough design verificationSpare components Chris
11 Mechanical failure 3 4Thorough design verificationSpare components Wes
12 Software failure 3 4Thorough design verificationSpare components Sean
13 Environmental factors 1 5 Review weather conditions Jared
14 Technological limits 3 1 Review current technologies Sean
Use or disclosure of document data is subject to the restrictions on the title page Page 38© 2014 Carnegie Robotics LLC.
Mechanical Risks
Risk Severity Occurance Probability Mitigation Owner
1
Unstable control of the robot while it'sit's hanging from straps connected to mini-
crane 5 0Consultation with advisor/customerScale back of scope Wes
2 Module being dropped 5 2Reinforced chassis and shock absortion Wes
4Lose control of vehicle while it's descending
from the ramp 5 1
Manual brakes/emergency brakesLimited/no power to the motors ->-> "coasting function" or clutch Wes
4 Limited slip to turn 5 3Make sure motors are powerfulenough to cause slipping Wes
Use or disclosure of document data is subject to the restrictions on the title page Page 39© 2014 Carnegie Robotics LLC.
Electrical Risks
Risk Severity Occurance Probability Mitigation Owner
1
Visual inspection of robot isnot adequate in identifying
all malfunctions 5 2Perform electrical self tests to identify other malfunctions Nico
2 Battery short circuits 5 1 Fuse to break circuit Chris
3 Emergency stop malfunction 5 1 It doesn't. Chris
4 Electrical noise in the system 4 1 Proper signal conditioning and isolation Nico
5 Packet loss 5 5 Apply failsafe Sean
6 Lighting malfunction 2 1 Infrared / additional backup Jared
7 Fauly IMU readings 4 1 redundant IMU Jared
Use or disclosure of document data is subject to the restrictions on the title page Page 40© 2014 Carnegie Robotics LLC.
Software Risks
Risk Severity Occurance Probability Mitigation Owner1 Packet loss 5 5 Apply software failsafe Sean / Jared
2Wheel slippage causesbad odometry readings 3 4
Use GPS / Inertial sensors to correct odometry readings Jared
3Poor / Unavailable GPS
connectivity 3 3Fall back on inertial sensors / odometry alone Jared / Sean
4 Fauly IMU readings 4 1 redundant IMU Jared
5 Unstable control loop 5 1 Vigorous control loop testing Nico
Use or disclosure of document data is subject to the restrictions on the title page Page 41© 2014 Carnegie Robotics LLC.
Safety Risks
Risk Severity Occurance Probability Mitigation Owner
1 Weight consideration when lifting the robot 5 1 >1 person is used to lift the robot Chris
2
Unstable control of the robot while it'sit's hanging from straps connected to mini-
crane 5 1
There needs to be 3 hook pointsin order to saftely move the robotusing a crane Wes
3 Safety to personnel 5 3 Needs to meet military safetystandard MIL 883E Chris
4Lose control of vehicle while it's descending
from the ramp 4 1
Manual brakes/emergency brakesLimited/no power to the motors ->-> "coasting function" or clutch Wes
Use or disclosure of document data is subject to the restrictions on the title page Page 42© 2014 Carnegie Robotics LLC.
Schedule
Use or disclosure of document data is subject to the restrictions on the title page Page 43© 2014 Carnegie Robotics LLC.
To be accomplished
• EMF interference mitigation• Further node deployment development
® Prototyping• Schematic and PCB design• Full BOMs• Detailed Design Review Slideshow• Final Detailed Design Review Slideshow• Continued EDGE Updates
Use or disclosure of document data is subject to the restrictions on the title page Page 44© 2014 Carnegie Robotics LLC.
Questions