MARKET RATES SYSTEM (MRS) 1 st BI-ANNUAL-2018 (1 ST January TO 30 th June) GOVERNMENT OF THE PUNJAB FINANCE DEPARTMENT Prepared & Compiled by Haroon Tahir [email protected]

Upload: doannhu

Post on 07-Apr-2018

230 views

Category:

Documents


1 download

TRANSCRIPT

MARKET RATES SYSTEM (MRS)

1st BI-ANNUAL-2018

(1ST January TO 30th June)

GOVERNMENT OF THE PUNJAB

FINANCE DEPARTMENT

Prepared & Compiled by Haroon Tahir

[email protected]

TABLE OF CONTENTS S.No. Chapter Page Nos

01. Carriage 3 to 23 02. Loading, Unloading & Stacking 24 to 26 03. Earthwork (Excavation & Embankment) 27 to 33 04. Dismantling (Demolition) 34 to 38 05. Mortar. 39 to 40 06. Concrete 41 to 50 07. Brickwork 51 to 56 08. Stone Masonry 57 to 59 09. Roofing 60 to 65 10. Flooring. 66 to 70 11. Surface Rendering 71 to 74 12. Wood Work 75 to 84 13. Painting & Varnishing. 85 to 90 14. Lining of Canals 91 to 92 15. Sheet Piling 93 to 94 16. Protection & Diversion Work 95 to 104 17. Outlets 105 to 106 18. Road & Road Structure 107 to 111 19. Plumbing, Sanitary Installation & Gas Fittings 112 to 117 20. Surface Drainage. 118 to 119 21. Sewerage 120 to 124 22. Sinking of Wells 125 to 127 23. Tubewell & Water Supply 128 to 140 24. Electric Installation 141 to 153 25. Iron Work 154 to 160 26. Miscellaneous 161 to 164

Chap-1 (Carriage) Page 3

1. CARRIAGENote: 1 The rates are applicable to carriage of material on pacca roads only.

For kacha roads an allowance of 25% extra shall be allowed for 2nd and subsequent mileage (Km) rates. Rateupto 1st mile (1st Km) is however common to both kacha and pacca roads.

Note: 2 For hilly areas 80% above the rates in the plain areas shall be allowed for total mileage (Km) covered.

Note: 3 In case of articles longer than 15 ft. (4.6 m) carried in trucks, the following rates shall be allowed:-

i) Above 15 ft. to 25 ft. (4.6 to 7.6 m) :- Total rates to be paid for 15 ft. to 25 ft. (4.6 to 7.6 m) length will be 1.5 times of the rate given in the Composite Schedule of Rates.

ii) Above 25 ft. (7.6 m) :- The total rate to be paid for above 25 ft. (7.6 m) length will be 2 times of the rate given in the Composite Schedule of Rates.

The length measured shall not be the actual length, but the length of the form of consignment as actuallyreceived.

Note: 4 The term 'mile' (Km) whenever used is to mean statute mile (Km).

Note: 5 The rates include loading and unloading of material from the conveyance and stacking as directed.

Note: 6 The rates for carriage by boat or steamer shall be the same as by any other mechanical means on land.

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. Unit of Unit of No.

M/ment Labour Composite M/ment Labour Composite1 Carriage of 100 Cft. (2.83 cu.m) of all materials like stone 16.1

aggregate, spawl, kankar lime (unslaked), surkhi, etc. or150 Cft. (4.25 cu.m) of timber, by truck or by any othermeans owned by the contractor.

1st chain (1st 30 m) Chain 189.15 30M 189.152nd chain (2nd 30 m) " 34.80 30M 34.803rd to 10th chain (60 to 300 m) " 21.65 30M 21.651000 to 3000 ft. (300 to 900 m) 1000 ft. 212.70 300 M 212.70 1st Km Km 190.752nd Km Km 88.203rd Km Km 65.654th Km Km 44.305th Km Km 40.756th Km Km 39.957th Km Km 36.708th Km Km 36.259th Km Km 33.6010th Km Km 30.9011th Kms to 200Kms Km 23.05201 Kms to 250 Kms Km 3.25251 Kms & susequent Kms Km 2.00

2 Carriage of 5 tons of all material like coal, stone lime 16.1 Cement carried in containers other

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

Add 20% extra for the item"Recouping of Reserve Stock of stonefor Flood Protection Work inIrrigation Department".

Chap-1 (Carriage) Page 4

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. Unit of Unit of No.

M/ment Labour Composite M/ment Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

(unslaked), etc. B.G. Rail fastenings, points and crossing, than bags will be paid according toBridge Girders, pipes, sheets, Rail, M.S. bars, etc. etc. this item. The word "pipes" coversby truck or any other means owned by the contractor. G.I,C.I,R.C.C. and P.C.C.

1st chain (1st 30 m) Chain 189.15 30M 189.152nd chain (2nd 30 m) " 34.80 30M 34.803rd to 10th chain (60 to 300 m) " 21.65 30M 21.651000 to 3000 ft. (300 to 900 m) 1000 Ft. 212.70 300M 212.701st Km Km 190.752nd Km Km 88.203rd Km Km 65.654th Km Km 44.301st mile Mile 306.955th Km Km 40.752nd mile " 70.806th Km Km 39.953rd mile Mile 63.657th Km Km 36.704th mile " 57.458th Km Km 36.255th mile 52.609th Km Km 33.606th mile 48.5010th Km Km 30.901 " 30.1011th Kms to 200Kms Km 23.05201 Kms to 250 Kms Km 3.25251 Kms & susequent Kms Km 2.00

3 Carriage of 100 maunds of fuel wood by truck 16.1or any other means owned by the contractor:

1st chain (1st 30 m) Chain 189.15 30 M 189.152nd chain (2nd 30 m) " 34.80 30 M 34.803rd to 10th chain (60 to 300 m) " 21.65 30 M 21.651000 to 3000 ft. (300 to 900 m) 1000 ft 212.70 300 M 212.701st Km Km 190.752nd Km Km 88.203rd Km Km 65.654th Km Km 44.301st mile Mile 306.955th Km Km 40.752nd mile " 70.806th Km Km 39.953rd mile " 63.657th Km Km 36.704th mile " 57.458th Km Km 36.255th mile " 52.609th Km Km 33.606th mile " 48.5010th Km Km 30.90

Chap-1 (Carriage) Page 5

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. Unit of Unit of No.

M/ment Labour Composite M/ment Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

7th mile and subsequent miles " 30.1011th & subsequent Kms Km 23.05

4 Carriage of 1000 Nos. bricks 10"x5"x3" (250x125x75 mm) ditto Reduce the rate by 33% in case ofor 1000 Nos. tiles 12"x6"x2" (300x150x50 mm) by truck or carriage of 1000 Nos. tiles sizeany other means owned by the contractor :- 12"x6"x1¼" (300 x 150 x 30 mm).

1st chain (1st 30 m) Chain 189.15 30 M 189.152nd chain (2nd 30 m) " 34.80 30 M 34.803rd to 10th chain (60 to 300 m) " 21.65 30 M 21.651000 to 3000 ft. (300 to 900 m) 1000 Ft 212.70 300 M 212.701st Km Km 190.752nd Km Km 88.203rd Km Km 65.654th Km Km 44.301st mile Mile 306.955th Km Km 40.752nd mile " 70.806th Km Km 39.953rd mile " 63.657th Km Km 36.704th mile " 57.458th Km Km 36.255th mile " 52.609th Km Km 33.606th mile " 48.5010th Km Km 30.907th mile and subsequent miles " 30.1011th & subsequent Kms Km 23.05

5 Carriage of 100 cft. (2.83 cu.m) of all material like stone, 16.1 Material trolly to be supplied by theaggregate, spawl, kankar lime(unslaked), surkhi, etc. or Government and maintained and run150 cft. (4.25 cu.m) of timber, by means of material trolly. by the contractor.

1st chain (1st 30 m) Chain 189.15 30 M 189.152nd chain to 10th chain (2nd 30 m to 300 m) " 34.80 30 M 34.801000 to 3000 ft. (300 to 900 m) 1000 Ft. 212.70 300 M 212.701st Km Km 156.452nd Km Km 116.853rd Km Km 59.704th Km Km 45.601st mile Mile 251.755th Km Km 39.752nd mile 84.956th Km Km 38.103rd mile 71.907th Km Km 31.85 8th Km Km 31.40 9th Km Km 29.156th mile 48.5010th Km Km 26.807th mile and subsequent miles 30.1011th Kms to 200Kms Km 21.65201 Kms to 250 Kms Km 3.25251 Kms & susequent Kms Km 2.00

6 Carriage of 5 tons of all material like coal, stone lime 16.1 Material trolly to be supplied by the

Chap-1 (Carriage) Page 6

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. Unit of Unit of No.

M/ment Labour Composite M/ment Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

(unslaked), etc. B.G. Rail fastening, points and crossing, Government and maintained and runBridge girders, pipes, sheets, Rail, M.S. bars, etc. etc. by by the contractor.means of material trolly.

1st chain (1st 30 m) Chain 189.15 30 M 189.152nd chain (2nd 30 m) " 34.80 30 M 34.801000 to 3000 ft. (300 to 900 m) 0/00 Ft. 212.70 300 M 212.701st Km Km 156.452nd Km Km 116.853rd Km Km 59.704th Km Km 45.60 5th Km Km 39.75 6th Km Km 38.103rd mile and subsequent miles 71.97th Km Km 31.854th mile 57.458th Km Km 31.40 9th Km Km 29.15 10th Km Km 26.80 q 11th Kms to 200Kms Km 21.65201 Kms to 250 Kms Km 3.25251 Kms & susequent Kms Km 2.00

7 Carriage of 100 maunds of fuel wood, by means of ditto Material trolly to be suppliedmaterial trolly. by the Government and

1st chain (1st 30 m) Chain 189.15 30 M 189.15 maintained and run by the2nd chain (2nd 30 m) " 34.8 30 M 34.80 contractor.1000 to 3000 ft. (300 to 900 m) 1000 Ft 212.70 300 M 212.701st Km Km 156.452nd Km Km 116.853rd Km Km 59.704th Km Km 45.601st mile Mile 251.755th Km Km 39.752nd mile " 84.956th Km Km 38.103rd mile subsequent miles " 71.907th Km Km 31.854th mile 57.458th Km Km 31.405th mile 52.609th Km Km 29.156th mile 48.5010th Km Km 26.807th mile and subsequent miles 30.1011th & subsequent Kms Km 21.65

8 Carriage of 1000 Nos. tiles 12"x6"x2" (300x150x50 mm), ditto Material trolly to be supplied by theby means of material trolly. Government and maintained and run

1st chain (1st 30 m) Chain 189.15 30 M 189.15 by the contractor.2nd chain (2nd 30 m) " 34.80 30 M 34.801000 to 3000 ft. (300 to 900 m) 0/00 Ft. 212.70 300 M 212.701st Km Km 156.452nd Km Km 116.85 16.1

Chap-1 (Carriage) Page 7

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. Unit of Unit of No.

M/ment Labour Composite M/ment Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

3rd Km Km 59.704th Km Km 45.601st mile Mile 251.755th Km Km 39.752nd mile " 84.956th Km Km 38.103rd mile subsequent miles " 71.907th Km Km 31.854th mile 57.458th. Km 31.405th mile 52.609th Km Km 29.156th mile 48.5010th Km Km 26.807th mile and subsequent miles 30.1011th & subsequent Kms Km 21.65

9 Carriage of 1000 No. bricks, 9"x4½"x3" ditto(225x113x75 mm) or 8"x4"x4" (200x100x100mm) (nominal)

1st chain (1st 30 m) Chain 154.98 30 M 154.982nd chain (2nd 30 m) " 33.35 30 M 33.353rd to 10th chain (60 to 300 m) " 17.77 30 M 17.771000 to 3000 ft. (300 to 900 m) 0/00 Ft. 174.14 300 M 174.141st Km Km 156.402nd Km Km 72.153rd Km Km 53.804th Km Km 36.551st mile Mile 251.655th Km Km 34.402nd mile " 58.006th Km Km 33.553rd mile " 53.857th Km Km 30.104th mile " 47.108th Km Km 29.705th mile " 43.109th Km Km 27.506th mile " 39.7010th Km Km 25.307th mile and subsequent miles " 24.7011th & subsequent Kms Km 18.75

10 Carriage of 1000 No. tiles 9"x4½"x1½" 16.1(225x113x38 mm).

1st chain (1st 30 m) Chain 93.53 30 M 93.532nd chain (2nd 30 m) " 17.19 30 M 17.19 16.13rd to 10th chain (60 to 300 m) " 10.62 30 M 10.621000 to 3000 ft. (300 to 900 m) 0/00 Ft. 105.20 300 M 105.201st Km Km 94.402nd Km Km 43.65

Chap-1 (Carriage) Page 8

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. Unit of Unit of No.

M/ment Labour Composite M/ment Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

3rd Km Km 32.504th Km Km 21.901st mile Mile 151.905th Km Km 20.002nd mile " 35.056th Km Km 19.653rd mile " 31.257th Km Km 18.154th mile " 28.458th Km Km 17.955th mile " 26.009th Km Km 16.606th mile " 24.0010th Km Km 15.307th mile and subsequent miles " 14.8511th & subsequent Kms Km 11.35

11 Carriage of 1 Cwt. (50 Kg) cement in bags. ditto

1st chain (1st 30 m) Chain 3.57 30 M 3.572nd chain (2nd 30 m) " 0.43 30 M 0.433rd to 10th chain (60 to 300 m) " 0.20 30 M 0.20

1000 to 3000 ft. (300 to 900 m) 0/00 Ft. 2.10 300 M 2.10

1st Km Km 2.351st mile Mile 3.802nd Km Km 1.602nd mile " 1.103rd Km Km 0.653rd mile subsequent miles " 0.554th Km and subsequent kilometers. Km 0.40

12 Carriage of 100 Nos. empty cement bags including 16.1bundling.

1st 1000 (300 m) ft. 0/00 Ft. 52.18 300 M 52.181000 to 3000 (300 to 900 m) ft. " 6.50 300 M 6.50

1st Km Km 5.751st mile Mile 9.252nd Km Km 5.202nd mile to 6th mile Mile 1.953rd Km Km 2.407th mile and subsequent miles " 3.654th Km & subsequent Kms Km 2.00

13 Carriage of 100 (2.83 cu.m) cft. of Sarkanda or pilchi, frash ditto Previous lead of collection notor brushwood, by boat or road :- to be deducted from the next

lead of carriage.

1st chain (1st 30 m) Chain 77.38 30 M 77.382nd chain (2nd 30 m) " 34.80 30 M 34.80

Chap-1 (Carriage) Page 9

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. Unit of Unit of No.

M/ment Labour Composite M/ment Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

3rd to 10th chain (60 to 300 m) " 10.62 30 M 10.62

1000 to 3000 ft. (300 to 900 m) 0/00 Ft. 87.38 300 M 87.38

1st Km Km 88.401st mile Mile 135.052nd Km Km 43.652nd mile " 99.003rd Km Km 32.503rd mile " 82.704th Km Km 21.904th mile " 60.355th Km Km 20.005th mile " 49.956th Km Km 19.656th mile 39.707th Km Km 18.157th mile and subsequent miles 24.708th Km Km 17.959th Km Km 16.6010th Km Km 15.3011th Km & subsequent Km 11.35

14 Carriage of light machinery weighing upto 3 tonne Ton Tonne dittoupto 1000 ft. (300 metre) 0/00 ft. 632.23 300 M 632.23Exceeding 1000 to 5000 ft (300 to 1500metre) 1000 ft. 153.19 " 153.19

1st Km Km 187.651st mile Mile 301.952nd Km Km 86.252nd mile " 55.953rd Km Km 57.153rd mile " 52.854th Km Km 35.904th mile " 42.305th Km Km 33.705th mile " 42.806th Km Km 32.306th mile " 32.957th Km Km 27.707th mile and subsequent miles " 23.558th Km Km 27.309th Km Km 26.5010th Km Km 20.7511th Km & susequent Km 17.15

15 Carriage of small consignments weighing upto 5 maunds 16.1 For consignment weighing 5 to 10

Chap-1 (Carriage) Page 10

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. Unit of Unit of No.

M/ment Labour Composite M/ment Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

(job rates) : maunds, rate be increased by 25%;and for consignments weighing 10

Consig- to 20 maunds, rate be increased byUpto 1000 ft. (300 metre) ment/ 51.34 Consign- 51.34 100%.

1000 ft. ment/Exceeding 1000 to 3000 ft. (300 to 900 1000 ft. 35.21 300 M 35.21metre)

1st Km Consign- 29.351st mile Consign- 47.25 ment/ Km2nd Km ment/Mile 18.052nd mile and subsequent miles " 8.65 "3rd Km & subsequent " 5.75

16 Carriage of consignments job.

i) Cooly load for distance:- Each Each

a) Upto 5 Km Consignment 58.75 Consignmen 58.75b) Above 5 to 13 Km " 125.05 " 125.05

ii) Carriage of consignments odd jobs. Each Each a) Donkey load for distance upto 500 feet. Consignment 10.85 Consignmen 10.85b) Upto 1000 feet. " 16.45 " 16.45c) Upto ½ Mile/ 0.8 Km " 20.80 " 20.80d) Upto one Mile/ 1.6 Km " 26.00 " 26.00e) Upto three Miles/ 4.8 Km " 45.95 " 45.95f) Exceeding 3 Miles/ 16 km " 82.25 " 82.25

Each Eachiii) Cart load for a distance :- Consign- Consig-

ment nment a) upto 4 Miles/ 6.4 Km " 89.85 " 89.85b) Exceeding 4 Miles(6.4 Km) to10 Miles(16 Km) " 163.55 " 163.55

iv) Camel load for a distance:-

a) upto 4 Miles/ 6.4 Km.) " 66.45 " 66.45b) exceeding 4 to 12 mills (6.4 Km to 19.2 Km) " 100.75 " 100.75

17 Hire charges of:- 1. This item will be allowed withprior concurrence of Superintending

i) truck (10 Ton Capacity) Per 3000.00 Per 3000.00 Engineer.day day 2. The rate includes pay of driver

ii) tractor with trolly " 5456.00 " 1000.00 and cleaner only. The repairs shallbe the responsibility of the owner

iii) tractor without trolly " 5456.00 " 800.00 and the cost of lubrication, fuel,loading and unloading shall be paid

Chap-1 (Carriage) Page 11

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. Unit of Unit of No.

M/ment Labour Composite M/ment Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

by the borrower.

18 Carriage of bitumen, tar or other lubricants, in drums: 16.10 Kilometer to 100 Kilometers P.Ton 1256.300 Kilometer to 200 Kilometers P.Ton 1651.050 Kilometer to 250 Kilometers Per 50.35 P.Ton 1921.05251 to susequent Kilometers Ton P.Ton 8.152nd mile " 8.25

"3rd mile 13.20

19 Carriage of Asbestos cement pipes BSS Class 'B" withcomet joint and rubber ring, including loading, unloadingand stacking (rate per 100 Rft. (30 m pipes):-

i) 3" (75 mm) i/d pipes:-1st chain (1st 30 m) Chain 7.45 30 M 7.452nd chain (2nd 30 m) " 1.35 30 M 1.353rd to 10th chain (60 to 300 m) " 0.85 30 M 0.851000 to 3000 ft. (300 to 900 m) 0/00 Ft. 8.40 300 M 8.401st Km Km 7.502nd Km Km 3.453rd Km Km 2.551st mile Mile 12.104th Km Km 1.752nd mile " 2.805th Km Km 1.603rd mile " 2.506th Km Km 1.504th mile " 2.257th Km Km 1.405th mile " 2.108th Km Km 1.356th mile " 1.909th Km Km 1.307th mile and subsequent miles " 1.2010th Km Km 1.20

11th Km & Susequent Km 1.15

ii) 4" (100 mm) i/d pipes:-

1st chain (1st 30 m) Chain 9.80 30 M 9.802nd chain (2nd 30 m) " 1.80 30 M 1.803rd to 10th chain (60 to 300 m) " 1.10 30 M 1.10

1000 to 9000 ft. (300 to 900 m) 0/00 Ft. 11.00 300 M 11.00

1st Km Km 9.85

Chap-1 (Carriage) Page 12

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. Unit of Unit of No.

M/ment Labour Composite M/ment Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

1st mile Mile 15.852nd Km Km 4.502nd mile " 3.653rd Km Km 3.353rd mile " 3.304th Km Km 2.254th mile " 2.955th Km Km 2.105th mile " 2.706th Km Km 2.006th mile " 2.507th Km Km 1.857th mile and subsequent miles " 1.558th Km Km 1.809th Km Km 1.7010th Km Km 1.5511th Km & subsequent Km Km 1.50

iii) 6" (150 mm) i/d pipes:-

1st chain (1st 30 m) Chain 14.70 30 M 14.702nd chain (2nd 30 m) " 2.70 30 M 2.703rd to 10th chain (60 to 300 m) " 1.70 30 M 1.701000 to 9000 ft. (300 to 900 m) 0/00 Ft. 16.50 300 M 16.501st Km Km 14.802nd Km Km 6.853rd Km Km 5.101st mile Mile 23.804th Km Km 3.402nd mile " 5.505th Km Km 3.153rd mile " 4.956th Km Km 3.104th mile " 4.457th Km Km 2.805th mile " 4.108th Km Km 2.706th mile " 3.759th Km Km 2.607th mile and subsequent miles " 2.3510th Km Km 2.3511th Km & subsequent Km Km 2.00

iv) 8" (200 mm) i/d pipes:

1st chain (1st 30 m) Chain 24.85 30 M 24.852nd chain (2nd 30 m) " 4.55 30 M 4.553rd to 10th chain (60 to 300 m) " 2.85 30 M 2.851000 to 3000 ft. (300 to 900 m) 0/00 Ft. 27.90 300 M 27.901st Km Km 25.052nd Km Km 11.90

Chap-1 (Carriage) Page 13

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. Unit of Unit of No.

M/ment Labour Composite M/ment Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

3rd Km Km 8.751st mile Mile 40.304th Km Km 5.852nd mile " 9.305th Km Km 5.403rd mile " 8.356th Km Km 5.304th mile " 7.557th Km Km 4.855th mile " 6.908th Km Km 4.706th mile " 6.359th Km Km 4.207th mile and subsequent miles " 3.9510th Km Km 2.4511th Km & subsequent Km Km 1.75

v) 10" (250 mm) i/d pipes:-1st chain (1st 30 m) Chain 33.35 30 M 33.352nd chain (2nd 30 m) " 6.15 30 M 6.153rd to 10th chain (60 to 300 m) " 3.80 30 M 3.801000 to 3000 ft. (300 to 900 m) 0/00 Ft. 37.50 300 M 37.501st Km Km 33.652nd Km Km 15.453rd Km Km 11.451st mile Mile 54.154th Km Km 7.702nd mile " 12.505th Km Km 7.103rd mile " 11.256th Km Km 6.954th mile Mile 10.157th Km Km 6.605th mile " 9.308th Km Km 6.556th mile " 8.559th Km Km 6.057th mile and subsequent miles " 5.3010th Km Km 5.6011th Km & subsequent Kms Km 4.10

vi) 12" (300 mm) i/d pipes:1st chain (1st 30 m) Chain 43.40 30 M 43.402nd chain (2nd 30 m) " 8.00 30 M 8.003rd to 10th chain (60 to 300 m) " 4.95 30 M 4.951000 to 3000 ft. (300 to 900 m) 0/00 Ft. 48.80 300 M 48.801st Km Km 43.752nd Km Km 21.053rd Km Km 15.304th Km Km 10.00

Chap-1 (Carriage) Page 14

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. Unit of Unit of No.

M/ment Labour Composite M/ment Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

1st mile Mile 70.405th Km Km 9.202nd mile " 16.256th Km Km 9.003rd mile " 14.607th Km Km 8.254th mile " 13.158th Km Km 8.155th mile " 12.059th Km Km 7.556th mile " 11.1510th Km Km 6.957th mile and subsequent miles " 6.9011th Km & subsequent Kms Km 5.25

vii) 16" (400 mm) i/d pipes:-1st chain (1st 30 m) Chain 71.10 30 M 71.102nd chain (2nd 30 m) " 13.10 30 M 13.103rd to 10th chain (60 to 300 m) " 8.15 30 M 8.151000 to 3000 ft. (300 to 900 m) 0/00 Ft. 79.95 300 M 79.951st Km Km 71.702nd Km Km 33.403rd Km Km 24.651st mile Mile 115.404th Km Km 16.602nd mile " 26.605th Km Km 15.303rd mile " 23.956th Km Km 15.004th mile " 21.607th Km Km 13.755th mile " 19.758th Km Km 13.606th mile " 18.259th Km Km 12.607th mile and subsequent miles " 11.3010th Km Km 11.6011th Km & subsequent Kms Km 8.65

viii) 18" (450 mm) i/d pipes:-

1st chain (1st 30 m) Chain 91.40 30 M 91.402nd chain (2nd 30 m) " 16.80 30 M 16.803rd to 10th chain (60 to 300 m) " 10.45 30 M 10.451000 to 3000 ft. (300 to 900 m) 0/00 Ft. 102.75 300 M 102.751st Km Km 92.152nd Km Km 42.603rd Km Km 31.751st mile Mile 148.304th Km Km 21.40

Chap-1 (Carriage) Page 15

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. Unit of Unit of No.

M/ment Labour Composite M/ment Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

2nd mile " 34.205th Km Km 19.703rd mile " 30.756th Km Km 19.304th mile " 27.757th Km Km 17.755th mile " 25.408th Km Km 17.506th mile " 23.459th Km Km 16.257th mile and subsequent miles " 14.5510th Km Km 14.9511th Km & subsequent Kms Km 11.05

ix) 20" (500 mm) i/d pipes:-

1st chain (1st 30 m) Chain 97.00 30 M 97.002nd chain (2nd 30 m) " 17.85 30 M 17.853rd to 10th chain (60 to 300 m) " 11.10 30 M 11.101000 to 3000 ft. (300 to 900 m) 0/00 Ft. 109.05 300 M 109.051st Km Km 97.802nd Km Km 45.203rd Km Km 33.651st mile Mile 157.404th Km Km 22.702nd mile " 36.305th Km Km 20.903rd mile " 32.656th Km Km 20.454th mile " 29.457th Km Km 18.805th mile " 26.958th Km Km 18.556th mile " 24.909th Km Km 17.207th mile and subsequent miles " 15.4510th Km Km 15.8511th Km & subsequent Kms Km 11.95

x) 24" (600 mm) i/d pipes:-1st chain (1st 30 m) Chain 107.50 30 M 107.502nd chain (2nd 30 m) " 19.75 30 M 19.753rd to 10th chain (60 to 300 m) " 12.30 30 M 12.301000 to 5000 ft. (300 to 1500 m) 0/00 Ft. 120.85 300 M 120.851st Km Km 108.352nd Km Km 50.053rd Km Km 37.301st mile Mile 174.404th Km Km 25.652nd mile " 40.25

Chap-1 (Carriage) Page 16

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. Unit of Unit of No.

M/ment Labour Composite M/ment Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

5th Km Km 23.103rd mile " 36.156th Km Km 22.654th mile Mile 32.657th Km Km 20.805th mile " 29.908th Km Km 20.556th mile " 27.559th Km Km 19.057th mile and subsequent miles " 17.1010th Km Km 17.5011th Km & subsequent Kms Km 13.00

20 Carriage of PVC pipes B.S.S. Class 'B' including loading,unloading and stacking (Rate per 1000 ft.) (300 metre) :-

i) 3" (75 mm) i/d pipes:-

1st chain (1st 30 m) Chain 14.65 30 M 14.652nd chain (2nd 30 m) " 2.70 30 M 2.703rd to 10th chain (60 to 300 m) " 1.70 30 M 1.701000 to 3000 ft. (300 to 900 m) 0/00 Ft. 16.45 300 M 16.451st Km Km 14.752nd Km Km 6.803rd Km Km 5.101st mile Mile 23.754th Km Km 3.452nd mile " 5.505th Km Km 3.153rd mile " 4.956th Km Km. 3.104th mile " 4.457th Km Km 2.855th mile Mile 4.058th Km Km 2.756th mile " 3.759th Km Km 2.557th mile and subsequent miles " 2.3510th Km Km 2.3511th Km & subsequent Kms Km 1.95

ii) 4" (100 mm) i/d pipes:-

1st chain (1st 30 m) Chain 22.55 30 M 22.552nd chain (2nd 30 m) " 4.15 30 M 4.153rd to 10th chain (60 to 300 m) " 2.60 30 M 2.601000 to 3000 ft. (300 to 900 m) 0/00 Ft. 25.35 300 M 25.351st Km Km 22.752nd Km Km 10.703rd Km Km 7.85

Chap-1 (Carriage) Page 17

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. Unit of Unit of No.

M/ment Labour Composite M/ment Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

1st mile Mile 36.604th Km Km 5.202nd mile " 8.455th Km Km 4.803rd mile " 7.606th Km Km 4.704th mile " 6.857th Km Km 4.305th mile " 6.258th Km Km 4.256th mile " 5.809th Km Km 3.907th mile and subsequent miles " 3.6010th Km Km 3.6011th Km & subsequent Kms Km 3.10

iii) 5" (125 mm) i/d pipes:-

1st chain (1st 30 m) Chain 30.75 30 M 30.752nd chain (2nd 30 m) " 5.65 " 5.653rd to 10th chain (60 to 300 m) " 3.50 " 3.501000 to 3000 ft. (300 to 900 m) 0/00 Ft. 34.60 300 M 34.601st Km Km 31.052nd Km " 14.503rd Km " 10.801st mile Mile 49.954th Km " 7.352nd mile " 11.505th Km Km. 6.553rd mile " 10.356th Km " 6.454th mile Mile 9.357th Km " 5.905th mile " 8.558th Km 5.856th mile " 7.909th Km 5.407th mile and subsequent miles " 4.9010th Km 4.9511th Km & subsequent Kms 3.75

iv) 6" (150 mm) i/d pipes:

1st chain (1st 30 m) Chain 42.40 30 M 42.402nd chain (2nd 30 m) " 7.80 30 M 7.803rd to 10th chain (60 to 300 m) " 4.85 30 M 4.851000 to 3000 ft. (300 to 300 m) 0/00 Ft. 47.70 300 M 47.701st Km. Km. 42.752nd Km Km. 19.753rd Km Km. 14.75

Chap-1 (Carriage) Page 18

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. Unit of Unit of No.

M/ment Labour Composite M/ment Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

1st mile Mile 68.80 4th Km Km. 9.952nd mile " 15.905th Km Km. 9.103rd mile " 14.256th Km Km. 8.954th mile " 12.907th Km Km. 8.255th mile " 11.808th Km Km. 8.156th mile " 10.909th Km Km. 7.557th mile and subsequent miles " 6.7510th Km Km. 6.9511th Km & subsequent Kms Km. 5.15

v) 8" (200 mm) i/d pipes:-

1st chain (1st 30 m) Chain 74.40 30 M 74.402nd chain (2nd 30 m) " 13.70 30 M 13.703rd to 10th chain (60 to 300 m) " 8.50 30 M 8.501000 to 3000 ft. (300 to 900 m) 0/00 Ft. 83.65 300 M 83.651st Km Km 75.002nd Km Km 34.703rd Km Km 25.851st mile Mile 120.704th Km Km 17.452nd mile " 27.855th Km Km 16.053rd mile Mile 25.056th Km Km 15.704th mile " 22.607th Km Km 14.455th mile " 20.708th Km Km 14.256th mile " 19.109th Km Km 13.257th mile and subsequent miles " 11.8510th Km Km 12.1511th Km & subsequent Kms Km 9.05

vi) 10" (250 mm) i/d pipes:-1st chain (1st 30 m) Chain 115.35 30 M 115.352nd chain (2nd 30 m) " 21.20 30 M 21.203rd to 10th chain (60 to 300 m) " 13.20 30 M 13.201000 to 3000 ft. (300 to 900 m) 0/00 Ft. 129.70 300 M 129.701st Km Km 116.302nd Km Km 53.753rd Km Km 40.00

Chap-1 (Carriage) Page 19

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. Unit of Unit of No.

M/ment Labour Composite M/ment Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

1st mile Mile 187.154th Km Km 27.002nd mile " 43.155th Km Km 24.853rd mile " 38.806th Km Km 24.354th mile " 35.007th Km Km 22.355th mile " 32.058th Km Km 22.056th mile " 29.609th Km Km 20.457th mile and subsequent miles " 18.3510th Km Km 18.8511th Km & subsequent Kms Km 14.10

vii) 12" (300 mm) i/d pipes:-

1st chain (1st 30 m) Chain 162.40 30 M 162.402nd chain (2nd 30 m) " 29.85 30 M 29.853rd to 10th chain (60 to 300 m) " 18.60 30 M 18.601000 to 3000 ft. (300 to 900 m) 0/00 Ft. 182.55 300 M 182.551st Km Km 163.752nd Km Km 75.703rd Km Km 56.401st mile Mile 263.504th Km Km 38.052nd mile Mile 60.805th Km Km 35.003rd mile " 54.656th Km Km 34.304th mile " 49.307th Km Km 31.505th mile " 45.158th Km Km 31.106th mile " 41.659th Km Km 28.857th mile and subsequent miles " 25.8510th Km Km 26.5011th Km & subsequent Kms Km 19.85

viii) 14" (350 mm) i/d pipes:-1st chain (1st 30 m) Chain 211.35 30 M 211.352nd chain (2nd 30 m) " 38.90 30 M 38.903rd to 10th chain (60 to 300 m) " 24.20 30 M 24.201000 to 3000 ft. (300 to 900 m) 0/00 Ft. 237.65 300 M 237.651st Km Km 213.102nd Km Km 98.553rd Km Km 73.35

Chap-1 (Carriage) Page 20

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. Unit of Unit of No.

M/ment Labour Composite M/ment Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

1st mile Mile 342.954th Km Km 49.502nd mile " 79.105th Km Km 45.503rd mile " 71.106th Km Km 44.604th mile Mile 64.157th Km Km 40.955th mile " 58.758th Km Km 40.456th mile " 54.209th Km Km 37.507th mile and subsequent miles " 33.6510th Km Km 34.5511th Km & subsequent Kms Km 25.85

21 Carriage of PVC pipes B.S.S. Class 'D' including loading,unloading and stacking (Rates per 1000 ft.):-

i) 2" (50 mm) i/d pipes:-1st chain (1st 30 m) Chain 10.70 30 M 10.702nd chain (2nd 30 m) " 1.95 30 M 1.953rd to 10th chain (60 to 300 m) " 1.25 30 M 1.251000 to 3000 ft. (300 to 900 m) 0/00 Ft. 12.05 300 M 12.051st Km Km 10.802nd Km Km 5.003rd Km Km 3.701st mile Mile 17.354th Km Km 2.502nd mile " 4.005th Km Km 2.303rd mile " 3.606th Km Km 2.254th mile " 3.257th Km Km 2.105th mile " 3.008th Km Km 2.056th mile " 2.759th Km Km 1.907th mile and subsequent miles " 1.7010Km Km 1.7511th Km & subsequent Kms Km 1.35

ii) 2½" (63 mm) i/d pipes:-

1st chain (1st 30 m) Chain 16.65 30 M 16.652nd chain (2nd 30 m) " 3.05 30 M 3.053rd to 10th chain (60 to 300 m) " 1.90 30 M 1.901000 to 3000 ft. (300 to 900 m) 0/00 Ft. 18.70 300 M 18.701st Km Km 16.80

Chap-1 (Carriage) Page 21

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. Unit of Unit of No.

M/ment Labour Composite M/ment Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

2nd Km Km 7.803rd Km Km 5.851st mile Mile 27.004th Km Km 3.952nd mile " 6.255th Km Km 3.653rd mile " 5.606th Km Km 3.554th mile " 5.057th Km Km 3.255th mile " 4.658th Km Km 3.056th mile " 4.259th Km Km 2.907th mile and subsequent miles " 2.6510Km Km 2.6511th Km & subsequent Kms Km 2.05

iii) 3" (75 mm) i/d pipes:-1st chain (1st 30 m) Chain 23.10 30 M 23.102nd chain (2nd 30 m) " 4.25 30 M 4.253rd to 10th chain (60 to 300 m) " 2.65 30 M 2.651000 to 3000 ft. (300 to 900 m) 0/00 Ft. 25.95 300 M 25.951st Km Km 23.252nd Km Km 10.753rd Km Km 8.051st mile Mile 37.454th Km Km 5.452nd mile " 8.655th Km Km 5.003rd mile " 7.756th Km Km 4.904th mile " 7.007th Km Km 4.505th mile Mile 6.408th Km Km 4.456th mile " 5.909th Km Km 4.007th mile and subsequent miles " 3.6510th Km Km 3.7011th Km & subsequent Kms Km 2.85

iv) 4" (100 mm) i/d pipes:-1st chain (1st 30 m) Chain 38.20 30 M 38.202nd chain (2nd 30 m) " 7.05 30 M 7.053rd to 10th chain (60 to 300 m) " 4.35 30 M 4.351000 to 3000 ft. (300 to 900 m) 0/00 Ft. 42.95 300 M 42.951st Km Km 38.502nd Km Km 17.803rd Km Km 13.25

Chap-1 (Carriage) Page 22

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. Unit of Unit of No.

M/ment Labour Composite M/ment Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

1st mile Mile 61.954th Km Km 8.952nd mile " 14.305th Km Km 8.203rd mile " 12.856th Km Km 8.054th mile " 11.607th Km Km 7.505th mile " 10.608th Km Km 7.306th mile " 9.809th Km Km 6.757th mile and subsequent miles " 6.1010th Km Km 6.1511th Km & subsequent Kms Km 4.75

v) 5" (125 mm) i/d pipes:-

1st chain (1st 30 m) Chain 57.10 30 M 57.102nd chain (2nd 30 m) " 10.50 30 M 10.503rd to 10th chain (60 to 300 m) " 6.55 30 M 6.551000 to 3000 ft. (300 to 900 m) 0/00 Ft. 64.20 300 M 64.201st Km Km 57.552nd Km Km 26.603rd Km Km 19.801st mile Mile 92.604th Km Km 13.352nd mile " 21.355th Km Km 12.303rd mile " 19.206th Km Km 12.054th mile " 17.357th Km Km 11.105th mile " 15.858th Km Km 10.956th mile 14.659th Km Km 10.157th mile and subsequent miles 9.1010th Km Km 9.2511th Km & subsequent Kms Km 7.05

vi) 6" (150 mm) i/d pipes:-1st chain (1st 30 m) Chain 82.25 30 M 82.252nd chain (2nd 30 m) " 15.15 30 M 15.153rd to 10th chain (60 to 300 m) " 9.40 30 M 9.401000 to 3000 ft. (300 to 900 m) 0/00 Ft. 92.45 300 M 92.451st Km Km 82.952nd Km Km 38.353rd Km Km 28.551st mile Mile 133.45

Chap-1 (Carriage) Page 23

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. Unit of Unit of No.

M/ment Labour Composite M/ment Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

4th Km Km 19.252nd mile 30.805th Km Km 17.703rd mile 27.656th Km Km 17.354th mile 24.957th Km Km 15.955th mile 22.858th Km Km 15.756th mile 21.109th Km Km 14.607th mile and subsequent miles 13.1010th Km Km 13.4011th Km & subsequent Kms Km 10.15

22 Hand shunting loaded Railway wagons ortrucks:- a) upto ¼ mile / ¼ Km Each 280.40 Each 175.25b) upto ½ mile / ½ Km No 507.65 No 317.30c) upto ¾ mile / ¾ Km " 685.35 " 428.35d) upto 1 (1.6 Km) mile " 815.55 " 509.70e) 2nd mile and subsequent miles/ Each Each

2nd and subsequent kilometres No/Mile 472.90 No/Km 295.55

23 Hand shunting empty Railway wagons or trucks.

a) upto ¼ mile / ¼ Km Each 162.65 Each 101.65b) upto ½ mile / ½ Km No. 269.50 No. 168.45c) upto ¾ mile / ¾ Km " 355.40 " 222.15d) upto 1 mile / 1 Km " 426.60 " 266.65e) 2nd mile and subsequent miles/ Each Each

2nd and subsequent kilometres No/Mile 232.20 No/Km 145.15

Chap-2 (Loading/Unloading) Page 24

2. LOADING, UNLOADING & STACKING1 The rate for loading into and unloading from mobile trucks, trollies and boats, etc. will be the same as for Railway wagons.

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

1 Loading or unloading into or from Railway wagons, lead 100 Cft. 626.20 cu.m 221.20 within one chain, (30m) shingle, sand, ballast, surkhi, ashes, kankar, brick bats, coal, lime or 1,000 Nos. tiles size12"x6"x2" (300x150x50 mm) or 9"x4½"x1½"(225x113x37mm) properly laid & stacked.

2 Loading or unloading bricks into or from Railway wagonslaid and stacked, lead within one chain:-

a) Bricks 10" (250 mm) size. 1000 Nos. 782.75 1000 Nos. 782.75

b) Bricks 9" (225 mm) or smaller size. ditto 626.20 ditto 626.20

3 Loading or unloading into or from Railway wagons cement 100 Bags 782.75 100 Bags 782.75in bags (from inside or outside the godown) and stackingwithin one chain (30 m)

4 Loading or unloading into or from Railway wagons empty 100 Nos. 75.15 100 Nos. 75.15cement bags (from inside or outside the godown) andstacking.

5 Loading or unloading into or from Railway wagons (from 100 Mds. 469.65 100 Kg 12.60inside or outside the godown) and stacking, white lime in bags.

6 Loading or unloading into or from Railway wagons Per 375.75 Per 369.80Structural Steel, R.S. joists, broad, narrow or meter gauge Tonne Tonnerail and rail fastenings, etc.

7 Loading or unloading 45 gallon (204.57 Litres) drums full Each 46.95 Each 46.95into or from Railway wagons, lead upto one chain.

8 Loading or unloading packages of all sorts, upto one Cwt Each 23.50 Each 23.50 Except cement in jute or(50 Kg). paper bags.

9 Loading or unloading sleepers other than wooden,including stacking lead within one chain:-

a) Broad gauge sleepers 100 Nos. 1565.50 100 Nos. 1565.50

b) Metre gauge and narrow gauge sleepers. ditto 782.75 ditto 782.75

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

Chap-2 (Loading/Unloading) Page 25

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

10 Loading or unloading timber logs or timber for shuttering, Per 195.7 Per 192.6into or from Railway wagons of any gauge, including Ton Tonnestacking lead within one chain (30 m)

11 Loading or unloading bhoosa in Railway wagons lead upto 100 Mds. 1878.6 100 Kg 50.35150 ft. (45 m)

12 Loading or unloading timber scrap or wooden plugs, into or Per 313.10 Per 308.15from Railway wagons, and stacking within one chain lead. Ton Tonne

13 Loading or unloading pitching stone or spawl from Railway 100 Cft. 231.70 cu.m 81.85wagons of any gauge (including clearing 5 ft. (1500 mm)away from the rail).

14 Loading or unloading building stone (including clearing 5 ft. 100 Cft. 300.60 cu.m 106.15(1.5 m) away from rails).

15 Unloading oil, bitumen tar, etc.

a) Crude oil (to be pumped from tank wagon into tank). 1000 782.75 100 17.20Gallon litres

b) Crude oil (drained by gravity). 1000 782.75 100 17.20Gallon litres

c) Crude oil materials from railway wagons. 100 Cft. 100.20 cu.m 35.40

d) Fuel oil from tank into empty drums, including Per 278.30 Per 273.90stacking within one chain (30 m). Ton Tonne

e) Petrol (2 gallon tin) 100 Nos. 394.50 100 Nos. 394.50 The rate includes checkingand weighing the tins.

f) Kerosene oil (4 gallon tin) 100 Nos. 782.75 100 Nos. 782.7516 Removing and stacking within one chain

(30 m) lead:

a) Stone, spawl, brick bats, shingle, sand, lime, 100 Cft. 313.10 cu.m 110.60surkhi, ashes, kankar and coat, etc.

b) Bricks. 1000 Nos. 834.95 1000 Nos. 834.95

c) Broad gauge wooden sleepers. 100 Nos. 500.95 100 Nos. 500.95

d) Metre gauge or narrow gauge wooden sleepers. 100 Nos. 298.20 100 Nos. 298.20

e) Rails girders, pipes, cement etc. Per 139.15 Per 136.95Ton Tonne

Chap-2 (Loading/Unloading) Page 26

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

f) Bridge and crossing timbers, etc. 100 No. 1669.90 100 No. 1669.90

17 Loading into wagons girders, rails, permanent way Per 313.10 Per 308.15material (except wooden sleepers) iron work, M.S. bars, Ton Tonnepipes, etc. including lead one chain (30 M) and stackinginside wagons.

18 Unloading from wagons girders, rails, permanent way Per 178.90 Per 176.10material (except wooden sleepers) iron work, M.S. bars, Ton Tonnepipes, etc. lead upto one chain (30 m) but excludingstacking.

19 Loading into wagons wooden broad gauge sleepers, 100 Nos. 1252.40 100 Nos. 1252.40including one chain (30 m) lead and stacking,.

20 Unloading wooden broad gauge sleepers from wagons, 100 Nos. 596.40 100 Nos. 596.40including one chain (30 m) lead and stacking.

21 Loading metre gauge or narrow gauge wooden sleepers, 100 Nos. 626.20 100 Nos. 626.20including one chain (30 m) lead and stacking insidewagons.

22 Unloading metre gauge or narrow gauge wooden sleepers, 100 Nos. 329.60 100 Nos. 329.60including one chain (30 m) lead but excluding stacking.

23 Loading bridge and crossing timbers, including one chain 100 Nos. 2504.85 100 Nos. 2504.85(30 m) lead and stacking.

24 Unloading bridge and crossing timbers, including one 100 Nos. 1252.40 100 Nos. 1252.40chain (30 m) lead but excluding stacking.

25 Loading or unloading bitumen, asphalt or tar in drums, into Per 187.85 Per 184.90or from railway wagons, lead upto one chain (30 m). Ton Tonne

Chap-3 (Earthwork) Page 27

1 Special allowances for the hardness, wetness and slush:-The grant of allowances for hard, very hard, wet and slush will be subject to Superinteding Engineer's approval. Specific instructions regarding grant of suchallowances may be issued by the various Administrative Departments and Statutory Bodies. The earth requiring repeated blows of Kassi to break it and ofwhich dry bulk density is not less than 1.5, will be treated as hard.

2 Deduction for shrinkage from bank measurements:-The following allowances should be provided for material which is not rammed, or equally consolidated:-a) Deduction for shrinkage from the bank measurements when the earthwork is done by manual labour.......... 10%b) Deduction for settlement from the bank measurement when the earthwork is done by machines................... 3 to 6%

Before the work is let out to be done by tractors, scrapers, etc. deduction ranging between 3% to 6% should be agreed to with the contractors.

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. Unit of Unit of No.

M/ment Labour Composite M/ment Labour Composite

1 Earthwork excavation undressed lead upto a single throw 171 to 17.5of Kassi, phaorah or shovel:-

a) In ashes, sand, soft soil or silt clearance. 1000 Cft. 2,348.30 -- cu.m 82.95 --b) In ordinary soil. 1000 Cft. 2,817.95 -- cu.m 99.55 --

2 Earthwork excavation in ashes, sand and soft soil or silt 1000 Cft. 3,444.15 -- cu.m 121.65 -- ditto

clearance, undressed lead upto 50 ft (15 metre).

3 Bed clearance and dressing slopes of drains to required ditto The rate is applicable where the earthsections including the removal of weeds, roots, etc. of the bed to be removed is of thedisposal of excavated materials within 50 ft. (15 metre) lead. type of ordinary soil. When it is silt ora) Excavated material undressed. 1000 Cft. 4,383.45 -- cu.m 154.80 -- 1 or 2 above, whichever is applicable.b) Excavated material dressed in the specified manner. 1000 Cft. 4,742.40 -- cu.m 167.50 -- the drains of each category.

4 Borrowpit excavation undressed lead upto 100 ft (30 metre).

a) Ordinary soil 1000 Cft. 4,383.45 -- cu.m 154.80 --b) Hard soil 1000 Cft. 5,385.40 -- cu.m 190.20 --

5 Earthowrk in ordinary soil for embankments lead upto 100 *411-1 to The rate includes hire charges of

ft. (30 m), including ploughing and mixing with blade grade 411-13 and machinery, cost of fuel, lubricants, payor disc harrow or other suitable equipment, and 301-1 & of driver and cleaner. The rate alsocompaction by mechanical means at optimum moisture 202-3 includes clearing and grubbingcontent and dressing to designed section, complete in all where necessary.respects:- i) 95% to 100% maximum modified AASHO dry density. 1000 Cft. 4,784.90 5,479.40 cu.m 169.00 193.55ii) 90% maximum modified AASHO dry density. 1000 Cft. 4,784.90 5,374.30 cu.m 169.00 189.80iii) 85% maximum modified AASHO dry density. 1000 Cft. 4,784.90 5,269.20 cu.m 169.00 186.10

6 Regular excavation dressed. 1000 Cft. 3,229.80 -- cu.m 114.10 -- *411-2

7 Earthwork excavation in open cutting upto 5'-0" (1.5 m) 17.1 to depth for storm water channels, drains, sullage drains in 17.5open areas, roads, streets, lanes, including under pinning of walls and shoring to protect existing works, shuttering and timbering the trenches, dressed to designed level and dimensions, trimming, removal of surface water from

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

3. EARTHWORK (EXCAVATION & EMBANKMENT)

Chap-3 (Earthwork) Page 28

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. Unit of Unit of No.

M/ment Labour Composite M/ment Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

trenches, back filling and surplus excavated material disposed of and dressed within 50 ft. (15 m) lead:- i) ordinary 1000 Cft. 5,491.75 5,569.00 cu.m 193.95 196.70ii) hard 1000 Cft. 6,493.65 6,570.95 cu.m 229.35 232.10 iii) very hard 1000 Cft. 7,558.20 7,635.50 cu.m 266.95 269.70iv) gravel & shingle 1000 Cft. 12,719.50 12,796.80 cu.m 449.25 452.00

8 Earthwork excavation in open cutting 5.01 ft. (1.5 m) to ditto

10.0 ft. (3.0 mm) depth for storm water channels, drains, sullage drains in open areas, roads, streets, lanes, including under pinning of walls and shoring to protect existing works, shuttering and timbering the trenches, dressed to designed level and dimensions, trimming, removal of surface water from trenches, back filling and surplus excavated material disposed of and dressed within 100 ft. (30 m) lead:- i) ordinary 1000 Cft. 5,975.40 6,129.10 cu.m 211.05 216.50ii) hard 1000 Cft. 6,977.30 7,131.05 cu.m 246.45 251.85iii) very hard 1000 Cft. 8,041.85 8,195.60 cu.m 284.05 289.45iv) gravel & shingle 1000 Cft. 13,829.40 13,983.10 cu.m 488.45 493.90

9 Excavation in shingle or gravel formation and rock, not 17.1 to 17.5

requiring blasting, undressed lead upto 100 ft (30 m). i) Dry 1000 Cft. 11,897.95 -- cu.m 420.25 --ii) Wet 1000 Cft. 13,776.60 -- cu.m 486.60 --iii) In flowing water 1000 Cft. 17,533.80 -- cu.m 619.30 --

10 Earthwork excavation in irrigation channels, drains, etc. to

designed section, grades and profiles, excavated material dittodisposed off and dressed within 50 ft. (15 m) lead:-

i) ordinary 1000 Cft. 5,036.05 -- cu.m 177.85 --ii) hard 1000 Cft. 6,038.00 -- cu.m 213.25 --iii) very hard 1000 Cft. 7,102.55 -- cu.m 250.85 --iv) gravel & shingle 1000 Cft. 12,576.95 -- cu.m 444.20 --

11 Excavation in rock dressed to designed section, grades and profiles, excavated material disposed off within 100 ft. (30 m) 17.1 to 17.5 Tools and plants shall be the liabilityand lift upto 5'-0" (1.5 m). of the contractor.a) Soft rock, slate, shale, schist laterite work, with pick and 1000 Cft. 12,029.95 -- cu.m 424.90 --

crow bar. b) Medium hard rock, requiring occasional blasting. 1000 Cft. 19,034.65 19,625.05 cu.m 672.30 693.15

12 a) Excavation in hard rock requiring blasting and disposal

of excavated material (blasted material) upto 50 ft. (15 17.1 to 17.5 1) Tools and plants required shall bem) lead, (including dressing and leveling to designed the liability of the Contractorsection,e tc. complete).

2) Reduce the rate by 8% if thei) Grade I 1000 Cft. 11,618.65 12,209.05 cu.m 410.35 431.20 excavated section is not dressed orii) Grade II 1000 Cft. 12,442.85 13,426.85 cu.m 439.50 474.25 levelled to designed section.iii) Grade III 1000 Cft. 14,880.60 16,061.40 cu.m 525.60 567.30iv) Grade IV 1000 Cft. 16,529.05 17,906.65 cu.m 583.80 632.45

Chap-3 (Earthwork) Page 29

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. Unit of Unit of No.

M/ment Labour Composite M/ment Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

v) Grade V 1000 Cft. 18,297.30 19,871.70 cu.m 646.25 701.85vi) Grade VI 1000 Cft. 19,632.60 21,403.80 cu.m 693.40 756.00

b) Excavation in hard rock requiring blasting, but blasting

prohibited, and disposal of excavated material within 50 17.1 to 17.5 1) Tools and plants required shall beft. (15 m) lead (including dressing and levelling to the liability of the contractor.designed section, etc. complete):-

2) Reduce the rate by 8% if thei) Grade I 1000 Cft. 23,237.30 24,418.10 cu.m 820.75 862.45 excavated section is not dressed orii) Grade II 1000 Cft. 24,885.70 26,853.70 cu.m 878.95 948.45 levelled to designed section.iii) Grade III 1000 Cft. 29,761.25 32,122.85 cu.m 1051.15 1134.60iv) Grade IV 1000 Cft. 33,058.10 35,813.30 cu.m 1167.60 1264.95v) Grade V 1000 Cft. 36,594.65 39,743.45 cu.m 1292.50 1403.75vi) Grade VI 1000 Cft. 39,265.25 42,807.65 cu.m 1386.85 1511.95

13 Rehandling of earthwork:

a) Lead upto a single throw of Kassi, phaorah or shovel 1000 Cft. 1,565.50 -- cu.m 55.30 -- dittob) Upto a lead of 50 ft. (15 m). 1000 Cft. 2,191.75 -- cu.m 77.40 --

14 Rehandling of gravel work or excavated rock, 1000 Cft. 6,262.10 -- cu.m 221.20 -- 17.1 to 17.5

lead upto 50 ft.( 15 m)

15 Filling, watering and ramming earth under floors:- ditto

i) with surplus earth from foundation, etc. 1000 Cft. 3,170.65 -- cu.m 112.00 --ii) with new earth excavated from outside, 1000 Cft. 6,385.05 -- cu.m 225.50 --

lead upto one chain (30 m). 16 Extra for every 50 ft. (15 m) additional lead or part thereof :- This rate shall be applicable upto

1000 ft. total distance, including the i) for earhtwork soft, ordinary, hard and very hard. 1000 Cft. 60.85 -- cu.m 2.15 -- lead covered in the item of earthworkii) for gravel, shingle or rock. 1000 Cft. 72.05 -- cu.m 2.55 --

17 Transportation of earth all types when the total distance, This rate will be paid inaddition to the

including the lead covered in the item of work, is more than rate of earthwork, without deducting1000 ft. (300 m) the lead covered in the item ofa) upto ¼ mile (400 m). 1000 Cft. 2,930.80 -- cu.m 103.50 -- earthworkb) for every 330 ft. (100 m) additional lead or part thereof,

beyond ¼ mile (400 m) upto one mile. (1.6 Km.) 1000 Cft. 11.55 -- cu.m 0.40 --c) for every ¼ mile (400 m) additional lead or part thereof,

beyond one mile (1.6 Km.) upto 5 mile (8 Km). 1000 Cft. 177.00 -- cu.m 6.25 --d) for every ½ mile (800 m) additional lead

or part thereof, beyond 5 miles (8 Km). 1000 Cft. 158.95 -- cu.m 5.60 --

18 Dressing and levelling of earhtwork to designed section, etc. 17.10 to 17.5complete:- a) Ashes, sand, silt or soft soil. 1000 Cft. 205.65 -- cu.m 7.25 --b) Ordinary or hard soil. 1000 Cft. 401.45 -- cu.m 14.20 --c) Gravel work or soft rock not requiring 1000 Cft. 965.70 -- cu.m 34.10 --

blasting.

Chap-3 (Earthwork) Page 30

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. Unit of Unit of No.

M/ment Labour Composite M/ment Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

19 Dowel dressing. Per 188.15 -- Metre 6.15 -- ditto This rate is in addition to payment for

Chain dressed earhtwork.

20 a) Dressing slopes of banks or ground surface. 100Sft. 84.05 -- sq.m 9.05 -- ditto To be paid only when exclusively dressing is done and no earthwork is carried out in embankment or cutting.

b) Dressing of earthwork (done by machinery or otherwise 100Sft. 148.85 -- sq.m 16.00 -- i) The surface area dressed is to beand left undressed) to designed section. taken for measurement.

ii) The item is applicable where the dressing is done by the contractor other than the one who executed the

work.21 Excavation in foundation of building, bridges and other

structures, including dagbelling, dressing, refilling around 17.1 to 17.5structure with excavated earth, watering and ramming lead upto one chain (30 m) and lift upto 5 ft. (1.5 m) a) in sand, ashes or loose soil 1000 Cft. 5,662.25 -- cu.m 200.00 --b) in ordinary soil. 1000 Cft. 6,614.80 -- cu.m 233.65 --c) in hard soil or soft murum. 1000 Cft. 7,404.15 -- cu.m 261.50 --

22 Cutting hard rock such as granite, ballast, hard lime stone or 1000 Cft. 47,604.50 51,641.50 cu.m 1681.40 1824.00 17.1 to 17.5 Tools and plants required shall be thesand stone, etc. with chisels and hammers, for small liability of the contractor.foundations.

23 Extra for excavation requiring shoring. 1000 Cft. 804.40 1,063.15 cu.m 28.40 37.55 17.1 to 17.5 Composite rate includes materials,

i.e. plank, etc.24 Compaction of earthwork (soft, ordinary or hard soil) :- ditto

a) Mixing, moistening earth to optimum moisture content 1000 Cft. 760.40 -- cu.m 26.85 --

in layers for compaction, etc. complete.

b) Compaction by rolling with animal driven roller/hand rammed:

i) soft or sandy soil 1000 Cft. 939.30 -- cu.m 33.20 --

1) The rate does not include hireii) ordinary soil 1000 Cft. 1,095.85 -- cu.m 38.70 -- charges of the roller.

2) Roller to be 'supplied by iii) hard soil 1000 Cft. 1,252.40 -- cu.m 44.25 -- Government

iv) admixture of shingle 1000 Cft. 1,408.95 -- cu.m 49.75 --

c) Ramming earthwork (all types of soil). 1000 Cft. 939.30 -- cu.m 33.20 --

d) Ramming earhtwork behind retaining walls. 1000 Cft. 1,252.40 -- cu.m 44.25 --

25 Compaction of earthwork with power road roller, including 17.1 (a)

ploughing, mixing, moistening earth to optimum moisture *411-5 and The rate also includes hire charges of

Chap-3 (Earthwork) Page 31

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. Unit of Unit of No.

M/ment Labour Composite M/ment Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

content in layers, etc. complete: 202-3 machinery, cost of fuel, lubricant, pay of driver and cleaner, etc.

i) 95% to 100% maximum modified AASHO dry density. 1000 Cft. -- 694.50 cu.m - 24.55

ii) 90% maximum modified AASHO dry density. 1000 Cft. -- 589.40 cu.m - 20.80

iiii) 85% maximum modified AASHO dry density. 1000 Cft. -- 484.30 cu.m - 17.10

26 Extra for wet earthwork. 1000 Cft. 2,191.75 -- cu.m 77.40 - 17.1 to 17.5 That will support a man's weight.

27 Extra for slush or Daldal including dewatering. 1000 Cft. 5,009.65 -- cu.m 176.95 - 17.1 to 17.5 That will not support a man's weight.

28 Extra for puddling. 1000 Cft. 3,953.40 -- cu.m 139.65 - ditto

29 Earthwork on small rain water drains, along canal banks, 100 Rft. 594.90 -- Metre 19.50 - dittoroads and plantation drains, dressed, etc. complete.

30 Filling and compacting soil, earth and boulders behind 1000 Cft. 5,635.85 -- cu.m 199.05 -- 17.1 to 17.5

retaining walls (including excavation of soil and lead upto 50 ft.( 15 m).

31 Dag bailing 3" (75 mm) deep. Per mile 2,412.05 -- Per 1499.10 -- ditto Dag bailing for layout of borrow pit, to

Km be done by contractors at their own cost.

32 Turfing slopes of banks or lawns with grass sods including 100Sft. 1,043.70 -- sq.m 112.30 -- dittoploughing, laying, setting and watering (Turf got from within a distance of 5 miles (8 Km.) and maintenance for 15 days).

33 Berm cutting:- 17.1 to 17.5

a) lead upto a single throw of Kassi, phaora or shovel 1000 Cft. 2,817.95 -- cu.m 99.55 --

(without dressing). b) upto 50 ft(15 m)lead (including dressing). 1000 Cft. 5,036.05 -- cu.m 177.85 --

34 Berm trimming both sides of channels:- 17.1 to 17.5

a) upto 3½ ft. (1.06 m) depth. Per Mile 7,349.75 -- Per Km. 4593.60 -- b) exceeding 3½ ft. to 5 ft. (1.06 to 1.5 m) depth. Per Mile 10,270.05 -- Per Km. 6418.80 --c) exceeding 5 ft. to 8 ft. (1.5 to 2.4 m) depth Per Mile 16,032.30 -- Per Km. 10020.20 --

35 Ploughing and levelling borrowpits. ditto Area ploughed to be measured.

i) upto 3 ft. (0.9 m) depth. Per Acre 1,565.50 -- Per Hect. 3868.50 --ii) above 3 ft. (0.9 m) depth. Per Acre 3,131.05 -- Per Hect. 7736.95 --

36 Making boundary or service roads, including dag-belling, ditto

leveling and dressing:

i) in unploughed land:

Chap-3 (Earthwork) Page 32

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. Unit of Unit of No.

M/ment Labour Composite M/ment Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

a) from 10.0 ft. to 20.0 ft. (3 to 6 m) wide. Per Chain 793.75 -- Metre 26.05 --b) from 20.1 ft. to 40.0 ft. (6.10 to 12 m) wide. Per Chain 1,065.70 -- Metre 34.95 --

ii) in ploughed land:

a) from 10.0 ft. to 20.0 ft. (3 to 6 m) wide. Per Chain 816.65 -- Metre 26.80 --b) from 20.1 ft. to 40.0 ft. (6.10 to 12 m) wide. Per Chain 1,088.55 -- Metre 35.70 --

37 Earthwork by boats, including hire of boats:- 17.1 to 17.5 For ordinary soil.

i) Digging and loading into boats, upto 50 ft. (15 m) lead. 1000 Cft. 4,696.55 -- cu.m 165.90 --ii) Carriage by boats upto 10 chains (300 m). 1000 Cft. 1,185.65 -- cu.m 41.90 --iii) Extra for every additional one chain (30 m) or part 1000 Cft. 125.25 -- cu.m 4.40 --

thereof beyond 10 chains (300 m). iv) Unloading earth from boats. 1000 Cft. 2,191.75 -- cu.m 77.40 --

38 Unloading earth from B.G. trucks and clearing 5 ft. (1.5 m) 1000 Cft. 1,878.60 -- cu.m 66.35 -- 17.1 to 17.5

from rail.

39 Earthwork by tramway, digging and loading in trucks, upto 50 1000 Cft. 4,383.45 -- cu.m 154.80 -- 17.1 to 17.5ft. (15 m) lead.

40 Unloading earth from B.G. trucks and spreading upto 1000 Cft. 3,522.40 -- cu.m 124.40 -- ditto

15 ft. (4.5 m) from rail.

41 Supplying clean and screened river or pit sand within 5 100Cft. 626.75 649.75 cu.m 221.35 229.50 ditto The rate incudes:-chains (150 m). i) removal of top crust of earth

over burden ii) royalty to the government or cost to the private owner.

42 Earthwork excavation in open cutting for sewers and 17.1 to 17.5 The rate does not include back fillingmanholes as shown in drawings including shuttering and **13.1 &13.4 after laying of sewer, which is payabletimbering, dressing to correct section and dimensions separately.according to templates and levels, and removing surface water, in all types of soil except shingle, gravel and rock:-

If the timbering and shuttering is noti) 0 ft. to 7.0 ft. (0 to 2.10 m) depth 1000 Cft. 5,109.35 5,492.50 cu.m 180.45 194.00 actually done at site, the compositeii) 7-01 ft. to 15.0 ft. (2.15 to 4.5 m) depth 1000 Cft. 8,663.25 9,231.70 cu.m 306.00 326.05 rate may be reduced by Rs. 368.20,iii) above 15.0 ft. (4.5 m) depth 1000 Cft. 11,168.05 11,736.55 cu.m 394.45 414.55 579.60 and 579.60 respectively.

43 Earthwork excavation of trenches in open cutting for sewers 17.1 to 17.5 The rate does not include back filling

and manhole chambers, etc. below sub-soil water level to **13.3 & after laying of sewer, which is payablecorrect section and dimensions according to templates and 13.5 separately.levels, including shoring, timbering and shuttering of M.S. sheets on both sides of the trenches:

i) 0 ft. to 4.0 ft. (0 to 1.20 m) depth below SSWL. 1000 Cft. 7,048.15 9,629.30 cu.m 248.95 340.10ii) 4.01 ft. to 8.0 ft. (1.22 to 2.4 m) depth below SSWL. 1000 Cft. 8,811.30 12,068.75 cu.m 311.20 426.25iii) Exceeding 8 ft. (2.4 m) depth below SSWL. 1000 Cft. 13,216.95 16,701.60 cu.m 466.80 589.90

Chap-3 (Earthwork) Page 33

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. Unit of Unit of No.

M/ment Labour Composite M/ment Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

44 Excavation of trenches in all kinds of soil, except cutting 1000 Cft. 4,709.75 -- cu.m 166.35 -- 17.1 to 17.5 The rate does not include back filling

rock, for watersupply pipelines upto 5 ft. (1.5 m) depth **8.1 after laying of pipe line, which isfrom ground level, including trimming, dressing sides, payable separately.leveling the beds of trenches to correct grade and cutting pits for joints, etc. complete in all respects.

45 Cutting and removing trees within a distance of 100 ft. (30 m)

a) upto 2½ ft. (760 mm) girth. Each 916.40 -- Each 916.40 b) above 2½ ft. to 6 ft. (760 to 1800 mm) girth. Each 1,788.25 -- Each 1788.25

46 Uprooting stump and removing within 100 ft. (30 m) from 2 ft. Each 1,174.15 -- Each 1174.15

to 6 ft. (600 to 1800 mm) girth.

47 Jungle clearance and removing within 100 ft. (30 m).

a) light 1000 Sft. 156.55 -- sq.m 1.70 --b) thick 1000 Sft. 313.10 -- sq.m 3.35 --

48 Uprooting Sarkanda growth and disposal within 100 ft. (30 m) 100Sft. 75.15 -- sq.m 8.10 --

49 Ploughing 3 times. Per 636.00 -- Per Hect. 1571.55 --

Acre

50 Leveling, dressing and making lawns. 100Sft. 313.10 -- sq.m 33.70 --

51 Turfing lawns (excluding cost of turf). 100Sft. 271.90 -- sq.m 29.25 --

52 Earthwork in excavation of drains, irrigation channels through excavator / drag lines in all kind of soil and conditions(dry,wetslush,daldal and under water) including its disposal and preparation of working pad for operation of machinery.(Rates includes 100 ft lead) 1000 Cft. -- 1805.00 cu.m -- 63.75

* Specification number correspond to Book of "Specification for Road & Bridge Construction, 1971".** Specification number correspond to Book of "Building & Roads Department Specification Vol. II, 1966 (Public Health Works).

Chap-4 (Dismantling) Page 34

1 Rates for all finished works include the removal of surplus debris, unused material and byproducts.

2 The rates for dismantling roofs or upper storey floor, include the dismantling of all materials, except roofsupports such as beams and trusses.

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

Stone Work

1 Dismantling dry stone masonry. 100Cft. 532.30 cu.m 188.00 18.1

2 Dismantling stone masonry in mud mortar. 100Cft. 782.75 cu.m 276.45 ditto

3 Dismantling stone masonry in lime or cement mortar. 100Cft. 1,878.60 cu.m 663.50 ditto Add extra 13%, 32% and 51% onlabour rates only for 2nd, 3rd, 4thand subsequent floors respectively.

4 a) Dismantling dry stone or spawl pitching. 100Cft. 939.30 cu.m 331.75 ditto

b) Dismantling stone or spawl pitching (mud grouted). 100Cft. 1,189.80 cu.m 420.25 ditto

5 Dismantling stone or spawl pitching and apron in silted 100Cft. 1,565.50 cu.m 552.95 dittocondition.

6 Dismantling stone pitching, cement or lime grouted. 100Cft. 2,504.85 cu.m 884.70 ditto

7 Dismantling stone in crates:

a) wooden crates 100Cft. 1,252.40 cu.m 442.35

b) wire crates ditto 1,565.50 ditto 552.95

8 Dismantling stone ware drain including base concrete. 100Cft. 876.70 cu.m 309.65 ditto

Brick Work

9 100Cft. 313.1 cu.m 110.6 18.1

10 100Cft. 782.75 cu.m 276.45 ditto

11 100Cft. 532.3 cu.m 188 ditto

12 100Cft. 1095.85 cu.m 387.05 18.1 Add extra 13%, 32% and 51% onlabour rates only for 2nd, 3rd, 4th

13 100Cft. 2661.4 cu.m 940 ditto and subsequent floors respectivelyagainst item No. 12, 13, 14 & 15.

14 Dismantling cement block masonry. 100Cft. 2,348.30 cu.m 829.40 ditto

Dismantling brick work in mud mortar.

Dismantling brick work in lime or cement mortar.

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

4. DISMANTLING (DEMOLITION)

Dismantling mud/pise walling.

Dismantling sun dried brick masonry.

Dismantling dry brick masonry.

Chap-4 (Dismantling) Page 35

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

15 Dismantling Dhajji walling. 100Cft. 626.20 cu.m 221.15 ditto

Concrete

16 Dismantling mud concrete. 100Cft. 1,252.40 cu.m 442.35 ditto

17 Dismantling lime concrete. 100Cft. 1,722.05 cu.m 608.25 Add extra 13%, 32% and 51% onlabour rates only for 2nd, 3rd, 4th

18 Dismantling lime or cement concrete, under water. 100Cft. 6,575.20 cu.m 2322.35 and subsequent floors respectivelyagainst item No. 17, 19 & 20.

19 a) Dismantling cement concrete plain 100Cft. 3,444.15 cu.m 1216.45 ditto1:4:8.

b) Dismantling cement concrete plain ditto 5,635.85 ditto 1990.601:3:6.

c) Dismantling cement concrete 1:2:4 ditto 6,888.30 ditto 2432.95plain.

d) Dismantling cement concrete with brick ditto 1,878.60 ditto 663.50aggregate.

e) Dismantling D.P.C. of cement concrete ditto 939.30 ditto 331.751½" thick (40 mm) and clearing the site.

20 Dismantling cement concrete reinforced, 100Cft. 11,271.75 cu.m 3981.20 ditto

separating reinforcement from concrete,cleaning and straightening the same.

Roofing

21 Dismantling sirki sarkanda or thatched 100Sft. 375.75 sq.m 40.45 18.1roofing, supported on battens or bellies.

22 a) Dismantling 1st class tile roofing. 100Sft. 939.30 sq.m 101.05 Add extra 13%, 32 and 51% onlabour rate only for 2nd, 3rd, 4th

b) Dismantling 2nd class tile roofing. 100Sft. 782.75 sq.m 84.20 ditto and subsequent floors respectivelyagainst items No. 22, 25, 26 and 28.

23 Dismantling from any height, asbestos sheets and ridge 100Sft. 491.30 sq.m 52.85 18.1coping.

24 a) Dismantling roof of wooden planks and battens, from 100Sft. 393.05 sq.m 42.3 dittoany height.

b) Dismantling wooden ceiling above 20' (6.0 m) height 100Sft. 1,554.85 sq.m 167.30 dittoin difficult position, including lifting with care andspecial scaffolding along live electric wires and withmachines underneath.

Chap-4 (Dismantling) Page 36

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

25 Dismantling jack arch roofing, including removal of joists. 100Sft. 1,252.40 sq.m 134.75 ditto

26 Dismantling R.B. roof complete with mud and plaster, 100Sft. 1,565.50 sq.m 168.45 dittoincluding separating reinforcement, cleaning andstraightening the same.

27 a) Stripping and stacking slate or tiles from the truss 100Sft. 782.75 sq.m 84.20roofing.

b) Stripping and stacking C.I. sheet roof. ditto 711.75 ditto 76.60

c) Extra for dismantling C.I. sheet roof above 20 ft. (6m) ditto 869.35 ditto 93.55in difficult position, including lifting with specialscaffolding along live electric wire with machineunderneath.

28 Dismantling slates or tiles including battens, purlins and 100Sft. 1,252.40 sq.m 134.75 18.1planking.

Flooring

29 Dismantling brick or flagged flooring without 100Sft. 532.30 sq.m 57.30 18.1 Add extra 13%, 32% and 51% onconcrete foundation. labour rates only for 2nd, 3rd, 4th

and subsequent floors respectively30 Dismantling plank or wooden block flooring, 100Sft. 782.75 sq.m 84.20 ditto against items No. 29 and 30.

etc.

31 Disjoining R.C.C. pipes inside the trench and dismantling i) The rate does not include theand removing the pipes from the trench and stacking them cost of excavation and refilling ofoutside:- trench, or the demolition of any

masonry or brick work.a) 6" to 12" (150 to 300 mm) diameter Per Lft 19.65 Metre 64.45b) 13" to 24" (325 to 600 mm) diameter Per Lft 32.20 Metre 105.60 ii) Bends, elbows, sluice valves,c) 25" to 36" (625 to 900 mm) diameter ditto 37.60 ditto 123.35 etc. should not be paid for extra ifd) Above 36" (Above 900 mm) diameter ditto 53.65 ditto 175.95 fixed in the length of pipe line that

is being dismantled.

WOOD WORK32 a) Removing door with chowkat. Per 251.05 Per 251.05 18.1 Add extra 13%, 32% and 51% on

No. No. labour rates only for 2nd, 3rd, 4thb) Removing windows and sky lights with chowkat. ditto 194.10 ditto 194.10 and subsequent floors respectively

against items No. 32, 33, 34, 35 &36.

33 Removing ventilators and wooden sunshade, etc. Per No. 101.50 Per No. 101.50 ditto

34 a) Dismantling wooden beams upto 12' (3.65m) Per No. 195.70 Per No. 195.70 dittolength.

Chap-4 (Dismantling) Page 37

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

b) Dismantling wooden beams from 12.1' to 23' ditto 313.10 ditto 313.10(3.65 to 7.0 m) length.

35 a) Dismantling wooden partition Jaffry work etc. 100Sft. 350.95 sq.m 37.75 ditto

b) Dismantling wooden trusses. 100Kg 1,100.35 %Kg 1100.35

36 Dismantling wooden palisade fencing. Per Lft. 27.90 Metre 91.50 ditto

I ron work

37 Dismantling iron work of trusses, sheds, water tanks, etc. 100Kg 1,062.70 %Kg 1062.70 18.1 Add extra 13%, 32% and 51% onexcluding cutting of rivets. labour rates only for 2nd, 3rd, 4th

and subsequent floors respectivelyagainst items No. 37 and 38.

38 Dismantling rolled steel beams or iron rails, etc. 100Kg 513.90 %Kg 513.90 ditto

39 Dismantling iron latrine. Per Unit/ 1,139.15 Per Unit/ 1139.15 ditto2 Seats 2 Seats

40 Dismantling tees, bends or sluice valves upto 12" Each per 23.25 Each per 9.30 ditto(300 mm) bore. inch bore cm bore

41 a) Dismantling B.G. water column. Each 7,598.60 Each 7598.60 ditto

b) Dismantling M.G. or N.G. water column. Each 5,027.55 Each 5027.55 ditto

42 Dismantling all type of wire fencing, including rolling wire 100Lft. 532.30 Metre 17.45 18.1into bundles and collecting material.

Miscellaneous

43 Dismantling wire netting of tennis courts and frame work. 100Sft. 250.50 sq.m 26.95 18.1

44 Dismantling cloth ceiling and supporting timber. 100Sft. 469.65 sq.m 50.55 ditto

45 Dismantling and removing road metalling. 100Cft. 1,252.40 cu.m 442.35 ditto

46 Dismantling and removing road pavement, etc., including 100Cft. 1,672.00 cu.m 590.55 dittoscreening and stacking of byproducts upto one chain lead(30 metre).

47 Removing mud plaster from walls. 100Sft. 130.45 sq.m 14.05 ditto Add extra 13%, 32% and 51% onlabour rates only for 2nd, 3rd, 4th

48 Removing cement or lime plaster. 100Sft. 260.90 sq.m 28.05 ditto and subsequent floors against itemNo. 47, 48, 49, & 50 respectively

Chap-4 (Dismantling) Page 38

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

49 Scraping:- 18.1

a) White wash or colour wash. 100Sft. 156.55 sq.m 16.85

b) Ordinary distemper, oil bound distemper, ditto 469.65 ditto 50.55or paint of wall.

50 Dismantling glazed or encaustic tiles, etc. 100Sft. 1,339.00 sq.m 144.10 18.1

51 Scraping boulders. 100Cft. 2,191.75 cu.m 774.15 18.1

52 Cleaning lime or cement mortar of old stones 100Cft. 1,095.85 cu.m 387.05 18.1to be used in masonry.

Electric Wiring

53 Dismantling light, fan and call bell point Per 42.75 43.20 Per 42.75 43.20including casing and capping/strip open type, point pointand making good damaged surface (buildingportion).

54 Dismantling plug point and making good Per 36.65 37.05 Per 36.65 37.05damaged surface (building portion). point point

55 Dismantling G.I./M.S. conduit/G.I. flexible/PVC pipes orconduit wiring, etc. of all sizes including making gooddamaged surface (building portion):-

i) on surface Per foot 7.80 7.90 P.Mtr 25.60 25.90ii) recessed in wall Per foot 17.00 17.15 P.Mtr 55.75 56.25

Chap-5 (Mortar) Page 39

Dry Material Required for Dry Material Required for 100 Cft. Wet (Ready) Mortar One Cum Wet (Ready) Mortar

S. No. Ratio of Mortar Cement Lime Cement Lime Sand (50 Kg) Putty Sand (50 Kg.) Putty Cum.

Bag Cft. Cft. Bag. Cum 1 2 3 4 5 6 7 81 Cement : Sand

1 : 2 33.48 82 11.83 0.821 : 3 23.11 85 8.16 0.851 : 4 18.37 90 6.49 0.901 : 5 14.70 90 5.19 0.901 : 6 13.61 100 4.81 1.001 : 7 11.68 100 4.12 1.001 : 8 10.21 100 3.61 1.00

2 Cement : Lime : Sand1 : 1 : 6 12.25 15.0 90 4.33 0.15 0.901 : 1 : 7 10.70 13.1 92 3.78 0.13 0.921 : 1 : 8 9.39 11.5 92 3.32 0.12 0.921 : 1 : 9 8.52 10.44 94 3.00 0.10 0.941 : 1 : 10 7.67 9.4 94 2.71 0.09 0.941 : 2 : 8 9.19 22.5 90 3.25 0.23 0.901 : 2 : 9 8.16 20.0 90 2.88 0.20 0.901 : 2 : 10 7.67 18.8 94 2.71 0.19 0.941 : 2 : 12 6.39 15.66 94 2.26 0.16 0.941 : 3 : 12 6.26 23.0 92 2.21 0.23 0.921 : 3 : 14 5.47 20.1 94 1.93 0.20 0.941 : 3 : 16 4.82 17.7 94 1.70 0.18 0.941 : ¼ : 3 23.11 7.0 85 8.16 0.07 0.85

3 Lime : Sand1 : 2 43 86 0.43 0.861 : 3 31 93 0.31 0.93

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN5. MORTAR

Chap-5 (Mortar) Page 40

Dry Material Required for 100 Cft. Dry Material Required for Wet (Ready) Mortar one M3 Wet (Ready) Mortar

S. Ratio of Mortar Clay Lime Sand Surkhi Cinder Clay Lime Sand Surkhi CinderNo. (Putty) (Putty)

Cft. Cft. Cft. Cft. Cft. M3 M3 M3 M3 M3

1 2 3 4 5 6 7 3 4 5 6 7

4 Mud 135 1.35

5 Lime : Surkhi2 : 3 49.00 - 73.5 - 0.49 - 0.74 -1 : 2 40.75 - 81.5 - 0.41 - 0.82 -1 : 3 30.30 - 91.0 - 0.30 - 0.91 -

6 Lime : Sand : Surkhi1 : 1 : 1 40.50 40.5 40.5 - 0.41 0.41 0.41

7 Lime : Cinder1 : 1 57.0 - 57.0 - 0.57 - - 0.57

Wet material required for 100 Cft. Wet material required for 1M³ (35.32 Cft) masonry (including wastage): masonry ( including wastage) :

1 Brick Masonry :a) Mud Mortar 35.00 Cft 0.35 M3

b) Cement, Sand 25.00 Cft 0.25 M3

c) Cement, Lime (Putty) Sand 25.00 Cft 0.25 M3

d) Lime (Putty) Sand 25.00 Cft 0.25 M3

2 Stone Masonry :a) Random rubble, uncoursed

i) Foundation and Plinth 45.00 Cft 0.45 M3

ii) Superstructure 40.00 Cft 0.40 M3

iii) Coursed 35.00 Cft 0.35 M3

b) Ashlar Block in course or Scabled masonry 30.00 Cft 0.30 M3

c) Ashlar fine masonry 20.00 Cft 0.20 M3

(1) Cement 1 Cft. = 40.8233 KgNotes : (2) Unslaked lime 1.7 Cft. = 37.3242 Kg

(3) Slaked lime 2.5 Cft. = 37.3242 Kg

(4) Quick lime 40 Kg Will yield 2.6 Cft. lime putty.

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN5. MORTAR

Chap-6 (Concrete) Page 41

1.2.3.

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

1 Mud concrete in foundation including watering and ramming, 100Cft 3450.80 5019.80 cu.m 1218.80 1773.00 The stone ballast, crushed bajri,

using brick or stone ballast 1½" (40 mm) gauge. round shingle from nallah, or brickballast may be used according to

2 Dry rammed brick or stone ballast, 1½" to 2"( 40 mm to 50 100Cft 2348.30 3734.30 cu.m 829.40 1318.95 their comparative cheaper rates inmm) gauge. various areas of the Province.

3 Cement concrete brick or stone ballast 1½ " to 2" (40 mm to 20.1 -do-50 mm) gauge, in foundation and plinth:-

(a) Ratio 1: 3: 6 100Cft 4544.45 14344.85 cu.m 1605.10 5066.60(b) Ratio 1: 4: 8 ditto 4544.45 12320.45 " 1605.10 4351.60(c) Ratio 1:5:10 ditto 4544.45 11246.45 " 1605.10 3972.25(d) Ratio 1: 6:12 ditto 4544.45 10443.05 " 1605.10 3688.50(e) Ratio 1: 6: 18 ditto 4544.45 9534.05 " 1605.10 3367.45(f) Ratio 1: 7:20 ditto 4544.45 9157.85 " 1605.10 3234.55

4 Extra on item No. 3 above, for sedimentation tank or filterbeds of Public Health Engineering Works: The stone ballast, crushed bajri,

round shingle from nallah, or brick(a) in bed 100Cft 1398.95 - cu.m 494.10 - ballast may be used according to

their comparative cheaper rates in(b) on slope ditto 2068.45 - " 730.60 - various areas of the Province.

5 Cement concrete plain including placing, 20.1compacting, finishing and curingcomplete (including screening andwashing of stone aggregate):

6. CONCRETE

a) The carriage for the whole distance to the site of work shall be calculated on the basis of the rates of the actual means of transport used in carriage, i.e. road and / or rail, as the case may be.

If concrete mixer or high frequency vibrator, etc. is supplied by the Government, all charges including depreciation will be recovered from the contractor.Rates for all finished works include the removal of surplus debris, unused material and by products.

b) It shall be payable from the nearest approved quarry fom sit of work.

Subsequent carriage of crushed stone aggregate and bajri will be paid according to the following:

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

Chap-6 (Concrete) Page 42

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

(a) Ratio 1: 1:2 100Cft 6077.00 30013.40 cu.m 2146.40 10600.75(b) Ratio 1: 1½: 1½ ditto 6077.00 29250.20 " 2146.40 10331.15(c) Ratio 1: 1½: 3 ditto 6077.00 24795.20 " 2146.40 8757.65 (d) Ratio 1: 2: 3 ditto 6077.00 23696.00 " 2146.40 8369.45(e) Ratio 1: 3: 3 ditto 6077.00 21171.20 " 2146.40 7477.65(f) Ratio 1: 2: 4 100Cft 6077.00 21996.20 cu.m 2146.40 7769.05(g) Ratio 1: 2: 6 ditto 6077.00 20163.80 " 2146.40 7121.85(h) Ratio 1: 3: 6 ditto 6077.00 19382.60 " 2146.40 6845.95(i) Ratio 1: 4: 8 ditto 6077.00 17510.60 " 2146.40 6184.75

6 Providing and laying reinforced cement concrete (including 20.4 1) The rate includes rendering floorprestressed concrete), using coarse sand and screened surface smooth, and the plasteringgraded and washed aggregate, in required shape and design, done for making up all surfacesincluding forms, moulds, shuttering, lifting, compacting, after removing centring.curing, rendering and finishing exposed surface, complete(but excluding the cost of steel reinforcement, its fabrication 2) Plastering done under soffit ofand placing in position, etc.):- R.C.C. roof slab meant for human

habitation buildings shall be paid(a) (i) Reinforced cement concrete in roof slab, beams, extra.columns lintels, girders and other structural members laid insitu or precast laid in position, or prestressed members cast 3) This item shall not be applicablein situ, complete in all respects:- to factory made units.

(1) Type A (nominal mix 1:1:2) Per Cft 141.45 431.60 cu.m 4996.00 15244.10(2) Type B (nominal mix 1: 1½: 3) ditto 141.45 379.85 " 4996.00 13416.30(3) (c) Type C (nominal mix 1: 2: 4) ditto 141.45 352.1 " 4996 12436.15(a)(ii) Reinforced cement concrete in slab of rafts / stripfoundation, base slab of column and retaining walls; etc andother structural members other than those mentioned in 5(a) (i) above not requiring form work (i.e. horizentalshuttering) complete in all respects:-(1) Type A (nominal mix 1: 1: 2) Per Cft 81.85 339.75 cu.m 2890.95 11999.95(2) Type B (nominal mix 1: 1½: 3) ditto 81.85 283.10 " 2890.95 9999.10(3) Type C (nominal mix 1: 2: 4) ditto 81.85 255.30 " 2890.95 9017.20

4) Composite rate shall be reduced by Rs: 5/50- P.Cft & Rs:12/- P.Cft if chenab sand and local sand respectively is used.

Chap-6 (Concrete) Page 43

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

(b) Precast reinforced cement concrete and prestressedreinforced cement concrete in columns, beams, lintels, staircases, shelves, etc.(1) Type A (nominal mix 1: 1: 2) Per Cft 106.40 384.25 cu.m 3758.05 13571.70(2) Type B (nominal mix 1:1½: 3) ditto 106.40 332.10 " 3758.05 11729.75(3) Type C (nominal mix 1: 2: 4) ditto 106.40 304.75 " 3758.05 10763.75

(c) Erecting and fixing in position, precast cement concreteor stone slab in roofs or lintels, etc. lift unto 20 ft., (6m) Per Cft 48.05 57.90 cu.m 1697.15 2045.05including all charges.

(d) Add extra labour for R.C. concrete in Per Cft 23.50 -- cu.m 830.00 -2nd and subsequent storeys.

7 Providing and casting in situ bored reinforced concrete piles *851-1 Composite rate shall be reduced bywith type C concrete (nominal mix 1: 2: 4 ) , using 10% extra to Rs: 5/50 P.Cft & Rs:12/- P.Cft if chenab cement in dry mix, and course sand, including all labour and 851-10 sand and local sand respectively is used.material (except the cost of steel reinforcement and itslabour for bending and laying in position, etc. which will bepaid separately, including, screening & washing of shingleand curing:-i) 18 " (450 mm) dia pile Per Rft 801.35 1125.05 Metre 2628.45 3690.15ii) 20" (500 mm) dia pile Per Rft 944.10 1343.45 Metre 3096.65 4406.50iii) 22" (550 mm) dia pile Per Rft 1157.45 1620.85 Metre 3796.45 5316.4iv) 24" (600 mm) dia pile Per Rft 1447.15 2022.50 Metre 4746.65 6633.85

8 Fabrication of mild steel reinforcement bar cage for R.C.C. *851-5 The rate includes wastage, overlaps,

bored piles, including cutting, bending, laying in position, etc. but does not apply to the laps and

welding and fastening, including cost of binding wire and spiral reinforcement which are specifically

labour charges for binding of steel reinforcement (also shown in the structural / working drawings

includes removal of rust from the bars):- of piles as per lapping requirements of design.

(a) plain bars Per Cwt. 1619.65 5103.90 100 kg 3188.30 10047.05(b) deformed bars ditto 1619.65 6539.20 " 3188.30 12872.45

9 Fabrication of mild steel reinforcement for cement concrete, *851.5 The rate includes wastage, overlapsincluding cutting, bending, laying in position, making joints and chairs, etc.

Chap-6 (Concrete) Page 44

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

and fastenings, including cost of binding wire and labourcharges for binding of steel reinforcement (also includesremoval of rust from bars):-(a) Plain bars Per Cwt. 418.45 4083.20 100 kg 823.70 8037.80(b) Deformed bars (Grade-40) ditto 418.45 5634.20 ditto 823.70 11090.95('c) Deformed bars (Grade-60) ditto 418.45 5931.20 ditto 823.70 11675.60

10 Precast cement concrete solid or face blocks (1:2:4), Per Cft 53.90 197.50 cu.m 1903.75 6975.70 20.2including cost of templates.

11 Precast cement concrete hollow blocks (1: 2: 4) , including Per Cft 119.40 213.80 cu.m 4217.20 7551.40 20.2cost of templates and constructing walls thereof.

12 Providing and fixing ornamental cement jali 2" (50 mm) thick Per Sft 33.50 57.75 sq.m 360.45 621.40 20.1 to(1: 2: 4), without steel. 20.4

13 Extra labour for laying concrete plain or reinforced:

(a) above 20' (6 m) upto 40'(12 m) height 100Cft 2504.85 - cu.m 884.70 -(b) for every additional 10'(3 m) height. 100Cft 1565.50 - cu.m 552.95 -

14 Extra labour for work of weirs, rail or road bridges, syphons, and 100Cft 626.20 - cu.m 221.15 -concreting in superstructure

15 Making reinforced cement concrete spout, including fixing in Each 418.45 579.65 Each 418.45 579.65 20.4position (2½' x 6" x5") (760 mmx150 mm x 125 mm)

16 Making holes upto 3"(75 mm) dia 18"(450 mm) depth in cement Per hole 1004.25 - Each 1004.25 - 20.1concrete or stone masonry walls and repairing.

17 Extra labour for skipping concrete in wells. 100Cft 3725.05 - cu.m 1315.70 - 20.1

18 Nicking concrete surface:(a) Cement concrete surface 100Sft 356.40 - sq.m 38.35 -(b) Lime concrete surface ditto 117.60 - " 12.65 -

Chap-6 (Concrete) Page 45

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

19 Preparing, watering and ramming surface for laying concrete(for Headworks only):-(a) Horizontal floor 100Sft 356.15 - sq.m 38.30 -(b) Glacis and crest ditto 512.95 - " 55.20 -(c) Inverted filters ditto 167.40 - " 18.00 -

20 Fabrication of high tensile steel prestressing cables for 100 Kg. 5102.75 38160.45 100 Kg. 5102.75 38160.45 *811-1 The rate includes wastage inprestressed (post tensioned) concrete, including assembling by to cutting and breakage in stressing,drawing the H.T. wire through metal spacer plate, inserting in helix 811-11 etc.core and taping or tying, sheathing in longitudinally welded metalcorrugated sheath, positioning , anchorage with male and femaleset of anchorage cone, forming ducts for transverse cable,stressing cables with jack at both ends as per stressing schedule,maintaining stressing record and supply the same in the approvedproforma to the Engineer-in-charge, making loop at blind end,including all materials required for it, grouting the cable ducts withcement, cutting projected ends and making good recesses, etc.,complete in all respects.

21 Fabrication of High Tensile steel reinforcement for prestressed 100kg 3035.00 34969.60 %kg 3035.00 34969.60 1) The rate includes wastage in(pretension) concrete work, including inserting wire in moulds, cutting and breakage in stressing,etc.providing M.S. shear bars, spacers and lift hooks, male and female anchorage, tie down, struts, stressing cables, maintaining 2) Quantity of H. T. wire will formstress record and supply the same in approved proforma to the basis of payment.Engineer-in-charge, cutting wires and projecting ends and making 3) This item shall not be applicablegood recesses, etc., complete in all respects. to factory made units.

22 Lifting, transporting and placing precast prestressed concrete *811-1B eam, Girder and other members (excluding battens) etc. in toPosition on the bridge to correct alignment and level, etc. 811-11complete

i) Beam upto 50 ft. (15 m) length 100Cft 1865.30 cu.m 658.80ii) Beam above 50 ft. (15m) upto 75 ft. (22.5m) length 100Cft 2638.77 cu.m 932.00iii) Beam above 75ft. (22.5m) upto 100ft. (30m) length 100Cft 3578.85 cu.m 1264.05iv) Beam above 100ft. (30m) upto 150ft.(45m) length 100Cft 4652.80 cu.m 1643.35v) Beam above 150ft. (45m) length 100Cft 5763.60 cu.m 2035.70

Chap-6 (Concrete) Page 46

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

23 Providing and laying foam concrete 3 inch (75 mm) thick, Per Sft. 32.95 69.75 sq.m. 354.55 750.50using cement sand in the ratio of 1:2 and aluminium powderat the rate of 0.2% of the cement, sand mix,

24 Providing and fixing 6 in(150 mm). wide curved sheet ofrequired shape fixed on face of the construction joint with G.I.screw,1.5 in (40 mm) long to cover construction jointsvertically:-

i) aluminium sheet 1/16 in(1.5 mm) thick Per Rft. 16.25 93.20 Metre 53.30 305.70ii) G.I. sheet, 18 SWG Per Rft. 16.65 83.25 Metre 54.60 273.05

25 Providing and fixing 1/8" (3 mm) thick 3" (75 mm) wide aluminiumstrip on horizontal and vertical expansion joints in walls, columns,ceilings and floors etc., including cost of clips/screws etc.,complete in all respects:-

a) On interior surface (without mastic strip) Per Rft. 14.85 91.75 Metre 48.70 300.95b) On exterior surface (with mastic strip) ditto 14.85 95.35 " 48.70 312.75

26 Providing and fixing 1/16" (1.5 mm) thick copper flashing on Per Sft. 16.75 105.75 Sq.m 180.25 1137.85expansion joints complete in all respects.

27 Providing and fixing 6 in (150 mm). wideG.I. sheet 18SWG. Per Rft. 5.50 66.35 Metre 18.05 217.65stopper to expansion joint.

28 Providing embeding 10" (250 mm) wide ¼" (6 mm) thick Per Rft. 22.30 70.30 Metre 73.15 230.55rubber water stopper in expansion joints of R.C.C. roofslab complete in all respects.

29 Filling expansion joints with bitumen. sand & saw dust in Per Rft P.Metre/ratio 1:2:2. per inch 3.90 16.65 Per 25 mm 12.80 54.60

width Width

30 Filling expansion joints with bitumen. Per Rft. 57.90 - Metre 189.90 -

Chap-6 (Concrete) Page 47

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

31 Laying asphaltic mixture in expansion joints. Per Rft. 54.80 - Metre 179.75 - Material to be paid on actuals.

32 Providing and fixing theremopore (foamed polythene)sheet in horizontal and vertical expansion joints:

a) 1" (25 mm) thick thermopore sheet Per Sft. 6.70 12.20 Sq.m 72.10 131.25b) 1½" (40 mm) thick thermopore sheet ditto 6.70 16.05 " 72.10 172.70

33 Providing and laying damp proof course of cement concrete 1:2: 4(using cement, sand and shingle), including bitumencoating :-

(a) with one coat bitumen and one coat polythene sheet 500gauge

i) 1½" thick (40 mm) 100Sft 1565.75 4482.05 sq.m 168.50 482.25ii) 2" thick (50 mm) 100Sft 1565.75 5022.70 sq.m 168.50 540.45iii) 3" thick (75 mm) 100Sft 1625.15 6262.35 sq.m 174.85 673.85

(b) with 2 coats of bitumen:

i) 1½" thick (40 mm) 100Sft 1565.75 4750.95 sq.m 168.50 511.20ii) 2" thick (50 mm) 100Sft 1565.75 5290.95 sq.m 168.50 569.30iii) 3" thick (75 mm) 100Sft 1625.15 6530.60 sq.m 174.85 702.70

34 Providing and laying damp proof course with cement sandplaster and bitumen coating:-

(a) with one coat of bitumen and one coat of polythene sheet500 gauge :-

i) Ratio 1: 4 a) ½" thick (13 mm) 100Sft 1476.65 2953.80 sq.m 158.90 317.85 b) ¾" thick (20 mm) 100Sft 1476.65 3232.00 sq.m 158.90 347.75

Chap-6 (Concrete) Page 48

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

ii) Ratio 1:3 a) ½ " thick (13 mm) 100Sft 1476.65 3043.60 sq.m 158.90 327.50 b) ¾ " thick (20mm) 100Sft 1476.65 3337.95 sq.m 158.90 359.15

iii) Ratio 1:2a) ½ " thick (13 mm) 100Sft 1476.65 3182.55 sq.m 158.90 342.45b) ¾ " thick (20 mm) 100Sft 1476.65 3596.60 sq.m 158.90 387.00

(b) with 2 coats of bitumen:-

i) Ratio 1: 4a) ½" thick (13 mm) 100Sft 1476.65 3096.55 sq.m 158.90 333.20b) ¾" thick (20 mm) 100Sft 1476.65 3374.90 sq.m 158.90 363.15

ii) Ratio 1:3a) ½ " thick (13 mm) 100Sft 1476.65 3187.30 sq.m 158.90 342.95b) ¾ " thick (20 mm) 100Sft 1476.65 3481.65 sq.m 158.90 374.65

iii) Ratio 1:2a) ½ " thick (13 mm) 100Sft 1476.65 3410.70 sq.m 158.90 367.00b) ¾ " thick (20 mm) 100Sft 1476.65 3851.15 sq.m 158.90 414.40

35 Providing and laying vertical damp proof course with cementsand plaster and bitumen coating:-

(a) with one coat of bitumen and one coat of polythene sheet 500 gauge:

i) Ratio 1: 4a) ½" thick (13 mm) 100Sft 1476.65 2868.95 sq.m 158.90 308.70b) ¾" thick (20 mm) 100Sft 1476.65 3147.55 sq.m 158.90 338.70

ii) Ratio 1:3a) ½ " thick (13 mm) 100Sft 1476.65 2959.15 sq.m 158.90 318.40b) ¾ " thick (20 mm) 100Sft 1476.65 3253.50 sq.m 158.90 350.10

Chap-6 (Concrete) Page 49

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

iii) Ratio 1:2a) ½ " thick (13 mm) 100Sft 1476.65 3182.55 sq.m 158.90 342.45b) ¾ " thick (20 mm) 100Sft 1476.65 3623.00 sq.m 158.90 389.85

(b) with 2 coats of bitumen:-

i) Ratio 1: 4a) ½" thick (13 mm) 100Sft 1476.65 3096.40 sq.m 158.90 333.15b) ¾" thick (20 mm) 100Sft 1476.65 3374.90 sq.m 158.90 363.15

ii) Ratio 1:3a) ½ " thick (13 mm) 100Sft 1476.65 3186.50 sq.m 158.90 342.85b) ¾ " thick (20 mm) 100Sft 1476.65 3480.85 sq.m 158.90 374.55

iii) Ratio 1:2a) ½ " thick (13 mm) 100Sft 1476.65 3410.00 sq.m 158.90 366.90b) ¾ " thick (20 mm) 100Sft 1476.65 3850.30 sq.m 158.90 414.30

36 Grouting concrete between, the grooves of gates, including 100Cft 6957.05 - cu.m. 2457.25 -shuttering.

37 Chiesel dressing concrete surface on sides of grooves. 100Sft 196.00 - sq.m 21.10 -

38 Laying and ramming dry ballast or kankar. 100Cft 2543.95 - cu.m 898.50 -

39 Hoisting and placing in position R.C.C. shelves. per No. 76.75 - per No. 76.75 -

40 Breaking brick ballast, screening and stacking:-(a) 2"(50 mm) ring 100Cft. 1956.90 - cu.m 691.20 -(b) 1½ "(40 mm) ring ditto 2191.75 - " 774.15 -(c) 1" (25 mm) ring ditto 2543.95 - " 898.50 -(d) Jhama ballast ¾"(20 mm) ring ditto 2935.35 - " 1036.75 -

41 Supplying and fixing broken glasses on court yard walls, Per Rft 60.45 107.65 metre 198.30 353.10including 1:3: 6 cement concrete coping.

Chap-6 (Concrete) Page 50

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

42 Crushing stone ballast by machine. 100Cft 1956.90 - cu.m. 691.20 - This does not include the chargesfor working of crushers, but includesmanual labour for carriageof stone tocrusher within three chains (90 m)and also stacking the product aftercrushing within three chains (90 m).

43 Breaking stone ballast screened and stacked:-

(a) 2" ring (50 mm) 100Cft. 2191.75 - cu.m. 774.15 -(b) 1½ " ring (40 mm) ditto 2543.95 - " 898.50 -(c) 1" ring (25 mm) ditto 2935.35 - " 1036.75 -d) ½ " ring (13 mm) ditto 3913.80 - " 1382.35 -(e)1/8" to ¼" ring (3 mm to 6 mm) ditto 6653.45 - " 2350.00 -

44 Screening and stacking stone ballast shingle or bajri, etc. 100Cft. 626.20 - cu.m. 221.15 -

45 Washing ballast, bajri or shingle. 100Cft. 626.20 - cu.m. 221.15 -

46 Erecting and carting sun shades of precast R.C. concreteupto 5' x 2½' (1.50 m x 0.76 m) Each 339.60 - Each 339.60 -

Specification numbers correspond to book of standard specification of Road and Bridge Construction, "1971"

chapter-7(Brickwork) Page 51

1 Rates for all finsihed works include the removal of surplus debris, unused material and byproducts.2 The rates apply to all sizes of bricks, including the modular bricks of size 8"x4"x4" (200x100x100 mm) nominal.

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

1 Pacca brick work in mud mortar in buildings: 21.1 Masonry of boundary wall to beto considered as masonry other than

i) in foundation and plinth 100Cft. 3041.40 13463.70 cu.m 1074.20 4755.40 21.4 building.ii) in ground floor ditto 4024.00 14446.30 ditto 1421.30 5102.45

The composite rate is to bereduced by 7% and 14%, if 2nd or3rd class bricks are used.

2 Add extra labour on item No. 1 for brick work in:-

i) first floor 100Cft. 804.40 -- cu.m 284.10 -ii) second floor ditto 1787.00 -- ditto 631.15 -iii) third floor ditto 2769.60 -- ditto 978.20 -iv) fourth & subsequent floors ditto 4421.75 -- ditto 1561.75 -

3 Pacca brick work in mud mortar other than building:- 21.1 to Same remarks as against21.4 item No. 1 above

i) upto 20 ft. (6.1 m) height 100Cft. 4145.80 14568.10 cu.m 1464.30 5145.45ii) extra labour for every 5 ft. (1.5 m) ditto 804.40 -- ditto 284.10 -

additional height, or part thereof.

4 Pacca brick work in foundation and plinth in:- ditto Same remarks as againstitem No. 1 above.

i) Cement, sand mortar:-

Ratio 1:2 100Cft. 4000.35 19414.35 cu.m 1412.85 6857.15Ratio 1:3 ditto 4000.35 18211.35 ditto 1412.85 6432.25Ratio 1:4 ditto 4000.35 17489.55 ditto 1412.85 6177.30Ratio 1:5 ditto 4000.35 17008.35 ditto 1412.85 6007.35Ratio 1:6 ditto 4000.35 16646.75 ditto 1412.85 5879.65Ratio 1:7 ditto 4000.35 16410.15 ditto 1412.85 5796.05Ratio 1:8 ditto 4000.35 16202.25 ditto 1412.85 5722.65

ii) lime, cement sand mortar:- 21.1 The rate of lime mortar alsoincludes grinding of mortar.

Ratio 1:1:6 100Cft. 4000.35 16930.70 cu.m 1412.85 5979.90Ratio 1:1:7 ditto 4000.35 16676.35 ditto 1412.85 5890.10Ratio 1:1:8 ditto 4000.35 16470.35 ditto 1412.85 5817.35Ratio 1:1:9 ditto 4000.35 16297.70 ditto 1412.85 5756.35Ratio 1:1:10 ditto 4000.35 16168.35 ditto 1412.85 5710.65

iii) lime, sand mortar 1:2 100Cft. 4000.35 15769.25 cu.m 1412.85 5569.7 ditto ditto

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

7. BRICK WORK

chapter-7(Brickwork) Page 52

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

5 Pacca brick work in ground floor:- ditto i) The composite rate is tobe reduced by 7% and 14%,

i) cement, sand mortar:- if 2nd or 3rd class bricks areused.

Ratio 1:2 100Cft. 5296.05 20710.05 cu.m 1870.55 7314.80 ii) Masonry of boundary wallRatio 1:3 ditto 5296.05 19507.05 ditto 1870.55 6889.90 to be considered as masonryRatio 1:4 ditto 5296.05 18785.25 ditto 1870.55 6634.95 other than building.Ratio 1:5 ditto 5296.05 18304.05 ditto 1870.55 6465.00Ratio 1:6 ditto 5296.05 17942.50 ditto 1870.55 6337.30Ratio 1:7 ditto 5296.05 17705.85 ditto 1870.55 6253.70Ratio 1:8 ditto 5296.05 17496.65 ditto 1870.55 6179.80

ii) lime, cement, sand mortar:- The rate of lime mortar alsoincludes grinding of mortar.

Ratio 1:1:6 100Cft. 5296.05 18226.45 cu.m 1870.55 6437.60Ratio 1:1:7 ditto 5296.05 17974.70 ditto 1870.55 6348.65Ratio 1:1:8 ditto 5296.05 17766.05 ditto 1870.55 6274.95Ratio 1:1:9 ditto 5296.05 17593.40 ditto 1870.55 6214.00Ratio 1:1:10 ditto 5296.05 17464.45 ditto 1870.55 6168.45

iii) lime, sand mortar 1:2 100Cft. 5296.05 17064.95 cu.m 1870.55 6027.35 The rate of lime mortar also

includes grinding of mortar.

6 Add extra labour on item No. 5 for brickworkin:-

i) first floor 100Cft. 804.40 -- cu.m 284.10 -ii) second floor ditto 1787.00 -- ditto 631.15 -iii) third floor ditto 2769.60 -- ditto 978.20 -iv) fourth & subsequent floors ditto 4421.75 -- ditto 1561.75 -

7 Pacca brick work other than building upto 10ft. (3 m) 21.1 i) The composite rate is to beheight. to reduced by 7% and 14%, if 2nd or

21.5 3rd class bricks are used.i) cement, sand mortar:-

ii) Workshops, godowns,, bins,Ratio 1:2 100Cft. 4613.15 20027.15 cu.m 1629.35 7073.60 house type godowns, reservoirs,Ratio 1:3 ditto 4613.15 18824.15 ditto 1629.35 6648.70 filter beds, storage tanks, wells,Ratio 1:4 ditto 4613.15 18102.35 ditto 1629.35 6393.75 screening chambers, collectingRatio 1:5 ditto 4613.15 17621.15 ditto 1629.35 6223.80 tanks, manholes etc. are to beRatio 1:6 ditto 4613.15 17259.60 ditto 1629.35 6096.10 treated as masonry other thanRatio 1:7 ditto 4613.15 17022.95 ditto 1629.35 6012.50 buildings.Ratio 1:8 ditto 4613.15 16815.05 ditto 1629.35 5939.10

ii) lime, cement, sand mortar:- The rate of lime mortar alsoincludes grinding of mortar.

Ratio 1:1:6 100Cft. 4613.15 17543.50 cu.m 1629.35 6196.35Ratio 1:1:7 ditto 4613.15 17289.15 ditto 1629.35 6106.55

chapter-7(Brickwork) Page 53

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

Ratio 1:1:8 ditto 4613.15 17083.15 ditto 1629.35 6033.75Ratio 1:1:9 ditto 4613.15 16910.40 ditto 1629.35 5972.75Ratio 1:1:10 ditto 4613.15 16781.15 ditto 1629.35 5927.10

iii) lime, sand mortar 1:2 100Cft. 4613.15 16382.05 cu.m 1629.35 5786.15 ditto

8 Add extra labour on item No. 7, for every 10ft.(3 m) 100Cft. 804.40 -- cu.m 284.10 -additional height, or part thereof.

9 Extra labour for arch work in brick masonry, including 100Cft. 1382.30 -- cu.m 488.25 - 21.5labour for centring and decentring.

10 Extra for pacca brick work in steining of wells or any other 100Cft. 891.00 1510.90 cu.m 314.70 533.65 21.1 The composite rate is to becircular masonry. to reduced by 7% and 14%, if 2nd or

21.4 3rd class bricks are used.

11 Extra labour for profile and flared walls. 100Cft. 306.50 -- cu.m 108.25 -

12 Extra labour for pacca brick work in piers and abutment:-

i) from 10ft. to 20ft. (3 m to 6 m) height 100Cft. 398.65 -- cu.m 140.80 -ii) above 20 ft. (6 m) height. 100Cft. 804.40 -- cu.m 284.10 -

13 Extra for face work (half brick thick) using special bricks 100Cft. 4143.65 cu.m 1463.55 This item is to be executed onlyinstead of first class bricks. under the written permission of

Superintending Engineer.

14 Reinforced brick work in lintel of openings, laid in 1:3 Per Cft. 131.65 283.05 cu.m 4649.90 9997.35cement mortar, including all labour, material, forms,moulds, lifting & shuttering, etc, (but excluding cost andlabour of steel reinforcement which shall be paid forseparately).

15 Extra for dressing or chamfering bricks for:-

a) special architectural bricks 100 Nos. 2351.30 - % Nos. 2351.30 -b) all other purposes ditto 1175.65 - ditto 1175.65 -

16 Perforated pacca brick walling half brick thick, in ground 21.1 The composite rate is to befloors:- to reduced by 7% and 14%, if 2nd or

21.4 3rd class bricks are used.i) mud mortar 100 Sft. 2008.85 4618.20 Sqm. 216.15 496.90

ii) cement, sand mortar:-

Ratio 1:2 100 Sft. 2654.40 6511.70 sq.m. 285.60 700.65Ratio 1:3 ditto 2654.40 6210.60 ditto 285.60 668.25Ratio 1:4 ditto 2654.40 6030.50 ditto 285.60 648.90

chapter-7(Brickwork) Page 54

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

Ratio 1:5 ditto 2654.40 5910.20 ditto 285.60 635.95Ratio 1:6 ditto 2654.40 5825.65 ditto 285.60 626.85Ratio 1:7 ditto 2654.40 5760.05 ditto 285.60 619.80Ratio 1:8 ditto 2654.40 5711.80 ditto 285.60 614.60

iii) lime, cement sand mortar The rate of lime mortar alsoincludes grinding of mortar.

Ratio 1:1:6 100Sft. 2654.40 5890.80 sq.m 285.60 633.85Ratio 1:1:7 100Sft. 2654.40 5826.15 sq.m 285.60 626.90Ratio 1:1:8 100Sft. 2654.40 5778.40 sq.m 285.60 621.75Ratio 1:1:9 100Sft. 2654.40 5731.85 sq.m 285.60 616.75Ratio 1:1:10 100Sft. 2654.40 5704.45 sq.m 285.60 613.80

iv) lime, sand mortar 1:2 100Sft. 2654.40 5597.75 sq.m 285.60 602.30 ditto

17 Add extra labour on item No. 16 for pacca brick work in:-

i) first floor 100Sft. 405.75 - sq.m 43.65 -ii) second floor ditto 889.95 - ditto 95.75 -iii) third floor ditto 1388.40 - ditto 149.40 -iv) fourth & subsequent floors ditto 2125.90 - ditto 228.75 -

18 Perforated pacca brick walling one brick thick, in ground 21.1 The composite rate is to befloor: to reduced by 7% and 14%, if 2nd or

21.4 3rd class bricks are used.i) mud mortar 100Sft. 2841.50 8052.65 sq.m 305.75 866.45

ii) cement, sand mortar:-

Ratio 1:2 100 Sft. 3986.40 11693.40 sq.m 428.95 1258.20Ratio 1:3 ditto 3986.40 11091.90 ditto 428.95 1193.50Ratio 1:4 ditto 3986.40 10731.00 ditto 428.95 1154.65Ratio 1:5 ditto 3986.40 10490.40 ditto 428.95 1128.75Ratio 1:6 ditto 3986.40 10321.30 ditto 428.95 1110.55Ratio 1:7 ditto 3986.40 10189.70 ditto 428.95 1096.40Ratio 1:8 ditto 3986.40 10087.40 ditto 428.95 1085.40

iii) lime, cement, sand mortar:- The rate of lime mortar alsoRatio 1:1:6 100Sft. 3986.40 10451.60 sq.m 428.95 1124.60 includes grinding of mortarRatio 1:1:7 ditto 3986.40 10321.30 ditto 428.95 1110.55Ratio 1:1:8 ditto 3986.40 10221.45 ditto 428.95 1099.85Ratio 1:1:9 ditto 3986.40 10135.05 ditto 428.95 1090.55Ratio 1:1:10 ditto 3986.40 10071.75 ditto 428.95 1083.70

iv) lime, sand mortar 1:2 100Sft. 3986.40 9869.60 sq.m 428.95 1061.95 ditto

19 Add extra labour on item No. 18 for perforated pacca brickwork in:-

i) first floor 100Sft. 603.30 -- sq.m 213.10 -

chapter-7(Brickwork) Page 55

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

ii) second floor ditto 1340.25 -- ditto 473.35 -iii) third floor ditto 2077.20 -- ditto 733.65 -iv) fourth & subsequent floors ditto 3316.30 -- ditto 1171.30 -

20 Fire brick masonry in fireclay mortar:- 21.1to

i) upto 20 ft. (6.10 m) height including all charges. Per Cft. 49.70 643.95 cu.m 1755.25 22744.65 21.2

ii) Extra for every 5 ft. (1.5 m) additional height, or part 100Cft. 804.40 -- ditto 284.10 - A&C No.I dated 2.9.1998thereof.

21 First class brick walling laid in 1:3 cement sand mortar,reinforced with 1" (25 mm) wide 18 gauge hoop iron:- 21.19

i) 4½" (113 mm) thick walling with hoop iron, bonding 6" 100Sft. 2207.05 8684.25 sq.m 237.50 934.45(150 mm) apart.

ii) 4½" (113 mm) thick walling with hoop iron, bonding 100Sft. 1966.80 7990.70 sq.m 211.65 859.8012" (300 mm) apart.

iii) 3" (75 mm) thick walling with hoop iron, bonding 6" ditto 1747.80 6498.20 ditto 188.05 699.20(150 mm) apart.

iv) 3" (75 mm) thick walling with hoop iron, bonding 12" ditto 1398.25 5645.15 ditto 150.45 607.40(300 mm) apart.

22 Ghilafi work (1½ brick thick wall) 100Cft. 4050.10 9713.65 cu.m 1430.50 3430.85 21.18

23 Dry brick pitching 100Cft. 2456.50 12662.50 cu.m 867.65 4472.40 21.1

24 Sun dried bricks in mud mortar 100Cft. 3424.10 4328.90 cu.m 1209.40 1528.95 21.16

25 Pise wall (mud walling) 100Cft. 1978.40 -- cu.m 698.75 - 21.17

26 Eave brick moulded, weathered and throated with back 21.1 to 21.2brick or drip course cornice, in 1:3 cement mortar:-

i) 3" (75 mm) thick drip course cornice Rft. 25.05 59.70 Metre 82.15 195.80 correction vide A&C No.I ii) 4½" (113 mm) thick drip course cornice. ditto 28.40 108.80 ditto 93.15 356.85 dated 2.9.98iii) 4½" (113 mm) thick eave brick with back brick. ditto 19.65 121.45 ditto 64.45 398.35

27 Laying dressed or moulded brick cornices in 1:6 cement 21.1 to 21.2mortar, plastering or painting complete:-

i) 1 brick Rft. 28.40 43.65 Metre 93.15 143.15ii) 2 bricks ditto 41.80 88.30 ditto 137.10 289.60iii) 3 bricks ditto 55.80 133.55 ditto 183.00 438.05iv) 4 bricks ditto 70.20 180.75 ditto 230.25 592.85

28 Cleaning bricks dismantled from kacha pacca masonry 1,000 1095.85 -- 1,000 1095.85 -Nos Nos

29 Scraping bricks dismantled from pacca masonry 1,000 2066.50 -- 1,000 2066.50 -

chapter-7(Brickwork) Page 56

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

Nos Nos

30 Supplying and filling sand under floor; or plugging in wells. 100Cft. 260.90 1580.90 cu.m 92.15 558.35

31 Providing and laying 2" (50 mm) thick and 15" (375 mm) Rft. 104.60 160.15 Metre 343.10 525.30projected tile band, laid in 1:2 cement sand mortar, withhoop iron 1" (25 mm) wide 18 gauge flat iron sheet 9"apart.

32 First class brick tiles clad by laying tiles in stretcher This item is to be executed onlycourse in cement sand mortar reinforced with 18 SWG under the written permission of thehoop iron strips bonding placed at 2.0' (600 mm) apart Superintending Engineer.horizontally, and at 1.0' (300 mm) interval vertically.

i) 1:3 100Sft. 1966.80 9213.60 sq.m 211.65 991.40ii) 1:4 ditto 1966.80 8924.85 ditto 211.65 960.30

33 Chamfering sides of head regulators and masonry walls to Per Sft. 55.80 -- sq.m 600.40 -increase width.

34 Replacing kallar eaten bricks Each No. 42.75 49.10 Each 42.75 49.10

35 Repairing corners of bridges and other hydraulic masonry Each No. 278.95 353.30 Each 278.95 353.30works

36 Extra labour for drains of bath rooms, etc. Per Lft. 22.30 -- Metre 73.15

37 Maroo corners Each 142.55 -- Each 142.55 Payable in addition to brick workCorner Corner

38 % Sft 4355.40 13974.45 P.Sqm 468.65 1503.65Providing and laying Fair Face Gutka, clading laid with 1:3 cement / red

chapter-8(Stone masonary) Page 57

1 The composite rates do not include the carriage of stone or spawl which will be paid separately by road and/or rail whichever means oftransport is adopted. The supply and carriage to site of work of all other materials is included in the composite rates.

2 The payment of carriage of stone or spawl will be made on the basis of the actual stack measurement (without any reduction factor) of thestone or spawl carried.

3 Where the stone or spawl is issued from stock and the contractor is paid for its carriage and/or labour only; or where the stone or spawl issupplied, carried or handled by the contractor in which no laying is required, the actual stack measurement (without any reduction factor)shall form the basis of the payment of supply or carriage of stone or spawl. The quantity of finished and completed item of work shall formthe basis of laying.

4 Rates for all finished work include the removal of surplus debris, unused material and byproducts.

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

1 Random, rubble masonry (uncoursed), in foundation and 22.10,plinth: 22.11

a) dry masonry 100 Cft. 4130.30 4934.30 cu.m 1458.80 1742.80b) in mud mortar 100 Cft. 5171.10 6253.20 cu.m 1826.45 2208.65c) in lime, sand mortar 1:2 100 Cft. 7885.70 10698.50 cu.m 2785.25 3778.70d) in cement, sand mortar

i) ratio 1:3 100 Cft. 7885.70 14697.20 cu.m 2785.25 5191.05ii) ratio 1:4 100 Cft. 7885.70 13614.50 cu.m 2785.25 4808.65

iii) ratio 1:6 100 Cft. 7885.70 12375.30 cu.m 2785.25 4370.95iv) ratio 1:8 100 Cft. 7885.70 11689.70 cu.m 2785.25 4128.80

2 Coursed rubble masonry hammer dressed, in foundation 22.8and plinth:

a) dry masonry 100 Cft. 5021.30 5825.30 cu.m 1773.50 2057.50b) in mud mortar 100 Cft. 7102.90 8185.00 cu.m 2508.75 2890.95c) in lime, sand mortar 1:2 100 Cft. 8757.85 11346.70 cu.m 3093.25 4007.65d) in cement, sand mortar:

i) ratio 1:3 100 Cft. 8757.85 15189.85 cu.m 3093.25 5365.05ii) ratio 1:4 100 Cft. 8757.85 14227.45 cu.m 3093.25 5025.15

iii) ratio 1:6 100 Cft. 8757.85 13125.55 cu.m 3093.25 4635.95iv) ratio 1:8 100 Cft. 8757.85 12519.85 cu.m 3093.25 4422.00

3 Random rubble masonry (uncoursed) in 22.10ground floor or 20 ft.(6 m) height, building/otherthan building.

a) dry masonry 100 Cft. 4575.80 5379.80 cu.m 1616.15 1900.15b) in mud mortar 100 Cft. 6211.90 7294.00 cu.m 2194.05 2576.25

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

8. STONE MASONRY

chapter-8(Stone masonary) Page 58

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

c) in lime, sand mortar 1:2 100 Cft. 8535.10 11347.90 cu.m 3014.60 4008.10d) in cement, sand mortar:

i) ratio 1:3 100 Cft. 8535.10 15346.60 cu.m 3014.60 5420.40ii) ratio 1:4 100 Cft. 8535.10 14263.90 cu.m 3014.60 5038.00

iii) ratio 1:6 100 Cft. 8535.10 13024.75 cu.m 3014.60 4600.35iv) ratio 1:8 100 Cft. 8535.10 12339.10 cu.m 3014.60 4358.15

4 Coursed rubble masonry hammer dressed, in ground floor 22.8or 20 ft. (6 m) height, building/other than building.

a) dry masonry 100 Cft. 5858.15 6662.15 cu.m 2069.10 2353.05b) in mud mortar 100 Cft. 8776.70 9846.40 cu.m 3099.95 3477.75c) in lime, sand mortar 1:2 100 Cft. 9817.50 12406.35 cu.m 3467.55 4381.90d) in cement, sand mortar:

i) ratio 1:3 100 Cft. 9817.50 16249.50 cu.m 3467.55 5739.30ii) ratio 1:4 100 Cft. 9817.50 15287.10 cu.m 3467.55 5399.40

iii) ratio 1:6 100 Cft. 9817.50 14185.20 cu.m 3467.55 5010.20iv) ratio 1:8 100 Cft. 9817.50 13579.50 cu.m 3467.55 4796.30

5 Ashlar block in course or scabbled masonry (including 22.5dressing, etc.,) in ground floor or 20 ft. (6 m) height, &building/other than building. 22.6

a) in lime, sand mortar 1:2 100 Cft. 25464.10 27955.00 cu.m 8993.90 9873.70b) in cement, sand mortar:

i) ratio 1:3 100 Cft. 25464.10 30621.05 cu.m 8993.90 10815.35ii) ratio 1:4 100 Cft. 25464.10 29899.25 cu.m 8993.90 10560.40

iii) ratio 1:6 100 Cft. 25464.10 29081.20 cu.m 8993.90 10271.50

6 Ashlar fine masonry (including dressing, etc.) in ground 22.3floor or 20 ft. 6 m) height, building/other than building. (A) to

(C) &a) in lime, sand mortar 1:2 100 Cft. 45228.50 47493.90 cu.m 15974.70 16774.85 22.4b) in cement, sand mortar:

i) ratio 1:3 100 Cft. 45228.50 48826.95 cu.m 15974.70 17245.70ii) ratio 1:4 100 Cft. 45228.50 48465.55 cu.m 15974.70 17118.05

iii) ratio 1:6 100 Cft. 45228.50 48064.70 cu.m 15974.70 16976.45

7 Extra labour on items 3, 4, 5 & 6 above for work in:-

i) first floor 100 Cft. 1130.50 - cu.m 399.30 -ii) second floor 100 Cft. 2483.50 - cu.m 877.15 -iii) third floor 100 Cft. 3867.80 - cu.m 1366.10 -iv) fourth floor 100 Cft. 6072.85 - cu.m 2144.95 -

8 Extra labour on items 3,4,5 & 6 above for every 5 ft.(1.5 m) 100 Cft. 982.60 - cu.m 347.05 -

additional height, other than building, or part thereof.

chapter-8(Stone masonary) Page 59

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

9 Extra labour for arch work in stone masonry, including 100 Cft. 2760.25 - cu.m 974.90 - 22.12centering and decentring, etc.

10 Extra labour for:- 22.7

a) coping and caps, etc. 100 Cft. 12830.40 - cu.m 4531.70 -b) cornice & string course 100 Rft. 12830.40 - Rm. 420.85 -

11 Dressing stones:- 22.2i) This rate of dressing shall be paid

a) hammer dressed 100 Sft. 5129.50 - sq.m 551.95 only when the supply of undressedb) rough tooled dressed 100 Sft. 9632.85 - sq.m 1036.50 stone is made.c) chisel dressed 100 Sft. 11684.65 - sq.m 1257.25 ii) In case of masonry, dressing isd) fine dressed 100 Sft. 23802.25 - sq.m 2561.10 already included and this rate shall

not be added thereto.iii) Only dressed surface of stoneshall be measured.

12 Dhajji walling 5"x5" (125 mmx125 mm) thick deodar 100 Sft. 10175.85 15959.55 sq.m 1094.90 1717.25 22.13framing with stone laid in 1:6 cement sand mortar, and 1:4cement sand plaster on both sides.

13 Providing and fixing stone blocks from 2 Cft. Per Cft. 473.80 503.40 cu.m 16734.60 17780.10(0.6 cu.m) to 6 Cft (0.17 cu.m). eachincluding lift upto 20 ft. (6 m)

14 Providing and fixing stone blocks, under 2 Per Cft. 266.95 299.55 cu.m 9428.65 10580.10Cft. (06 cu.m) each including lift upto 20 ft.(6 m)

chapter-9(Roofing) Page 60

Rates for all finished works include the removal of surplus debris unused material and byproducts.

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

1 First class tile roofing, consisting of 4" (100 mm) earth 100Sft. 7174.75 12339.45 sq.m 772.00 1327.75 23.1 Add extra 13%, 32% & 51% onand 1" (25 mm) mud plaster with Gobri leeping over ½" (13 labour rates only or 6%, 15% & 23%mm) thick cement plaster 1:6 with 34 lbs. per %Sft or on composite rates for 2nd, 3rd, 4th1.72 Kg/sq.m hot bitumen coating sand blinded, provided & sub- sequent floors, respectively.over 2 layers of tiles 12"x6"x1¼" (300x150x30 mm) laid in1:6 cement mortar with ½" (13 mm) thick sand wichedlayer of 1:6 cement mortar, including 1:2 cement pointingunderside of tiles, complete, including curing, etc.

2 Second class tile roofing consisting of 4" (100 mm) earth 100Sft. 5565.65 9281.90 sq.m 598.85 998.75 23.2 dittoand 1" (25 mm) mud plaster with Gobri leeping over ½" (13mm) thick cement plaster 1:6 with 34 lbs. per %Sft or1.72 Kg/sq.m of hot bitumen coating sand blinded,provided over one layer of 12"x6"x2" (300x150x50 mm)tiles laid in 1:6 cement mortar, including 1:2 cementpointing underneath of tiles complete including curing, etc.

3 Covering mud roof with coal tar, and fine sand. 100Sft. 302.60 953.50 sq.m 32.55 102.60 23.1 to 23.2 ditto

4 Filling spaces in between:-

a) Wooden battens over beams, filled with 100Sft. 557.90 2321.45 sq.m 60.05 249.80 Add extra 13%, 32% & 51% ondeodar wood pieces (spacers). roof area labour rates only or 6%, 15% &

b) RCC battens, filled with CC block 1:3:6. -ditto- 1064.20 1461.60 114.50 157.25 23% on composite rates for 2nd,c) Spaces filled with bricks. -ditto- 292.90 766.60 31.50 82.50 3rd, 4th & sub- sequent floors,

respectively.

5 Single layer of tiles 9"x4½"x1½" (225x113x40 mm) laid 100Sft. 1745.00 6122.70 sq.m 187.75 658.80 23.1 dittoover 4"(100 mm) earth and 1" (25 mm) mud plaster withoutBhoosa, grouted with cement sand 1:3 on top of RCC roofslab, provided with 34 lbs. per %Sft. or 1.72 Kg/Sq.mbitumen coating sand blinded.

6 Jack arch roofing 4½" (113 mm) thick laid in 1:5 cement 23.3 to For steel part and its erection etc.mortar, including an average depth of 4" (100 mm) cement 23.5 items 10 & 14 under Chapter IRONconcrete in haunches and over crown, with 3" (75 mm) WORK be referred.earth and 1" (25 mm) plaster, soffits of arches cementplaster 1:6 and ½" (13 mm) thick. The rate also includes Add extra 13%, 32% & 51% onbitumen coating, centring, laying skew bricks in cement labour rates only or 6%, 15% & 23%mortar (1:3), and encasing exposed flanges of the joints on composite rates for 2nd, 3rd, 4thwith fine cement concrete 1:2:4 using stone aggregate:- & sub- sequent floors, respectively.

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

9. ROOFING

chapter-9(Roofing) Page 61

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

a) cement concrete in haunches 1:6:12. 100Sft. 7887.25 18712.55 sq.m 848.65 2013.45b) cement concrete in haunches 1:3:6. ditto 7887.25 19948.95 ditto 848.65 2146.50

7 Jack arch roofing 4½" (113 mm) thick laid in 1:5 cement 23.3 For steel part and its erection etc.mortar, including an average depth of 4" (100 mm) cement to items 10 & 14 under Chapter IRONconcrete in haunches and over crown, with ½" (13 mm) 23.5 WORK be referred.cement plaster 1:6 on top (except earth filling mud plasterand gobri) soffit of arches cement plastered. The rate also Add extra 13%, 32% & 51% onincludes bitumen coating, centring, laying skew bricks in labour rates only or 6%, 15% & 23%cement sand mortar (1:3), and encasing exposed flanges on composite rates for 2nd, 3rd, 4thof the joints with fine cement concrete 1:2:4 using stone & sub- sequent floors, respectively.aggregate:-

a) cement concrete in haunches 1:6:12. 100Sft. 6413.35 17734.05 sq.m 690.10 1908.20b) cement concrete in haunches 1:3:6. ditto 6413.35 18212.65 ditto 690.10 1959.70

8 Extra for vaulted jack arch roofing. 100Sft. 1425.60 sq.m 153.40 - ditto

9 Jack arch roofing of shingle and cement concrete 1:3:6, 100Sft. 9197.10 17880.20 sq.m 989.60 1923.90 23.3 ditto

4½" (113 mm) thick at crown, with ½" (13 mm) cement toplaster including cost of supplying, erecting and 23.5dismantling centring.

10 Earth filling over roof including watering, ramming with 1" 23.1 Add extra 13%, 32% & 51% on(25 mm) mud plaster finished, with gobri leeping: to labour rates only or 6%, 15% & 23%

23.3 on composite rates for 2nd, 3rd, 4tha) 3" (75 mm) thick earth filling and 1" (25 mm) mud 100Sft. 790.05 1103.20 sq.m 85.00 118.70 & sub- sequent floors, respectively.

plaster

b) 4" (100 mm) thick earth filling and 1" (25mm) 100Sft. 1036.50 1411.45 sq.m 111.55 151.85mud plaster

11 1/8" (3 mm) thick gobri leeping on roofs or floors. 100Sft. 103.90 118.25 sq.m 11.20 12.70 ditto ditto

12 Two coats of bitumen laid hot using 34 lbs. per %Sft, or 100Sft. 626.20 1873.45 sq.m 67.40 201.60 23.11.72 Kg per square metre over roof and blinded with sandat one Cft. per %Sft. (0.003 cu.m per sq.m)

13 Providing & Fixing corrugated galvanized iron sheets with G.I. bolts, 23.7 Add extra 13%, 32% & 51% onnuts, limpet and bitumen washers, wind ties, complete in labour rates only or 6%, 15% & 23%all respects without valleys and ridges:- on composite rates for 2nd, 3rd, 4th

& sub- sequent floors, respectively,a) 20 BWG 100Sft. 1115.85 14458.65 sq.m 120.05 1555.75 on items 13 to 18.b) 22 BWG 100Sft. 1115.85 12408.8 sq.m 120.05 1335.2c) 24 BWG 100Sft. 1115.85 10104.25 sq.m 120.05 1087.2

14 Khassi parnalas in cement, sand mortar 1:2, 12" (300 Rft. 79.65 101.20 Metre 261.25 331.95 23.10

chapter-9(Roofing) Page 62

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

mm) outside width finished smooth with a floating coat ofneat cement.

15 Khuras on roof 2'x2'x6" (600 x 600 x 150 mm) Each 300.45 494.65 Each 300.45 494.65 23.10

16 Bottom Khuras of brick masonry in cement mortar 1:6, Each 300.45 827.65 Each 300.45 827.65 23.104'x2'x4½" (1200x600x113 mm) over 3" (75 mm) cement concrete 1:4:8.

17 Plain galvanized iron sheets 22 SWG rain water down pipeincluding clamp and fixing in position.

a) 4" (100 mm) diameter down pipe Per Rft. 61.55 167.35 Metre 201.90 548.90b) 5" (125 mm) diameter down pipe Per Rft. 61.55 190.00 Metre 201.90 623.20

18 Plain galvanized iron sheet flashing, 22 gauge. Per Sft. 61.55 139.35 sq.m 662.30 1499.40 23.11

19 Providing and fixing 1/16" (1.5 mm) thick lead flashing over Per Sft. 17.80 84.25 Sq.m 191.55 906.55roof expansion joint complete in all respects.

20 Cast iron rain water downpipe fixed in position, excluding Add extra 13%, 32% & 51% onheads and shoes, but including painting and clamps, etc:- labour rates only or 6%, 15% & 23%

on composite rates for 2nd, 3rd, 4tha) 4" dia (100 mm) cast iron down pipe. Per Rft. 55.80 218.05 Metre 183.00 715.20 & sub- sequent floors, respectively,b) 3" (75 mm) cast iron down pipe. Per Rft. 55.80 194.30 Metre 183.00 637.30 on items 19 to 24

21 Rain water down pipe cast iron head fixed in place, Each 230.85 536.65 Each 230.85 536.65including cost of clamp holdfast and painting.

22 Shoes, bends or offsets for cast iron rain water down pipe, Each 83.70 326.00 Each 83.70 326.00including fixing and painting.

23 Plain GI sheet iron spouts fixed in position, including Each 256.50 376.95 Each 256.50 376.95 23.10painting.

24 Laying ½" (13 mm) thick deodar ceiling complete, 100Sft. 5912.30 19506.60 sq.m 636.15 2098.90 26.1including sawing, planing and fixing.

25 Flat sheet roof with galvanized iron plain sheets, includingbattens, rolls, screws, clips etc. (Planking to be paid forseparately):-

a) 22 BWG sheets roofing 100Sft. 3571.50 15821.40 sq.m 384.30 1702.40 23.60b) 24 BWG sheets roofing 100Sft. 3571.50 14293.95 sq.m 384.30 1538.05

26 Asbestos cement corrugated sheet roofing including 100Sft. 2456.50 6363.10 sq.m 264.30 684.65 23.8

necessary overlaps, and GI hook bolts, nuts, screws,washers and bitumen washers, etc. (excluding valleys and

chapter-9(Roofing) Page 63

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

ridges, etc).

27 Extra labour for erection of GI sheets, flat sheet or 100Sft. 296.55 -- sq.m 31.90 - 23.6asbestos sheet roofing, above 20' (6.10 m) height indifficult position, including lifting with care and specialscaffolding along live electric wires.

28 Fixing asbestos cement sheet ridges and valleys ¼" Per Rft. 29.00 78.45 Metre 95.10 257.30 23.8(6 mm) thick.

29 Plain galvanized iron sheet ridging, including fixture, 23.6timber for ridge roll and ridge sheeting:-

a) 6" (150 mm) lap and 18" (450 mm) Per Rft. 76.95 394.00 Per Metre 252.40 1292.30overall, of 22 gauge G.I sheet ridging.

b) 9" (225 mm) lap and 24" (600 mm) Per Rft. 100.45 396.10 Per Metre 329.50 1299.20overall, of 24 gauge G.I sheet ridging.

c) 12" (300 mm) lap and 30" (750 mm) Per Rft. 100.45 461.65 Per Metre 329.50 1514.20overall, of 22 gauge G.I sheet ridging.

30 Plain 22 gauge G.I sheet gutter semi circular Per Rft. 50.20 169.20 Per Metre 164.65 555.00 23.118" (200 mm) dia meter.

31 Making masonry ventilators in cement, sand Each 1115.85 1610.50 Each 1115.85 1610.50mortar 1:4

32 Fixing water spouts or parnalas. Each 334.75 -- Each 334.75 - 23.10

33 Making drip course 2"x½" (50x13 mm) under RCC slab edges Per Rft. 14.40 15.70 Metre 47.25 51.50in outer opening, in cement, sand mortar 1:2.

34 Supplying and laying of twin G.I sheet 20 SWG duly Per Sft. 42.05 308.25 sq.m 452.45 3316.75painted with bitumen, with polythene film in between 300gauge, to provide a sliding joint under the bearing of thebeams, including 3" (75 mm) long, 3/8" (10 mm) dia bar toact as holdfast on wall and beam.

35 Providing and laying roof insulation, comprising of singlelayer of tiles 9"x4½"x1½" (225x113x40 mm) grouted withcement sand mortar 1:3 laid over 2" (50 mm) thick earth(including mud plaster) over thermopore sheet, overpolythene sheet 300 gauge over a layer of bitumen,complete in all respects:-

i) Thermopore sheet ½ " (13 mm) thick 100Sft. 2695.75 7185.40 sq.m 290.05 773.15ii) Thermopore sheet ¾ " (20 mm) thick 100Sft. 2695.75 7311.40 sq.m 290.05 786.70iii) Thermopore sheet 1" (25 mm) thick 100Sft. 2700.25 7441.85 sq.m 290.55 800.75

36 Providing and fixing AC rain water down pipe 4" (100 mm) Rft. 16.75 300.50 Metre 54.95 985.65

chapter-9(Roofing) Page 64

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

dia, with shoe, T-bend, clamp, etc.

37 Making jharries in existing brick masonry for providing Rate will be increased by 1.5 timerecesses for bearing of RCC roof slab, including repairing for stone masonry or plain; concrete;the damaged face:- and 2 times for reinforced cement

concrete.i) for slabs upto 6" (150 mm) thick Rft. 17.80 19.70 Metre 58.40 64.60ii) for slabs exceeding 6" to 12" (150 to 300 mm) thick. Rft. 30.65 34.10 Metre 100.55 111.85

38 Making recess in existing brick masonry for bearing of Rates will be increased by 1.5 timesbeam, girder, R.S. Joist, etc. including repairing damaged for stone masonry and plainface:- cement concrete and two times

for reinforced cement concrete.i) upto 1.0' (300 mm) height of girder or beam. Each 74.25 80.60 Each 74.25 80.60

ii) for every 6" (150 mm) additional height or part thereof. Each 35.65 38.70 Each 35.65 38.70

39 Hoisting RS. Beams and wooden beams and placing in Each 323.95 - Each 323.95 -position.

40 Hoisting and placing in position sahl ballies, over roof. Each 47.80 - Each 47.80 -

41 Hoisting precast R.C.C/prestressed concretebattens and placing in position.

a) 5' to 6' (1.50 to 1.83 m) long Each 46.30 - Each 46.30 -b) 6' to 7' (1.83 to 2.13 m) long Each 64.80 - Each 64.80 -c) 7' to 8' (2.13 to 2.44 m) long Each 81.00 - Each 81.00 -d) 8' to 9' (2.44 to 2.74 m) long Each 108.00 - Each 108.00 -e) above 9' (2.74 m) length Each 129.55 - Each 129.55 -

42 Hoisting and placing in position R.C. trough: Applicable only to roof trough(inverted tees & trough) for height of

a) upto 10' (3 m) in length Each 129.55 - Each 129.55 - 1st storey only.b) 10' to 11' (3 to 3.36 m) in length ditto 161.95 - ditto 161.95 -c) 11' to 12' (3.36 to 3.66 m) in length ditto 215.95 - ditto 215.95 -d) 12' to 13' (3.66 to 3.96 m) in length ditto 249.20 - ditto 249.20 -e) 13' to 14' (3.96 to 4.26 m) in length ditto 269.95 - ditto 269.95 -f) 14' to 15' (4.26 to 4.57 m) in length ditto 294.50 - ditto 294.50 -g) 15' to 16' (4.57 to 4.88 m) in length ditto 323.95 - ditto 323.95 -h) 16' to 17' (4.88 to 5.19 m) in length ditto 359.90 - ditto 359.90 -i) 17' to 18' (5.19 to 5.49 m) in length ditto 462.75 - ditto 462.75 -j) 18' to 19' (5.49 to 5.80 m) in length ditto 498.35 - ditto 498.35 -k) 19' to 20' (5.80 to 6.10 m) in length ditto 539.90 - ditto 539.90 -

43 Hoisting and placing in position R.C. inverted battens:-

i) upto 10' (3.05 m) span Each 100.55 - Each 100.55 -ii) from 10' to 12' (3.05 to 3.66 m) span ditto 223.45 - ditto 223.45 -iii) from 12' to 13' (3.66 to 3.96 m) span ditto 268.15 - ditto 268.15 -

chapter-9(Roofing) Page 65

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

iv) from 13' to 14' (3.96 to 4.26 m) span ditto 335.15 - ditto 335.15 -v) from 14' to 15' (4.26 to 4.57 m) span ditto 365.65 - ditto 365.65 -vi) from 15' to 16' (4.57 to 4.88 m) span ditto 402.20 - ditto 402.20 -vii) from 16' to 18' (4.88 to 5.49 m) span ditto 502.75 - ditto 502.75 -viii) from 18' to 20' (5.49 to 6.10 m) span ditto 804.40 - ditto 804.40 -

44 Reinforced cement concrete spout, including fixing in Each 446.35 745.75 Each 446.35 745.75position, with top and bottom Khurras.

45

a) 1" thick % Sft 407.90 5,447.90 P.Sqm 43.90 586.20 b) 1-1/2" thick % Sft 407.90 8,093.90 P.Sqm 43.90 870.90 c) 2" thick % Sft 407.90 10,487.90 P.Sqm 43.90 1,128.50

Providing and Laying Insulation material of Extruded Polystyrene XPS inRigid Insulation / Foam Board on roof or walls, Density 32-38Kg/M,compressive strength 250-400 kpa, R-value 5 per inch thickness and waterobsorption (1% by volume, cell structure clored cell) i/c cutting and placing in position. complete in all respect.

chapter-10(Flooring) Page 66

Rates for all finished works include the removal of surplus debris, unused material and byproducts

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

1 Laying Murum flooring, consisting of 1"(25 mm) layer of 100 Sft. 3201.65 4471.00 sq.m 344.50 481.10fine powdery or flakey variety of Murum, laid over 6"(150mm) good hard layer of Murum spreaded over 9"(225 mm)thick sub-base comprising of hand packed rubble orbroken bricks properly watered and rammed, provided overwell rammed earth.

2 Earth flooring, consisting of 6"(150 mm) thick consolidated 100 Sft. 1098.10 1407.10 sq.m 118.15 151.40 24.1layer of moistened earth, including ramming.

3 Providing, laying, watering and ramming brick ballast 1½" 100 Cft. 2508.15 4098.15 cum. 885.90 1447.45to 2"(40 mm to 50 mm) gauge mixed with 25% sand, forfloor foundation, complete in all respects.

4 Mud flooring, consisting of 6"(150 mm) thick consolidated 100 Sft. 1992.20 2463.80 sq.m 214.35 265.10 24.2layer of moistened earth and finished off with 1"(25 mm)mud plaster and gobri leeping.

5 Dry brick paving laid flat, sand grouted, including 100 Sft. 1015.25 3764.30 sq.m 109.25 405.05 24.12

preparation of bed by watering, ramming and bringing thesame to proper camber, by ½"(13 mm) thick mud plaster.

6 Dry brick on edge paving, sand grouted, including 100 Sft. 1836.35 5921.65 sq.m 197.60 637.15 24.12preparation of bed by watering, ramming & bringing thesame to proper camber, by ½ "(13 mm) thick mud plaster.

7 Grouting 4½"(113 mm) dry brick work with cement mortar 100 Sft. 995.80 1487.80 sq.m 107.15 160.10ratio 1: 5

8 Flat brick flooring laid in 1:6 cement mortar, over a bed of 100 Sft. 1800.20 5381.60 sq.m 193.70 579.05 24.43/4" (20 mm) thick cement mortar, 1:6.

9 Brick on edge flooring, laid in 1:6 cement mortar, over a 100 Sft. 2,291.50 7,501.25 sq.m 246.55 807.15 24.4bed of ¾" (20 mm) thick cement mortar 1:6.

10 Brick tiles (12"x6"x2") (300x150x50mm) laid in 1:6 100 Sft. 2,250.25 4,320.85 sq.m 242.15 464.90 dittocement mortar, over a bed of ¾" (20 mm) thick cementmortar 1:6.

11 Brick ties (9"x4½"x1½")(225 mm x 113 mm x 40 mm) laid 100 Sft. 2,473.00 5,848.60 sq.m 266.10 629.30 24.4flat in 1:3 cement mortar, over a bed of 3/4"(20 mm) thickcement mortar 1:6.

12 Cement tiles (8"x8"x¾")(200 x 200 x 20 mm) laid flat in 100 Sft. 1,478.30 6,440.00 sq.m 159.05 692.95 24.71:2 cement mortar, over 3/4" (20 mm) thick bed of cement

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

10. FLOORING

chapter-10(Flooring) Page 67

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

mortar 1:2.

13 Cement concrete tiles laid in 1:2 cement mortar, over 24.83/4" (20 mm) thick bed of cement mortar 1:2:-

(a) 12"x12"x1" (300 x 300 x 25 mm) 100 Sft. 1,478.30 4,573.25 sq.m 159.05 492.10 (b) 9"x9"x¾" (225 x 225 x 20 mm) ditto 1,478.30 5,814.25 ditto 159.05 625.60 (c) 6"x6"x¾"(150 x 150 x 20 mm) ditto 1,478.30 8,259.10 ditto 159.05 888.70

14 Coloured cement tiles (8"x8"x¾")(200 x 200 x 20 mm) of 100 Sft. 1,478.30 6,469.55 sq.m 159.05 696.10 24.7

approved dark shade laid flat in 1:2 cement mortar, over ¾" (20 mm) bedding mortar of 1:2.

15 Providing and laying topping of cement concrete 1:2:4, 24.9 If glass or marble strips are usedincluding surface finishing and dividing in panels:- for panelling, it will be paid extra as

per item No. 41 or 42. (a) 1"(25 mm) thick 100 Sft. 1,586.70 2,807.75 sq.m 170.75 302.10 (b) 1¼"(30 mm) thick ditto 1,586.70 3,078.05 ditto 170.75 331.20 (c) 1½"(40 mm) thick ditto 2,018.85 3,780.50 ditto 217.25 406.80 (d) 1¾"(45 mm) thick ditto 2,018.85 4,064.10 ditto 217.25 437.30 (e) 2"(50 mm) thick ditto 2,451.05 4,830.70 ditto 263.75 519.80 (f) 2¼"(56 mm) thick ditto 2,529.30 5,161.65 ditto 272.15 555.40 (g) 2½"(62 mm) thick ditto 2,883.20 5,705.35 ditto 310.25 613.90 (h)2¾"(70 mm) thick ditto 2,883.20 6,067.90 ditto 310.25 652.90 (i) 3"(75 mm) thick ditto 2,883.20 6,382.55 ditto 310.25 686.75

16 Providing and laying conglomerate flooring (two coat work) 24.10 If glass or marble strips are used

with top layer of ½"(13mm) thick wearing surface, for panelling, it will be paid extra asconsisting of one part of cement and 2 parts of stone per item No. 41 or 42.chips passing 3/16"(6 mm) sieve, over bottom layer ofcement concrete 1:3:6, including surface finishing anddividing in panels:-

(a) 1½"(40 mm) thick 100 Sft. 2,354.00 4,063.60 sq.m 253.30 437.25 (b) 1¾"(45 mm) thick ditto 2,354.00 4,244.00 ditto 253.30 456.65 (c) 2"(50 mm) thick ditto 3,008.95 5,173.40 ditto 323.75 556.65

17 Add extra in cement concrete floor topping, if finished with 100 Sft. 557.90 1,067.95 sq.m 60.05 114.90pigment and polishing.

18 Extra labour for each storey above ground, for mosaic, 100 Sft 469.65 - sq.m 50.55 - On items 19-25 & 29-34conglomerate, tiles, stone and wooden floor.

19 Flag stone flooring in lime mortar 1:2, over ¾"(20 mm) 24.5bedding mortar, in platforms and floors, etc.

(a) 2"(50 mm) thick 100 Sft. 4,841.05 6,504.30 sq.m 520.90 699.85 (b) 3"(75 mm) thick ditto 4,841.05 6,761.70 ditto 520.90 727.55

chapter-10(Flooring) Page 68

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

20 Asphalt flooring , including preparation of proper base 24.10remelting, setting out, and finishing complete:-

(a) 1"(25 mm) thick topping 100 Sft. 2,011.00 12,890.90 sq.m 216.40 1387.05 (b) ½"(13 mm) thick topping ditto 1,575.10 7,137.75 ditto 169.50 768.00 (c) ¼"(6 mm) thick topping ditto 1,157.00 4,040.10 ditto 124.50 434.70

21 13/8"(35 mm) thick mosaic flooring, consisting of 3/8"(10 If glass or marble strips are usedmm) mosaic topping of one part of cement and marble for panelling, it will be paid extra aspowder in the ratio of 3:1 and two parts of marble chips, per item No. 41 or 42.laid over 1"(25 mm) thick flooring of 1:2:4 cement concreteincluding rubbing and polishing complete :-

(a) using grey cement 100 Sft. 7,174.80 9,800.30 sq.m 772.00 1054.50 (b) using white cement ditto 7,174.80 10,234.65 ditto 772.00 1101.25

22 1½"(40 mm) thick mosaic flooring, consisting of ½ "(13 If glass or marble strips are used

mm) mosaic topping of one part of cement and marble for panelling, it will be paid extra aspowder in the ratio of 3:1 and two parts of marble chips, per item No. 41 or 42.laid over 1"(25 mm) thick floor of 1:2:4 cement concrete,including rubbing and polishing complete with finishing :-

(a) using grey cement 100 Sft. 7,174.80 9,988.75 sq.m 772.00 1074.80 (b) using white cement ditto 7,174.80 10,834.45 ditto 772.00 1165.80

23 Providing and laying floor of mosaic marble chips tiles 100 Sft. 4,108.55 8,234.45 sq.m 442.10 886.05 24.81"(25 mm) thick of approved quality and shade, laid inwhite cement and pigment, over ¾"(20 mm) thick beddingof cement sand mortar 1:2, including finishing andpolishing, complete.

24 Laying floor of approved white glazed tile ¼" (6 mm) thick 100 Sft. 5,320.90 12,880.45 sq.m 572.55 1385.95 24.7in white cement 1:2 over ¾" (20mm) thick cement mortar1:2, complete.

25 Laying floor of approved coloured glazed tiles ¼ "(6 mm) 100 Sft. 5,320.90 14,436.70 sq.m 572.55 1553.40 dittothick, laid in white cement and pigment on a bed of ¾"(20 mm) thick cement mortar 1:2.

26 Rubbing and polishing old grit/ mosaic floor, including 100 Sft. 1,502.15 1,635.85 sq.m 161.65 176.00 The composite rate will be reducedrepairing voids, uneven surface, complete in all respects. by Rs. 150.00 per % Sft or Rs.13.95 per

Sq. metre respectively, if nopolishing is done.

27 Rubbing and polishing grit floor, including repairing voids, 100 Sft. 1,600.05 1,736.50 sq.m 172.15 186.85 The composite rate will be reduceduneven surface, complete in all respects by Rs. 150.00 per % Sft or Rs.13.95 per

Sq. metre respectively, if nopolishing is done.

chapter-10(Flooring) Page 69

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

28 Cleaning and washing mosaic or marble floor with caustic 100 Sft. 213.75 259.30 sq.m 23.00 27.90 24.6soda mixture.

29 Shisham wood boarding or strip flooring 3/4" (20mm) thick 100 Sft. 4,455.00 36,690.35 sq.m 479.35 3947.90 24.13(sawn to required size) tongued and grooved or splayedrebated fixed with brass screws on deodar wood battens1½ "x2"(40 x 50 mm),size placed at 12"(300 mm) centreto centre, including two coats of bitumen laid hot on thebase.

30 Deodar wood boarding or strip flooring 3/4" (20 mm) thick 100 Sft. 5,021.30 41,695.80 sq.m 540.30 4486.45 ditto(sawn to required size) tongued and grooved or splayedrebated fixed with brass screws on deodar wood battens1½"x2"(40 x 50 mm) size , placed at 12"(300 mm) centre,to centre including two coats of bitumen laid hot on thebase.

31 Teak wood boarding or strip flooring ½" (13 mm) "thick 100 Sft. 4,274.60 49,777.50 sq.m 459.95 5356.05 ditto(sawn to required size) to tongued and grooved screwedon deodar wood battens 1½ " x2"(40 x 50 mm) size,placed at 12"(300 mm) centre to centre, including 2 coatsof bitumen laid hot on base.

32 Shisham wood block flooring 1"(25 mm) thick cut to 100 Sft. 4,629.90 41,938.35 sq.m 498.20 4512.55 24.13required size, fixed on a layer of asphalt bitumen laid onbase.

33 Teak wood block 1"(25 mm) thick cut to required size, 100 Sft. 4,274.60 84,496.75 sq.m 459.95 9091.85 dittofixed on a layer of asphalt bitumen laid on base.

34 Laying wooden paving of hard wood on edge in coal tar dittoand asphalt:- 100 Sft. sq.m

Per Inch per cm (a) Shisham wood thickness 2,753.50 26,028.00 thickness 296.30 2800.60 (b) Kikar wood ditto 2,753.50 16,930.80 ditto 296.30 1821.75

35 Tile skirting laid in 1:2 cement mortar, over ¾"(20 mm)thick cement mortar, 1:2 including cement washing andfilling joints complete:-

(a) cement tiles 100 Sft. 2,416.15 7,797.75 sq.m 260.00 839.05 (b) mosaic tiles ditto 3,942.85 11,266.45 ditto 424.25 1212.25

36 Providing grey cement skirting or dado 3/8"(10 mm) thickincluding rounding of corner and straight ening of top edgeand finishing to smooth surface afterplastering :-

(a) 1:2 cement, sand mortar 100 Sft. 2,943.20 3,569.50 sq.m 316.70 384.10

chapter-10(Flooring) Page 70

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

(b) 1:3 cement, sand mortar ditto 2,943.20 3,384.75 ditto 316.70 364.20 (c) Extra if skirting or dado is finished ditto 195.70 463.35 ditto 21.05 49.85 with pigment of any colour.

37 White glazed tile (6"x6"x¼") (6 mm) thick dado jointed in white 100 Sft. 6,549.20 14,108.70 sq.m 704.70 1518.10 24.7cement and laid over 1:2 cement sand mortar 3/4" (20mm)thick, including finishing.

38 Coloured glazed tile dado (6"x6"¼") (6mm) thick in pigment over 100 Sft. 6,549.20 15,647.60 sq.m 704.70 1683.70 ditto1:2 cement, sand mortar 3/4"(20mm) thick, including finishing.

39 Mosaic dado or skirting with one part of cement andmarble powder in the ratio of 3:1 and two parts of marblechips, laid over ½"(13 mm) thick cement plaster 1:3,including rubbing and polishing, complete with finishing:

(a) using grey cement: i) 3/8"(10 mm) thick 100 Sft. 8,618.30 10,002.20 sq.m 927.35 1076.25 ii) ½"(13 mm) thick ditto 8,618.30 10,846.75 ditto 927.35 1167.10

(b) using white cement :

'i) 3/8"(10 mm) thick 100 Sft. 8,618.30 11,062.35 sq.m 927.35 1190.30 ii) ½"(13 mm) thick ditto 8,618.30 11,433.50 ditto 927.35 1230.25

40 Rubber flooring, consisting of 12"x12"x1/8" Per Sft. 20.65 83.55 sq.m 222.20 899.00 24.14 The cost of base for rubber flooring(300x300x3mm) rubber tiles, laid on firm foundation. is not included in the rate and is

payable separately.

41 Providing and fixing glass strip 5mm thick and 1½" Per Rft. - 4.20 Metre - 13.80 Labour for fixing already included in(40 mm) wide, for dividing the mosaic flooring into panels. items No. 15, 16, 21and 22 of this

Chapter.

42 Providing and fixing marble strip of any shade for dividingthe mosaic flooring into panels

a) s Size 1½" x 3/8" (40 x 10 mm) Per Rft. - 6.60 Metre - 21.65b) s Size 1½" x ¼" (40 x 6 mm) ditto - 4.60 ditto - 15.10

43

a) 50-mm thick P.Sft 14.35 84.50 Sq.m 154.30 909.30 b) 60-mm thick P.Sft 14.35 95.60 Sq.m 154.30 1,028.45 c) 80-mm thick P.Sft 14.35 118.90 Sq.m 154.30 1,279.55

Providing and laying Tuff pavers, having 7000 PSI, crushing strengthof approved manufacturer, over 2" to 3" sand cushion i/c grouting withsand in joints i/c finishing to require slope . complete in all respect. (50% Grey / 50% Coloured)

chapter-11(Surface Rendering) Page 71

1 PLASTERING, POINTING, WHITE WASHING, COLOUR WASHING AND DISTEMPERING, ETC.2 Rates for all finished works include the removal of surplus debris, unused material and byproducts.

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

1 Mud plaster on walls (excluding Gobri leeping) upto 20' 25.7(6.00 m) height:-

a) ½" (13 mm) thick 100 Sft. 466.90 549.00 sq.m 50.25 59.05b) 1" (25 mm) thick ditto 657.90 822.05 ditto 70.80 88.45

2 Mud plaster on floor or roof (excluding Gobri leeping):- ditto Add extra 13%, 32% and 51% above

the labour rates only or 6%, 15% &a) ½" (13 mm) thick 100 Sft. 421.35 503.40 sq.m 45.35 54.15 23% on the composite rates for 2nd,

3rd, 4th and subsequenct floors,b) 1" (25 mm) thick ditto 421.35 585.50 ditto 45.35 63.00 respectively.

3 Cement lime plaster 1:7:12 (cement, lime and sand) upto 25.1 to 25.620' (6.00 m) height.

a) ¼" (6 mm) thick 100 Sft. 1323.95 1495.70 sq.m 142.45 160.95

b) ½" (13 mm) thick ditto 1323.95 1667.25 ditto 142.45 179.40

4 Cement Neru plaster 1:2 (cement and sand) upto 20' ditto(6.00 m) height:-

a) ¼" (6 mm) thick 100 Sft. 1323.95 1770.90 sq.m 142.45 190.55b) ½" (13 mm) thick ditto 1323.95 2040.90 ditto 142.45 219.60

5 2" (50 mm) stucco cement plaster 1:2:4 (cement, sand 100 Sft. 3413.40 6148.70 sq.m 367.30 661.60 ditto

and shingle) upto 20' (6.00 m) height.

6 Providing and laying machine sprayed plaster ½" (13 mm) dittothick, using cement and chips zero gauge, over theexisting plastered and roughened surface, upto 20' (6.00m) height:-

i) ratio 1:1 100 Sft. 1121.30 2798.90 sq.m 120.65 301.15ii) ratio 1:1½ ditto 1121.30 2690.60 ditto 120.65 289.50iii) ratio 1:2 ditto 1121.30 2628.20 ditto 120.65 282.80

7 Cement plaster 1:2 upto 20' (6.00 m) height:- 25.1to

a) 3/8" (10 mm) thick 100 Sft. 1323.95 1950.25 sq.m 142.45 209.85 25.6b) ½" (13 mm) thick ditto 1323.95 2136.05 ditto 142.45 229.85c) ¾" (20 mm) thick ditto 1658.70 2911.25 ditto 178.50 313.25

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

11. SURFACE RENDERING

chapter-11(Surface Rendering) Page 72

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

8 Cement plaster 1:3 upto 20' (6.00 m) height:- ditto

a) 3/8" (10 mm) thick 100 Sft. 1323.95 1765.50 sq.m 142.45 189.95b) ½" (13 mm) thick ditto 1323.95 1912.70 ditto 142.45 205.80c) ¾" (20 mm) thick ditto 1658.70 2541.80 ditto 178.50 273.50

9 Cement plaster 1:4 upto 20' (6.00 m) height:- ditto

a) 3/8" (10 mm) thick 100 Sft. 1323.95 1715.80 sq.m 142.45 184.60b) ½" (13 mm) thick ditto 1323.95 1822.60 ditto 142.45 196.10c) ¾" (20 mm) thick ditto 1658.70 2435.85 ditto 178.50 262.10

10 Cement plaster 3/8" (10 mm) thick under soffit of R.C.C. ditto i) This item shall be applicable toroof slabs only, upto 20' height. buildings meant for human

habitation only, such as buildingslike residences, offices,

a) 1:2 100 Sft. 1502.15 2252.70 sq.m 161.65 242.40 educational institutions andb) 1:3 ditto 1502.15 2067.30 ditto 161.65 222.45 hospitals, etc. It shall not bec) 1:4 ditto 1502.15 2017.60 ditto 161.65 217.10 admissible on godowns; bins;

agriculture, poultry and animalsheds; cycle stands; garrages; etc.ii) The thickness of the plaster willnot be more than 3/8" (10 mm)thick.

11 Cement plaster 1:5 upto 20' (6.00 mm) height:- 25.1 to 25.6

a) 3/8" (10 mm) thick 100 Sft. 1323.95 1672.55 sq.m 142.45 179.95b) ½" (13 mm) thick ditto 1323.95 1747.55 ditto 142.45 188.05c) ¾" (20 mm) thick ditto 1658.70 2355.90 ditto 178.50 253.50

12 Cement plaster 1:6 upto 20' (6.00 mm) dittoheight:-a) 3/8" (10 mm) thick 100 Sft. 1323.95 1610.75 sq.m 142.45 173.30b) ½" (13 mm) thick ditto 1323.95 1704.30 ditto 142.45 183.40c) ¾" (20 mm) thick ditto 1658.70 2232.30 ditto 178.50 240.20

13 Applying floating coat of cement 1/32" (0.8 mm) thick. 100 Sft. 756.40 1003.60 sq.m 81.40 108.00 25.4 to 25.6

14 Lime pointing flush upto 20' (6.00 m) height including 100 Sft. 989.20 1109.75 sq.m 106.45 119.40 25.8

raking joints, in lime, sand mortar 1:2.

15 Lime pointing struck joints on walls, upto 20' (6.00 m) 100 Sft. 1502.15 1622.70 sq.m 161.65 174.60 dittoheight, including raking joints in lime sand mortar 1:2.

16 Cement pointing flush upto 20' (6.00 m) heihgt:- ditto

a) ratio 1:2 100 Sft. 1323.95 1792.70 sq.m 142.45 192.90b) ratio 1:3 ditto 1323.95 1684.10 ditto 142.45 181.20

chapter-11(Surface Rendering) Page 73

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

17 Cement pointing 1:2 flush on floor. 100 Sft. 989.20 1457.95 sq.m 106.45 156.90 ditto

18 Cement pointing struck joints, on walls, upto20' (6.00 m) hiehgt:-

a) ratio 1:2 100 Sft. 1502.15 1970.90 sq.m 161.65 212.05b) ratio 1:3 ditto 1502.15 1862.30 ditto 161.65 200.40

19 Pointing flush on stone work, upto 20' (6.00 m) height. 25.8

a) in lime mortar 1:2 (lime, sand) 100 Sft. 1189.05 1349.80 sq.m 127.95 145.25b) in cement mortar 1:3 ditto 1189.05 1549.20 ditto 127.95 166.70c) on stone work raised:-

i) in lime mortar 1:2 100 Sft. 2214.95 2375.70 sq.m 238.35 255.65ii) in cement mortar 1:3 ditto 2214.95 2575.10 ditto 238.35 277.10

20 Raking and washing joints of stone masonry 100 Sft. 712.80 - sq.m 76.70 - ditto

(old work).

21 Raking and washing joints of brick masonry (old work). 100 Sft. 356.40 - sq.m 38.35 - ditto

22 Priming coat of chalk under distemper. 100 Sft. 133.90 155.75 sq.m 14.40 16.75 25.11

23 Distempering:- ditto

a) new surface:-i) one coat 100 Sft. 135.25 216.45 sq.m 14.55 23.30ii) two coats ditto 200.10 305.90 ditto 21.55 32.90iii) three coats ditto 265.00 395.40 ditto 28.50 42.55

b) old surface:- i) one coat 100 Sft. 124.25 180.85 sq.m 13.35 19.45ii) two coats ditto 200.10 256.70 ditto 21.55 27.60

24 Colour washing:- 25.10

a) new surface:- i) one coat 100 Sft. 123.10 151.80 sq.m 13.25 16.35ii) two coats ditto 184.65 226.55 ditto 19.85 24.40

b) old surface:-

i) one coat 100 Sft. 123.10 140.85 sq.m 13.25 15.15ii) two coats ditto 184.65 213.75 ditto 19.85 23.00

25 White washing:- 25.9

a) new surface:- i) one coat 100 Sft. 123.10 146.55 sq.m 13.25 15.75ii) two coats ditto 184.65 219.75 ditto 19.85 23.65

chapter-11(Surface Rendering) Page 74

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

iii) three coats ditto 239.10 285.80 ditto 25.75 30.75

b) old surface:- i) one coat 100 Sft. 123.10 140.70 sq.m 13.25 15.15ii) two coats ditto 184.65 213.85 ditto 19.85 23.00

26 Gobri leeping:- 25.7

a) on walls 100 Sft. 146.10 150.20 sq.m 15.70 16.15b) over roofs ditto 124.70 128.85 ditto 13.40 13.85

27 Striking joints of burnt bricks in lime or cement mortar. 100 Sft. 178.20 - sq.m 19.15 - 25.8 Payable with fresh masonry, when

the face of the work is not to be plastered/pointed.

28 Extra for lime, mud or cement plaster and pointing from 100 Sft. 242.10 - sq.m 26.05 -20' (6.00 m) and above for each additional 10' (3.00 m) height or part thereof.

29 Caulking joints of sleeper wall, with sand and coaltar. 100 Sft. 669.50 1054.50 sq.m 72.05 113.45

30 Caulking joints of sleepers, withmud and chopped straw. 100 Sft. 669.50 699.60 sq.m 72.05 75.30

31 Extra cost of labour and material for red oxide pigment in 100 Sft. 222.75 323.25 sq.m 23.95 34.80

cement pointing to match with the colour of bricks.

32 Providing grooved cement sand plaster 1:3 over existingplastered and roughened surface upto 20' (6.00 m) height.

i) 3/8" (10 mm) thick 100 Sft. 1502.15 1943.70 sq.m 161.65 209.15ii) ½" (13 mm) thick ditto 1502.15 2090.90 ditto 161.65 225.00

33 Providing and fitting expanded metal edge bead for Rft. 10.60 40.20 Metre 34.75 131.85corners, with nails on both sides of edges.

34 Petty repairs to fire place.

i) Single Each 234.35 286.30 Each 234.35 286.30ii) Double Each 468.65 572.60 Each 468.65 572.60

Area above 100 Sft (10.76 sq.m)35 Petty repair to main rooms. Each 488.90 627.65 Each 488.90 627.65

Area upto 100 Sft (10.76 sq.m)36 Petty repair to small rooms. Each 244.45 313.80 Each 244.45 313.80

37 Petty repair to verandah. Each 488.90 599.80 Each 488.90 599.80The height will be taken from the

38 Extra labour for white washing, colour washing, priming coat 100 Sft. 20.50 - sq.m 2.20 - floor, roof or ground uderneath asand distempering, etc. from 20' (6.00 m) height and above, Per Per the case may be on the siderequiring scaffolding, for every additional 10' (3.00m) height coat coat towards which the work is to beor part thereof. done.

chapter-12(Wood Work) Page 75

1 No extra rate is to be paid for sawing as the rates are inclusive of these.2 Rates for all finished works include the removal of surplus debris, unused material and byproducts.

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

1 Plain wood work sawn, wrought, planed and fixed 26.1inposition, including cost of nails and screws etc.

a) Deodar wood Per Cft. 784.10 3849.85 cu.m 27694.40 135976.70b) Shisham wood ditto 891.00 3267.25 ditto 31470.10 115399.25

2 Plain wood work for regulation karries or needles, etc. 26.1including sawing, planning, wroughting wood and providingand fixing steel parts of karries i.e. end strip and rods, etc.

a) Deodar wood Per Cft. 507.85 3625.70 cu.m 17937.25 128059.70b) Shisham wood ditto 507.85 2953.70 ditto 17937.25 104324.70

3 First class teak wood wrought joinery in doors and 26.1windows, etc. panelled, panelled and glazed or fully toglazed and fixed in position, including chowkat, holdfast, 26.3tower bolt, chocks, rubber stop, cleats/G.I. clamps, &chords with hooks, nails, screws, etc. complete 26.7(excluding sliding bolt and lock):-

i) 2" (50 mm) thick Per Sft. 135.25 1561.90 sq.m 1455.30 16806.05ii) 1¾" ( 45 mm) thick ditto 135.25 1459.25 ditto 1455.30 15701.55iii) 1½" (40 mm) thick ditto 135.25 1359.00 ditto 1455.30 14622.85

4 First class teak wood wrought joinery in wire gauze doors 26.8 i) This also includes the cost ofand windows with frames 22 SWG galvanized iron wire to wood required for extra thickness ofgauze 12x12 meshes to square inch, (5x5 meshes in cm2) 26.10 chowkat.including brass fittings, sash bars, etc. complete:- ii) If 24 SWG wire gauge is used,

the composite rate shall bea) teak wood framing 1¾" (45 mm) thick with wire gauze reduced by Rs.4.70 per sft. and

fixed in position:- Rs.50.60 per sq.m.

i) without springs or spring hinges. Per Sft. 24.75 632.85 sq.m 266.30 6809.45

ii) with springs or spring hinges. ditto 24.75 636.55 ditto 266.30 6849.30

b) teak wood framing 1½" (40 mm) thick, with wiregauze fixed in position:-i) without springs or spring hinges. Per Sft. 24.75 583.95 sq.m 266.30 6283.30ii) with springs or spring hinges. ditto 24.75 588.15 ditto 266.30 6328.50

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

12. WOOD WORK

chapter-12(Wood Work) Page 76

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

c) G.I. wire gauze 22 SWG, 12x12 meshes per square Per Sft. 44.55 200.2 sq.m 479.35 2154.15inch, (5x5 meshes per cm2) fixed to chowkat with ¾"(20 mm) teak wood strips and screws.

d) G.I. wire gauze 22 SWG, 12x12 meshes per square Per Sft. 41.75 611.65 sq.m 449.25 6581.35inch (5x5 meshes per cm2) fixed with ½" (13 mm) stripon separate frame of teak wood 2"x2" (50x50 mm),for windows, etc.

5 P/F expanded metal ½" to ¾" (13 to 20 mm) mesh, 16 Per Sft. 55.70 317.25 sq.m 599.35 3413.60Guage, fixed to chowkat with 1" (25 mm) teak wood coverstrips and screw etc., complete.

6 Providing and fixing expanded metal ½" (13 mm) to ¾" Per Sft. 55.70 463.55 sq.m 599.35 4987.8020 mm), 16 gauge, fixed to chowkat with 1" (25 mm)covermoulding and screws, including teak wood frame 2"x2" (50 mm x 50 mm)

7 First class deodar wood wrought joinery in doors and 26.1 towindows, etc. panelled, or panelled or glazed, or fully 26.3 & 26.7glazed, fixed in position, including chowkat, holdfast, hinges, tower bolts, chocks, rubber stop, cleats/G.I. clamps, handles and chord with hooks, etc. complete (excluding sliding bolt or lock):-

a) 2" thick (50 mm) Per Sft. 132.00 1044.65 sq.m 1420.30 11240.45b) 1¾" thick (45 mm) ditto 132.00 979.70 ditto 1420.30 10541.65c) 1½" thick (40 mm) ditto 132.00 934.45 ditto 1420.30 10054.70

8 Deodar wood framed, braced and battened doors and 26.1, 26.2windows, complete with iron fittings and fixed in position, & 26.4including chowkats:-

a) 2¼" (56 mm) thick, with 1¼" (30 mm) Per Sft. 148.50 703.90 sq.m 1597.85 7573.95battens and 1" (25 mm) planks.

b) 1¾" (40 mm) thick with 1" (25 mm) ditto 137.10 611.50 ditto 1475.20 6579.75battens and ¾" (20 mm) planks.

9 1" (25 mm) thick battneded doors and windows fitted in Per Sft. 169.30 424.05 sq.m 1821.65 4562.80position, complete with iron fittings, without chowkats.

10 Deodar battened ledged and braced doors and windows 26.1, 26.22¼" (56 mm) thick (1¼" (30 mm) thick ledge braces and 26.4 to1" (25 mm) thick battens complete with iron fittings, Per Sft. 159.90 691.45 sq.m 1720.50 7440.00 26.6chowkats and fixed in position.

11 a) Deodar wood framed with braces and 22 SWG G.I. 26.1, 26.2 If 24 gauge G.I. sheet is used, the

sheet facing, including holdfast, wooden beadings, & 26.4 composite rate will be reduced byhinges, and locking arrangements as directed by the Re.4.70 per Sft. (Rs. Per 50.60

chapter-12(Wood Work) Page 77

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

Engineer incharge:- Sq.m) for G.I. facing on one sideand Rs.9.40 per Sft. (Rs.101.20

i) G.I. sheet facing on one side. Per Sft. 69.60 543.30 sq.m 748.90 5845.90 per Sq.m) for G.I. sheet facing onii) G.I. sheet facing on both sides. ditto 76.55 574.65 ditto 823.70 6183.25 both sides.

b) Partal wood framed with braces and 22 SWG G.I.sheet facing, including holdfast, wooden beadings, -ditto-hinges and locking arrangements, as directed by theEngineer-in-charge:-

i) G.I. sheet facing on one side. Per Sft. 69.60 261.15 sq.m 748.90 2809.95ii) G.I. sheet facing on both sides. ditto 76.55 292.50 ditto 823.70 3147.30

12 First class deodar wood wrought joinery work in wire 26.8 to i) This also includes the cost ofgauze doors and windows, with 22 SWG G.I. wire gauze, 26.10 wood required for extra thickness12x12 meshes per square inches (5x5 per cm2) including of chowkat.iron fittings etc. complete:-

ii) If 24 SWG wire gauze is useda) deodar wood framing 1¾" (45 mm) thick with wire the composite rate shall be

gauze fixed in position:- reduced by Rs.4.70 per sft orRs.50.60 per sq.m.

i) without springs or spring hinges. Per Sft. 74.25 458.35 sq.m 798.95 4931.85ii) with springs or spring hinges. ditto 74.25 462.50 ditto 798.95 4976.50

b) deodar wood framing 1½" (40 mm) thick, with wiregauze fixed in position:-i) without springs or spring hinges Per Sft. 74.25 428.10 sq.m 798.95 4606.35ii) with springs or spring hinges ditto 74.25 430.80 ditto 798.95 4635.40

c) G.I. wire gauze 22 SWG, 12x12 meshes per squareinch, (5x5 in cm2) fixed to chowkat, with ¾" Per Sft. 55.70 164.55 sq.m 599.35 1770.55('20 mm) thick deodar wood strip and screws.

d) G.I. wire gauze 22 SWG 12x12 meshes per squareinch, (5x5 meshes in cm2) fixed to chowkat, with ½" Per Sft. 83.55 403.05 sq.m 899.00 4336.80(13 mm) strip on separate frame of deodar wood 2" x2" (50 mm x 50 mm).

13 Making and fixing trellis doors and windows of deodar Per Sft. 123.75 474.10 sq.m 1331.55 5101.30 26.1wood, complete. 26.2

14 Providing and fixing mild steel chowkat of doors, windows,C.window, etc. including holdfast, making and threadingholes for hinges, etc. complete:-

a) M.S. angle iron 1½"x 1½"x ¼" (40x40x6 mm) welded Per Sft. 29.65 155.60 sq.m 319.05 1674.25with M.S. flat 2"x ¼" (50 mm x 6 mm)

chapter-12(Wood Work) Page 78

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

b) M.S. tee iron 1½"x 1½"x ¼" (40x40x6 mm) welded Per Sft. 29.65 119.85 sq.m 319.05 1289.60with M.S. flat 2"x ¼" (50 mm x 6 mm)

15 Providing and fixing M.S. sheet hollow pressed frame ofdoors, windows, C. windows, etc. (chowkat only) of 20SWG welded with M.S. flat 6"x 1¼" x 1/8" (150mmx30mmx3mm) M.S. holdfast 9"x1"x1/8"(225mmx25mmx3mm) welded/screwed 4" (100 mm) longiron hinges, including filling chowkat with cement sandmortar 1:8 and embedding holdfast in cement concrete1:2:4, complete in all respects:

a) single rebate Per Sft. 45.80 139.75 sq.m 492.80 1503.70b) double rebate ditto 53.75 161.45 ditto 578.35 1737.20

16 Extra for providing and fixing iron double spring hinges, Per Sft. 4.25 32.35 sq.m 45.75 348.10 26.2with brass fittings (it shall include brass finger plate, 6" door area door area(150 mm) tower bolt).

17 Providing and fixing brass spring hinges to wire gauzed Each 89.10 241.50 Each 89.10 241.50doors.

18 Providing and fixing sliding bolt to doors:-

i) iron sliding bolt, 10" (250 mm) long Each 83.55 145.95 Each 83.55 145.95ii) iron sliding bolt, 12" (300 mm) long ditto 83.55 187.95 ditto 83.55 187.95iii) brass sliding bolt, 10" (250 mm) long ditto 83.55 186.75 ditto 83.55 186.75iv) brass sliding bolt, 12" (300 mm) long ditto 83.55 343.95 ditto 83.55 343.95

19 Extra for brass fittings to doors and windows, except forhinges, which shall be of iron:-

i) deodar wood panelled or panelled and Per Sft. 2.55 12.85 sq.m 27.45 138.25glazed or fully glazed.

ii) deodar wood wire gauzed shutters. ditto 2.55 10.35 ditto 27.45 111.35

20 Extra for providing and fixing approved quality rim lock Each 267.30 478.50 Each 267.30 478.50adjustable over the style surface.

21 Providing and fixing, approved quality mortice lock. Each 371.25 562.05 Each 371.25 562.05

22 Providing and fixing, expended metal ½" to ¾" (13 mm to20 mm) mesh 16 gauge.

a) fixed to chowkat with 1" (25 mm) thick deodar wood Per Sft. 55.70 240.35 sq.m 599.35 2586.15strip and screws, etc.

b) fixed with 1" (25 mm) cover moulding and screws, ditto 55.70 329.95 ditto 599.35 3550.25including deodar wood frame 2"x2" (50 x 50 mm)

chapter-12(Wood Work) Page 79

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

23 a) Providing and fixing deodar wood almirah 9" to 12" For hollow frame shutter with(225 mm to 300 mm) depth, including boxing with Per Sft. 178.20 1486.75 sq.m 1917.45 15997.70 commercial ply on one side, theback, shelves, shutter and brass fittings, etc. composite rate shall be reduced bycomplete. Rs.54.00 per Sft;or Rs.580.00

per Sqm and for hollow frameshutter with commercial ply onboth sides, the composite rateshall be reduced by Rs.22.80 perSft. or Rs.245.00 per Sq. metre.

b) Providing and fixing deodar wood almirah 9" to 12"(225 mm to 300 mm)depth with shelves, shutters, Per Sft. 133.65 539.25 sq.m 1438.05 5802.35brass fittings, etc., without boxing and back,complete.

24 Providing and fixng class room almirah consiting of 1" (25 Per Sft. 106.25 385.70 Sq.m 1143.45 4149.95mm) thick solid flush shutter with deodar wood lipping ¼" (6 mm) thick all around (Approved Factory Manufactured) fixed in deodarwood frame 3"x1" (75mm x 25mm) including full hinges C.P. fittings with RCC (1:1½:3) shelves 1½" (40 mm) thickincluding 3 coats of painting.

25 Providing and fixing wooden box type wardrobe 22" (550 If hollow flush door leaves 1" thickmm) deep including ¾" (20 mm) thick boxing and shelves, (25 mm) with commercial plyhanger rods, hard board back drawers, brass fittings, 3 ply) on both sides of deodarlocking arrangements, handles, internal bolts, shoe rods, wood frame and partal woodetc. including three coats of enamel paint:- bracing and deodar wood lipping is

used, the composite rate will bei) Partal wood boxing and deodar wood reduced by Rs.13.00 per Sft. or

shelves and leaves, etc. Per Sft. 205.60 747.75 sq.m 2212.40 8046.00 Rs.140.00 per Sq. metre.

ii) Deodar wood boxing, and deodar wood ditto 198.85 903.65 ditto 2139.35 9723.05shelves and leaves, etc.

26 Providing and fixing wardrobe 22" (550 mm) deepconsisting of RCC shelves 1½" (40 mm) thick including ½"thick vinboard boxing and back (one side ply) vinboard Per Sft. 79.75 612.85 Sq.m 858.30 6594.05shutter ¾" (20 mm) thick including deodar wood lipping ¼"(6 mm) on all edges, fixes including deodar wood frame3"x1" (75mm x 25mm) with hanger rod in centre positiondrawers at bottom and openable shutter on upper portionincluding full hinges C.P. fitting and painting 3 coatscomplete.

27 Providing and fixing chowkat for doors, windows and C.windows, including holdfast, etc.

a) Teak wood Per Sft. 39.60 533.00 Sq.m 426.10 5735.30b) Deodar wood ditto 24.75 339.05 ditto 266.30 3648.30

chapter-12(Wood Work) Page 80

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

c) Shisham wood ditto 29.70 188.90 ditto 319.55 2032.50

28 Making and fixing deodar wood planking in eave boards, 26.1etc. planed on both sides, rebated and fixed including 26.2nails and screws, bolts and brackets:-

a) 1" (25 mm) thick Sft. 44.55 295.65 sq.m 479.35 3181.30b) ¾" (20 mm) thick ditto 44.55 232.85 ditto 479.35 2505.25c) ½" (13 mm) thick ditto 44.55 170.25 ditto 479.35 1832.00

29 Making and fixing deodar wood shelves, including dittobrackets:-

i) 1" (25 mm) thick Sft. 44.55 295.65 sq.m 479.35 3181.30ii) 1½" (40 mm) thick ditto 44.55 421.05 ditto 479.35 4530.65iii) 2" (50 mm) thick ditto 44.55 546.45 ditto 479.35 5879.95

30 a) Making and fixing cleats for doors and windows, Each 53.45 130.15 Each 53.45 130.15 26.1 andincluding hinges and screws. 26.2

b) Making and fixing cleats with brass hooks for roof Each 71.30 110.50 Each 71.30 110.50ventilators.

c) Providing and fixing door stops of 1½" (40 mm) dia Each 7.45 60.55 Each 7.45 60.55rubber block.

d) Providing and fixing G.I. hook with clamps for doors. Each 2.40 11.30 Each 2.40 11.30

31 Hard wood railing of any shape and design, including dittobends and corners, fixed in position, including polishingcomplete as directed.

a) Shisham wood Per Rft. 201.45 359.60 Metre 660.70 1179.45b) Teak wood ditto 150.15 750.35 ditto 492.50 2461.10

32 Deodar wood dado or picture rail 3"x1½" (75x40 mm) as Per Rft. 75.10 237.30 Metre 246.25 778.25 26.1per approved design including moulding and fixed in place, 26.2cost of screws, nails, plugs, and painting complete.

33 Sawing wood by hand:-

a) Soft wood (deodar, kail or chir). 100Sft. 891.00 - sq.m 95.85 -b) Hard wood (shisham, kikar, teak or ditto 1188.00 - ditto 127.85 -

sahl).

34 Sawing wood by machine:

a) Soft wood 100Sft. 525.69 - sq.m 56.55 -b) Hard wood ditto 790.00 - ditto 85.00 -

chapter-12(Wood Work) Page 81

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

35 Making and fixing sun-shade of deodar wood including Per Sft. 62.35 363.45 sq.m 671.10 3910.45 26.1fixing brackets.

36 Making and fixing 1" (25 mm) thick kail or chir wooden dittonotice board with frame. Per Sft. 74.25 207.35 sq.m 798.95 2231.10

37 Making deodar punkha pole 10'x6"x6" Each 267.30 6920.10 Each 267.30 6920.10 ditto(3.0 m x 150 mm x 150 mm)

38 Dismantling and refixing eave boards. Per Rft. 19.10 -- Metre 62.65 --

39 Making wooden stair-cases complete 2' to 3' (600 to 900 Per Rft. 294.50 2250.45 Metre 965.95 7381.50 26.1mm) wide frame 1½" (40 mm) thick planks of deodarwood, including hand rails.

40 Providing and fixing partition, including frame work:-

a) Sheets on one side of framework:-

i) Hard board 100Sft. 1392.20 12100.50 sq.m 149.80 1302.00ii) Ply wood ¼" (6 mm) thick ditto 1392.20 13612.50 ditto 149.80 1464.70iii) Masonite ditto 1392.20 13864.50 ditto 149.80 1491.80

b) Sheets on both sides of frame work:-

i) Hard board 100Sft. 1670.65 13795.15 sq.m 179.75 1484.35ii) Ply wood ¼" (6 mm) thick ditto 1670.65 24136.50 ditto 179.75 2597.10iii) Masonite ditto 1670.65 17323.15 ditto 179.75 1863.95

41 Providing and fixing ceiling, including frame work:-

i) Hard board 100Sft. 2728.00 10311.85 sq.m 293.55 1109.55ii) Chip board ditto 2728.00 12951.85 ditto 293.55 1393.60iii) Ply wood ¼" (6 mm) thick ditto 2728.00 12831.85 ditto 293.55 1380.70iv) Masonite ditto 2728.00 12231.85 ditto 293.55 1316.15

42 Providing and fixing thermopore false ceiling, including In case of acousticwooden frame panelling, cost of M.S. clamps, making Thermopore sheet, theholes in walls and repairing damaged surface, complete in composite rate will beall respects:- increased by Rs.9.00 per Sft.

a) Deodar wood frame panelling:

i) ¾" (20 mm) thick 100Sft. 3056.15 9820.65 sq.m 328.85 1056.70ii) 1" (25 mm) thick ditto 3056.15 9896.35 ditto 328.85 1064.85

b) Partal wood frame panelling:

chapter-12(Wood Work) Page 82

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

i) ¾" (20 mm) thick 100Sft. 3056.15 7398.15 sq.m 328.85 796.05ii) 1" (25 mm) thick ditto 3056.15 7524.15 ditto 328.85 809.60

43 a) Fixing door, including chowkats. Each 418.45 - Each 418.45 -

b) Fixing windows, including chowkats. ditto 209.20 - ditto 209.20 -44 a) Glazing with panes (16 oz. to 18 oz.,) Per Sft. 31.80 65.95 sq.m 342.40 709.45 26.12

including cost of putty.

b) Glazing with panes (16 oz. to 18 oz.) Per Sft. 40.10 97.45 sq.m 431.40 1048.45using deodar wooden fillets and putty.

45 Glazing with panes (24 oz. to 26 oz.), using Per Sft. 59.65 116.60 sq.m 641.85 1254.70 26.12putty and deodar wooden fillets.

46 a) Cutting to required size and fixing glass Per Sft. 22.30 23.40 sq.m 239.70 251.65panes with putty

b) Cutting to required size and fixing glass panes with Per Sft. 33.40 50.90 sq.m 359.50 547.55wooden fillets and putty.

47 Glazing with plate glass 1/4" (6 mm) thick including the costof deodar wood fillets and putty:-

a) Glazing upto 8 sft (0.75 sq.m) Per Sft. 51.25 115.90 sq.m 551.25 1246.90

b) Glazing exceeding 8 Sft (0.75 sq.m) but not exceeding 24 sft Per Sft. 51.25 116.10 sq.m 551.25 1249.00(2.25 sq.m).

48 Providing and fixing 1½" (40 mm) thick deodar woodpanelled or panelled and glazed, doors and windows, withmild steel chowkat (frame), etc. complete in all respects(excluding sliding bolt or lock) with:-

i) M.S. angle iron 1½"x1½"x¼", welded Per Sft. 190.40 699.00 sq.m 2048.80 7521.40i) (40 mmx 40 mmx 6mm) with M.S. flat

2"x¼" (50 mm x 6 mm)ii) M.S. tee iron 1½"x1½"x¼", welded Per Sft. 190.40 651.50 sq.m 2048.80 7010.10

(40 mmx40 mmx 6mm) with M.S. flat½"x¼" (13 mm x 6 mm)

49 Providing and fixing 1½" (40 mm) thick hollow flush doors Teak ply would be used under theand windows with commercial ply (3 ply) on both faces of written permission of thedeodar wood shutter frame 1¼" (30 mm) thick and partal superintending Engineer, and thewood braces at about 3" (75 mm) apart and deodar wood composite rate of using teak plylipping 1½"x3/8" (40 mmx10 mm) fixed with M.S. chowkat will be increased by Rs.20.00 per(frame) including chromium plated fittings, etc. complete Sft. ( 216.00 per Sq.m)in all respects (without sliding bolt or lock):-

i) M.S. angle iron 1½"x1½"x¼", welded Per Sft. 132.00 577.30 sq.m 1420.30 6211.90(40 mmx40 mmx 6mm) with M.S. flat2"x¼" (50 mm x 6 mm)

chapter-12(Wood Work) Page 83

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

ii) M.S. tee iron 1½"x1½"x¼", welded Per Sft. 132.00 541.55 sq.m 1420.30 5826.85(40 mmx40 mmx 6mm) with M.S. flat½"x¼" (13 mm x 6 mm)

50 Providing and fixing 1½" (40mm) thick solid flush door shutter It C.P. Finger plate and kick plate(Approved Factory Manufactured) with commercial ply (5 mm thick) are not provided/fixed theon both sides double pressed and deodar wood lipping Per Sft. 72.75 365.25 sq.m 782.65 3930.25 composite rate will be reduced by1½"x3/8" (40mm x 10mm) around shutter including Rs.15.20 per Sft.chromium plated fitting, iron hinges with aluminium kick Reduce composite rate by Rs.20.00 plate 22 SWG on both sides & finger plate complete in all per. Sq/ft or Rs.215 per sq.meter ifrespect. 3-mm commmercial ply is used

51 Providing and fixing panelled door of M.S. sheet, with Per Sft. 124.40 385.80 sq.m 1338.40 4151.15forged door leaves of M.S. sheet 22 SWG fitted in hollowframe chowkat 3"x4½" (75 mmx113 mm) made of M.S.sheet 18 SWG filled with plain cement concrete 1:3:6 etc.complete with all fittings and hammer painting, includingcarriage to site and fixing in position.

52 Providing and laying 24 SWG aluminum kick plate 4" (100 Per Rft. 26.75 40.50 Metre 87.65 132.85mm) high, fixed with screws 4" (100 mm) centre to centre,on bottom rail of flush doors only of commercial ply.

53 Providing and fitting curtain railing to doors and windows, Per Rft. 11.15 126.15 Metre 36.55 413.80comprising of TOSO-elite Japan made superior type ofrailing or equivalent, fixed over 4"x¾" (100mmx20mm)deodar wood strip, including painting.

54 Providing and fixing M.S. flat ½"x1/8" (13mm x 3mm) grill Per Sft. 63.45 200.90 sq.m 682.95 2161.70including ¾" x 1/8" (20 mmx3 mm) M.S. flat frame, inwindows of approved design, including painting threecoats, complete in all respects.

55 Providing and fixing G.I. wire gauze 22 SWG, 12x12 Per Sft. 22.70 67.85 sq.m 244.05 730.10 It 24 SWG wire gauze is used, themeshes per square inch, (5x5 meshes in cm2) fixed to composite rate shall be reduced bysteel window, complete with flat iron patti ½"x 1/8" (13 Rs.4.70 per Sft. or Rs.50.60 P.SQMmmx3 mm) and machine made screws.

56 Providing and fixing wooden moulding stopper 2½"x5/8"(63 x 16 mm) on door frame fitted with ply of approvedquality complete in all respects.

a) Teak wood moulding Per Sft. 27.85 121.40 sq.m 299.60 1306.05b) Deodar wood moulding ditto 27.85 67.50 ditto 299.60 726.35

57 Providing and fixing deodar wood dolly frame having Rate shall be paid as per surface 1½"x1½" (40 x 40 mm) vertical and horizontal double post area of dolly frame with 1½"x1½" (40 x 40 mm) full width of james braces at e-g 0.75' x (3.5' + (2 x 7))12" (300 mm) including filling of the spaces in between

chapter-12(Wood Work) Page 84

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

braces with 1:3:6 PCC fixing ply of approved qualityincluding holdfasts complete in all respects.

a) Teak wood ply Per Sft. 68.55 325.35 sq.m 737.45 3500.60b) With commercial ply ditto 68.55 319.20 ditto 737.45 3434.40

58 Providing and fixing ornamental wooden architrave 3" x (1½" tapered to ¼") all along the door frame complete in allrespect.

a) Teak wood architrave Per Sft. 12.50 75.10 sq.m 134.50 808.05b) Deodar wood architrave ditto 12.50 38.55 ditto 134.50 414.90

59 Providing and fixing Vin board cabinet 3/4" thick with

drawers 3"deep in 'Kitchen including termite proofing and polishing with synthetic enamel as specified, with handles hinges,screws etc., complete in all respects.

i) 1-1/2' deep,without back Per Sft 144.70 561.05 sq.m 1556.80 6036.90ii) 1-1/2' deep,with back Per Sft 144.70 612.65 sq.m 1556.80 6592.10iii) 2' deep,without back Per Sft 144.70 611.35 sq.m 1556.80 6578.25iv) 2' deep,with back Per Sft 144.70 662.95 sq.m 1556.80 7133.45

chapter-13(Painting & Var) Page 85

1 The rates include charges for scaffolding and other arrangements.

2 The rates for all finished works include the removal of surplus debris, unused material and by products

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

1 a) Cleaning painted wood work with oil and water. 100 Sft. 156.55 190.95 sq.m 16.85 20.55

b) Oiling woodwork with boiled linseed oil. 100 Sft. 104.35 152.25 sq.m 11.25 16.40 27.7

2 Brushing and scraping blisters of old paints from 100 Sft. 313.10 -- sq.m 33.70 - 27.3woodwork.

3 Scraping, brushing and removing old paint from metal 100 Sft. 1252.40 -- sq.m 134.75 - 27.9surface.

4 Painting old surfaces:- 27.127.3 &

a) Painting corrugated surfaces, patent roofing, etc. with 27.9oil paint.

i) first coat 100 Sft. 368.25 545.95 sq.m 39.60 58.75ii) each subsequent coat ditto 278.95 369.70 ditto 30.00 39.80

b) Painting sashes, fanlights, glazed or gauzed doorsand windows:-

i) first coat 100 Sft. 223.15 317.65 sq.m 24.00 34.20ii) each subsequent coat ditto 189.70 266.80 ditto 20.40 28.70

c) Painting doors and windows, any type:

i) first coat 100 Sft. 368.25 549.70 sq.m 39.60 59.15ii) each subsequent coat ditto 278.95 416.95 ditto 30.00 44.85

d) Painting guard bars, gates of iron bars, gratings,railing (including standards, braces etc.) and similaropen work:-i) first coat 100 Sft. 223.15 317.65 sq.m 24.00 34.20ii) each subsequent coat ditto 189.70 266.80 ditto 20.40 28.70

e) Painting fillets, framings, skirtings, pipes, gutters andsimilar linear work not exceeding 6" in girth:-

i) first coat 100 Lft. 189.70 284.20 Metre 6.20 9.30ii) each subsequent coat ditto 133.90 211.00 ditto 4.40 6.90

f) Painting small detached articles, not exceeding onesquare foot (Sq.m) of painted surface:-

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

13. PAINTING AND VARNISHING

chapter-13(Painting & Var) Page 86

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

i) first coat 100 Nos. 543.35 721.10 100 Nos. 543.35 721.10ii) each subsequent coat ditto 493.70 588.15 ditto 493.70 588.15

g) Painting small detached articles, exceeding onesquare foot (Sq.m) but not exceeding three squarefeet (Sq.m) of painted surface:-

i) first coat 100 Nos 1241.95 1771.40 100 Nos 1241.95 1771.40ii) each subsequent coat ditto 732.80 997.55 ditto 732.80 997.55

5 Painting new surface:- 27.127.2 &

a) Preparing surface and painting corrugated surface, 27.9patent roofing, etc.

i) priming coat. 100 Sft. 539.45 770.10 sq.m 58.05 82.85ii) each subsequent coat of paint. ditto 190.25 411.50 ditto 20.45 44.30

b) Preparing surface and painting sashes, fan light,glazed or gauzed doors and windows etc. any type(including edges):-

i) priming coat. 100 Sft. 228.30 388.05 sq.m 24.55 41.75ii) each subsequent coat of paint. ditto 160.70 286.25 ditto 17.30 30.80

c) Preparing surface and painting of doors and windowsany type (including edges):-

i) priming coat. 100 Sft. 539.45 766.40 sq.m 58.05 82.45ii) each subsequent coat of paint. ditto 190.25 411.50 ditto 20.45 44.30

d) Preparing surface and painting guard bars, gates ofiron bars, gratings, railing (including standards,braces, etc.) and in similar open work:-i) priming coat. 100 Sft. 355.80 493.50 sq.m 38.30 53.10ii) each subsequent coat of paint. ditto 160.70 286.25 ditto 17.30 30.80

e) Preparing surface and painting of fillets, framing,skirtings, pipes, gutters, and similar linear work notexceeding 6" (150 mm) girth:-

i) priming coat. 100 Lft. 284.55 388.75 Metre 9.35 12.75ii) each subsequent coat of paint. ditto 107.10 210.30 ditto 3.50 6.90

f) Preparing surface and painting of small detachedarticles, not exceeding one sq. ft. (Sq.m) of paintedsurface:-

i) priming coat. 100 Nos. 836.9 1388.1 100 Nos. 836.9 1388.1ii) each subsequent coat of paint. ditto 409.80 848.55 ditto 409.80 848.55

chapter-13(Painting & Var) Page 87

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

g) Preparing surface and painting of small detachedarticles, exceeding one Sft. but not exceeding 3 Sft.(Sq.m) of painted surface:-

i) priming coat. 100 Nos. 2342.00 3242.30 100 Nos. 2342.00 3242.30ii) each subsequent coat of paint. ditto 706.40 1493.15 ditto 706.40 1493.15

h) Extra for knotting and stopping to 100 Sft. 35.65 51.30 sq.m 3.85 5.50priming coat on new surface of wood.

6 Applying Khanki Mixture hot to barrage 27.10gates:-

i) first coat 100 Sft. 278.95 479.40 sq.m 30.00 51.60ii) second coat ditto 225.50 354.05 ditto 24.25 38.10

7 French polishing complete:- 27.6

a) on new work 100 Sft. 2738.45 2806.65 sq.m 294.65 302.00b) on old work ditto 1465.60 1502.10 ditto 157.70 161.65

8 Varnishing wood work, including cleaning and preparingsurface.

a) first coat 100 Sft. 223.15 356.65 sq.m 24.00 38.40b) second coat ditto 83.70 184.85 ditto 9.00 19.90c) third coat ditto 83.70 163.85 ditto 9.00 17.65

9 Bitumen coating to plastered or cement concrete surface:-

i) 20 lbs. per 100 Sft. (9.07 Kg per Sq.m) 100 Sft. 260.90 1005.95 sq.m 28.10 108.25ii) 14 lbs. per 100 Sft. (6.35 Kg per Sq.m) ditto 250.50 631.90 ditto 26.95 68.00iii) 10 lbs. per 100 Sft. (4.54 Kg per Sq.m) ditto 206.65 588.05 ditto 22.25 63.30

10 Writing letters or figures, per letter, per inch (25 mm) Per No. 11.15 11.80 Per No. 11.15 11.80 27.1

height.

11 Writing letters or figures at any surface with reflective paint Per Letter 11.15 11.55 Per Letter 11.15 11.55 27.1of approved quality and colour per letter per inch height. per inch per 25 mm

height height

12 Writing letters of figures on any surface with reflective tape ditto 12.80 13.70 ditto 12.80 13.70 dittoof approved quality and colour per letter per inch (25 mm)height.

13 Coaltar painting: 27.8to

a) first coat, laid hot 100 Sft. 235.20 816.85 sq.m 25.30 87.90 27.11b) second coat, laid hot ditto 142.55 513.00 ditto 15.35 55.20

chapter-13(Painting & Var) Page 88

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

14 Solignum painting:- 27.8

a) one coat, applied hot 100 Sft. 196.00 223.20 sq.m 21.10 24.00b) two coats, applied hot ditto 297.00 340.45 ditto 31.95 36.65

15 Creosote painting:- ditto

a) one coat, applied hot 100 Sft. 235.20 353.10 sq.m 25.30 38.00b) two coats, applied hot ditto 356.40 554.05 ditto 38.35 59.60

16 Burning off or rubbing down with pumice stone, old paint 100 Sft. 869.35 884.95 sq.m 93.55 95.20 27.3from wood work.

17 Removing with caustic soda, old paint from wood work. 100 Sft. 313.10 320.85 sq.m 33.70 34.50 ditto

18 Painting distance marks for white ground and black Each 55.80 62.70 Each 55.80 62.70 27.1lettering on both sides.

19 Painting two feet wide gauges, reading to 10th of a foot Per Rft. 111.60 124.95 per Metre 366.00 409.80 ditto(metre).

20 Painting sounding rods and other gauges, reading to 10th Per Lft. 55.80 59.95 per Metre 183.00 196.60 27.1of a foot (metre)

21 Painting leveling staves. Per Lft. 171.00 177.65 per Metre 560.85 582.70

22 a) Painting and lettering mile/Km stones, dittoon both sides:

i) one coat Each 119.55 167.40 Each 119.55 167.40ii) two coats ditto 209.20 286.05 ditto 209.20 286.05

b) Painting and lettering Furlong/½ Km 27.1stones, on both sides:-

i) one coat Each 15.95 21.60 Each 15.95 21.60ii) two coats ditto 27.90 37.80 ditto 27.90 37.80

c) Painting and lettering Sign posts:-

i) one coat Each 133.90 164.95 Each 133.90 164.95ii) two coats ditto 220.95 273.85 ditto 220.95 273.85

23 Removing paint or varnish from wall. 100 Sft. 626.20 - sq.m 67.40 - 27.12

24 Scraping from hydraulic gates:- 27.1

a) Khanki paint 100 Sft. 1252.40 - sq.m 134.75 -b) Aluminium paint ditto 1252.40 - ditto 134.75 -

chapter-13(Painting & Var) Page 89

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

25 Painting letters with shade. per letter 17.85 17.85 per letter 17.85 17.85 27.1per inch per 25 mmheight height

26 Scraping rust from old rail or girders. 100 Sft. 939.30 981.30 sq.m 101.05 105.60 27.927.10

27 Chiselling old paint from brick work. 100 Sft. 1252.40 1284.80 sq.m 134.75 138.25 27.12

28 Cleaning glasses with chalk and spirit, etc. 100 Sft. 1043.70 1061.70 sq.m 112.30 114.25

29 Cleaning and oiling rafter or rolled steel 100 Sft. 313.10 343.25 sq.m 33.70 36.95 27.9beams.

30 Cleaning and painting punkha poles, including fixing Each 222.75 230.85 Each 222.75 230.85 27.3hooks.

31 Preparing surface and painting with emulsion paint:- 27.12

a) first coat 100 Sft. 272.80 460.00 sq.m 29.35 49.50b) 2nd and each subsequent coat ditto 209.50 356.85 ditto 22.55 38.40

32 Preparing surface and painting with water proof coloured 27.12cement finish, like duracem, buxcem or other finishes withsimilar specifications, on walls, etc.

a) new surface:

i) 1st coat 100 Sft. 272.80 361.30 sq.m 29.35 38.85ii) 2nd and subsequent coat ditto 209.50 286.90 ditto 22.55 30.85

b) old surface:

i) 1st coat 100 Sft. 272.80 309.80 sq.m 29.35 33.35ii) 2nd and subsequent coat ditto 209.50 245.90 ditto 22.55 26.45

32A Providing and applying weather shield paint of approvedquality on external surface of building including preparation ofsurface, application of primer complete in all respect:

a) new surface:

i) 1st coat %sft 982.60 1457.60 sq.m 105.75 156.85ii) 2nd coat %sft 535.85 742.90 sq.m 57.65 79.95

b) old surface: %sft 535.85 742.90 sq.m 57.65 79.95

33 Painting traffic lane 5" (125 mm) wide, with road marking Per Rft. 1.65 2.55 Metre 5.50 8.45enamel.

chapter-13(Painting & Var) Page 90

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

34 Painting traffic lane 5" (125 mm) wide with reflective Per Rft. 3.80 12.05 Metre 12.45 39.50 AASHTO Rates shall be reduced by Rs.0.50clorinated rubber (CR) paint including glass beads comlpete M248-91 P.Rft or Rs.1.65 P.Mtr. in all respect. (2000) If glass beads are not used.

35 Repainting of ceiling fan (all sizes and types), including Per Job 63.65 97.25 Job 63.65 97.25painting of blades, canopy, suspension rod and regulator,with suitable enamel paint.

36 Repainting of iron poles with cross arms, with bitumen or Per Job 148.50 269.10 Job 148.50 269.10 other approved paint.

37 Repainting of pipes and specials of G.I., M.S. or conduit,etc., fixed for on surface electric wiring, with approvedpaint:

i) upto 40 mm (1½") dia Per Rft. 1.35 4.45 Metre 4.45 8.25ii) above 40 mm (1½") to 50 mm (2") dia ditto 2.70 4.70 ditto 8.90 15.45iii) above 50 mm (2") to 100 mm (4") dia ditto 4.55 7.50 ditto 14.85 24.65

38 Repainting main switches and branch distribution boards Per Job 29.40 77.65 Job 29.40 77.65of all sizes and types, with approved paint (complete set).

39 Extra labour for painting, varnishing, etc. from 20' (6.10 m) 100 Sft. 100.20 - sq.m 10.80 - The height will be taken from theheight and above, for every additional 10' (3.05 m) height, per coat floor, roof or ground underneath, asor part thereof, requiring scaffolding. the case may be on the side

towards which the work is to bedone.

chapter-14(Lining of canal) Page 91

1 Rates for all finished works include the removal of surplus debris, unused material and byproducts.2 The rates also include curing for specified period wherever necessary.3 Nominal dimension of tile or brick shall be taken for the purpose of measurement and payment.

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

1 Formation, dressing and preparing sub-grade:- 28.1 to 28.3

a) in bed 100Sft. 697.55 - sq.m 75.05 -b) on slope ditto 952.50 - ditto 102.50 -

2 Stabilized layer of cement, sand ratio 1:30, 2" (50 mm) 100Sft. 1622.00 2168.60 sq.m 174.55 233.35 dittothick on slope.

3 Cement plaster ½" (13 mm) thick ratio 1:10. ditto

a) in bed 100Sft. 1187.75 1453.30 sq.m 127.80 156.40b) on slope ditto 1465.45 1731.00 ditto 157.70 186.25

4 Cement plaster 3/8" (10 mm) thick ratio 1:3. ditto

a) in bed 100Sft. 1187.75 1653.35 sq.m 127.80 177.90b) on slope ditto 1465.45 1931.05 ditto 157.70 207.80

5 Cement plaster 1½" (40 mm) thick ratio 1:6. ditto

a) in bed 100Sft. 1465.45 2584.00 sq.m 157.70 278.05b) on slope ditto 1800.20 2918.75 ditto 193.70 314.05

6 Tile lining 12"x6"x2" (300x 150x50 mm) in 1:6 cement, 28.2 to 28.3 The rates are only for laying tilessand mortar:- over 1/8" (3 mm) thick layer of 1:6

mortar. Items 1 to 5 above area) in bed 100Cft. 6753.10 16562.30 cu.m 2385.20 5849.80 payable separately.b) on slope ditto 7758.65 17567.80 ditto 2740.35 6204.95

7 Tile lining 12"x6"x2" (300x150x50 mm) in 28.2 to 28.3 The rates are only for laying tiles1:3 cement, sand mortar:- over 1/8" (3 mm) thick layer of 1:3

mortar. Items 1 to 5 above area) in bed 100Cft. 6753.10 18102.10 cu.m 2385.20 6393.65 payable separately.

b) on slope ditto 7758.65 19107.65 ditto 2740.35 6748.80

8 Brick lining 9"x4½"x3" (225x113x75 mm) in 1:6 cement, 28.2 The rates are only for laying brickssand mortar:- over 1/8" (3 mm) thick layer of 1:6

mortar. Items 1 to 5 above area) in bed 100Cft. 6753.10 19424.30 cu.m 2385.20 6860.65 payable separately.b) on slope ditto 7758.65 20429.80 ditto 2740.35 7215.80

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

14. LINING OF CANALS

chapter-14(Lining of canal) Page 92

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

9 Brick lining 9"x4½"x3" (225x113x75 mm), in 1:3 cement, ditto The rates are only for layingsand mortar:- bricks over 1/8" (3 mm) thick

layer of 1:3 mortar. Items 1 toa) in bed 100Cft. 6753.10 20964.10 cu.m 2385.20 7404.55 5 above are payableb) on slope ditto 7758.65 21969.65 ditto 2740.35 7759.65 separately.

10 Cement concrete lining, using washed screened and 20.1, 28.1graded stone aggregate:- & 28.3

a) in bed:-

i) ratio 1:2:4 100Cft. 6077.00 21996.20 cu.m 2146.40 7769.05ii) ratio 1:3:6 ditto 6077.00 19382.60 ditto 2146.40 6845.95iii) ratio 1:4:8 ditto 6077.00 17510.60 ditto 2146.40 6184.75

b) on slope:-

i) ratio 1:2:4 100Cft. 7000.95 22920.15 cu.m 2472.75 8095.40 ii) ratio 1:3:6 ditto 7000.95 20306.55 ditto 2472.75 7172.25iii) ratio 1:4:8 ditto 7000.95 18434.55 ditto 2472.75 6511.10

chapter-15(Sheet piling) Page 93

Rates for all finished works include the removal of surplus debris, unused material and by products.

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

1 Cutting Ransome and Larson piles. Per 178.20 - Per 178.20 - 29.1-cut cut 29.3

2 Cutting universal piles. Per cut 263.75 - Per cut 263.75 - ditto

3 Driving steel piles, 25' to 30'. (7.5 to 9.0 m) 100Sft. 4281.80 - sq.m 460.70 - ditto 1) The rate includes laying andremoving of track and also carriageof piles to machine, averagedistance of 3 chains (90 metre).

2) The rates are for the tacklegangs only supplied by thecontractor, Mechanical staffon-machines will be supplied byGovernment.

3) T-piles and adjustable junctionpiles will be counted as two piles.

4 Driving steel piles,more than 15' (4.6 m) and less than 25' 100Sft. 4103.60 - sq.m 441.55 - ditto ditto(7.5 m).

5 Driving steel piles, 15' (4.5 m) and under. 100Sft. 3034.40 - sq.m 326.50 - ditto ditto

6 Dolleying piles. Each 267.80 - Each 267.80 - ditto Upto 5' (1.5 m) dolleying.

7 Drilling holes in piles by hand. Each 24.50 - Each 24.50 - ditto

8 Raising and lowering machine. Per Ft. 4013.70 - Metre 13164.85 - ditto

9 Turning Machine, 90o . Per 5982.25 - Per 5982.25 - 29.1 toJob Job 29.3

10 Turning Machine, 135o . Per 7407.85 - Per 7407.85 - dittoJob Job

11 Turning Machine, 180o . Per 10085.85 - Per 10085.85 - 29.1 toJob Job 29.3

12 Travelling machine (light). Per 11916.15 - 30 M. 11916.15 - dittoChain

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

15. SHEET PILING

chapter-15(Sheet piling) Page 94

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

13 Loading and unloading piles. Ton 231.70 - Tonne 228.05 - ditto To be done by hand carts orramps, including cost of ropes.

14 Dismantling piling machine. Each 24427.50 - Each 24427.50 - ditto

15 Erecting piling machine. Each 28185.55 - Each 28185.55 - ditto

16 Carriage of piling machine under different conditions. per 4843.10 - 30 M 4843.10 - dittochain

chapter-16(Protec & Div) Page 95

1 Rates for all finished works include the removal of surplus debris, unused material and byproducts.2 The composite rates of the items in which stone, boulders, shingle spawl are used do not contain the carriage

of the these stone materials, which will be paid separately by road, and/or rail, whichever means of transport isadopted. The supply and carriage to site of work of all other material required in the item, is included in thecomposite rates.

3 The carriage of stone or spawl will be paid on the basis of actual stack measurement (without any reductionfactor) of the stone, boulders, shingle or spawl carried.

4 Where stone, boulder or spawl is issued from stock and contractor is paid for its carriage and/or labour only; or where such stone product is supplied, carried or handled by the contractor in which no laying is required,the actual stack measurement (without any reduction factor) shall from the basis of payment of supply orcarriage of the stone, boulder or spawl, etc. The quantity of finished and completed item of work shall form thebasis of laying.

5 In case of the items in which the rates include carriage of stakes, bushing, Pilchi, sarkanda or farash, etc. withinone mile (1.6 Km.)

i) the cost of the carriage within one mile (one Km) shall not be deducted from the carriage charges to follow thereafterfrom the point of supply.

ii) if the site of work happens to be within one mile (one Km.) of the source of supply, the materials will be collectedand measured at site of work and no extra carriage would be admissible in such cases.

iii) where the site of the work is situated at more than one mile (one Km.) distance from the source of supply, the pointof supply will be fixed carefully by the Engineer-in-charge in such a way that the carriage charges wouldbe arrived at, most economically. Extra carriage will be admissible from the place of supply of thematerial which will be considered its starting point. The demarcation of the place of supply will bepre-determined before calling the tenders.

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

1 Cutting pilchi frash or sarkanda inlcuidng carriage within 100Cft. 1189.80 cu.m 420.20one mile.

2 Weaving matresses. 100Cft. 2254.35 cu.m 796.10

3 a) Supplying and filling jute bags 1.25 (o.o35 cum) Cft., Per 35.20 50.10 Per Baq 35.20 50.1 The rate does not include supply ofcapacity, with sand or earth, sewing and stacking, in Bag sand or earth for filling bags, whichdry. will be paid extra.

b) Supply and filling jute bags 1.25 (0.35 ccum) Cft. ditto 54.80 69.65 Per Baq 54.80 69.65 -ditto-capacity, with sand or earth, sewing and laying inposition, under water.

4 a) Supplying and filling jute bags 4 to 5 cft Per 84.30 137.75 Per 84.30 137.75 The rate does not include supply of(0.11 to 0.14 cum) capacity, with sand or earth, Bag Bag sand or earth for filling bags, whichsewing and stacking, in dry. will be paid extra.

b) Supply and filling new jute bags 4 to 5 cft (0.11 to ditto 120.45 173.85 ditto 120.45 173.85 -ditto-0.14 cu.m) capacity, with sand or earth, sewing and

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

16. PROTECTION & DIVERSION WORKS

chapter-16(Protec & Div) Page 96

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

laying in position, under water.

5 Carriage of jute bags 1.25 Cft. (0.035 cu m) capacity, filledwith sand or earth:-

a) 1st chain (30 m) 100 Nos 313.10 % Nos 313.10

b) 2nd to 4th chain (30 m to 120 m) Per chain 112.70 Per 30 m 112.70per 100 Per 100 Nos/

Nos

c) 5th and subsequent chains ditto 43.85 ditto 43.85(150 m and subsequent every 30 m)

6 Carriage of new jute bags 4 to 5 Cft.(0.11 to 0.14 cu.m) capacity, filled with sand or earth:-

a) 1st chain (Ist 30 metre) 100 Nos 1252.40 % Nos 1252.40

b) 2nd to 4th chain (60 m to 120 m) per chain 438.35 Per 30 m 438.35per 100Nos per %Nos

c) 5th and subsequent chains (150 m and ditto 169.10 ditto 169.10subsequent every 30 m)

7 Rolling matresses to river edge and floating,after unroling:-

a) area of matress upto 2,000 Sft. 100Sft. 704.50 sq.m 75.80( 186 sq.m)

b) area of matress 2,000 to 2,500 Sft. 100Sft. 1174.15 sq.m 126.35

(186 sq.m to 232 sq.m)

c) area of matress over 2,500 Sft. ditto 1369.85 ditto 147.40(232 sq.m)

8 Sewing empty cement bags in sheets. 100 Nos 1095.85 1131.70 % Nos 1095.85 1131.7

9 Making compact round pilchi, frash or sarkanda round 100Cft. 1526.40 1629.60 cu.m 539.10 575.55 Measured in the shape of compactbundles of specified size for the work. round bundles and of size specified

for the work, before filling at site.

10 Launching the above and placing in position. 100Cft. 751.45 cu.m 265.35

chapter-16(Protec & Div) Page 97

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

11 Supply within 5 chains (150 m):-

a) Boulders 9" (225 mm) and above 100Cft. 2266.85 cu.m 800.55

b) Over size shingle 3" to 9"(75 to 225 mm) ditto 1515.40 ditto 535.15

c) Mixed graded shingle ditto 1797.20 ditto 634.70

12 Supplying Munj or Patha Trungers 6" (150 mm) mesh to hold Each 97.85 142.75 Each 97.85 142.753 Cft. (0.085 cu.m)

13 Providing and weaving G.I. wire netting for wire crates, withG.I. wire of approved size (including siding and partition tomake crate):-

a) 6" (150 mm) mesh

i) 15 SWG wire 100Sft. 1171.65 1504.25 sq.m 126.05 161.85ii) 10 SWG wire ditto 1255.30 2335.30 ditto 135.05 251.30iii) 8 SWG wire ditto 1255.30 2948.75 ditto 135.05 317.3

b) 4" (100 mm) mesh

i) 15 SWG wire 100Sft. 1506.40 2006.40 sq.m 162.10 215.9ii) 10 SWG wire ditto 1673.75 3290.50 ditto 180.10 354.05iii) 8 SWG wire ditto 1673.75 4208.50 ditto 180.10 452.85

14 Providing and laying shingle on top of bund, including 100Cft. 782.75 1244.75 cu.m 276.45 439.60handling of materials within three chains.

15 Supply and dumping at site, without boat, includinghandling of materials within three chains (90 m)

a) stone or boulder 100Cft. 1369.85 1831.85 cu.m 483.75 646.9 The rate includes supply of brickb) shingle or spawl ditto 1369.85 1831.85 ditto 483.75 646.9 bats to site of work.c) brick bats ditto 1056.75 1980.75 ditto 373.25 699.60

16 Supply and dumping by boat, including loading into boat The rate includes supply of brickwithin three chains (90 m) lead, and hire charges of boat and bats to site of work.boatman.

a) stone or boulder 100Cft. 2456.50 2918.50 cu.m 867.65 1030.8b) shingle or spawl ditto 2456.50 2918.50 ditto 867.65 1030.80c) brick bats ditto 2143.40 3067.40 ditto 757.05 1083.40

17 Providing and filling brick bats in crates 100Cft. 1908.60 2832.60 cu.m 674.10 1000.45 The rate includes supply of brick(excluding cost of crates). bats to site of work.

18 Supplying and filling bricks in crates and hand packing 100Cft. 2299.95 13639.95 cu.m 812.35 4817.65 The rate includes supply of bricks(excluding cost of crates). to site of work.

19 Supply and filling in wire crates, including sewing crates(excluding cost of crates):-

chapter-16(Protec & Div) Page 98

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

i) stone or boulder 100Cft. 2613.05 3075.05 cu.m 922.95 1086.10ii) shingle or spawl ditto 2613.05 3075.05 ditto 922.95 1086.10

20 Extra for anchoring boat, for dumping by boats or tipping 100Cft. 275.55 - cu.m 97.30 -crates.

21 Extra for tipping crates (in addition to anchoring boats). 100Cft. 1377.65 - cu.m 486.60 -

22 Pilchi reventment, including carriage upto one mile 100Sft. 782.75 1292.75 sq.m 84.25 139.1 30.1(1.6 km.)

23 Surface protection with pilchi matresses, carriage upto 100Sft. 1956.90 2007.90 sq.m 210.55 216.05 dittoone mile (1.6 Km).

24 Pilchi, sarkanda or frash pitching on slopes, including The cost of placing earth betweensupply of pilchi, sarkanda or frash within one mile, (1.6 km) 100Sft. 4693.35 5802.90 sq.m 505.00 624.40 rolls shall be paid separately, asalso supply and driving of pegs 1½' (460 mm) long earthwork.sharpened at one end and, tying with wire or Munj Ban(excluding cost of placing earth between rolls).

25 Constructing Groynes upto 5' (1.5 m) height, with single 100Sft. 1540.10 1643.30 sq.m 165.70 176.80 Measurement to be made of therow of wooden vertical stakes 7" to 12" (175 to 300 mm) area of elevation on one face only.dia, 1' (300 mm) apart, average lead one mile (1.6 km.)

26 Construction Groynes upto 10' (3.0 m) height, with double 100Sft. 2634.70 2757.10 sq.m 283.50 296.65row of wooden vertical stakes 7" to 12" (175 to 300 mm)dia, 2' (600 mm) apart, average lead one mile (1.6 Km).

27 Providing and laying stone pitching/filling, dry hand 100Cft. 1673.75 2564.75 cu.m 591.15 905.85packed, as filling behind retaining walls or in pitching andaprons.

28 Providing and laying stone pitching with hammer dressed 100Cft. 4353.05 5145.05 cu.m 1537.50 1817.25stones on surface, laid in courses.

29 Providing and laying stone pitching, for top layer only:-

a) one slope 100Cft. 3684.80 4476.80 cu.m 1301.45 1581.2b) on level ditto 3293.40 4085.40 ditto 1163.25 1442.95

30 Providing and laying stone or spawl filling:-

a) on level 100Cft. 1005.50 1425.50 cu.m 355.15 503.50

b) on slope ditto 1210.45 1630.45 ditto 427.55 575.85

chapter-16(Protec & Div) Page 99

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

31 Providing and laying stone pitching, hand packed, withsurface levelled off to the correct section and voids filled in1:8 cement, sand mortar, in floors of bridges along banksand in appons etc.

i) top layer on slope 100Cft. 4811.45 7620.55 cu.m 1699.40 2691.55ii) top layer on level ditto 4420.05 7229.15 ditto 1561.15 2553.35iii) stone pitching/filling on slope or on level ditto 2589.70 5497.80 ditto 914.70 1941.8

(other than top layer).

32 Grouting stone pitching or apron, etc. in:-

a) cement, sand mortar 1:3 100Sft. 1698.35 5700.70 sq.m 182.75 613.4b) cement, sand mortar 1:8 ditto 1432.20 3449.30 ditto 154.10 371.15

33 Sand grouting in stone apron, with high 100Sft. 569.60 1229.60 sq.m 61.30 132.30pressure hose.

34 Grouting stone filling or pitching, with bajri. 100Cft. 978.45 2499.45 cu.m 345.60 882.8

35 Removing stone and repitching hand packed, on slopes or 100Cft. 3480.10 - cu.m 1229.15 -level after making good damaged slope/portion.

36 Collecting and stacking boulders from nullah beds or loose 100Cft. 1252.40 - cu.m 442.35 -shale, or from any other site, within 3 chains (90 m) lead.

37 Levelling and dressing stone filling under blocks and 100Cft. 1005.50 2526.50 cu.m 355.15 892.35grouting with shingle.

38 Grouting jharies between blocks with bajri. 100Cft. 1005.50 2019.50 cu.m 355.15 713.30

39 Breaking stone into spawls and stacking 100Cft. 939.30 - cu.m 331.75 -

Canal and Roads

40 Fixing floating spurs, with material from canal plantationwithin one mile (1.6 Km) lead:-

a) upto 2.0' (600 mm) F.S. depth Each 32.00 - Each 32.00 -

b) above 2.0' to 3.0' (600 to 900 mm) F.S. depth ditto 36.00 - ditto 36.00 -

c) above 3.0' to 4.0' F.S. (900 mm to 1200mm) depth Each 47.95 - ditto 47.95 -

d) above 4.0' (1200 mm) F.S. depth ditto 119.90 - ditto 119.90 -

41 Staking and bushing from canal plantation, royalty to bepaid to Forest Department or cost to private owner, if andwhen required:-

chapter-16(Protec & Div) Page 100

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

a) i) Cutting and supply unsharpened pegs 3.5' (1.07 100 Nos 1565.50 1598.05 % Nos 1565.50 1598.05m) long, 3" to 6" (75 to 150 mm) dia, within one mile(1.6 Km) lead.

ii) Sharpening one end of 3.5' (1.07 m) long pegs, 3" 100 Nos 669.50 - 100 Nos 669.50 -to 6" (75 to 150 mm) dia.

iii) Driving pegs 3.5' (1.07 m) long, 3" to 6" (75 to 150 100 Nos 997.90 - 100 Nos 997.90 -mm) dia (driven 1.0' (300 mm) below the available bedor ground (average).

iv) Tying pegs with Munj, Patha ban (one line, Per Chain 78.30 109.50 Per 30 78.30 109.50incuding tying around the pegs). of One Metre

Row of one row

v) Cutting and supplying brush wood from canal ditto 1077.10 1251.95 ditto 1077.10 1251.95plantation or private owners, lead within one mile(1.6 Km) and wattling between stakes and intertwining(thickness of wattled brushwood 1.0' (300 mm)average).

b) i) Cutting and supplying unsharpened pegs 4.0' 100 Nos 86.85 123.85 100 Nos 86.85 123.85(1.20 m) long, 3" to 6" (75 to 150 mm) dia, from canalplantation, lead within one mile (1.6 Km).

ii) Sharpening one end of 4' (1.20 M) long pegs, 3" 100 Nos 669.50 - 100 Nos 669.50 -to 6" (75 to 150 mm) dia.

iii) Driving pegs 4' (1.20 m) long, 3" to 6" (75 to 150 100 Nos 1169.95 - 100 Nos 1169.95 -mm) dia (driven 1.0' (300 mm) below the available bedor ground (average).

iv) Tying pegs with Munj, Patha ban (one line, Per 78.30 Per 78.30 incuding tying around the pegs). Chain of 30 M of

one row one row

v) Cutting and supplying brush wood from canal ditto 2847.90 ditto 2847.90 plantation or private source, lead within one mile(1.6 Km). and wattling between stakes and intertwining(thickness of wattled brushwood 1.0' (300 mm)average).

c) i) Cutting and supplying unsharpened pegs 5.0' (1.5 100 Nos 108.60 154.95 100 Nos 108.60 154.95m) long, 3" to 6" (75 to 150 mm) dia, from canalplantation, lead within one mile (1.6 Km).

ii) Sharpening one end of 5' (1.5 m) long pegs, 3" to 100 Nos 705.15 - 100 Nos 705.15 -6" (75 to 150 mm) dia.

chapter-16(Protec & Div) Page 101

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

iii) Driving pegs 5' (1.5 m) long, 3" to 6" (75 to 150 100 Nos 1339.00 - 100 Nos 1339.00 -mm) dia (driven 1.5' (450 mm) below the available bedor ground (average).

iv) Tying pegs with Munj, Patha ban (one line, Per 78.30 109.50 Per 78.30 109.50incuding tying around the pegs). Chain of 30 M

one row of one row

v) Cutting and supplying brush wood from canal Per chain 1336.50 1581.10 Per 30 M 1336.50 1581.10plantation or private source, lead within one mile of one row of one row(1.6 Km) and wattling between stakes and intertwining(thickness of wattled brushwood 1.0' (300 mm)average).

d) i) Cutting and supplying unsharpened 100 Nos 3131.05 3186.65 100 Nos 3131.05 3186.65pegs 6.0' (1.8 m) long, 3" to 6" (75 to150 mm) dia, from canal plantation, leadwithin one mile (1.6 Km).

ii) Sharpening one end of 6' (1.8 m) long pegs, 3" to 100 Nos 839.05 - 100 Nos 839.05 -6" (75 to 150 mm) dia.

iii) Driving pegs 6' (1.8 m) long, 3" to 6" (75 to 150 100 Nos 1606.80 - 100 Nos 1606.80 -mm) dia (driven 1.75' (530 mm) below the availablebed or ground (average).

iv) Tying pegs with Munj, Patha ban (one line, Per Per Chainincuding tying around the pegs). Chain of 78.30 109.50 of one row 78.30 109.50

one row

v) Cutting and supplying brush wood from canal ditto 3239.30 3536.30 ditto 3239.30 3536.30plantation or private source, lead within one mile(1.6 Km) and wattling between stakes and intertwining(thickness of wattled brushwood 1.0' (300 mm)average).

e) i) Cutting and supplying unsharpened pegs 6'-1" to 100 Nos 2348.30 2463.60 100 Nos 2348.30 2463.608.0' long (1.85 to 2.45 m), 4" to 8" (100 to 200 mm)dia, from canal plantation, lead within one mile (1.6 Km).

ii) Sharpening one end of 6'-1" to 8.0' (1.85 to 2.45m) 100 Nos 1071.20 - 100 Nos 1071.20 -long pegs, 4" to 8" (100 to 200 mm) dia.

iii) Driving pegs 6'-1" to 8.0' (1.85 to 2.45 m) long, 3" 100 Nos 1772.00 - 100 Nos 1772.00 -to 6" (75 to 150 mm) dia driven 2' (600 mm) belowthe available bed or ground (average).

chapter-16(Protec & Div) Page 102

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

iv) Tying pegs with Munj, Patha ban (one line, Per chain 78.30 95.60 Per 30 M 78.30 95.6incuding tying around the pegs). of one row of one row

v) Cutting and supplying brush wood from canal Per 3684.80 4034.25 Per 30 M 3684.80 4034.25plantation or private source, lead within one mile Chain of of one row(1.6 Km) and wattling between stakes and intertwining one row(thickness of wattled brushwood 1.0' (300 mm)average).

42 Staking with Bamboo from market and bushing from canalplantation or private source (royalty of brushwood to bepaid to Forest Department or cost to private owner, if andwhen required):-

a) i) Supplying Bamboos 8'-1" to 10.0' (2.46 to 3.05 m) 100 Nos 7200.00 - 100 Nos 7200.00 -long, 2½" to 5" (63 m to 125 mm) dia.

ii) Sharpening one end of 8'-1" to 10.0' (2.46 to 30.5 100 Nos 937.30 - 100 Nos 937.30 -m) long Bomboos, 2½" to 5" (63 to 125 mm) dia.

iii) Driving Bamboos 8'-1" to 10.0' (2.46 to 3.05 m) 100 Nos 1941.55 - 100 Nos 1941.55 -long 2½" to 5" (63 to 125 mm) dia, driven 2.5' (750mm) below the available bed or ground (average).

iv) Tying Bamboos 2½" to 5" (63 to 125 mm) dia with Per Per 30 MMunj, Patha Ban, two lines, including tying around Chain of 117.40 166.35 of one 117.40 166.35the Bamboos. one row Row

v) Cutting and supplying brushwood from canal ditto 4521.65 4975.50 ditto 4521.65 4975.50plantation or private source, lead within one mile(1.6 Km), and wattling between stakes andintertwining (thickness of wattled brushwood 1.0' (300 mm) average).

b) i) Supplying Bamboos 10'-1" to 12.0' (3.07 to 3.66 100 Nos - 10800.00 100 Nos - 10800m) long, 2½" to 5" (63 to 125 mm) dia.

ii) Sharpening one end of 10'-1" to 12.0' 100 Nos 1071.20 - 100 Nos 1071.20 -(3.07 to 3.66 m) long Bamboos, 2½" to5" (63 to 125 mm) dia.

iii) Driving Bamboos 10'-1" to 12.0' (3.07 to 3.66 m) 100 Nos 2106.75 - 100 Nos 2106.75 -long 2½" to 5" (63 to 125 mm) dia, driven 2.75' (840 mm) below the available bed or ground (average).

iv) Tying Bamboos 2½" to 5" (63 to 125 mm) dia with Per chain Per 30 MS.W.G. No. 10 wire, two lines, including tying around of one 391.40 1263.80 of one Row 391.40 1263.80the Bamboos and third tie around the top end only. row

chapter-16(Protec & Div) Page 103

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

v) Cutting and supplying brushwood from canal ditto 5527.15 6103.75 ditto 5527.15 6103.75plantation or private source, lead within one mile(1.6 Km) and wattling between stakes and intertwining(thickness of wattled brushwood 1.0' ( 300 mm)average).

c) i) Supplying Bamboos 12'-1" to 14.0' (3.68 to 4.27 100 Nos - 11400.00 100 Nos - 11400.00m) long, 2½" to 5" (63 to 125 mm) dia.

ii) Sharpening one end of 12'-1" to 14.0' (3.68 to 4.27 100 Nos 1205.10 - 100 Nos 1205.10 -m) long Bamboos, 2½" to 5" (63 to 125 mm) dia.

iii) Driving Bamboos 12'-1" to 14.0' (3.68 to 4.27 m) 100 Nos 2410.20 - 100 Nos 2410.20 -long 2½" to 5" dia, driven 3.5' (1.07 mm) below theavailable bed or ground (average).

iv) Tying Bamboos 2½" to 5" (63 to 125 mm) dia with Per chain Per 30 MS.W.G. No. 10 wire, two lines, including tying around of one row 391.40 1263.80 of one row 391.40 1263.80the Bamboos and third tie around the top end only.

v) Cutting and supplying brushwood from canal ditto 6532.70 7196.70 ditto 6532.70 7196.70plantation or private source, lead within one mile(1.6 Km) and wattling between stakes and intertwining(thickness of wattled brushwood 1.0' (300 mm)average).

d) i) Supplying Bamboos 14'-1" to 16.0' (4.30 to 4.90 m) 100 Nos - 12600.00 100 Nos - 12600.00long, 2½" to 5" (63 to 125 mm) dia.

ii) Sharpening one end of 14'-1" to 16.0' (4.30 to 100 Nos 1339.00 - 100 Nos 1339.00 -4.90 m) long Bamboos, 2½" to 5" (63 to 125 mm) dia.

iii) Driving Bamboos 14'-1" to 16.0' long (4.30 to 4.90m) 100 Nos 2678.00 - 100 Nos 2678.00 -2½" to 5" (63 to 125 mm) dia, driven 4' (1.20 m)below the available bed or ground (average).iv) Tying Bamboos 2½" to 5" (63 to 125 mm) dia with Per Chain Per 30 MS.W.G. No. 10 wire, two lines, including tying around of one 391.40 1263.80 of one 391.40 1263.80the Bamboos and third tie around the top end only. Row Row

v) Cutting and supplying brushwood from canal ditto 7526.10 8294.90 ditto 7526.10 8294.90plantation or private source, lead within one mile(1.6 Km) and wattling between stakes and intertwining(thickness of wattled brushwood 1.0' (300 mm)average).

e) i) Supplying Bamboos 16'-1" to 20' (4.9 to 6.10 m) 100 Nos - 13200.00 100 Nos - 13200.00long, 2½" to 5" (63 to 125 mm) dia.

ii) Sharpening one end of 16'-1" to 20' (4.9 to 100 Nos 1606.80 - 100 Nos 1606.80 -6.10 m) long Bamboos, 2½" to 5" (63 to 125 mm) dia.

chapter-16(Protec & Div) Page 104

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

iii) Driving Bamboos 16'-1" to 20' long (4.9 to 6.10 m) 100 Nos 3213.60 - 100 Nos 3213.60 -2½" to 5" (63 to 125 mm) dia, driven 4' (1.20 m)below the available bed or ground (average).

iv) Tying Bamboos 2½" to 5" (63 to 125 mm) dia with Per Chain Per 30 MS.W.G. No. 10 wire, two lines, including tying around of one 391.40 1263.80 of one 391.40 1263.80the Bamboos and third tie around the top end only. row row

v) Cutting and supplying brushwood from canal ditto 9434.70 10413.05 ditto 9434.70 10413.05plantation or private source, lead within one mile (1.6 Km) and wattling between stakes and intertwining(thickness of wattled brushwood 1.0' (300 mm) average).

43 Cutting and supplying brushwood from canal plantation or 100Cft. 391.40 461.15 cu.m 138.25 162.85 Royalty to be paid to the Forestfrom any other source, within one mile (1.6 Km). Department or cost to the private

owner, if and when required.

44 Filling brush wood only, thoroughly packed. 100Cft. 313.10 - cu.m 110.60 - Measured in compacted andpacked shape before filling.

45 Covering road 10' to 12' (3.00 to 3.65 m) wide, with 3" Per 751.45 - Per 751.45 -(75 mm) sarkanda or jungle upto one chain lead (30 m). Chain 30 M

46 a) Gachi pitching 1' (300 mm) thick. 100Sft. 4070.35 - Sq.m 437.95 -b) Gachi pitching done with silt clearance 100Sft. 3444.15 - Sq.m 370.60 -

and berm dressing.

chapter-17(Outlet) Page 105

Rates for all finished works include the removal of surplus debris, unused material and byproducts.

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

1 Earthwork for outlets, excavation refilling, ramming and 17.1 Includes consolidation of earth afterpuddling:- to refilling.

17.5a) channels, discharge upto 50 cusecs. Job 1304.60 - Job 1304.60 -

b) channels, discharge from 51 to 100 cusecs. Job 1722.05 - Job 1722.05 -

c) channels, discharge from 101 to 200 cusecs. Job 2609.20 - Job 2609.20 -

d) channels, discharge from 201 to 350 cusecs. Job 3522.40 - Job 3522.40 -

e) channels, discharge over 350 cusecs. Job 5218.40 - Job 5218.40 -

2 Dismantling outlets:- 18.1 These rates are for totaldismantlement and removal

a) old types, such as K.G.O's orifices, etc. Each 1304.60 - Each 1304.60 - of material. The rates do notinclude earth work for which

b) A.P.M. or O.F., "H" upto 2.0 ft. (600 mm) ditto 1956.90 - ditto 1956.90 - rates are given in item 1,above.

c) A.P.M. or O.F., "H" from 2.1 ft. to 3.0'. ditto 2609.20 - ditto 2609.20 -(630 mm to 900 mm)

d) A.P.M. or O.F., "H" above 3.0'. ditto 3261.50 - ditto 3261.50 -(900 mm)

e) Tail cluster bifurcation ditto 1956.90 - ditto 1956.90 -

f) Tail cluster trifurcation ditto 2609.20 - ditto 2609.20 -

g) Tail cluster quardification ditto 3261.50 - ditto 3261.50 -

3 Making temporary A.P.M. bricks block and fixing at site. Each 552.35 871.25 Each 552.35 871.25 21.1 & 21.2

4 Dismantling walls, taking out temporary Job 1160.80 - Job 1160.80 - 18.1, 21.1A.P.M. brick block, fixing iron block and & 21.2rebuilding dismantled walls.

5 Dismantling walls and fitting iron block of O.F. outlet. Each 1160.80 - Each 1160.80 - 18.1, 21.1

& 21.2

6 Constructing, watching and removing bund for outlet built 17.1in running water:- to

17.2

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

17. OUTLETS

chapter-17(Outlet) Page 106

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

a) upto 3.0' (0.300 m) depth Each 3131.05 - Each 3131.05 -b) above 3.0' (0.300 m) depth ditto 4226.90 - ditto 4226.90 -

7 Adjusting "B" of tail cluster by dismantling and rebuilding Each 629.00 1067.60 Each 629.00 1067.60 18.1, 21.1throat walls. & 21.2

8 Adjusting "Y" of an A.P.M. outlet, including dismantling Each 1228.25 1941.65 Each 1228.25 1941.65 ditto

and rebuilding.

9 Extra labour in fixing A.P.M. and O.F. outlet blocks, 21.1 & 21.2 Rates to be Rs. 4.00 less in caseincluding dressing of bricks:- of O.F. outlets, where there is no

O.F. iron block.a) for channel depth of 5.0'. (1.5 m) Each 1339.00 1475.80 Each 1339.00 1475.80b) for channel depth of 4.0'. (1.2 m) ditto 1004.25 1141.05 ditto 1004.25 1141.05c) for channel depth of 3.0'. (900 mm) ditto 803.40 940.20 ditto 803.40 940.20d) for channel depth of 2.0'. (600 mm) ditto 669.50 775.40 ditto 669.50 775.40e) for channel depth of less than 2.0'. (600 mm) ditto 535.60 610.60 ditto 535.60 610.60

10 Repairing damaged reducing collar of Hume pipe outlets. Each 552.35 770.75 Each 552.35 770.75

11 Laying iron pipes for outlets. Per Lft. 26.80 - Metre 87.85 - 21.1, 21.2& 17.1 to

17.5

12 Water allowance for constructing outlets or culverts, when Each 636.65 Each 636.65 At the discretion of thecanal water is not flowing. to to Engineer-in-charge depending upon

1304.60 1304.60 the distance and source of supply.

13 Hoisting and placing R.C. slab or stone in position on Each 458.00 - Each 458.00 -outlets or W.C. culverts.

14 Fixing pipe outlet, including back filling of earth and 17.1 to 17.5puddling:- & 21.1 to

21.2a) portion under bank. Rft. 119.20 128.35 Metre 391.15 421.05 b) portion under road, beyond bank. ditto 51.00 60.15 ditto 167.40 197.3

15 Removing pipe outlet, refilling earth and puddling. 17.1to

a) portion under bank. Rft. 104.35 - Metre 342.40 - 17.5b) portion under road, beyond bank. ditto 39.15 - ditto 128.40 -

16 Changing pipe outlets by removing one pipe and replacingit at the same site with another pipe complete with earthand puddling.

a) portion under bank. Rft. 142.35 151.45 Metre 467.00 496.9b) portion under road, beyond bank. ditto 71.15 80.30 ditto 233.50 263.4

chapter-18(R & Road Struc) Page 107

1 Specification No. correspond to Book of "Standard Specification for Road and Bridge Construction 1971".2 Rates for all finished works include the removal of surplus debris, unused material and byproducts.3 The rates include the provision and maintenance of field test laboratory, pay of laboratory staff, cost of material for testing, etc.4 Subsequent carriage of crushed stone aggregate and bajri will be paid according to the following:

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

Sub-base & base construction

1 Providing and laying sub-base course of brick on edge 100Cft. 3689.75 14564.15 cu.m 1303.20 5144.05 521-1 The nominal thickness of bricks 4½" (113 mm) thick, including compaction to required to shall be taken for the purpose ofcamber and grade. 521-6 measurement and payment.

2 Providing and laying sub-base course of brick aggregate, 100Cft. 2775.00 5727.00 cu.m 980.15 2022.80 501-1 To be used only when brickincluding compaction of sub-base course material to to aggregate is cheaper than stonerequired depth, camber, grade & density. 501-6 aggregate.

3 a) Providing and laying sub-base course of stone product dittoof approved quality and grade, including placing, mixing,spreading and compaction of sub-base material torequired depth, camber, grade to achieve 100%maximum modified AASHO dry density, includingcarriage of all material to site of work except gravel and.aggregate.

i) Pit run or bed run gravel. 100Cft. 2775.00 3243.00 cu.m 980.15 1145.45ii) Crushed stone aggregate. 100Cft. 2775.00 5367.00 cu.m 980.15 1895.60

(b) Subsequent carriage of gravel and crushed stone 100Cft. of 1) The carriage of the whole distanceaggregate consoli- to the site of work shall be

dated calculated on the basis of the ratessub-base of the actual means of transport

used in carriage, i.e. road and/or rail,as the case may be.

2) It shall be payable from thenearest approved quarry.3) The quantity of pit run or bed run gravel and crushed stone aggregate for payment of carriage be taken as per actual loose volume not more than 120 Cft.

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

18. ROAD & ROAD STRUCTURE

a) The carriage for the whole distance to the site of work shall be calculated on the basis of the rates of the actual means of transport used in carriage, i.e. road and / or rail, as the case may be.b) It shall be payable from the nearest approved quarry fom sit of work.

chapter-18(R & Road Struc) Page 108

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

4 a) Providing and laying base course of crushed stone 100Cft. 3220.50 6611.25 cu.m 1137.50 2335.10 501-1aggregate of approved quality and grade, and supply and tospreading of stone screening, including placing, mixing, 501-6spreading and compaction of base course material torequired depth, camber and grade to achieve 100%maximum modified AASHO dry density, includingcarriage of all materials to site of work except gravel and.aggregate.

b) Subsequent carriage of crushed stone aggregate. 100Cft. of 1) The carriage for the wholeconsole- distance to the site of work shall bedated calculated on the basis of the ratesbase of the actual means of transport

used in carriage, i.e. road and/orrail, as the case may be.

2) It shall be payable from thenearest approved quarry.

5 Providing and laying road edging of 3" (75 mm) wide and Per Rft. 8.90 30.70 Metre 29.25 100.65 552-1 to9" (225 mm) deep brick on end, complete in all respects. 552-5

Bituminous Work & Resurfacing.

6 Providing and laying bituminous priming coat, using 10 100Sft. 156.55 844.70 sq.m 16.85 90.90 601-1 tolbs. kerosene oil and 10 lbs. binder per 100 Sft. or 0.5 Kg 601-6kerosene and 0.5 Kg binder per square metre.

7 Providing and laying bituminous tack coat, using 10 lbs. of 100Sft. 156.55 505.20 sq.m 16.85 54.35 611-1 tobitumen per 100 Sft (0.49 Kg of bitumen per sq.m.) 611-5

8 a) Providing surface treatment to roads, including supply 612-1 to

of bitumen and bajri/crushed stone aggregate of 612-6approved quality, including cleaning of road surface,heating and spraying bitumen, spreading bajri and rollingwith road roller (including its operation cost, fuel andhire charges, etc.) etc. complete including carriage of allmaterials to site of work except bajjri/crushed stone aggregate.

1) 1st coat:-

3) The quantity of crushed stoneaggregate for payment of carriageshall be taken as per actual loosevolume but not more than 122 Cft.

chapter-18(R & Road Struc) Page 109

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

i) 40 lbs. bitumen, and 5.5 Cft. bajri of nominal size 1" (25 100Sft. 136.20 2002.65 Sq.m 14.65 215.50mm) per 100 sq. feet or 1.96 Kg bitumen and 0.017cu.metre bajri per square metre..

ii) 35 lbs. bitumen, and 4.0 Cft. bajri of nominal size ¾" 100Sft. 136.20 1731.80 Sq.m 14.65 186.35(20 mm) per %Sft. or 1.72 Kg bitumen and 0.013 cu.metrebajri per sq.metre.

2) 2nd coat:-

i) 25 lbs. bitumen, and 2.75 Cft. bajri of nominal size ½" 100Sft. 104.75 1239.40 Sq.m 11.25 133.35(13 mm) per %sft or 1.23 Kg bitumen and 0.008 cu. metre bajri persq.metre.

ii) 18 lbs. bitumen, and 2.0 Cft. bajri of nominal size 3/8" 100Sft. 104.75 922.70 Sq.m 11.25 99.30(10 mm) per %Sft. or 0.89 Kg bitumen and 0.006 cu.metrebajri per sq. metre.

3) 3rd coat:-

14 lbs. bitumen, and 1.5 Cft. bajri of nominal size ¼" (6 100Sft. 71.70 704.95 sq.m 7.70 75.85mm) per %sft or 0.69 Kg bitumen and 0.005 cubic metre bajjri per sq.metre.

b) Subsequent carriage of crushed stone aggregate/bajri, 100Cft. cu.m 1) The carriage for the wholedistance to the site of work shall becalculated on the basis of the ratesof the actual means of transportused in carriage, i.e. road and/or rail,as the case may be.

2) It shal be payable from thenearest approved quarry.

9 a) Resurfacing of road, including supply of bitumen and 612-1bajri/crushed stone aggregate of approved quality, toincluding cleaning of road surface, heating and spraying 612-6of bitumen, and spreading bajri/crushed stoneaggregate and rolling with road roller (including itsoperation cost, fuel and hire charges, etc.) complete,including carriage of all materials to site of work.

chapter-18(R & Road Struc) Page 110

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

i) 22 lbs. bitumen, and 2.5 Cft. bajri of nominal size ½" 100Sft. 90.80 1092.90 sq.m 9.75 117.60(13 mm) per %Sft. or 1.07 Kg bitumen and bajjri 0.007 cu.mper sq.m.

ii) 20 lbs. bitumen, and 2.0 Cft. bajri of nominal size 3/8" 100Sft. 90.80 988.05 sq.m 9.75 106.30(10 mm) per % Sft. or 0.79 Kg bitumen and 0.006cu.metre bajri per sq.metre.

b) Subsequent carriage of crushed stone aggregate/bajri. 100Cft. cu.m Same remarks as againstitem 8(b) above.

10 a) Providing and laying plant premixed bituminous carpet, per inch per 25mm 641-1 toincluding compaction and finishing to required camber, grade thickness thickness 642-6and density. per 100Sft. per Sq.m (i) 3% Bitumen -do- 942.20 2758.65 -do- 101.40 296.95(ii) 3.5% Bitumen -do- 942.20 2971.85 -do- 101.40 319.90(iii) 4% Bitumen -do- 942.20 3185.00 -do- 101.40 342.85(iv) 4.5% Bitumen -do- 942.20 3398.15 -do- 101.40 365.75(v) 5% Bitumen -do- 942.20 3611.15 -do- 101.40 388.70(vi) 5.5% Bitumen -do- 942.20 3824.45 -do- 101.40 411.65(vii) 6% Bitumen -do- 942.20 4037.60 -do- 101.40 434.60b) Subsequent carriage of crushed stone aggregate/bajri. 100Cft. cu.m Same remarks as against item 8(b)

above.11 Scarifying old road surface including removal of debris within 100Sft. 260.90 - Sq.m 28.10 -

1 chain (30 m).

Incidental Construction

12 Providing R.C.C. railing on bridges, as per standard drawing. Per Rft. 137.75 946.90 Metre 451.95 3106.65 901-1 The rate includes cost of steel, itsto fabrication, laying in position and

901-4 fastening, including cost of bindingwire and removal of rust from thebars, etc.

13 Providing and fixing G.I. pipe railing, as per Per Rft. of 108.00 746.05 Metre 354.30 2447.60 dittostandard drawing. 3 rows of

Pipes

14 Providing and fixing steel bearings of standard quality and Each Set - 2400.00 Each set - 2400.00 911-1 totype at site of work. of one of one 911-6

end end

15 Providing and fixing rubber bearing pad at site Per - 18.00 cu.cm - 1.10 dittoof work. Cu. Inch

16 Providing and laying expansion joint of neoprine strip 4"x¼" Per Rft. 89.10 193.60 Metre 292.30 635.15 921-1 to(100 mmx 6 mm) and plastic bitumen. 921-4

chapter-18(R & Road Struc) Page 111

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

17 Providing and fixing rain water outlet of A.C. pipe. Each 44.55 348.90 Each 44.55 348.90 931-1 to933-4

18 Providing and erection at site of work:- 941-1 to The rate is for complete item of941-5 work according to Standard design

i) R.C.C. mile/Km. stone Each 2644.75 4908.85 Each 2644.75 4908.85 including cement concreteii) R.C.C. furlong/½ Km. stone Each 129.05 351.85 Each 129.05 351.85 foundation block and paintingiii) R.C.C. boundary pillar. Each 249.45 617.80 Each 249.45 617.80 letters etc.iv) Sign post of M.S. plate 1/8" thick (3 mm)

a) Mandatory. Each 841.80 4549.25 Each 841.80 4549.25b) Warning/Direction/Informatory. Each 815.05 4280.90 Each 815.05 4280.90

19 Providing and laying dry brick pavement/soling in streets or 100Cft. 3358.75 14233.15 cu.m 1186.30 5027.15 The nominal thickness of bricks roads, etc. sand grounted, laid in proper camber, including ( 9" x 4-3/8"x 2-11/16") shall be taken preparation, watering, compaction of bed to proper camber, for the purpose of measurement and sand cushion. and payment.

chapter-19(PSI & GF) Page 112

1 Rates for all finished works include the removal of surplus debris, unused material & by products.2 The material used shall conform to Schedule of Rates, Vol. I, Part I, (Specifications for Materials of

Construction, 1964, and the work will be executed according to Buildings & Roads Department Specifications,Vol II, 1966 (Public Health Works).

3 The rates include cutting and making good of the surface of walls, roof, floor, etc. where necessary.

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

1 Providing and fitting glazed earthen ware water closetEuropean type, excluding seat and cover:-

i) white Each 445.50 2,186.40 Each 445.50 2,186.40 ii) coloured Each 445.50 2,372.40 Each 445.50 2,372.40

2 Providing and fixing, double seat and cover only.

i) bakelite Each 4.65 334.65 Each 4.65 334.65 ii) plastic Each 4.65 232.65 Each 4.65 232.65

3 Providing and fitting glazed earthen ware water closet,squatter type (Orisa pattern), combined with foot rest.

i) white Each 320.60 1,234.30 Each 320.60 1,234.30 ii) coloured Each 320.60 1,438.30 Each 320.60 1,438.30

4 Providing and fitting white glazed earthen ware water closet, Each 320.60 2,072.60 Each 320.60 2,072.60 squartter type, with separate foot rest.

5 Providing and fitting water closet, squatter type of terrazzo Each 320.60 658.30 Each 320.60 658.30 concrete.

6 Providing and fitting glazed earthen ware wash hand basin56x40 cm (22"x16") including bracket set, waste pipe andwaste coupling, etc.i) white, with pedestal Each 418.45 2,524.45 Each 418.45 2,524.45 ii) coloured, with pedestal Each 418.45 2,710.45 Each 418.45 2,710.45 iii) white, without pedestal Each 369.50 1,773.50 Each 369.50 1,773.50 iv) coloured, without pedestal Each 369.50 1,821.50 Each 369.50 1,821.50

7 Providing and fixing stainless steel sink with drain board, size Each 369.50 4,460.40 Each 369.50 4,460.40 120x60 cm (48"x24") including bracket set, waste pipe andwaste coupling.

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

19. PLUMBING, SANITARY INSTALLATION & GAS FITTINGS

chapter-19(PSI & GF) Page 113

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

8 Providing and fitting terrazzo concrete sink 60x45 cm (24"x18") Each 369.50 1,159.80 Each 369.50 1,159.80 with drain board of mosaic, including bracket set, waste pipeand waste coupling.

9 Providing and fixing glazed earthen ware sink, includingbracket set, waste pipe and waste coupling:-

i) 60x45 cm (24"x18") Each 369.50 1,737.35 Each 369.50 1,737.35 ii) 37.5x45 cm (15"x18") Each 369.50 1,557.35 Each 369.50 1,557.35

10 Providing and fixing glazed earthen ware flat back urinal. Each 222.75 925.60 Each 222.75 925.60

11 Providing and fitting glazed earthen ware low down flushingcistern 13.63 litres (3 gallons) capacity, including bracketset, copper connection, etc.

i) white Each 369.50 1,368.05 Each 369.50 1,368.05 ii) coloured Each 369.50 1,446.05 Each 369.50 1,446.05

12 Providing and fitting plastic made low down flushing cistern13.63 litre (3 gallons) capacity, including bracket set, copperconnection, etc. complete.

i) white Each 369.50 1,206.05 Each 369.50 1,206.05 If rubber connection is used, theii) coloured Each 369.50 1,206.05 Each 369.50 1,206.05 composite rate will be reduced by

Rs. 12.50

13 Providing and fixing white enameled cast iron low down flushing Each 369.50 1,393.65 Each 369.50 1,393.65 cistern 13.63 litres (3 gallons) capacity, including bracketset, copper connection, etc.

14 Providing and fixing cast iron high level flushing cisternincluding cost of bracket set, copper connection, etc.

i) 13.63 litres (3 gallons) capacity Each 391.80 2,513.90 Each 391.80 2,513.90 ii) 4.55 litres (1 gallon) capacity Each 391.80 1,673.90 Each 391.80 1,673.90

15 Providing and fixing, chromium plated soap dish. Each 22.30 194.35 Each 22.30 194.35

16 Providing and fitting, glazed earthen ware soap dish.

i) white Each 22.30 482.35 Each 22.30 482.35 ii) coloured Each 22.30 230.35 Each 22.30 230.35

17 Providing and fixing, chromium plated toilet paper holder. Each 29.70 414.75 Each 29.70 414.75

chapter-19(PSI & GF) Page 114

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

18 Providing and fixing, chromium plated towel rail:-

i) 60 cm (24") long, and 2 cm (¾") dia. Each 29.70 359.75 Each 29.70 359.75 ii) 50 cm (20") long, and 1.5 cm (½") dia. Each 29.70 299.75 Each 29.70 299.75

19 Providing and fixing looking glass 55x40 cm (22"x16") size, Each 55.7 387.80 Each 55.7 387.80and 5 mm thick, first quality.

20 Providing and fixing glass shelf 60x13 cm (24"x5"), with5mm thick glass:-

i) with chromium plated brackets and railing. Each 69.60 392.25 Each 69.60 392.25 ii) glass shelf only, without chromium plated brackets Each 44.55 90.15 Each 44.55 90.15

and railing.

21 Providing and fitting glazed earthen ware shelf 60x13 cm (24"x5"), with chromium plated bracket and railing:-

i) White Each 69.60 946.65 Each 69.60 946.65 ii) Coloured Each 69.60 1,078.65 Each 69.60 1,078.65

22 Providing and fitting:-

i) plastic soap dish Each 22.30 161.80 Each 22.30 161.80 ii) plastic toilet paper holder Each 29.70 227.55 Each 29.70 227.55 iii) plastic towel rail Each 29.70 251.55 Each 29.70 251.55 iv) plastic shelf 60x13 cm (24"x5") with bracket and railing. Each 29.70 433.30 Each 29.70 433.30

23 Providing and fixing chromium plated pillar-cock, heavy:-

i) 2 cm (¾") Each 29.70 701.70 Each 29.70 701.70 ii) 1.5 cm (½") Each 29.70 545.70 Each 29.70 545.70

24 Providing and fixing chromium plated stop cock, heavy:-

i) 2 cm (¾") Each 29.70 281.70 Each 29.70 281.70 ii) 1.5 cm (½") Each 29.70 185.70 Each 29.70 185.70

25 Providing and fixing underground stop cock 13 mm (½"), Each 43.65 497.35 Each 43.65 497.35 with chromium plated cover.

26 Providing and fixing chromium plated bib cock:-i) 2 cm (¾") Each 29.70 353.70 Each 29.70 353.70 ii) 1.5 cm (½") Each 29.70 335.70 Each 29.70 335.70

chapter-19(PSI & GF) Page 115

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

27 Providing and fixing chromium plated tee stop cock Each 29.70 455.70 Each 29.70 455.70 15mm (½").

28 Providing and fixing chromium plated shower rose:-

i) 1.5x10 cm (½"x4") Each 29.70 335.70 Each 29.70 335.70 ii) 2x15 cm (¾"x6") Each 29.70 413.70 Each 29.70 413.70

29 Providing and fixing, chromium plated mixing valve, for wash Each 37.15 1,561.15 Each 37.15 1,561.15 hand basin, sink or shower.

30 Providing and fixing gun metal peet/gate valve (screwed):- For brass peet/gate valve (screwed),the composite rates of items (i) to (v)

i) 30 mm (1¼") dia Each 44.55 446.55 Each 44.55 446.55 will be reduced by Rs. 66, 77, 95, 107ii) 40 mm(1½") dia Each 44.55 596.55 Each 44.55 596.55 and 120 respectively.iii) 50 mm(2") dia Each 44.55 824.55 Each 44.55 824.55 iv) 65 mm(2½") dia Each 44.55 1,292.55 Each 44.55 1,292.55 v) 80 mm(3") dia Each 44.55 1,904.55 Each 44.55 1,904.55

31 Providing and fitting, chromium plated or brass oxidised,swan neck cock 15 mm (½") dia.

i) single way Each 29.70 377.70 Each 29.70 377.70 ii) two way Each 44.55 644.55 Each 44.55 644.55 iii) three way Each 59.40 785.40 Each 59.40 785.40

32 Providing and fixing, union brass cock.

i) 13 mm (½") dia Each 29.70 149.70 Each 29.70 149.70 ii) 20 mm (¾") dia Each 29.70 233.70 Each 29.70 233.70

33 Providing and fixing, floor trap of cast iron, including concrete

chamber all round, and C.I. grating:-

i) 10x5 cm (4"x2") Each 89.10 411.10 Each 89.10 411.10 ii) 10x7.5 cm (4"x3") Each 89.10 411.10 Each 89.10 411.10

34 Providing and fitting "P" trap:-

i) 10 cm (4") of cast iron. Each 74.25 472.75 Each 74.25 472.75 ii) 10 cm (4") glazed. Each 74.25 142.75 Each 74.25 142.75

35 Providing and fitting 10 cm (4") gully trap, including cement Each 111.40 673.00 Each 111.40 673.00

concrete, cost of PVC grating 15x15 cm (6"x6") andmasonry chamber 30x30 cm (12"x12").

chapter-19(PSI & GF) Page 116

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

36 Providing and fitting, cast iron soil pipe with:-

i) lead caulked, yarn joint:-

a) 10 cm (4") i/d Per foot 37.45 234.65 Metre 122.85 769.60 b) 5 cm (2") i/d Per foot 15.00 99.40 Metre 49.15 326.00

ii) cement caulked joint:-

a) 10 cm (4") i/d Per foot 8.30 149.20 Metre 27.15 489.35 b) 5 cm (2") i/d Per foot 3.30 82.00 Metre 10.85 268.95

37 Providing and fitting, A.C. soil pipe with cement caulkedjoint, including all specials:-

i) 60 (2¼)" mm i/d Per foot 6.65 31.25 Metre 21.75 102.45 ii) 80 (3") mm i/d Per foot 7.35 72.20 Metre 24.15 236.90 iii) 100 (4") mm i/d Per foot 8.30 107.20 Metre 27.15 351.65 iv) 150 (6") mm i/d Per foot 11.05 133.50 Metre 36.20 437.80

38 Providing and fitting cast iron specials, such as tee bend, In case of plug type, the compositecollar, cross, etc. plain type:- rate shall be increased by Rs.2 per kg.

i) lead caulked joint Kg 30.50 158.80 Kg 30.50 158.80 ii) cement caulked joint Kg 18.60 117.25 Kg 18.60 117.25

39 Supply and fitting of cast iron manhole coverwith frame, etc. complete.

i) 30 cm (12") dia Each 44.55 200.55 Each 44.55 200.55 ii) 45 cm (18") dia Each 44.55 872.55 Each 44.55 872.55 iii) 60 cm (24") dia Each 72.45 1,476.45 Each 72.45 1,476.45

40 Providing and fitting R.C.C. pipe 10 cm (4") dia, including Per foot 18.70 66.70 Metre 61.40 218.85 laying and jointing in trenches.

41 Providing and fitting chromium plated or oxidised, gas cock 6'mm (¼"):-

i) single way Each 29.70 203.70 Each 29.70 203.70 ii) two way Each 44.55 308.55 Each 44.55 308.55 iii) three way Each 59.40 503.40 Each 59.40 503.40

42 Providing and fitting nipple or bush, 6 mm to Each 22.30 53.20 Each 22.30 53.20 10 mm (¼" to 3/8") i/d.

chapter-19(PSI & GF) Page 117

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

43 Providing and fixing, brass gas cock:-

a) 15 mm (½") dia Each 4.65 94.65 Each 4.65 94.65 b) 20 mm (¾") dia Each 168.75 106.65 Each 168.75 106.65

44 Providing and fixing brass stop cock/bib cock:-

a) 15 mm (½") dia Each 7.45 85.45 Each 7.45 85.45 b) 20 mm (¾") dia Each 7.45 127.45 Each 7.45 127.45

45 Hoisting and placing in position, precast R.C. latrine seats. Each 445.50 - Each 445.50 -

Replacement

1 Providing and fixing, chromium plated waste coupling:-

i) 3 cm (1¼") Each 44.55 128.55 Each 44.55 128.55 ii) 4 cm (1½") Each 44.55 134.55 Each 44.55 134.55

2 Providing and fixing rubber plug with chain:-

i) 3 cm (1¼") Each 1.80 48.60 Each 1.80 48.60 ii) 4 cm (1½") Each 1.80 55.80 Each 1.80 55.80

3 Providing and fixing, waste pipe of PVC:-

i) 3 cm (1¼") Each 22.30 48.70 Each 22.30 48.70 ii) 4 cm (1½") Each 22.30 54.70 Each 22.30 54.70

4 Providing and fixing, flushing bend of PVC.

i) 3 cm (1¼") Each 19.80 46.20 Each 19.80 46.20 ii) 4 cm (1½") Each 19.80 52.20 Each 19.80 52.20

5 Providing and fixing chromium plated bottle trap with wastepipe, etc. complete:-

i) 3 cm (1¼") i/d Each 44.55 560.55 Each 44.55 560.55 ii) 4 cm (1½") Each 44.55 680.55 Each 44.55 680.55

6 Providing and fixing, angle iron brackets for:-

i) wash hand basin and cistern Each 44.55 174.15 Each 44.55 174.15 ii) sinks Each 44.55 190.95 Each 44.55 190.95

chapter-19(PSI & GF) Page 118

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

7 Providing and fixing 1.5 cm (½") dia connection, includingcheck nuts, etc.:-

i) plastic rubber connection Each 17.80 50.20 Each 17.80 50.20 ii) copper connection Each 17.80 88.60 Each 17.80 88.60

8 Providing and fixing brass ball float valve:-

i) 1.5 cm (½") dia Each 37.15 241.15 Each 37.15 241.15 ii) 2.0 cm (¾") dia Each 37.15 307.15 Each 37.15 307.15 iii) 2.5 cm (1") dia Each 37.15 367.15 Each 37.15 367.15 iv) 3 cm (1¼") dia Each 37.15 397.15 Each 37.15 397.15 v) 4.0 cm (1½") dia Each 37.15 553.15 Each 37.15 553.15 vi) 5 cm (2") dia Each 37.15 931.15 Each 37.15 931.15

chapter-20(Surface Drainage) Page 118

1. Specification No. correspond to Book of Specification (B & R Department ) Vol. 11, 1966 (public Health Works).

2. Rates for all finished works include the removal of surplus debris, unused material and by products.

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

1 Tega formed of pacca bricks on end, laid in and over 17.1cement sand mortar projecting to a height of not morethan 6" (150 mm) top of drain along the property sidewhere required, laid to lines, grades, slopes and shapeaccording to the Engineer's drawing:-

a) 3" thick (75 mm)

i) ratio 1:3 100Rft 1,266.95 3,868.05 Metre 41.55 126.85 ii) ratio 1:5 ditto 1,266.95 3,680.85 ditto 41.55 120.75

B) 4½" thick (113 mm)

i) ratio 1:3 100Rft 1,900.10 5,638.35 ditto 62.30 184.95 ii) ratio 1:5 ditto 1,900.10 5,354.50 ditto 62.30 175.65

2 Pacca flat brick 3" (75 mm ) thick, laid in reimbursement, 17.1in cement, sand mortar, on sides of drains and in otherworks where required. All joints to be completely filledand struck flush:-

a) ratio 1:3 100Sft. 1,867.45 5,514.40 Sqm. 200.95 593.35 b) ratio 1:5 ditto 1,867.45 5,213.95 ditto 200.95 561.00 c) ratio 1:6 ditto 1,867.45 5,129.45 ditto 200.95 551.95

3 Pacca brick on edge, laid in reimbursement, in cement, 17.1sand mortar, on sides of drains and on other works whererequired. All joints to be completely filled and struckflush:-

a) ratio 1:3 100Sft. 2,647.90 8,151.20 Sqm. 284.90 877.05 b) ratio 1:5 ditto 2,647.90 7,669.30 ditto 284.90 825.20 c) ratio 1:6 ditto 2,647.90 7,549.40 ditto 284.90 812.30

4 Pacca flat brick, Herring bond pitching in cement, sand 17.2mortar, laid to lines, grades, shapes and slopes as perEngineer's drawing:-

a) ratio 1:3 100Sft. 1,800.20 5,447.15 Sqm. 193.70 586.10 b) ratio 1:5 ditto 1800.2 5146.7 ditto 193.7 553.8 c) ratio 1:6 ditto 1800.2 5062.2 ditto 193.7 544.7

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

20. SURFACE DRAINAGE

chapter-20(Surface Drainage) Page 119

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

5 Pacca brick on edge, Herring bond pitching in cement, 17.2sand mortar, laid to lines, grades, shapes and slopes asper Engineer's drawing:-

a) ratio 1:3 100Sft. 2,792.50 8,295.75 Sqm. 300.45 892.60 b) ratio 1:5 ditto 2,792.50 7,813.90 ditto 300.45 840.75 c) ratio 1:6 ditto 2,792.50 7,694.00 ditto 300.45 827.85

6 Constructing Punjab Standard Drains. of cement concrete1:2 ½ :5, with cement concrete bedding ratio 1:6:12, 17.1complete, laid to lines, grades, slopes and shapes,rendering exposed surface of concrete with 1:1 cement,sand mortar, ¼" (6 mm) thick, as per Engineer's drawing(excluding excavation):-

a) Type I Per Rft 42.95 104.25 Metre 140.95 341.95 b) Type II ditto 85.95 190.00 ditto 281.85 623.15 c) Type III ditto 113.40 247.60 ditto 371.90 812.10 d) Type IV ditto 135.20 294.85 ditto 443.40 967.15 e) Type V ditto 178.85 400.85 ditto 586.55 1,314.75 f) Type VI ditto 205.75 459.10 ditto 674.85 1,505.80 g) Type VII ditto 228.05 505.35 ditto 748.00 1,657.55 h) Type VIII ditto 254.70 566.05 ditto 835.45 1,856.70 i) Type IX ditto 342.00 802.30 ditto 1,121.75 2,631.55 j) Type X ditto 375.60 879.25 ditto 1,231.95 2,884.00 k) Type XI ditto 419.60 978.25 ditto 1,376.20 3,208.65 l) Type XII ditto 447.30 1,037.55 ditto 1,467.10 3,403.10

7 Laying R.C.C hume pipes in position, including jointing:-a) 6" to 12" (150 mm to 300 mm ) dia Per Lft. 80.45 83.85 Metre 263.85 275.00 b) 12" to 24" (300 mm to 600 mm) dia ditto 127.40 134.20 ditto 417.90 440.25 c) 24" to 36" (600 mm to 900 mm) dia ditto 160.90 171.15 ditto 527.70 561.35

chapter-21(Sewerage) Page 120

1 Specification No. correspond to Book of Specification of B&R Department Vol. II, 1966 (Public Health Works).2 Rate for all finished works include the removal of surplus debris, unused material and byproducts.

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

1 Providing and laying R.C.C. pipe, moulded with cement Chapter - 8concrete 1:1½:3, with spigot socket or collar joint, etc. including cost of reinforcement, conforming to B.S. 5911:Part I: 1981, Class "L" including carriage of pipe fromfactory to site of work, lowering in trenches to correctalignment and grade, jointing, cutting pipes wherenecessary, finishing and testing, etc., complete.i) 100 mm (4") i/d Rft. 21.25 89.40 Metre 69.70 293.25ii) 150 mm (6") i/d Rft. 25.60 133.95 Metre 83.95 439.35iii) 225 mm (9:) i/d Rft. 49.60 353.50 Metre 162.70 1159.50

2 Providing and laying non-reinforced concrete pipe, dittomoulded with cement concrete 1:1½:3, conforming toASTM Specification C-14-73, Class 2, including carriageof pipe from factory to site of work, lowering in trenches tocorrect alignment and grade, jointing, cutting pipe wherenecessary, finishing and testing, etc. complete.i) 100 mm (4") i/d Rft. 15.95 56.15 Metre 52.30 184.15ii) 150 mm (6") i/d Rft. 19.20 75.20 Metre 63.00 246.65iii) 200 mm (8") i/d Rft. 30.85 102.60 Metre 101.20 336.55iv) 225 mm (9:) i/d wall thickness 1 inch (25 mm) Rft. 33.05 122.00 Metre 108.40 400.15v) 250 mm (10") i/d Rft. 33.55 133.45 Metre 110.05 437.70

3 Providing and laying R.C.C. pipe sewers, moulded with dittocement concrete 1:1½:3 conforming to ASTMSpecification C-76-79, Class II. Wall B, including carriageof pipe from factory to site of work, lowering in trenches tocorrect alignment and grade, jointing with rubber ring,cutting pipes where necessary, testing, etc., complete.

i) 310 mm (12") i/d Rft. 50.45 415.20 Metre 165.50 1361.85ii) 380 mm (15") i/d Rft. 63.30 509.80 Metre 207.60 1672.15iii) 460 mm (18") i/d Rft. 76.15 557.50 Metre 249.75 1828.60iv) 530 mm (21":) i/d Rft. 95.25 712.50 Metre 312.40 2337.00v) 610 mm (24") i/d Rft. 109.60 850.45 Metre 359.50 2789.50vi) 690 mm (27") i/d Rft. 162.95 1178.75 Metre 534.50 3866.30vii) 760 mm (30") i/d Rft. 195.45 1267.70 Metre 641.10 4158.05viii) 840 mm (33") i/d Rft. 243.55 1483.35 Metre 798.85 4865.40ix) 910 mm (36") i/d Rft. 299.70 1981.80 Metre 983.00 6500.30x) 1070 mm (42") i/d Rft. 389.9 2569.85 Metre 1278.85 8429.1xi) 1220 mm (48") i/d Rft. 736.7 3464.45 Metre 2416.4 11363.4xii 1370 mm (54") i/d Rft. 1019.95 4359.35 Metre 3345.45 14298.65xiii) 1520 mm (60") i/d Rft. 1294.5 5004.9 Metre 4245.95 16416.05

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

21. SEWERAGE

chapter-21(Sewerage) Page 121

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

xiv) 1680 mm (66") i/d Rft. 2036.05 6117.5 Metre 6678.25 20065.4xv) 1830 mm (72") i/d Rft. 2530.00 6982.50 Metre 8298.40 22902.60

4 Providing and laying R.C.C. pipe sewers, moulded with Chapter-8cement concrete 1:1½:3 conforming to ASTM Specification C-76-79, Class III, Wall B, including carriage of pipes fromfactory to site of work, lowering in trenches to correctalignment and grade, jointing with rubber ring, cutting pipeswhere necessary, testing, etc. complete:-

i) 310 mm (12") i/d Rft. 50.45 511.70 Metre 165.45 1678.40ii) 380 mm (15") i/d Rft. 63.30 633.95 Metre 207.60 2079.35iii) 460 mm (18") i/d Rft. 76.15 785.90 Metre 249.80 2577.75iv) 530 mm (21":) i/d Rft. 95.25 955.90 Metre 312.45 3135.35v) 610 mm (24") i/d Rft. 109.60 1115.25 Metre 359.40 3658.00vi) 690 mm (27") i/d Rft. 162.95 1337.35 Metre 534.50 4386.50vii) 760 mm (30") i/d Rft. 195.45 1597.95 Metre 641.10 5241.30viii) 840 mm (33") i/d Rft. 243.55 1847.80 Metre 798.90 6060.80ix) 910 mm (36") i/d Rft. 299.70 2336.55 Metre 983.05 7663.90x) 1070 mm (42") i/d Rft. 389.90 3025.45 Metre 1278.90 9923.50xi) 1220 mm (48") i/d Rft. 748.15 3851.75 Metre 2453.85 12633.75xii 1370 mm (54") i/d Rft. 1036.00 4857.00 Metre 3398.00 15930.95xiii) 1520 mm (60") i/d Rft. 1314.50 5864.85 Metre 4311.55 19236.70xiv) 1680 mm (66") i/d Rft. 2068.10 7703.90 Metre 6783.30 25268.80xv) 1830 mm (72") i/d Rft. 2570.00 9540.65 Metre 8429.65 31293.35

5 Providing and laying R.C.C. pipe sewers, moulded with Chapter - 8cement concrete 1:1½:3 conforming to ASTMSpecification C-76-79, Class IV, Wall B, including carriageof pipes from factory to site of work, lowering in trenches to correct alignment and grade, jointing with rubber ring,cutting pipes where necessary, testing, etc. complete:-

i) 310 mm (12") i/d Rft. 50.45 620.85 Metre 165.45 2036.30ii) 380 mm (15") i/d Rft. 63.30 776.60 Metre 207.60 2547.30iii) 460 mm (18") i/d Rft. 76.15 932.40 Metre 249.80 3058.25iv) 530 mm (21":) i/d Rft. 95.25 1093.10 Metre 312.45 3585.45v) 610 mm (24") i/d Rft. 109.60 1257.70 Metre 359.40 4125.30vi) 690 mm (27") i/d Rft. 162.95 1622.30 Metre 534.50 5321.20vii) 760 mm (30") i/d Rft. 195.45 1871.00 Metre 641.10 6137.00viii) 840 mm (33") i/d Rft. 243.55 2161.40 Metre 798.90 7089.40ix) 910 mm (36") i/d Rft. 299.70 2882.70 Metre 983.05 9455.25x) 1070 mm (42") i/d Rft. 389.90 3535.95 Metre 1278.90 11597.95xi) 1220 mm (48") i/d Rft. 748.15 4469.05 Metre 2453.60 14658.50xii) 1370 mm (54") i/d Rft. 1036.00 5800.95 Metre 3398.20 19027.00xiii) 1520 mm (60") i/d Rft. 1314.50 7301.45 Metre 4311.55 23948.75xiv) 1680 mm (66") i/d Rft. 2068.10 9662.90 Metre 6783.30 31694.30xv) 1830 mm (72") i/d Rft. 2570.00 11499.65 Metre 8429.65 37718.85

chapter-21(Sewerage) Page 122

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

6 Lowering of sub-soil water table, by installation of tubewells 1) This rate shall be payable, inalong sewer line and pumping out water, for excavation in addition to the item of excavationopen cutting below sub-soil water level, concreting, curing, below SSWL for sewers andlaying and jointing pipes, filling haunches, etc. till the manholes under Chapter,completion of sewer line, including disposal of pumped out EARTHWORKwater:- 2) The grant of these rates shall be

Rft of Metre of subject to Superintending Engineer's1) 0-1 ft. (0 to 310 mm) below SSWL laid sewer - 313.5 laid sewer - 1028.25 approval.2) 0-2 ft. (0 to 610 mm) below SSWL ditto - 581.75 ditto - 1908.103) 0-3 ft. (0 to 910 mm) below SSWL ditto - 1008.4 ditto - 3307.55 3) The rate includes cost of4) 0-4 ft. (0 to 1220 mm) below SSWL ditto - 1466.8 ditto - 4811.15 providing pumps, POL and all5) 0-5 ft. (0 to 1520 mm) below SSWL ditto - 2064.40 ditto - 6771.25 operation charges at the site6) 0-6 ft. (0 to 1830 mm) below SSWL ditto - 2552.35 ditto - 8371.65 of work, etc.7) 0-7 ft. (0 to 2170 mm) below SSWL ditto - 3052.85 ditto - 10013.258) 0-8 ft. (0 to 2480 mm) below SSWL ditto - 3504.90 ditto - 11496.159) 0-9 ft. (0 to 2790 mm) below SSWL ditto - 3772.40 ditto - 12373.5010) 0-10 ft. (0 to 3100 mm) below SSWL ditto - 4356.70 ditto - 14289.9011) 0-11 ft. (0 to 3410 mm) below SSWL ditto - 4854.15 ditto - 15921.6012) 0-12 ft. (0 to 3720 mm) below SSWL ditto - 5388.35 ditto - 17673.85

7 Constructing gully grating chamber, 12"x12", ( 300x300 16.2 Pipe connection to be paidmm) complete in all respects: separately.

a) with C.I. gully trap, weighing 81 lbs. (36.75 Kg.) frame Each 896.30 2972.80 Each 896.30 2972.80

hinged safety type.

b) concrete Gully trap. ditto 896.30 2747.80 ditto 896.30 2747.80

8 Constructing standard gully grating chamber, 3'x2½' Each 2696.40 8573.10 Each 2696.40 8573.10 ditto Pipe connection to be paid(900x750 mm), with chinaware trap as per PHED Drawing separately.STD/PD No. 3 of 1977, complete in all respects.

9 Extra for making and finishing benching floor work in 100Sft. 1110.30 1623.25 Sq.m 119.45 174.65 14.4manhole chamber, with 1/8" (3 mm) thick cement finish.

10 Restoration of brick pavement on edge, over laid service 100Sft. 1622.85 3166.30 Sq.m 174.60 340.70 13.1line, with 2" (50 mm) sand cushion under soling.

11 Restoration of flat brick pavement sand grouted, over 2" 100Sft. 984.25 2089.20 Sq.m 105.90 224.80 13.1(50 mm) thick dry sand cushion, under soling on laidservice line.

12 Restoration of metalled road, on laid service line, including 13.1compaction:-

a) Carpetted road, with 2" (50 mm) carpet and 10" (250 100Sft. 2647.55 7688.10 Sq.m 284.90 827.25mm) depth of stone metal for sub-base and base.

chapter-21(Sewerage) Page 123

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

b) Carpeted road, with 1½" (38 mm) carpet and 6" (150 100Sft. 1876.75 5638.80 Sq.m 201.95 606.75mm) depth of stone metal, for sub-base and base.

c) Black Topped Road with two coats of surfacing & 10" 100Sft. 1011.85 3817.10 Sq.m 108.85 410.70(250 mm) depth of stone metal, for sub base & base.

13 Providing and fixing 1¼"x1¼"x3/16" (31x31x5 mm) angle 14.7iron step, in manhole chambers, including carriage and Each 90.35 253.30 Each 90.35 253.30setting the same in work to correct lines and levels.

14 Fixing manhole frame and cover in R.C.C. slab including Per 244.85 - Per 244.85 - dittocarriage to site. set set

15 Providing and fixing 3" (75 mm) thick R.C.C. manhole Per 157.95 5796.45 Per 157.95 5796.45 dittocover, 22" (550 mm) dia, with tee shaped C.I. frame of 20" set set(500 mm) clear i/d (frame weighing 37.324 Kg. or onemaund) as per Standard Drawing STD/PD No. 5, of 1977,complete in all respects.

15-A Providing and fixing 6" thick R.C.C. manhole Per 348.30 7184.65 Per 348.30 7184.65cover with tee shaped C.I. frame of 22" I/d (frame set setweighing 37.324 Kg. or one maund as per StandardDrawing STD/PD No. 6, of 1977, complete in all respect.

16 Providing and fixing, 6" (150 mm) thick R.C.C. manhole Per 311.10 2695.60 Per 311.10 2695.60 dittocover for 22" as per standard drawing STD/PD No. 6 of set set1977, complete in all respects.

17 Providing and fixing, 6" (150 mm) thick R.C.C. manhole Per 257.50 4162.30 Per 257.50 4162.30 dittocover with 3"x3"x¼" (75x75x6mm) angle iron frame, 22" set set(550 mm) i/d as per standard drawing STD/PD No. 7 of1977, complete in all respects.

18 Desilting of disposal work collecting tank, including 100Cft. 894.60 948.85 cum 315.95 335.15 16.2removal of sludge within 3 chains (90 metre).

19 Providing and installing, C.I. ventilating shaft painted with 14.6bituminous paint with foundation bolts, as per PHEDStandard Drawing STD/PD No. 4 of 1977, complete in allrespects (except concrete foundation block):-

a) 6" (150 mm) i/d shaft

i) 18 ft. (5.5 metre) long Per Cwt 251.40 6370.50 %kg 494.85 12540.35ii) 24 ft. (7.30 metre) long ditto 279.30 6406.80 ditto 549.80 12611.80iii) 30 ft. (9.15 metre) long ditto 301.65 6425.05 ditto 593.80 12647.70iv) 36 ft. (11 metre) long ditto 315.65 6440.55 ditto 621.30 12678.25

chapter-21(Sewerage) Page 124

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

b) 9" (225 mm) i/d shaft

i) 18 ft. (5.5 metre) long Per Cwt 223.50 6339.20 %kg 439.95 12478.75ii) 24 ft. (7.30 metre) long ditto 240.85 6355.90 ditto 474.10 12511.60iii) 30 ft. (9.15 metre) long ditto 257.90 6372.75 ditto 507.65 12544.75iv) 36 ft. (11 metre) long ditto 310.40 6425.10 ditto 611.05 12647.85

c) 12" (300 mm) i/d shaft

i) 18 ft. (5.5 metre) long Per Cwt 198.70 6315.10 %kg 391.15 12431.30ii) 24 ft. (7.30 metre) long ditto 255.45 6368.40 ditto 502.90 12536.20iii) 30 ft. (9.15 metre) long ditto 298.05 6410.45 ditto 586.70 12619.00

20 Silt clearing 10' (3.00 m) dia wells, andremoval of slush outside the compound:-

a) upto 10' (3.00 m) depth of slush Per well 6978.20 - Per well 6978.20 -b) beyond 10' (3.00 m) depth of slush Per well 13848.10 - Per well 13848.10 -

chapter-22(Sinking of Wells) Page 125

1 Rates for all finished works include the removal of surplus debris, unused material and byproducts.2 Well curbs to be laid at spring level or as deep as possible.

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

1 Excavation of well in dry upto 20'(6 metre) below groundlevel, and disposal of soil within one chain (30 metre)

a) in ordinary soil or sand :- 1000 Cft. cu.m

i) from 0' to 5' (o to 1.5 m) depth ditto 4652.75 - ditto 164.35 -ii) from 5.1' to 10' (1.5 to 3.0 metre) depth ditto 4859.35 - ditto 171.65 -iii) from 10.1' to 15' (3.0 to 4.5 metre) depth ditto 5466.80 - ditto 193.10 -iv) from 15.1' to 20' (4.5 metre to 6.0 metre) depth ditto 6274.60 - ditto 221.60 -

b) in hard soil

i) from 0' to 5'(0 to 1.5 metre) depth 1000 Cft. 5667.20 - cu.m 200.15 -ii) from 5.1' to 10'(1.5 to 3.0 metre) depth ditto 5923.95 - ditto 209.25 -iii) from 10.1' to 15'(3.0 to 4.5 metre) depth ditto 6475.00 - ditto 228.70 -iv) from 15.1' to 20'(4.5 to 6.0 metre) depth ditto 7282.80 - ditto 257.25 -

c) in hard strata, such as shingle, gravel, etc.

i) from 0' to 5'(0 to 1.5 metre) depth 1000 Cft. 12223.60 - cu.m 431.75 -ii) from 5.1' to 10'(1.5 to 3.0 metre) depth ditto 12661.95 - ditto 447.20 -iii) from 10.1' to 15'(3.0 to 4.5 metre) depth ditto 13200.45 - ditto 466.25 -iv) from 15.1' to 20'(4.5 to 6.0 metre ) depth ditto 14171.10 - ditto 500.50 -

2 Dry sinking of well, including loading, and removingexcavated material within one chain (30 m):-

a) in ordinary soil :-

i) from 10' to 15'(3.0 to 4.5 m) depth 1000 Cft. 25048.30 - cu.m 884.70ii) from 15.1' to 20'(4.5 to 6.0 m) depth ditto 31310.40 - ditto 1105.90iii) from 20.1' to 25'(6.0 to 7.5 m) depth ditto 37572.50 - ditto 1327.05iv) from 25.1' to 30'(7.5 to 9.0 m) depth ditto 43834.55 - ditto 1548.25v) from 30.1' to 35'(9.0 to 10.5 m) depth ditto 50096.65 - ditto 1769.40vi) from 35.1' to 40'(10.5 to 12.0 m) depth ditto 56358.70 - ditto 1990.60vii) from 40.1'to 45'(12.0 to 13.5 m) depth ditto 62620.80 - ditto 2211.75viii) from 45'(13.5 Sm) to any depth ditto 68882.90 - ditto 2432.95

b) in hard soil :-

i) from 10' to 15'(3.0 to 4.5 m) depth 1000 Cft. 34441.45 - cu.m 1216.45 -ii) from 15.1' to 20'(4.5 to 6.0 m) depth ditto 40703.50 - ditto 1437.65 -iii) from 20.1' to 25'(6.0 to 7.5 m) depth ditto 46965.60 - ditto 1658.85 -iv) from 25.1' to 30'(7.5 to 9.0 m) depth ditto 53227.70 - ditto 1880.00 -

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

22. SINKING OF WELLS

chapter-22(Sinking of Wells) Page 126

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

v) from 30.1' to 35'(9.0 to 10.5 m) depth ditto 59489.75 - ditto 2101.20 -vi) from 35.1' to 40'(10.5 to 12.0 m) depth ditto 65751.85 - ditto 2322.35 -vii) from 40.1' to 45'(12.0 to 13.5 m) depth ditto 72013.90 - ditto 2543.55 -viii) from 45'(13.5 m) to any depth ditto 78276.00 - ditto 2764.70 -

c) in hard strata, such as shingle, gravel, etc.

i) from 10' to 15'(3.0 to 4.5 m) depth 1000 Cft. 46965.60 - cu.m 1658.85 -ii) from 15.1' to 20'(4.5 to 6.0 m) depth ditto 53227.70 - ditto 1880.00 -iii) from 20.1' to 25'(6.0 to 7.5 m) depth ditto 59489.75 - ditto 2101.20 -iv) from 25.1' to 30'(7.5 to 9.0 m) depth ditto 60272.50 - ditto 2128.85 -v) from 30.1' to 35'(9.0 to 10.5 m) depth ditto 72013.90 - ditto 2543.55 -vi) from 35.1' to 40'(10.5 to 12.0 m) depth ditto 78276.00 - ditto 2764.70 -vii)from 40.1' to 45'(12.0 to 13.5 m) depth ditto 84538.10 - ditto 2985.90 -viii) from 45'-1" (13.5 m) to any depth ditto 90800.15 - ditto 3207.05 -

3 Wet sinking of well in ordinary soil (value of C upto 5), for *841-1 The outer dimensions of the curbdepths below spring level, including charges of machinery, to shall form basis of payment.shoring, kentledge and removal of excavated spoil within 841-9one chain (30 m):-

i) from o' to 10'(0 to 3.0 m) depth 1000 Cft. 38109.20 - cu.m 1346.00 -ii) above 10' to 20'(3.0 to 6.0 m) depth ditto 80982.00 - ditto 2860.30 -iii) above 20' to 30'(6.0 to 9.0 m) depth ditto 99670.15 - ditto 3520.35 -iv) above 30' to 40'(9.0 to 12.0 m) depth ditto 129571.20 - ditto 4576.45 -v) above 40' to 50'(12.0 to 15.0 m) depth ditto 143968.00 - ditto 5084.95 -vi) above 50' to 60'(15.0 to 18.0 m) depth ditto 161964.00 - ditto 5720.55 -vii) above 60' to 70'(18.0 to 21.0 m) depth ditto 166116.90 - ditto 5867.25 -viii) above 70' to 80'(21.0 to 24.0 m) depth ditto 170488.40 - ditto 6021.65 -ix) above 80'(24.0 m) to any depth ditto 185101.70 - ditto 6537.80 -

4 Wet sinking of well in cohesive soil (value of Cmore than *841-1 The outer dimensions of the curb5), for depths below spring level, including charges of to shall form basis of payment.machinery shoring, kentledge and removal of excavated 841-9spoil within one chain (30 m):-

i) from o' to 10'(0 to 3.0 m) depth 1000 Cft. - 51507.75 cu.m - 1819.25ii) above 10' to 20'(3.0 to 6.0 m) depth ditto - 64384.65 ditto - 2274.05iii) above 20' to 30'(6.0 to 9.0 m) depth ditto - 77261.60 ditto - 2728.90iv) above 30' to 40'(9.0 to 12.0 m) depth ditto - 103015.45 ditto - 3638.50v) above 40' to 50'(12.0 to 15.0 m) depth ditto - 118864.00 ditto - 4198.30vi) above 50' to 60'(15.0 to 18.0 m) depth ditto - 128769.30 ditto - 4548.15vii) above 60' to 70'(18.0 to 21.0 m) depth ditto - 140475.60 ditto - 4961.60viii) above 70' to 80'(21.0 to 24.0 m) depth ditto - 145776.60 ditto - 5148.85ix) above 80'(24.0 m) to any depth ditto - 154523.20 ditto - 5457.75

chapter-22(Sinking of Wells) Page 127

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

5 Wet sinking of well in shingle, or gravel, etc, for depths *841-1 The outer dimensions of the curbbelow spring level, including charges of machinery, to shall form basis of payment.shoring, kentledge and removal of excavated spoil within 841-9one chain (30 m) :-i) from o' to 10'(0 to 3.0 m) depth 1000 Cft. - 70237.80 cu.m - 2480.80ii) above 10' to 20'(3.0 to 6.0 m) depth ditto - 85846.20 ditto - 3032.10iii) above 20' to 30'(6.0 to 9.0 m) depth ditto - 103015.45 ditto - 3638.50iv) above 30' to 40'(9.0 to 12.0 m) depth ditto - 140475.60 ditto - 4961.60v) above 40' to 50'(12.0 to 15.0 m) depth ditto - 154523.20 ditto - 5457.75vi) above 50' to 60'(15.0 to 18.0 m) depth ditto - 171692.45 ditto - 6064.20vii) above 60' to 70'(18.0 to 21.0 m) depth ditto - 179678.10 ditto - 6346.25viii) above 70' to 80'(21.0 to 24.0 m) depth ditto - 183956.15 ditto - 6497.35ix) above 80'(24.0 m) to any depth ditto - 203320.00 ditto - 7181.25

6 Making and fixing in position, kiker wood well curb. Per Cft. 1070.80 2777.55 cu.m 37821.45 98102.85

7 Laying well curb in position only. Each 356.40 - Each 356.40 -

8 Providing, making and laying R.C.C. well curb in position, *841-1 1) If concrete mixer is supplied byusing coarse sand, including all kinds of form, moulds, to Government, all charges includingcuring, shuttering, rendering and finishing the exposed 841-9 depreciation will be recovered fromsurface, (including screening and washing of aggregate :- the contractor.

2) The rate does not include cost ofa) Ratio 1:1½:3 Per Cft. 233.15 457.35 cu.m 8234.90 16154.10 steel reinforcement and its labour forb) ratio 1:2:4 ditto 233.15 429.80 ditto 8234.90 15180.75 bending, which is payable, separately.

9 Providing and fixing structural steel for cutting 100Kg 836.90 11330.45 100Kg 836.90 11330.45 841-1 toedge. 841-9

10 Making and removing false masonry on well. 100Cft. 7575.45 19289.60 cu.m 2675.65 6813.10 21.1 to The rate includes dismantling of false21.5 & 18.1 masonry, scraping bricks obtained

from dismantling and credit ofbyproducts.

* Specification No. correspond to Book of "Standard Specification for Road and Bridge Construction, 1971".

chapter-23(Tubewell) Page 128

1 Specification No. correspond to Book of "Specification for B&R Department, 1966, Vol. II (Public Health Works)".2 Rates for all finished works include the removal of surplus debris, unused material and byproducts.

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

1 Boring for tubewell in all types of soil except shingle and Chap. 2rock, from ground level to 100 ft. (30 m) depth, includingsinking and withdrawing of casing pipe, complete:-

a) 3" (75 mm) i/d Per Rft. 66.20 Per Metre 217.15b) 4" (100 mm) i/d of bore 90.10 of bore 295.45c) 5" (125 mm) i/d ditto 163.85 ditto 537.35d) 6" (150 mm) i/d ditto 248.60 ditto 815.50e) 8" (200 mm) i/d ditto 324.20 ditto 1063.35f) 10" (250 mm) i/d ditto 410.30 ditto 1345.75g) 12" (300 mm) i/d ditto 444.65 ditto 1458.45h) 15" (375 mm) i/d ditto 672.60 ditto 2206.05i) 18" (450 mm) i/d ditto 713.35 ditto 2339.80

2 Boring for tubewell in all types of soil except shingle, dittogravel & rock, from a depth of 100.1 ft. to 200 ft.(30 to 60 m) below ground level, including sinking andwithdrawing of casing pipe, complete:-

a) 5" (125 mm) i/d Per Rft. 275.35 Per Metre 903.20b) 6" (150 mm) i/d of bore 387.30 of bore 1270.40c) 8" (200 mm) i/d ditto 439.75 ditto 1442.40d) 10" (250 mm) i/d ditto 503.05 ditto 1649.95e) 12" (300 mm) i/d ditto 545.05 ditto 1787.85f) 15" (375 mm) i/d ditto 789.55 ditto 2589.70g) 18" (450 mm) i/d ditto 830.30 ditto 2723.45

3 Boring for tubewell in all types of soil except shingle, dittogravel & rock, from a depth of 200.1 ft. to 300 ft. (60to 90 m) below ground level, including sinking andwithdrawing of casing pipe, complete:-a) 5" (125 mm) i/d Per Rft. 384.85 Per Metre 1262.30b) 6" (150 mm) i/d of bore 496.20 of bore 1627.50c) 8" (200 mm) i/d ditto 554.70 ditto 1819.45d) 10" (250 mm) i/d ditto 625.80 ditto 2052.70e) 12" (300 mm) i/d ditto 661.40 ditto 2169.45

f) 15" (375 mm) i/d ditto 867.60 ditto 2845.65g) 18" (450 mm) i/d ditto 909.60 ditto 2983.50

4 Boring for tubewell in all types of soil except shingle, Chap. 2gravel & rock, from a depth of 300.1 ft. to 400 ft.(90 to 120 m) below ground level, including sinking andwithdrawing of casing pipe, complete:-

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

23. TUBEWELL AND WATER SUPPLY

chapter-23(Tubewell) Page 129

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

a) 8" (200 mm) i/d Rft of bore 670.30 Per Metre 2198.50b) 10" (250 mm) i/d ditto 749.20 of bore 2457.40c) 12" (300 mm) i/d ditto 786.65 ditto 2580.25d) 15" (375 mm) i/d ditto 1061.80 ditto 3482.65e) 18" (450 mm) i/d ditto 1065.50 ditto 3494.80

5 Direct Rotary/Reverse Rotary drilling of bore for tubewells, dittoin all types of soil except shingle, gravel and rock:-

a) from ground level to 250 ft. (75 m) below ground level:-

Per Rft. Per Metrei) 15" to 18" (375 to 450 mm) i/d of bore 494.10 of bore 1620.65 Upto 2 cusec dischargeii) 20" to 26" (500 to 650 mm) i/d ditto 710.60 ditto 2330.80 Above 2 cusec discharge

b) exceeding 250 ft. (75 m) depth below ground level:-

Rft Per Metrei) 15" to 18" (375 to 450 mm) i/d of bore 494.10 of bore 1620.65 Upto 2 cusec dischargeii) 20" to 26" (500 to 650 mm) i/d ditto 710.60 ditto 2330.80 Above 2 cusec discharge

6 Boring for tubewell in shingle, gravel and rock, including ditto Location and depth of shingle,sinking and withdrawing of casing pipe:- gravel or rock is to be determined

from the bore log.a) from ground level to 200 ft. (60 m) below ground level:-

Per Rft. Per Metre

i) 12" to 18" (300 to 450 mm) i/d of bore 1114.35 of bore 3655.10 Upto 2 cusec dischargeii) 20" to 26" (500 to 650 mm) i/d ditto 1507.15 ditto 4943.35 Above 2 cusec discharge

b) exceeding 200 ft. (60 m) depth belowground level:-

i) 12" to 18" (300 to 450 mm) i/d ditto 1114.35 ditto 3655.10 Upto 2 cusec dischargeii) 20" to 26" (500 to 650 mm) i/d ditto 1507.15 ditto 4943.35 Above 2 cusec discharge

7 Providing strong substantially built box of deodar wood Job for 790.60 11026.60 Job for 790.60 11026.60 ditto4'x2½'x9" (1200x750x225 mm), with compartments, lock compl- compl-and locking arrangement, for preserving samples of strata ete bore ete borefrom bore hole.

8 Furnishing sample of water from bore hole. Per Set 118.80 170.70 Per Set 118.80 170.70 Chap. 2

of 2 of 2bottles bottles

9 Providing and installing, brass strainer in tubewell bore ditto Cost/labour of jointing both ends ishole, including sockets, special sockets, studs, etc. included in the rate.complete:-

a) 2" i/d, 5/32" (50 mm i/d 4 mm) thick Per Rft. 31.85 855.05 Per Metre 104.45 2804.60b) 3" i/d, 5/32" (75 mm i/d 4 mm) thick Per Rft. 31.85 1275.05 Per Metre 104.50 4182.20

chapter-23(Tubewell) Page 130

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

c) 4" i/d, 3/16" (100 mm i/d 5 mm) thick Per Rft. 42.50 1537.70 Per Metre 139.30 5043.60d) 5" i/d, 3/16" (125 mm i/d 5 mm) thick Per Rft. 48.25 1963.45 Per Metre 158.25 6440.10e) 6" i/d, 3/16" (150 mm i/d 5 mm) thick Per Rft. 53.10 2205.60 Per Metre 174.15 7234.35f) 7" i/d, 3/16" (175 mm i/d 5 mm) thick Per Rft. 62.50 2661.25 Per Metre 204.95 8728.85g) 8" i/d, 3/16" (200 mm i/d 5 mm) thick Per Rft. 76.55 3142.55 Per Metre 251.10 10307.55h) 9" i/d, 3/16" (225 mm i/d 5 mm) thick Per Rft. 76.55 3268.55 Per Metre 251.10 10720.85i) 10" i/d, 3/16" (250 mm i/d 5 mm) thick Per Rft. 86.60 3604.10 Per Metre 284.05 11821.45j) 10" i/d, ¼" (250 mm i/d 6 mm) thick Per Rft. 86.60 4592.40 Per Metre 284.05 15063.15k) 12" i/d, ¼" (300 mm i/d 6 mm) thick Per Rft. 87.85 5227.60 Per Metre 288.10 17146.50l) 15" i/d, ¼" (375 mm i/d 6 mm) thick Per Rft. 101.25 6440.60 Per Metre 332.10 21125.25m) 18" i/d, ¼" (450 mm i/d 6 mm) thick Per Rft. 101.25 7320.00 Per Metre 332.10 24009.60n) 20" i/d, ¼" (500 mm i/d 6 mm) thick Per Rft. 120.00 8085.60 Per Metre 393.65 26520.70o) 22" i/d, ¼" (550 mm i/d 6 mm) thick Per Rft. 121.25 9285.10 Per Metre 397.70 30455.20

10 Providing and installing M.S. Bail plug in tubewell bore In the case of increase or decreasehole: in the length of Bail plug, the rates

will be increased or decreased asa) 2" i/d, 1.5 ft. (50 mm i/d 450 mm) long. Each 149.75 649.15 Each 149.75 649.15 per rates given in serial No. 14 ofb) 3" i/d, 1.5 ft. (75 mm i/d 450 mm) long. Each 149.75 850.25 Each 149.75 850.25 this chapter for the respectivec) 4" i/d, 2 ft. (100 mm i/d 600 mm) long. Each 250.00 1597.20 Each 250.00 1597.20 diameter.d) 5" i/d, 2 ft. (125 mm i/d 600 mm) long. Each 250.00 1995.75 Each 250.00 1995.75e) 6" i/d, 2 ft. (150 mm i/d 600 mm) long. Each 337.40 2519.85 Each 337.40 2519.85f) 7" i/d, 2 ft. (175 mm i/d 600 mm) long. Each 337.40 2911.25 Each 337.40 2911.25g) 8" i/d, 2 ft. (200 mm i/d 600 mm) long Each 415.90 3238.45 Each 415.90 3238.45h) 9" i/d, 2 ft. (225 mm i/d 600 mm) long Each 415.90 3585.05 Each 415.90 3585.05i) 10" i/d, 2 ft. (250 mm i/d 600 mm) long Each 415.90 4539.10 Each 415.90 4539.10j) 12" i/d, 2 ft. (300 mm i/d 600 mm) long Each 499.20 5454.90 Each 499.20 5454.90k) 15" i/d, 2 ft. (375 mm i/d 600 mm) long Each 499.20 6694.00 Each 499.20 6694.00l) 18" i/d, 2 ft. (450 mm i/d 600 mm) long Each 600.30 7648.85 Each 600.30 7648.85m) 20" i/d, 2 ft. (500 mm i/d 600 mm) long Each 652.95 8482.35 Each 652.95 8482.35n) 22" i/d, 2 ft. (550 mm i/d 600 mm) long Each 652.95 9318.15 Each 652.95 9318.15

11 Providing and installing, P.V.C. strainer B.S.S. Class 'B', Chap. 2in tubewell bore hole, including sockets and solvents, etc.complete:-

a) 3" i/d (75 mm) Per Rft. 23.40 124.20 Per Metre 76.75 407.35b) 4" i/d (100 mm) Per Rft. 26.70 181.50 Per Metre 87.50 595.25c) 5" i/d (125 mm) Per Rft. 28.25 244.25 Per Metre 92.60 801.10d) 6" i/d (150 mm) Per Rft. 33.10 321.10 Per Metre 108.50 1053.15e) 8" i/d (200 mm) Per Rft. 45.20 765.20 Per Metre 148.30 2509.90f) 10" i/d (250 mm) Per Rft. 46.25 1138.25 Per Metre 151.70 3733.45g) 12" i/d (300 mm) Per Rft. 46.25 1522.25 Per Metre 151.70 4992.95

12 Providing and installing P.V.C. strainer B.S.S. Class `D' ,in tubewell bore hole, including sockets and solvent, etc.complete:-

a) 1¼" i/d (30 mm) Per Rft. 16.30 55.90 Per Metre 53.50 183.4

chapter-23(Tubewell) Page 131

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

b) 1½" i/d (40 mm) Per Rft. 16.70 62.30 Per Metre 54.75 204.3c) 2" i/d (50 mm) Per Rft. 16.85 93.65 Per Metre 55.20 307.15d) 3" i/d (75 mm) Per Rft. 23.40 189.00 Per Metre 76.80 619.95e) 4" i/d (100 mm) Per Rft. 26.60 295.40 Per Metre 87.25 968.95f) 5" i/d (125 mm) Per Rft. 28.25 430.25 Per Metre 92.60 1411.15g) 6" i/d (150 mm) Per Rft. 50.55 620.55 Per Metre 165.85 2035.45

13 Providing and installing P.V.C. Bail/End plug, in tubewellbore hole:-

i) B.S.S. Class `B'

a) 3" i/d (75 mm) Each 11.30 64.10 Each 11.30 64.10b) 4" i/d (100 mm) Each 12.75 84.75 Each 12.75 84.75c) 5" i/d (125 mm) Each 13.90 125.50 Each 13.90 125.50d) 6" i/d (150 mm) Each 18.05 182.45 Each 18.05 182.45e) 8" i/d (200 mm) Each 21.50 355.10 Each 21.50 355.10f) 10" i/d (250 mm) Each 22.70 490.70 Each 22.70 490.70g) 12" i/d (300 mm) Each 26.40 662.40 Each 26.40 662.40h) 14" i/d (350 mm) Each 26.40 686.40 Each 26.40 686.40

ii) B.S.S. Class `D'

a) 1¼" i/d (30 mm) Each 7.65 35.25 Each 7.65 35.25b) 1½" i/d (40 mm) Each 8.10 48.90 Each 8.10 48.90c) 2" i/d (50 mm) Each 8.40 68.40 Each 8.40 68.40d) 3" i/d (75 mm) Each 11.30 91.70 Each 11.30 91.70e) 4" i/d (100 mm) Each 12.75 119.55 Each 12.75 119.55f) 5" i/d (125 mm) Each 13.90 167.50 Each 13.90 167.50g) 6" i/d (150 mm) Each 18.05 218.45 Each 18.05 218.45

14 Providing and installing M.S. blind pipe socketed/welded Chap.joint, M.S. reducer (where necessary), in tubewell bore 2hole, including jointing/welding with strainer, etc.complete:-

a) 2" i/d, 1/8" (50 mm i/d 3 mm) thick Per Rft. 89.60 276.80 Per Metre 293.90 907.90b) 3" i/d, 1/8" (75 mm i/d 3 mm) thick Per Rft. 89.60 357.20 Per Metre 293.90 1171.60c) 4" i/d, 1/8" (100 mm i/d 3 mm) thick Per Rft. 112.05 468.45 Per Metre 367.50 1536.50d) 5" i/d, 3/16" (125 mm i/d 5 mm) thick Per Rft. 112.05 821.25 Per Metre 367.50 2693.70e) 6" i/d, 3/16" (150 mm i/d 5 mm) thick Per Rft. 159.95 997.55 Per Metre 524.65 3271.95f) 7" i/d, 3/16" (175 mm i/d 5 mm) thick Per Rft. 159.95 1137.95 Per Metre 524.65 3732.50g) 8" i/d, 3/16" (200 mm i/d 5 mm) thick Per Rft. 186.60 1364.00 Per Metre 612.05 4473.95h) 9" i/d, 3/16" (225 mm i/d 5 mm) thick Per Rft. 186.60 1537.80 Per Metre 612.05 5044.00i) 10" i/d, ¼" (250 mm i/d 6 mm) thick Per Rft. 186.60 1959.00 Per Metre 612.05 6425.50j) 12" i/d, ¼" (300 mm i/d 6 mm) thick Per Rft. 223.95 2308.95 Per Metre 734.55 7573.35k) 15" i/d, ¼" (375 mm i/d 6 mm) thick Per Rft. 223.95 2830.20 Per Metre 734.55 9283.05l) 18" i/d, ¼" (450 mm i/d 6 mm) thick Per Rft. 274.50 3514.85 Per Metre 900.35 11528.70m) 20" i/d, ¼" (500 mm i/d 6 mm) thick Per Rft. 295.70 3896.10 Per Metre 969.90 12779.15n) 22" i/d, ¼" (550 mm i/d 6 mm) thick Per Rft. 295.70 4256.10 Per Metre 969.90 13960.05

chapter-23(Tubewell) Page 132

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

15 Providing and installing P.V.C. blind pipe, B.S.S. Class ditto`B', in tubewell bore hole, including sockets and solventsand jointing with strainer, etc. complete.

a) 3" i/d (75 mm) Per Rft. 31.05 130.95 Per Metre 101.90 429.60b) 4" i/d (100 mm) Per Rft. 35.15 185.90 Per Metre 115.35 609.85c) 5" i/d (125 mm) Per Rft. 36.75 246.45 Per Metre 120.50 808.35d) 6" i/d (150 mm) Per Rft. 44.00 337.40 Per Metre 142.75 1105.10e) 8" i/d (200 mm) Per Rft. 58.70 510.50 Per Metre 192.60 1674.50f) 10" i/d (250 mm) Per Rft. 61.15 763.15 Per Metre 200.60 2503.20g) 12" i/d (300 mm) Per Rft. 73.20 1052.40 Per Metre 240.05 3451.80h) 14" i/d (350 mm) Per Rft. 70.10 1241.90 Per Metre 229.90 4073.40

16 Providing and installing P.V.C. blind pipe, B.S.S. Class`D', in tubewell bore hole, including sockets and solventsand jointing with strainer, etc. complete.

a) 1¼" i/d (30 mm) Per Rft. 19.45 54.55 Per Metre 63.75 178.90b) 1½" i/d (40 mm) Per Rft. 19.80 65.70 Per Metre 64.90 215.45c) 2" i/d (50 mm) Per Rft. 21.05 91.25 Per Metre 69.00 299.25d) 3" i/d (75 mm) Per Rft. 26.60 181.40 Per Metre 87.30 595.05e) 4" i/d (100 mm) Per Rft. 35.15 292.55 Per Metre 115.35 959.65f) 5" i/d (125 mm) Per Rft. 36.75 422.85 Per Metre 120.50 1386.95g) 6" i/d (150 mm) Per Rft. 44.75 600.95 Per Metre 146.80 1971.15

17 Testing and developing of tubewell of size 6" (150 mm) Compressor, accessories along withi/d and above continuously. working staff, to be supplied by

Government.i) upto 1.5 cs. discharge Per 958.30 Per 958.30

Hour Hourii) above 1.5 cs. discharge ditto 1159.95 ditto 1159.95

18 Shrouding with graded pea gravel 3/8" to 1/8" (10 to 3 Per Cft. 37.30 88.95 cu.m 1317.45 3141.70 The rate includes wastage, etc.mm), around tubewell in bore hole.

19 Laying cutting, jointing, testing and disinfecting cast iron Chap. 1) Pipes to be supplied bypipe line in trenches, with spigot and socket caulked lead 2 Government.joints, including cost of materials, such as lead, yarn, etc. 2) Providing and installing specialscomplete in all respects:- and valves is not included in the

rate, which is payable separately.

a) 3" (75 mm) i/d Per Rft. 59.70 Per Metre 195.75b) 4" (100 mm) i/d Per Rft. 73.90 Per Metre 242.30c) 5" (125 mm) i/d Per Rft. 93.00 Per Metre 305.00d) 6" (150 mm) i/d Per Rft. 109.40 Per Metre 358.85e) 8" (200 mm) i/d Per Rft. 130.65 Per Metre 428.50f) 10" (250 mm) i/d Per Rft. 198.65 Per Metre 651.55g) 12" (300 mm) i/d Per Rft. 233.35 Per Metre 765.35h) 15" (375 mm) i/d Per Rft. 300.60 Per Metre 985.90

chapter-23(Tubewell) Page 133

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

i) 18" (450 mm) i/d Per Rft. 394.85 Per Metre 1295.05

20 Laying, cutting, jointing, testing and disinfecting cast iron ditto 1) Pipes to be supplied bypipe line in trenches, with flanged and flanged joints, Government.complete in all respects:- 2) Providing and installing specials

and valves is not included in thea) 3" (75 mm) i/d Per Rft. 27.30 Per Metre 89.55 rate, which is payable separately.b) 4" (100 mm) i/d Per Rft. 30.15 Per Metre 98.95c) 5" (125 mm) i/d Per Rft. 42.20 Per Metre 138.45d) 6" (150 mm) i/d Per Rft. 46.55 Per Metre 152.65e) 8" (200 mm) i/d Per Rft. 54.60 Per Metre 179.10f) 10" (250 mm) i/d Per Rft. 75.45 Per Metre 247.50g) 12" (300 mm) i/d Per Rft. 88.65 Per Metre 290.70h) 15" (375 mm) i/d Per Rft. 122.65 Per Metre 402.15i) 18" (450 mm) i/d Per Rft. 157.35 Per Metre 516.15

21 Laying, cutting, jointing, testing and disinfecting cast iron Chap. 2 1) Pipes to be supplied bypipe line in trenches with Tyton joints, complete in all Government.respects:- 2) Providing and installing specials

and valves is not included in thea) 3" (75 mm) i/d Per Rft. 13.00 Per Metre 42.65 rate, which is payable separately.b) 4" (100 mm) i/d Per Rft. 14.70 Per Metre 48.20c) 5" (125 mm) i/d Per Rft. 19.00 Per Metre 62.30d) 6" (150 mm) i/d Per Rft. 21.25 Per Metre 69.70e) 8" (200 mm) i/d Per Rft. 28.95 Per Metre 94.95f) 10" (250 mm) i/d Per Rft. 36.65 Per Metre 120.20g) 12" (300 mm) i/d Per Rft. 43.50 Per Metre 142.75h) 15" (375 mm) i/d Per Rft. 61.25 Per Metre 200.85i) 18" (450 mm) i/d Per Rft. 73.30 Per Metre 240.40

22 Providing, laying, cutting, jointing, testing and disinfecting Chap. Cost of sockets, tees, elbows,G.I. pipeline in trenches, with socket joints, using G.I. 2 bends, valves, crosses, unions andpipes of B.S.S. 1387-1967 complete in all respects, with plugs, etc. is included in the rates.specials and valves.

i) Light Quality

a) ½" i/d (15 mm) 2mm thick Per Rft. 10.55 63.55 Per Metre 34.60 208.45b) ¾" i/d (20 mm) 2.35mm thick Per Rft. 11.50 88.10 Per Metre 37.80 288.95c) 1" i/d (25 mm) 2.65mm thick Per Rft. 13.05 122.80 Per Metre 42.75 402.80d) 1¼" i/d (32 mm) 2.65mm thick Per Rft. 13.15 154.50 Per Metre 43.05 506.70e) 1½" i/d (40 mm) 2.9mm thick Per Rft. 13.25 189.95 Per Metre 43.40 622.95f) 2" i/d (50 mm) 2.9mm thick Per Rft. 14.80 236.60 Per Metre 48.50 776.15g) 2"½ i/d (65 mm) 3.25mm thick Per Rft. 15.35 329.50 Per Metre 50.40 1080.70h) 3" i/d (75 mm) 3.25mm thick Per Rft. 17.70 380.85 Per Metre 58.00 1249.25i) 4" i/d (100 mm) 3.65mm thick Per Rft. 19.05 547.40 Per Metre 62.40 1795.55 ii) Medium Quality i. Cost of sockets, tees, elbow,

bends, valves, crosses, unions and a) ½" i/d (15 mm) 2.65mm thick Per Rft. 10.55 77.10 Per Metre 34.60 252.95 plugs etc is included in the rates b) ¾" i/d (20 mm) 2.65mm thick Per Rft. 11.50 97.25 Per Metre 37.80 319.05 except for internal G.I piping (1"dia,

chapter-23(Tubewell) Page 134

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

c) 1" i/d (25 mm) 3.25mm thick Per Rft. 13.05 141.75 Per Metre 42.75 464.95 3/4"dia & 1/2"dia) for Bath rooms/ d) 1¼" i/d (32 mm) 3.25mm thick Per Rft. 13.15 179.80 Per Metre 43.05 589.70 Levorotary.e) 1½" i/d (40 mm) 3.25mm thick Per Rft. 13.45 205.85 Per Metre 44.10 675.15f) 2" i/d (50 mm) 3.65mm thick Per Rft. 14.80 283.80 Per Metre 48.50 930.80 ii. For internal G.I piping (1"dia, 3/4"dia & g) 2"½ i/d (65 mm) 3.65mm thick Per Rft. 15.35 360.45 Per Metre 50.40 1182.35 Bath room(s)/ Levorotary of rate h) 3" i/d (75 mm) 4.05mm thick Per Rft. 17.70 462.65 Per Metre 58.00 1517.40 (composite) shall be reduced by 8%i) 4" i/d (100 mm) 4.5mm thick Per Rft. 19.05 659.65 Per Metre 62.40 2163.60 and specials mentioned above may j) 5" i/d (150 mm) 4.85mm thick Per Rft. 22.05 887.40 Per Metre 72.25 2910.70 be paid at the rates placed onk) 6" i/d (200 mm) 4.85mm thick Per Rft. 22.35 1031.45 Per Metre 73.30 3383.15 Website as per actual quantity used.

iii) Heavy Quality

a) ½" i/d (15 mm) 3.25mm thick Per Rft. 10.55 102.50 Per Metre 34.60 336.15b) ¾" i/d (20 mm) 3.25mm thick Per Rft. 11.50 132.65 Per Metre 37.80 435.10c) 1" i/d (25 mm) 4.05mm thick Per Rft. 13.05 197.70 Per Metre 42.75 648.45d) 1¼" i/d (32 mm) 4.05mm thick Per Rft. 13.15 251.35 Per Metre 43.05 824.35e) 1½" i/d (40 mm) 4.05mm thick Per Rft. 13.45 295.55 Per Metre 44.10 969.40f) 2" i/d (50 mm) 4.5mm thick Per Rft. 14.80 396.75 Per Metre 48.50 1301.35g) 2"½ i/d (65 mm) 4.5mm thick Per Rft. 15.35 503.20 Per Metre 50.40 1650.50h) 3" i/d (75 mm) 4.85mm thick Per Rft. 17.70 639.65 Per Metre 58.00 2098.05i) 4" i/d (100 mm) 5.4mm thick Per Rft. 19.05 904.45 Per Metre 62.40 2966.65j) 5" i/d (125 mm) 5.4mm thick Per Rft. 22.05 1132.85 Per Metre 72.25 3715.70k) 6" i/d (150 mm) 5.4mm thick Per Rft. 22.35 1341.65 Per Metre 73.30 4400.70

23 Providing, laying, cutting, jointing, testing and disinfectingAsbestos Cement / Fibre Cement pipe line in trenches, with PS 428 & Providing and installing specialscomet joint and rubber ring, complete in all respects:- ISO 160 and valves is not included in the

rate, which is payable separately.B Class Working Pressurea) 3" i/d (75 mm) Per Rft. 15.25 222.20 Per Metre 50.00 728.85b) 4" i/d (100 mm) Per Rft. 16.15 289.25 Per Metre 52.95 948.65c) 6" i/d (150 mm) Per Rft. 22.10 456.85 Per Metre 72.50 1498.45d) 8" i/d (200 mm) Per Rft. 30.45 764.00 Per Metre 99.95 2505.90e) 10" i/d (250 mm) Per Rft. 39.65 1040.15 Per Metre 130.10 3411.65f) 12" i/d (300 mm) Per Rft. 50.50 1374.25 Per Metre 165.70 4507.60g) 14" i/d (350 mm) Per Rft. 58.35 1978.40 Per Metre 191.35 6489.10h) 16" i/d (400 mm) Per Rft. 65.85 2511.15 Per Metre 215.95 8236.65i) 18" i/d (450 mm) Per Rft. 77.65 3127.95 Per Metre 254.70 10259.60j) 20" i/d (500 mm) Per Rft. 91.25 3846.65 Per Metre 299.30 12616.95k) 24" i/d (600 mm) Per Rft. 108.80 5305.00 Per Metre 356.90 17400.35l) 28" i/d (700 mm) Per Rft. 115.55 8501.65 Per Metre 379.05 27885.35m) 32" i/d (800 mm) Per Rft. 125.35 9727.00 Per Metre 411.10 31904.50n) 40" i/d 1000 mm) Per Rft. 137.75 15012.50 Per Metre 451.75 49241.05

24 C Class Working Pressure PS 428 &a) 3" i/d (75 mm) Per Rft. 15.25 222.20 Per Metre 50.00 728.85 ISO 160b) 4" i/d (100 mm) Per Rft. 16.15 317.40 Per Metre 52.95 1041.00c) 6" i/d (150 mm) Per Rft. 22.10 546.20 Per Metre 72.50 1791.50d) 8" i/d (200 mm) Per Rft. 30.45 861.90 Per Metre 99.95 2827.10e) 10" i/d (250 mm) Per Rft. 39.65 1201.70 Per Metre 130.10 3941.60f) 12" i/d (300 mm) Per Rft. 50.50 1671.70 Per Metre 165.70 5483.20g) 14" i/d (350 mm) Per Rft. 58.35 2878.00 Per Metre 191.35 9439.90

chapter-23(Tubewell) Page 135

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

h) 16" i/d (400 mm) Per Rft. 65.85 3675.20 Per Metre 215.95 12054.65i) 18" i/d (450 mm) Per Rft. 77.65 4508.60 Per Metre 254.70 14788.20j) 20" i/d (500 mm) Per Rft. 91.25 5364.40 Per Metre 299.30 17595.20k) 24" i/d (600 mm) Per Rft. 110.25 7548.80 Per Metre 361.65 24760.05

25 D Class Working Pressure PS 428 &a) 3" i/d (75 mm) Per Rft. 15.25 222.20 Per Metre 50.00 728.85 ISO 160b) 4" i/d (100 mm) Per Rft. 16.15 360.20 Per Metre 52.95 1181.50c) 6" i/d (150 mm) Per Rft. 22.10 653.90 Per Metre 72.50 2144.80d) 8" i/d (200 mm) Per Rft. 30.45 1153.25 Per Metre 99.95 3782.60e) 10" i/d (250 mm) Per Rft. 39.65 1701.10 Per Metre 130.10 5579.60f) 12" i/d (300 mm) Per Rft. 50.50 2479.55 Per Metre 165.70 8132.90g) 14" i/d (350 mm) Per Rft. 58.35 4144.85 Per Metre 191.35 13595.15h) 16" i/d (400 mm) Per Rft. 65.85 5352.05 Per Metre 215.95 17554.80i) 18" i/d (450 mm) Per Rft. 77.65 6442.50 Per Metre 254.70 21131.45j) 20" i/d (500 mm) Per Rft. 91.25 7861.35 Per Metre 299.30 25785.20

26 Providing, laying, cutting, jointing, testing and disinfecting PS 3051 Providing and installing specialsP.V.C. pipe line with `B' Class working pressure BS 3505 and valves is not included in thepipe, in trenches, complete in all respects:- rate, which is payable separately.

a) 3" i/d (75 mm) Per Rft. 4.40 106.30 Per Metre 14.35 348.60 b) 4" i/d (100 mm) Per Rft. 5.60 159.35 Per Metre 18.40 522.75 c) 5" i/d (125 mm) Per Rft. 6.85 220.75 Per Metre 22.45 724.00 d) 6" i/d (150 mm) Per Rft. 7.15 306.45 Per Metre 23.50 1005.10e) 8" i/d (200 mm) Per Rft. 10.15 471.00 Per Metre 33.35 1544.90f) 10" i/d (250 mm) Per Rft. 13.50 729.55 Per Metre 44.35 2392.95h) 12" i/d (300 mm) Per Rft. 16.75 1015.55 Per Metre 55.00 3331.00g) 14" i/d (350 mm) Per Rft. 21.70 1216.95 Per Metre 71.15 3991.55

27 Providing, laying, cutting, jointing, testing and disinfecting Chap Providing and installing specialspipe line in trenches with P.V.C. pipes of B.S.S. with `D' 2 and valves is not included in theClass working pressure complete in all respects:- rate, which is payable separately.a) 2" i/d (50 mm) Per Rft. 3.55 75.15 Per Metre 11.65 246.50 b) 3" i/d (75 mm) Per Rft. 4.35 162.20 Per Metre 14.20 532.10 c) 4" i/d (100 mm) Per Rft. 5.55 268.10 Per Metre 18.20 879.35 d) 5" i/d (125 mm) Per Rft. 6.75 400.60 Per Metre 22.20 1313.90 e) 6" i/d (150 mm) Per Rft. 7.05 574.40 Per Metre 23.20 1884.00

28 Providing and fixing cast iron special of B.S.S. Class `B' 9.1 i) Labour rates include the cost of(such as bend, tee cross collar, reducer, tail piece, jointing material & labour.flanged spigot, cap, flanged socket, taper, angle branch,plug etc.) for cast iron pipe line , complete:- ii) The internal dia of the pipe, from

which the branch is taken out willa) C.I.S.S. Specials, with spigot. and be considered the internal dia for

socket joint:- the purpose of payments ofi) 3" to 6" (75 to 150 mm) i/d Per Kg. 24.10 122.65 Per Kg 24.10 122.65 specials.ii) 8" to 12" (200 to 300 mm) i/d Per Kg. 13.20 111.75 Per Kg 13.20 111.75iii) 15" to 18" (375 to 450 mm) i/d Per Kg. 10.10 108.65 Per Kg 10.10 108.65

chapter-23(Tubewell) Page 136

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

b) C.I. flanged specials, with flanged andflanged joints:-

i) 3" to 6" (75 to 150 mm) i/d Per Kg 9.70 108.25 Per Kg 9.70 108.25ii) 8" to 12" (200 to 300 mm) i/d Per Kg 2.35 100.90 Per Kg 2.35 100.90iii) 15" to 18" (375 to 450 mm) i/d Per Kg 4.30 100.90 Per Kg 4.30 100.90

c) C.I. Specials, with tyton joints:-

i) 3" to 6" (75 to 150 mm) i/d Per Kg 14.00 112.50 Per Kg 14.00 112.50ii) 8" to 12" (200 to 300 mm) i/d Per Kg 14.00 112.50 Per Kg 14.00 112.50iii) 15" to 18" (375 to 450 mm) i/d Per Kg 14.00 112.50 Per Kg 14.00 112.50

29 Providing and fixing cast iron specials of B.S.S. Class 'B' 9.1 1) Labour rates include the cost of(such as bend, tee, cross collar, reducer, tail piece, jointing material and labour.flanged socket, flanged spigot, cap, taper, angle branch,plug, etc) for Asbestos cement pipe line, with comet joint 2) The internal dia of the pipe, fromand rubber ring, complete. which the branch is taken out, willi) 3" to 6" (75 to 150 mm) i/d Per Kg 12.55 111.05 Per Kg 12.55 111.05 be considered the internal dia forii) 8" to 18" (200 to 450 mm) i/d Per Kg 6.45 105.00 Per Kg 6.45 105.00 the purpose of payment.iii) 20" to 24" (500 to 600 mm) i/d Per Kg 5.15 103.65 Per Kg 5.15 103.65

30 Providing and fixing sluice valve of B.S.S. quality and 9.1 Labour rates include cost of jointingweight, Class `B', for cast iron pipe line, and Asbestos material and labour.cement pipe line (including cost of jointing material):-a) 3" i/d (75 mm) Each 908.80 6812.80 Each 908.80 6812.80b) 4" i/d (100 mm) Each 989.00 8009.00 Each 989.00 8009.00c) 5" i/d (125 mm) Each 1780.20 9940.20 Each 1780.20 9940.20d) 6" i/d (150 mm) Each 1897.85 13297.85 Each 1897.85 13297.85e) 8" i/d (200 mm) Each 2215.90 23095.90 Each 2215.90 23095.90f) 10" i/d (250 mm) Each 3768.05 29928.05 Each 3768.05 29928.05g) 12" i/d (300 mm) Each 4234.30 38614.30 Each 4234.30 38614.30h) 16" i/d (400 mm) Each 5616.05 59616.05 Each 5616.05 59616.05i) 18" i/d (450 mm) Each 6463.75 120463.75 Each 6463.75 120463.75

31 Providing and fixing, sluice valve of B.S.S. quality and Labour rates include cost of jointingweight, for Asbestos cement pipe line, with comet joint 9.1 material and labour.and rubber ring, complete (including cost of jointingmaterials):-a) 3" i/d (75 mm) Each 459.35 5499.35 Each 459.35 5499.35b) 4" i/d (100 mm) Each 553.75 6313.75 Each 553.75 6313.75c) 6" i/d (150 mm) Each 685.70 10645.70 Each 685.70 10645.70d) 8" i/d (200 mm) Each 1102.80 19102.80 Each 1102.80 19102.80e) 10" i/d (250 mm) Each 1408.50 24088.50 Each 1408.50 24088.50f) 12" i/d (300 mm) Each 1682.80 29882.80 Each 1682.80 29882.80g) 16" i/d (400 mm) Each 1982.35 57182.35 Each 1982.35 57182.35h) 18" i/d (450 mm) Each 2329.80 101929.80 Each 2329.80 101929.80

32 Providing and fixing, fire hydrants B.S.S. quality and Each 61.30 4741.30 Each 61.30 4741.30 9.1 1) Labour rates include cost ofweight of 2½" (65 mm) dia (including cost of jointing jointing material and labour.material).

2) Connecting pipes and specials,

chapter-23(Tubewell) Page 137

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

if used, will be paid extra.

33 Providing and fixing, air valve 2½ (65mm) dia of B.S.S. dittoquality and weight (complete with jointing material).

a) single Each 129.80 3369.80 Each 129.80 3369.80

b) double Each 129.80 7629.80 Each 129.80 7629.80

34 Providing and fitting C.I. flanges on pipes, includingturning, threading, facing and fitting, etc. complete in all dittorespects:-

a) 3" to 6" (75 to 150 mm) i/d Per Kg 39.00 116.05 Per Kg 39.00 116.05

b) 8" to 12" (200 to 300 mm) i/d Per Kg 24.50 101.50 Per Kg 24.50 101.50

c) 15" to 18" (375 to 450 mm) i/d Per Kg 20.85 97.85 Per Kg 20.85 97.85

35 Cutting C.I. pipe, and welding spigot or socket, flanged ortyton end, after finishing ends of pipes:

Per Inch Per cm i/d a) 3" to 6" (75 to 150 mm) i/d i/d of pipe 61.60 of pipe 24.65b) 8" to 12" (200 to 300 mm) i/d ditto 77.75 ditto 31.10c) 15" to 18" (375 to 450 mm) i/d ditto 71.30 ditto 28.50

36 Providing, laying, cutting, jointing, testing and disinfecting Cost of sockets, tees, elbows,G.I. pipe line in trenches, with flanged joints, using G.I. bends, valves, crosses, unions andpipe of B.S.S. 1387-1967 complete in all respects, plugs, etc. is included in the rates.including specials and valves:-

i) G.I. flanged joints (Heavy Quality)

a) 1½" i/d (40 mm) Per Rft. 19.30 301.35 Per Metre 63.40 988.50b) 2" i/d (50 mm) Per Rft. 19.30 401.70 Per Metre 63.40 1317.65c) 2½" i/d (65 mm) Per Rft. 20.50 508.65 Per Metre 67.15 1668.30d) 3" i/d (75 mm) Per Rft. 20.55 642.55 Per Metre 67.45 2107.50e) 4" i/d (100 mm) Per Rft. 24.05 909.50 Per Metre 78.90 2983.15f) 6" i/d (150 mm) Per Rft. 27.50 1138.30 Per Metre 90.20 3733.65g) 8" i/d (200 mm) Per Rft. 27.55 1346.85 Per Metre 90.35 4417.75

ii) C.I. flanged joints (Medium Quality)

a) 1½" i/d (40 mm) Per Rft. 22.20 222.45 Per Metre 72.80 729.70b) 2" i/d (50 mm) Per Rft. 20.80 299.45 Per Metre 68.20 982.20c) 2½" i/d (65 mm) Per Rft. 23.30 380.95 Per Metre 76.35 1249.50d) 3" i/d (75 mm) Per Rft. 23.35 484.40 Per Metre 76.50 1588.90e) 4" i/d (100 mm) Per Rft. 27.10 689.25 Per Metre 88.85 2260.80f) 6" i/d (150 mm) Per Rft. 30.80 925.65 Per Metre 100.95 3036.15g) 8" i/d (200 mm) Per Rft. 30.95 1086.70 Per Metre 101.55 3564.40

chapter-23(Tubewell) Page 138

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

37 Providing and installing P.V.C. bends, of B.S.S.

i) Class `B' working pressure:-a) 3" i/d (75 mm) Each 101.05 227.05 Each 101.05 227.05b) 4" i/d (100 mm) Each 113.90 383.90 Each 113.90 383.90c) 5" i/d (125 mm) Each 142.35 670.35 Each 142.35 670.35d) 6" i/d (150 mm) Each 146.50 915.70 Each 146.50 915.70

ii) Class `D' working pressure:-a) 1¼" i/d (30 mm) Each 69.15 102.75 Each 69.15 102.75b) 1½" i/d (40 mm) Each 73.50 109.50 Each 73.50 109.50c) 2" i/d (50 mm) Each 78.45 150.45 Each 78.45 150.45d) 3" i/d (75 mm) Each 101.05 288.25 Each 101.05 288.25e) 4" i/d (100 mm) Each 113.90 549.50 Each 113.90 549.50f) 5" i/d (125 mm) Each 142.35 1138.35 Each 142.35 1138.35g) 6" i/d (150 mm) Each 146.50 1562.50 Each 146.50 1562.50

38 Providing and installing P.V.C. tees, of B.S.S.

i) Class `B' working pressure:-

a) 3" i/d (80 mm) Each 151.60 631.60 Each 151.60 631.60b) 4" i/d (100 mm) Each 172.75 1108.75 Each 172.75 1108.75c) 5" i/d (125 mm) Each 210.75 2082.75 Each 210.75 2082.75d) 6" i/d (150 mm) Each 219.70 2175.70 Each 219.70 2175.70

ii) Class `D' working pressure:-

a) 1¼" i/d (30 mm) Each 105.30 237.30 Each 105.30 237.30b) 1½" i/d (40 mm) Each 110.50 270.10 Each 110.50 270.10c) 2" i/d (50 mm) Each 117.20 327.20 Each 117.20 327.20d) 3" i/d (75 mm) Each 151.60 613.60 Each 151.60 613.60e) 4" i/d (100 mm) Each 172.75 1108.75 Each 172.75 1108.75f) 5" i/d (125 mm) Each 210.75 2070.75 Each 210.75 2070.75g) 6" i/d (150 mm) Each 219.70 2139.70 Each 219.70 2139.70

39 Providing and installing P.V.C. sockets, B.S.S.

i) Class `B' working pressure:-

a) 3" i/d (75 mm) Each 68.85 152.85 Each 68.85 152.85b) 4" i/d (100 mm) Each 81.65 231.65 Each 81.65 231.65c) 5" i/d (125 mm) Each 102.10 312.10 Each 102.10 312.10d) 6" i/d (150 mm) Each 106.20 394.20 Each 106.20 394.20e) 8" i/d (200 mm) Each 152.60 800.60 Each 152.60 800.60f) 10" i/d (250 mm) Each 177.30 1917.30 Each 177.30 1917.30g) 12" i/d (300 mm) Each 205.70 4285.70 Each 205.70 4285.70h) 14" i/d (350 mm) Each 229.25 3469.25 Each 229.25 3469.25

chapter-23(Tubewell) Page 139

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

ii) Class `D' working pressure:-a) 1¼" i/d (30 mm) Each 42.30 65.10 Each 42.30 65.10b) 1½" i/d (40 mm) Each 46.65 77.85 Each 46.65 77.85c) 2" i/d (50 mm) Each 51.55 101.95 Each 51.55 101.95d) 3" i/d (75 mm) Each 68.85 223.65 Each 68.85 223.65e) 4" i/d (100 mm) Each 81.65 367.25 Each 81.65 367.25f) 5" i/d (125 mm) Each 102.10 630.10 Each 102.10 630.10g) 6" i/d (150 mm) Each 106.20 1030.20 Each 106.20 1030.20

40 Providing and installing P.V.C. Tapered core, B.S.S.

i) Class `B' working pressure:-

a) 3" i/d (75 mm) Each 101.05 143.05 Each 101.05 143.05b) 4" i/d (100 mm) Each 113.90 167.90 Each 113.90 167.90c) 5" i/d (125 mm) Each 142.35 210.75 Each 142.35 210.75d) 6" i/d (150 mm) Each 146.50 228.10 Each 146.50 228.10e) 8" i/d (200 mm) Each 206.30 341.90 Each 206.30 341.90f) 10" i/d (250 mm) Each 231.00 405.00 Each 231.00 405.00g) 12" i/d (300 mm) Each 270.15 483.75 Each 270.15 483.75h) 14" i/d (350 mm) Each 293.70 561.30 Each 293.70 561.30

ii) Class `D' working pressure:-a) 1¼" i/d (30 mm) Each 69.15 89.55 Each 69.15 89.55b) 1½" i/d (40 mm) Each 73.50 101.10 Each 73.50 101.10c) 2" i/d (50 mm) Each 78.45 113.25 Each 78.45 113.25

41 Making connection for new watersupply lines with the The rate includes the component ofrunning main, including excavation of trench and refilling, bailing out water from the trenchcomplete, but excluding cost of pipe and specials, etc. and cutting of existing pipe line.

Diameter of running main:Per Per

i) upto 6" i/d (150 mm) Connection 1788.25 Connection 1788.25ii) upto 8" i/d (200 mm) ditto 2257.95 ditto 2257.95iii) upto 10" i/d (250 mm) ction 3185.15 ction 3185.15iv) upto 12" i/d (300 mm) ditto 4359.30 ditto 4359.30v) upto 16" i/d (400 mm) ditto 5345.25 ditto 5345.25vi) upto 20" i/d (500 mm) ditto 6930.35 ditto 6930.35vii) upto 24" i/d (600 mm) ditto 8327.20 ditto 8327.20

42 Providing, laying, cutting, jointing, testing and disinfectingHigh Density Polyethylene Pipe (HDPE-100) working presure pipe in trenches. complete in all respects:-

a) PN-8 (SDR-21)i) 3" (90mm) P.Rft 5.85 125.60 19.10 412.15 ii) 4" (110mm) P.Rft 9.15 167.20 30.05 548.55 iii) 5" (125mm) P.Rft 10.10 212.95 33.05 698.65 iv) 6" (160mm) P.Rft 11.00 344.15 36.05 1,129.15 v) 8" (200mm) P.Rft 13.30 532.95 43.70 1,748.60

chapter-23(Tubewell) Page 140

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

vi) 10" (250mm) P.Rft 34.30 840.90 112.50 2,759.00 vii) 12" (315mm) P.Rft 40.40 1,336.45 132.60 4,384.90 viii) 14" (355mm) P.Rft 44.75 1,690.05 146.85 5,545.15

b) PN-10 (SDR-17)i) 3" (90mm) P.Rft 5.85 138.95 19.10 455.95 ii) 4" (110mm) P.Rft 9.95 204.00 32.65 669.30 iii) 5" (125mm) P.Rft 11.05 258.00 36.20 846.45 iv) 6" (160mm) P.Rft 12.10 417.70 39.65 1,370.45 v) 8" (200mm) P.Rft 14.85 650.20 48.70 2,133.25 vi) 10" (250mm) P.Rft 36.90 1,025.30 121.00 3,364.05 vii) 12" (315mm) P.Rft 44.20 1,637.00 145.05 5,371.10 viii) 14" (355mm) P.Rft 49.50 2,076.60 162.45 6,813.25

c) PN-12.5 (SDR-13.6)i) 3" (90mm) P.Rft 5.85 166.40 19.10 545.95 ii) 4" (110mm) P.Rft 9.95 236.35 32.65 775.40 iii) 5" (125mm) P.Rft 11.05 313.10 36.20 1,027.25 iv) 6" (160mm) P.Rft 12.10 507.45 39.60 1,664.95 v) 8" (200mm) P.Rft 14.85 786.95 48.70 2,582.00 vi) 10" (250mm) P.Rft 36.90 1,245.70 120.95 4,087.05 vii) 12" (315mm) P.Rft 44.20 1,986.70 145.00 6,518.40 viii) 14" (355mm) P.Rft 49.50 2,512.20 162.40 8,242.55

d) PN-16 (SDR-11)i) 3" (90mm) P.Rft 6.25 200.65 20.55 658.40 ii) 4" (110mm) P.Rft 10.25 293.65 33.70 963.50 iii) 5" (125mm) P.Rft 11.45 377.95 37.55 1,240.10 iv) 6" (160mm) P.Rft 12.60 613.50 41.35 2,012.85 v) 8" (200mm) P.Rft 15.70 952.45 51.50 3,124.95 vi) 10" (250mm) P.Rft 40.00 1,501.70 131.20 4,927.05 vii) 12" (315mm) P.Rft 48.95 2,391.80 160.60 7,847.45 viii) 14" (355mm) P.Rft 63.80 3,037.60 209.20 9,966.40

chapter-24(Electric Installation) Page 141

Rates for all finished works include the removal of surplus debris, unused material and byproducts.

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

1 Supply and erection of G.I. pipes for wiring purposes, includingpull boxes, inspection boxes, bends, tees, etc. complete withall specials.

a) on surface, including clamps, etc. 38.4

i) 15 mm i/d Per Rft. 21.75 70.95 Per Metre 71.30 232.70 ii) 20 mm i/d Per Rft. 21.75 86.15 Per Metre 71.30 282.60 iii) 25 mm i/d Per Rft. 21.75 110.50 Per Metre 71.30 362.40 iv) 32 mm i/d Per Rft. 27.15 142.30 Per Metre 89.10 466.70 v) 40 mm i/d Per Rft. 27.15 171.20 Per Metre 89.10 561.55 vi) 50 mm i/d Per Rft. 32.35 211.85 Per Metre 106.05 694.90 vii) 80 mm i/d Per Rft. 41.15 329.05 Per Metre 135.00 1,079.30

b) recessed in walls, including hooks, cutting jharries andrepairing surface: 38.3

i) 15 mm i/d Per Rft. 32.60 79.05 Per Metre 106.90 259.30 ii) 20 mm i/d Per Rft. 32.60 95.65 Per Metre 106.90 313.80 iii) 25 mm i/d Per Rft. 33.95 121.80 Per Metre 111.40 399.55 iv) 32 mm i/d Per Rft. 33.95 148.30 Per Metre 111.40 486.45 v) 40 mm i/d Per Rft. 37.05 179.60 Per Metre 121.50 589.10 vi) 50 mm i/d Per Rft. 50.95 229.60 Per Metre 167.05 753.10 vii) 80 mm i/d Per Rft. 81.50 369.40 Per Metre 267.30 1,211.60

2 Supply and erection of M.S. conduit pipes for wiring, including 38.4 & 38.6pull boxes, inspection boxes, bends, tees, etc. complete with all specials.

a) on surface, including clamps, etc.

i) 16 mm i/d Per Rft. 15.10 36.25 Per Metre 49.50 118.85 ii) 20 mm i/d Per Rft. 15.10 41.75 Per Metre 49.50 136.85 iii) 25 mm i/d Per Rft. 15.10 47.10 Per Metre 49.50 154.55 iv) 32 mm i/d Per Rft. 15.10 51.70 Per Metre 49.50 169.60 v) 40 mm i/d Per Rft. 17.00 64.90 Per Metre 55.70 212.95 vi) 50 mm i/d Per Rft. 20.90 79.35 Per Metre 68.55 260.20

b) recessed in walls, including cutting jharries, cost of 38.3 &hooks and repairing surface etc. 38.7

i) 16 mm i/d Per Rft. 29.10 51.30 Per Metre 95.45 168.25 ii) 20 mm i/d Per Rft. 29.10 56.25 Per Metre 95.45 184.50 iii) 25 mm i/d Per Rft. 32.60 64.30 Per Metre 106.90 210.90 iv) 32 mm i/d Per Rft. 33.95 70.55 Per Metre 111.40 231.40

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

24. ELECTRIC INSTALLATION

chapter-24(Electric Installation) Page 142

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

v) 40 mm i/d Per Rft. 35.45 82.30 Per Metre 116.20 270.00 vi) 50 mm i/d Per Rft. 37.05 96.05 Per Metre 121.50 315.05

3 Supply and erection of PVC pipe for wiring recessed in walls, 38.3 &including inspection boxes, pull boxes, hooks, cutting jharries, 38.5and repairing surface, etc., complete with all specials.

i) 12 mm i/d Per Rft. 26.30 36.90 Per Metre 86.25 121.00 ii) 20 mm i/d Per Rft. 27.15 40.30 Per Metre 89.10 132.20 iii) 25 mm i/d Per Rft. 30.20 47.50 Per Metre 99.00 155.75 iv) 32 mm i/d Per Rft. 32.60 56.10 Per Metre 106.90 184.10 v) 40 mm i/d Per Rft. 33.95 66.05 Per Metre 111.40 216.70 vi) 50 mm i/d Per Rft. 35.45 79.40 Per Metre 116.20 260.35

4 Supply and erection of PVC pipe for wiring on surfaceincluding clamps inspection boxes, pull boxes, bends, tees, repairing surface, etc., complete with all specials:-

i) 12 mm i/d Per Rft. 6.80 18.10 Per Metre 22.30 59.40 ii) 20 mm i/d Per Rft. 6.80 20.55 Per Metre 22.30 67.40 iii) 25 mm i/d Per Rft. 6.80 25.95 Per Metre 22.30 85.10 iv) 32 mm i/d Per Rft. 7.75 34.30 Per Metre 25.45 112.55 v) 40 mm i/d Per Rft. 7.75 44.35 Per Metre 25.45 145.45 vi) 50 mm i/d Per Rft. 9.35 61.50 Per Metre 30.70 201.75

5 Supply and erection of G.I. flexible pipe for wiring, including 38.4welding of sockets, nipples and check nuts, etc. complete:-

i) 12 mm i/d Per Rft. 17.80 62.90 Per Metre 58.30 206.30 ii) 20 mm i/d Per Rft. 18.95 79.90 Per Metre 62.20 262.10 iii) 25 mm i/d Per Rft. 19.60 105.05 Per Metre 64.35 344.60 iv) 32 mm i/d Per Rft. 23.70 128.35 Per Metre 77.75 421.05 v) 40 mm i/d Per Rft. 25.85 144.85 Per Metre 84.80 475.05 vi) 50 mm i/d Per Rft. 28.45 187.00 Per Metre 93.30 613.35 vii) 80 mm i/d Per Rft. 37.90 355.65 Per Metre 124.40 1,166.45

6 Supply and erection PVC pipe for recessed wiring (main and 38.2 &sub-main) purpose, including bends, specials, etc. in floor, 38.3wall or trenches:-

i) 50 mm i/d Per Rft. 35.45 81.05 Per Metre 116.20 265.90 ii) 80 mm i/d Per Rft. 40.75 103.10 Per Metre 133.65 338.20 iii) 100 mm i/d Per Rft. 40.75 128.80 Per Metre 133.65 422.40

7 Supply and erection of PVC pipe for surface wiring (main andsub-main) including clamps, inspection boxes, pull boxesbends etc., complete with all specials:-

i) 50 mm i/d Per Rft. 9.35 56.25 Per Metre 30.70 184.50

chapter-24(Electric Installation) Page 143

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

ii) 80 mm i/d Per Rft. 13.60 92.70 Per Metre 44.55 304.10 iii) 100 mm i/d Per Rft. 15.50 116.85 Per Metre 50.90 383.20

8 Supply and erection of wooden strip batten for wiring Per Rft. 2.70 5.00 Per Metre 8.90 16.45 38.8 Additional width required to

purposes, including clips, insulation cleats, etc. accommodate wires will be providedby erection of additional strips.

9 Supply and erection of Sahl wood casing and capping for Per Rft. 2.70 14.30 Per Metre 8.90 46.85 38.8wiring purposes, including insulation cleats, screws, etc. complete.

10 Supply and erection of single core PVC insulated copper 38.1conductor cables, in prelaid PVC pipe/M.S. conduit/G.Ipipe/wooden strip batten/wooden casing an capping/G.I.wire/trenches (rate for cables only):-

a) 250/440 volts, PVC insulated:

i) 3/0.74 mm (3/0.029") Per Rft. 5.45 11.85 Per Metre 17.80 38.85 ii) 3/0.91 mm (3/0.036") Per Rft. 5.45 12.30 Per Metre 17.80 40.30 iii) 7/0.74 mm (7/0.029") Per Rft. 5.45 16.15 Per Metre 17.80 52.90 iv) 7/0.91 mm (7/0.036") Per Rft. 6.05 23.15 Per Metre 19.80 75.95 v) 7/1.12 mm (7/0.044") Per Rft. 6.80 32.45 Per Metre 22.30 106.50 vi) 7/1.63 mm (7/0.064") Per Rft. 8.35 75.95 Per Metre 27.40 249.20 vii) 19/1.32 mm (19/0.052") Per Rft. 19.40 124.90 Per Metre 63.65 409.75 viii) 19/1.63 mm (19/0.064") Per Rft. 22.65 169.70 Per Metre 74.25 556.55

b) 250/440 volts, PVC insulated cotton braided andcompounded cables:-

i) 3/0.74 mm (3/0.029") Per Rft. 6.05 12.45 Per Metre 19.80 40.85 ii) 3/0.91 mm (3/0.036") Per Rft. 6.05 12.90 Per Metre 19.80 42.25 iii) 7/0.74 mm (7/0.029") Per Rft. 6.05 16.75 Per Metre 19.80 54.90 iv) 7/0.91 mm (7/0.036") Per Rft. 6.40 23.50 Per Metre 20.95 77.10 v) 7/1.12 mm (7/0.044") Per Rft. 7.15 32.80 Per Metre 23.45 107.65 vi) 7/1.63 mm (7/0.064") Per Rft. 8.25 75.85 Per Metre 27.00 248.75

11 Supply and erection of single core PVC insulated, PVCsheathed copper conductor, 250/440 volts grade cable(BSS-2004), in prelaid PVC pipes/M.S. conduit/G.I.pipe/wooden strip batten/wooden casing andcapping/trenches, etc. (rate for cable only):-

i) 3/0.74 mm (3/0.029") Per Rft. 5.45 11.40 Per Metre 17.80 37.45 ii) 3/0.91 mm (3/0.036") Per Rft. 5.45 14.40 Per Metre 17.80 47.30 iii) 7/0.74 mm (7/0.029") Per Rft. 5.45 18.70 Per Metre 17.80 61.35 iv) 7/0.91 mm (7/0.036") Per Rft. 6.05 26.15 Per Metre 19.80 85.75 v) 7/1.12 mm (7/0.044") Per Rft. 6.80 36.30 Per Metre 22.30 119.10 vi) 7/1.63 mm (7/0.064") Per Rft. 8.35 69.55 Per Metre 27.40 228.15

chapter-24(Electric Installation) Page 144

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

12 Supply and erection of single core PVC insulated, PVCsheathed copper conductor, 660/1100 volts grade cable, in 38.1 toprelaid G.I. pipe/M.S. conduits/PVC pipe/G.I. wire/trenches, 38.7etc (rate for cable only):-

i) 7/1.63 mm (7/0.064") Per Rft. 8.25 78.15 Per Metre 27.00 256.35 ii) 19/1.32 mm (19/0.052") Per Rft. 9.05 129.85 Per Metre 29.70 425.85 iii) 19/1.63 mm (19/0.064") Per Rft. 9.90 174.70 Per Metre 32.40 573.10 iv) 19/2.11 mm (19/0.083") Per Rft. 10.85 330.80 Per Metre 35.65 1,085.05 v) 37//1.83 mm (37/0.072") Per Rft. 18.75 460.70 Per Metre 61.45 1,511.15 vi) 37/2.11 mm (37/0.083") Per Rft. 22.65 577.75 Per Metre 74.25 1,895.10 vii) 37/2.62 mm (37/0.103") Per Rft. 31.95 885.40 Per Metre 104.80 2,904.15

13 Supply and erection of copper conductor cables for service dittoconnection, in prelaid pipe/G.I. wire/trenches, etc. (rate forcable only):-

a) PVC insulated, PVC sheathed twin core, 250/440 volts.

i) 3/0.74 mm (3/0.029") Per Rft. 6.05 19.30 Per Metre 19.80 63.30 ii) 3/0.91 mm (3/0.036") Per Rft. 6.05 26.15 Per Metre 19.80 85.75 iii) 7/0.74 mm (7/0.029") Per Rft. 6.05 34.70 Per Metre 19.80 113.85 iv) 7/0.91 mm (7/0.036") Per Rft. 6.40 49.60 Per Metre 20.95 162.75 v) 7/1.12 mm (7/0.044") Per Rft. 7.15 69.65 Per Metre 23.45 228.35 vi) 7/1.63 mm (7/0.064") Per Rft. 8.25 136.20 Per Metre 27.00 446.75

b) PVC insulated, PVC sheathed 3 core,660/1100 volt cable:-

i) 3/0.74 mm (3/0.029") Per Rft. 6.40 27.80 Per Metre 20.95 91.15 ii) 3/0.91 mm (3/0.036") Per Rft. 6.40 38.50 Per Metre 20.95 126.25 iii) 7/0.74 mm (7/0.029") Per Rft. 6.40 51.30 Per Metre 20.95 168.35 iv) 7/0.91 mm (7/0.036") Per Rft. 7.15 74.10 Per Metre 23.45 243.05 v) 7/1.12 mm (7/0.044") Per Rft. 7.55 104.60 Per Metre 24.75 343.05 vi) 7/1.63 mm (7/0.064") Per Rft. 8.60 209.05 Per Metre 28.30 685.75

c) PVC insulated, PVC sheathed 4 core,660/1100 volt non armoured cable:-

i) 3/0.74 mm (3/0.029") Per Rft. 6.80 35.05 Per Metre 22.30 114.90 ii) 3/0.91 mm (3/0.036") Per Rft. 6.80 47.85 Per Metre 22.30 157.00 iii) 7/0.74 mm (7/0.029") Per Rft. 7.15 64.80 Per Metre 23.45 212.50 iv) 7/0.91 mm (7/0.036") Per Rft. 7.15 94.45 Per Metre 23.45 309.80 v) 7/1.12 mm (7/0.044") Per Rft. 7.55 134.70 Per Metre 24.75 441.75 vi) 7/1.63 mm (7/0.064") Per Rft. 8.60 271.35 Per Metre 28.30 890.05 vii) 19/1.32 mm (19/0.052") Per Rft. 12.05 504.90 Per Metre 39.60 1,656.10

d) PVC insulated, PVC sheathed 4 core 660/1100 volt grade cable, Cost of trenches where necessaryarmoured with G.I. wire 16 SWG. is included in the rates.

chapter-24(Electric Installation) Page 145

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

i) 19/1.32 mm (19/0.052") Per Rft. 12.05 562.55 Per Metre 39.60 1,845.15 ii) 19/1.63 mm (19/0.064") Per Rft. 12.95 750.70 Per Metre 42.45 2,462.30 iii) 19/1.83 mm (19/0.072") Per Rft. 13.60 1,015.35 Per Metre 44.55 3,330.40 iv) 19/2.11 mm (19/0.083") Per Rft. 14.70 1,419.45 Per Metre 48.15 4,655.85 v) 37//1.83 mm (37/0.072") Per Rft. 15.10 1,931.75 Per Metre 49.50 6,336.20 vi) 37/2.11 mm (37/0.083") Per Rft. 18.10 2,441.60 Per Metre 59.40 8,008.50 vii) 37/2.36 mm (37/0.093") Per Rft. 21.75 2,975.80 Per Metre 71.30 9,760.55 viii) 37/2.62 mm (37/0.103") Per Rft. 27.15 3,703.75 Per Metre 89.10 12,148.25

14 Supply and erection of M.S. sheet box of 16 SWG, 10 cm (4") 38.1deep, with 4.75 mm thick (3/16") bakelite sheet top, for torecessed wiring, including making holes for regulators, 38.7switches, plugs, etc.

i) 10 x 10 cm (4"x4") Each 89.10 158.75 Each 89.10 158.75 ii) 17.5 x 10 cm (7"x4") Each 111.40 223.65 Each 111.40 223.65 iii) 22.5 x 10 cm (9"x4") Each 148.50 286.60 Each 148.50 286.60 iv) 20 x 25 cm (8"x10") Each 178.20 422.80 Each 178.20 422.80 v) 25 x 30 cm (10"x12") Each 222.75 562.80 Each 222.75 562.80 vi) 30 x 35 cm (12"x14") Each 297.00 738.85 Each 297.00 738.85

15 Supply and erection of round block of Sahl wood, 10x4 cm Each 25.45 38.75 Each 25.45 38.75 38.1(4"x1½") thick.

16 Supply and erection of teak wood board, 4.5 cm (1¾") thick. 38.1

i) 17.5 x 10 cm (7"x4") Each 35.65 92.70 Each 35.65 92.70 ii) 22.5 x 10 cm (9"x4") Each 35.65 105.05 Each 35.65 105.05 iii) 20 x 25 cm (8"x10") Each 39.60 122.60 Each 39.60 122.60 iv) 25 x 30 cm (10"x12") Each 44.55 164.85 Each 44.55 164.85 v) 30 x 35 cm (12"x14") Each 50.90 221.90 Each 50.90 221.90

17 Supply and erection of Sahl wood board, 4.5 cm (1¾") thick.

i) 17.5 x 10 cm (7"x4") Each 35.65 72.30 Each 35.65 72.30 ii) 22.5 x 10 cm (9"x4") Each 35.65 90.85 Each 35.65 90.85 iii) 20 x 25 cm (8"x10") Each 39.60 106.55 Each 39.60 106.55 iv) 25 x 30 cm (10"x12") Each 44.55 127.55 Each 44.55 127.55 v) 30 x 35 cm (12"x14") Each 50.90 150.60 Each 50.90 150.60

18 Supply and erection of iron/aluminum clad, 500 volts main 38.1 When the base frame is alreadyswitches with kitkat fuses, on angle iron board with 3 mm installed, the labour and composite(1/8") thick M.S. sheet covering, including bonding to earth rates will be reduced as follows:- For with necessary flexible pipe and thimbles, etc. 15 to 35 Amps. by Rs. 21.20 and Rs.

145.50. For 60 to 65 Amps. by Rs.a) double pole: 38.80 and Rs. 252.60. For 100 Amps.

by Rs. 38.80 and Rs. 350.80.i) 15/20 Amp. Each 594.00 1,646.90 Each 594.00 1,646.90 ii) 30/35 Amp. Each 594.00 1,937.35 Each 594.00 1,937.35 iii) 60/65 Amp. Each 891.00 2,553.85 Each 891.00 2,553.85

chapter-24(Electric Installation) Page 146

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

iv) 100 Amp. Each 891.00 3,110.05 Each 891.00 3,110.05

b) triple pole:i) 15/20 Amp. Each 891.00 2,271.45 Each 891.00 2,271.45 ii) 30/35 Amp. Each 594.00 2,407.05 Each 594.00 2,407.05

c) triple pole with neutral link:

i) 30/35 Amp. Each 594.00 2,580.05 Each 594.00 2,580.05 ii) 60/65 Amp. Each 891.00 3,298.00 Each 891.00 3,298.00 iii) 100 Amp. Each 1,167.20 4,087.15 Each 1,167.20 4,087.15

19 Supply and erection of iron/aluminum clad, 500 volts main When the base frame is alreadyswitches with triple pole and neutral link and HRC fuses, on 38.1 installed, the labour & compositeangle iron board with 3 mm (1/8") thick M.S. sheet covering, rates will be reduced as follows:-including bonding to earth with necessary flexible pipe andthimbles. i) For 60/65 Amp. by Rs. 21.20 and

Rs. 145.50.60/65 Amp Each 891.00 3,343.85 Each 891.00 3,343.85 ii) For 100 to 300 Amp. by Rs. 21.20100 Amp Each 1,167.20 4,658.30 Each 1,167.20 4,658.30 and Rs. 350.80150 Amp Each 1,167.20 6,223.05 Each 1,167.20 6,223.05 iii) For 400 to 500 Amp. by Rs. 42.20200 Amp Each 2,673.00 10,287.40 Each 2,673.00 10,287.40 and Rs. 526.20300 Amp Each 2,673.00 11,696.40 Each 2,673.00 11,696.40 400 Amp Each 3,786.75 15,814.25 Each 3,786.75 15,814.25 500 Amp Each 4,009.50 19,839.05 Each 4,009.50 19,839.05

20 Supply and erection of iron/aluminum clad, branch ditto When the base frame is alreadydistribution board, 250 volt, on angle iron frame of suitable installed the labour and compositesize with 3 mm (1/8") M.S. sheet covering: rates will be reduced by Rs. 19.50 &

Rs. 152.20 respectively.i) 2 way, 15 Amp per way Each 297.00 704.60 Each 297.00 704.60 ii) 3 way, 15 Amp per way Each 297.00 704.60 Each 297.00 704.60 iii) 4 way, 15 Amp per way Each 297.00 778.75 Each 297.00 778.75 iv) 5 way, 15 Amp per way Each 297.00 840.55 Each 297.00 840.55 v) 6 way, 15 Amp per way Each 297.00 883.80 Each 297.00 883.80 vi) 7 way, 15 Amp per way Each 297.00 939.45 Each 297.00 939.45 vii) 8 way, 15 Amp per way Each 297.00 988.85 Each 297.00 988.85 viii) 9 way, 15 Amp per way Each 297.00 1,044.50 Each 297.00 1,044.50 ix) 10 way, 15 Amp per way Each 297.00 1,124.85 Each 297.00 1,124.85 x) 11 way, 15 Amp per way Each 297.00 1,186.65 Each 297.00 1,186.65 xi) 12 way, 15 Amp per way Each 297.00 1,242.25 Each 297.00 1,242.25 xii) 2 way, 30 Amp per way Each 445.50 853.10 Each 445.50 853.10 xiii) 3 way, 30 Amp per way Each 445.50 859.25 Each 445.50 859.25 xiv) 4 way, 30 Amp per way Each 445.50 921.05 Each 445.50 921.05 xv) 5 way, 30 Amp per way Each 445.50 989.05 Each 445.50 989.05 xvi) 6 way, 30 Amp per way Each 445.50 1,032.30 Each 445.50 1,032.30 xvii) 7 way, 30 Amp per way Each 445.50 1,100.30 Each 445.50 1,100.30 xviii)8 way, 30 Amp per way Each 445.50 1,155.90 Each 445.50 1,155.90 xix) 9 way, 30 Amp per way Each 445.50 1,205.35 Each 445.50 1,205.35

chapter-24(Electric Installation) Page 147

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

xx) 10 way, 30 Amp per way Each 445.50 1,291.85 Each 445.50 1,291.85

21 Supply and erection of bus bars, for 500 volts 3 phase A.C. When the base frame is alreadysupply with four copper bars, including glazed porcelain 38.1 installed the labour and compositebridges, on angle iron board, fixed with rag bolts and M.S. rates will be reduced by Rs. 21.20 andsheet box 1.5 mm thick, etc. complete:- Rs. 145.50 respectively.

i) 60 Amp. with 4 copper bars Each 1,059.65 3,165.05 Each 1,059.65 3,165.05 size 1½"x1/8" (40 x 3 mm)

ii) 100 Amp. with 4 copper bars Each 1,059.65 3,165.05 Each 1,059.65 3,165.05 size 1½"x1/8" (40 x 3 mm)

iii) 200 Amp with 4 copper bars Each 1,673.75 3,878.05 Each 1,673.75 3,878.05 size 2"x1/8" (50x 3 mm)

iv) 300 Amp with 4 copper bars Each 2,004.75 4,209.05 Each 2,004.75 4,209.05 size 2"x3/16" (50x 5 mm)

v) 500 Amp with 4 copper Each 1,282.40 4,093.75 Each 1,282.40 4,093.75 size 2"x1/4" (50x 6 mm)

22 i) Supply and erection of plain pendent lamp holder, Each 18.55 110.70 Each 18.55 110.70 38.1complete with bakelite lamp holder and flexible twin wire23/0.0076" upto 2 metre length (without bulb and shade).

ii) Extra for additional length of flexible wire, beyond Per Rft. -- 1.65 Per Metre -- 5.45 2 metres.

23 Supply and erection of counter weight pedent with porcelain Each 37.15 246.40 Each 37.15 246.40 38.1

counter weight, and fitting on bakelite lamp holder, withflexible twin wire 23/0.0076" complete (without bulb andshade).

24 Supply and erection of stiff pedent with brass/metal pipe 6.3 Each 55.80 414.80 Each 55.80 414.80 dittocm (2.5") long, and 15 mm (½") dia brass oxidised or painted,along with brass lamp holder with VIR/PVC cable 3/0.74 mm(3/0.029").

25 Supply and erection of 22.5 cm (9") long swan neck plain Each 57.70 121.35 Each 57.70 121.35 dittobrass/steel brass oxidised bracket lamp holder, complete.

26 Supply and erection of wall type/pole type bracket, with double Each 79.70 451.85 Each 79.70 451.85 dittocover water tight reflector, flexible wire and brass bolder.

27 Supply and erection of bakelite button holder shade, large Each 12.80 52.20 Each 12.80 52.20 dittosize.

28 Supply and erection of call bell 220/250 volts, fixed on teak Each 55.80 241.15 Each 55.80 241.15 38.1wood board 17.5x10 cm (7"x4").

29 Supply and erection of bell push or bed switch, with 5 metres Each 11.15 213.65 Each 11.15 213.65 38.1twin flexible wire 23/0.0076".

chapter-24(Electric Installation) Page 148

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

30 Supply and erection of ceiling rose, bakelite. Each 18.55 38.60 Each 18.55 38.60 ditto

31 Supply and erection of switches 5 Amp.

i) open type Each 17.80 35.40 Each 17.80 35.40 dittoii) piano type Each 17.80 35.40 Each 17.80 35.40 iii) ring type, recessed Each 17.80 30.20 Each 17.80 30.20 iv) plate type, recessed Each 17.80 52.70 Each 17.80 52.70 v) double control, open type Each 24.70 53.90 Each 24.70 53.90 vi) double control, ring type recessed Each 24.70 47.70 Each 24.70 47.70 vii) double control, piano type Each 24.70 48.95 Each 24.70 48.95

32 Supply and erection of switches 10/15 Amp. ditto

i) open type Each 17.80 44.55 Each 17.80 44.55 ii) recessed type Each 17.80 54.45 Each 17.80 54.45

33 Supply and erection of wall socket with 3 pin 5 Amp, shoe. Each 17.80 81.60 Each 17.80 81.60 ditto

34 Supply and erection of 3 pin. 5 Amp wall socket. Each 17.80 56.90 Each 17.80 56.90 ditto

35 Supply and erection of 3 pin, 10/15 Amp. wall socket. ditto

i) open type Each 17.80 50.70 Each 17.80 50.70 ii) recessed type Each 17.80 87.80 Each 17.80 87.80

36 Supply and erection of 3 pin switch and plug combined, dittorecessed type.

i) 5 Amp Each 17.80 71.25 Each 17.80 71.25 ii) 10/15 Amp Each 17.80 97.00 Each 17.80 97.00

37 Supply and erection of 3 pin 10/15 Amp. wall socket with shoe, Each 17.80 149.60 Each 17.80 149.60 dittoopen type.

38 Supply and erection of cut out, bakelite. ditto

i) open type Each 9.90 36.60 Each 9.90 36.60 ii) recessed type Each 9.90 42.80 Each 9.90 42.80

39 Supply and erection of button holder. 38.1

i) bakelite large size Each 11.15 30.45 Each 11.15 30.45 ii) brass Each 11.15 42.80 Each 11.15 42.80

40 Supply and erection of brass bracket with holder. Each 14.85 46.50 Each 14.85 46.50 ditto

41 Supply and erection of bell push open/recessed type Each 9.90 30.45 Each 9.90 30.45 ditto(without flexible wire).

chapter-24(Electric Installation) Page 149

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

42 Supply and erection of kitkat, 500 volt: ditto

i) 15/20 Amp Each 18.10 50.55 Each 18.10 50.55 ii) 30/35 Amp Each 19.75 52.20 Each 19.75 52.20 iii) 60/65 Amp Each 30.20 76.55 Each 30.20 76.55 iv) 100 Amp Each 33.95 123.55 Each 33.95 123.55 v) 200 Amp Each 38.80 165.50 Each 38.80 165.50 vi) 300 Amp Each 38.80 326.20 Each 38.80 326.20 vii) 400 Amp Each 51.30 406.65 Each 51.30 406.65 viii) 500 Amp Each 51.30 582.80 Each 51.30 582.80

43 Supply and erection of tube light, including rod, choke, starter 38.1with frame, flexible wire, including connection from ceilingrose, etc., complete.

i) double rod (80 watts) with two chokes and 2 starters. Per set 320.60 1,278.80 Per set 320.60 1,278.80

ii) single rod (40 watts) with one choke and one starter. ditto 256.50 695.55 ditto 256.50 695.55

iii) round tube, 32 watt, with one choke and one starter, Each 256.50 753.65 Each 256.50 753.65 without cover.

iv) round tube, 32 watt with one chock and one starter, with ditto 213.75 834.50 ditto 213.75 834.50 cover.

44 Providing and fixing M.S. iron box for housing main switches, dittomade of 1.5 mm (1/16") thick M.S. sheet, with lockingarrangement, including painting:-i) 60x35x15 cm (24"x14"x6") Each 669.05 2,443.95 Each 669.05 2,443.95 ii) 95x40x20 cm (38"x16"x8") Each 966.30 3,084.05 Each 966.30 3,084.05 iii) 105x52.5x22.5 cm (42"x21"x9") Each 1,469.50 4,294.30 Each 1,469.50 4,294.30 iv) 135x70x27.5 cm (54"x28"x11") Each 1,616.50 6,038.50 Each 1,616.50 6,038.50

45 Supply and erection of girder clamp hook, 16 mm (5/8") with Each 42.75 157.70 Each 42.75 157.70 38.1M.S. plate 25x6 mm (1"x¼"), with bolts and nuts for hanging &ceiling fans. 38.10

46 Supply and erection of girder strut, of M.S. tee section Each 55.80 1,027.80 Each 55.80 1,027.80 ditto40x40x6 mm (1½"1½"x ¼"), complete with clamp, bolts andnuts, etc., including fixing with cement concrete 1:3:6.

47 Supply and erection of roof suspension hook, 16 mm (5/8") Each 59.80 1,239.35 Each 59.80 1,239.35 38.1dia rod with 75x40x3 mm (3"x1½"x1/8") M.S. steel channel, with clamp, bolts and nuts, etc., including fixing with cementconcrete 1:3:6.

48 Supply and erection of roof suspension hook of M.S plate Each 79.70 524.05 Each 79.70 524.05 75x40x12.7mm (3"x1½"x½") with 16 mm (5/8") hook completewith bolts, nuts and fixing with cement concrete 1:3:6

chapter-24(Electric Installation) Page 150

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

49 Supply and erection of 3/8" (10 mm) dia M.S. bar fan hook, Each 22.85 40.15 Each 22.85 40.15 dittoplaced at the time of casting of slab.

50 Erection of circular L.T. pole in cement concrete 1:3:6 one Each 716.00 2,810.50 Each 716.00 2,810.50 38.12metre below ground level (excluding the cost of pole),including cement concrete collar (1:2:4) excavation offoundation, and finishing surface.

51 Supply and erection of bracket of M.S. channel 75x40x6 mm (3"x1½"x¼") section:-i) 0.60 metre (2') long for 2 lines. Each 159.10 605.75 Each 159.10 605.75 ii) 1.200 metre (4') long for 4 lines. Each 185.65 1,357.65 Each 185.65 1,357.65

52 Supply and erection of anchor rod Henley type for pole, Per Rft. 10.70 24.60 Per Metre 35.10 80.70 38.14including necessary clamps and 7/12" stay wire, strainingscrews, etc., erected in cement concrete 1:3:6 and collar ofcement concrete.

53 Supply and erection of stay for house service pipe, erected Per Rft. 15.50 38.30 Per Metre 50.90 125.55 dittowith straining screws and 7/14" stay wire, complete.

54 Supply and erection of house service pipe Henley (G.I. pipe Per Rft. 67.90 281.80 Per Metre 222.75 924.25 water quality) or pole type, 50 mm (2") dia, erected to instalinsulated overhead line,include shackle insulator for holdinginsulated wire and straining devices for bearer wire and otheraccessories etc., complete.

55 Supply and erection of house service pipe 50 mm (2") dia G.I. Per Rft. 62.40 273.95 Per Metre 204.70 898.55 pipe Henley or pole type for bare copper wire overhead line,including shackle insulator, straining devices and otheraccessories etc.

56 Supply and erection of lightning arrestor horn type, complete. Each 334.75 2,559.55 Each 334.75 2,559.55

57 Supply and erection of shackle insulator, medium size. Each 42.00 208.85 Each 42.00 208.85 38.12

58 Supply and erection of pin insulator, green medium size. Each 42.00 91.45 Each 42.00 91.45 ditto

59 Supply and erection of bare copper conductor wire No. 2 to Per Kg 21.85 1,105.55 Per Kg 21.85 1,105.55 38.1No. 10 SWG, including binding wire No. 16 SWG.

60 Supply and erection of G.I. wire of all sizes, including binding Per Kg 21.85 145.55 Per Kg 21.85 145.55 dittowire No. 16 SWG for support of rubber wire or earthing wire,pole to pole etc.

61 Wiring overhead line in 2 single core, PVC/weather proof 38.12cable, on G.I. wire No. 8 SWG bearer wire and in house service pipe, including connection through joint box.

chapter-24(Electric Installation) Page 151

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

i) 3/0.74 mm (3/0.029") Per Rft. 5.65 13.80 Per Metre 18.60 45.20 ii) 7/0.74 mm (7/0.029") ditto 5.65 22.15 ditto 18.60 72.60 iii) 7/0.91 mm (7/0.036") ditto 5.65 28.80 ditto 18.60 94.40 iv) 7/1.12 mm (7/0.044") ditto 5.65 37.95 ditto 18.60 124.40

62 Supply and erection of all aluminum stranded hard drawn bare Per Rft. 10.45 23.75 Per Metre 34.25 77.90 38.1conductor, of size 7/3.099 mm (7/0.122").

63 Supply and erection of street light pole bracket 30 mm (1¼") Each 278.95 1,083.45 Each 278.95 1,083.45 G.I. pipe 2 metre long, complete with 2 No. pole clamp.

64 Supply and erection of pole mounted street light, holders, shade and glass, etc., for fitting 125/250 watts mercury vapourlamp (excluding cost of lamps):

i) G.E.C. design Each 557.90 2,980.50 Each 557.90 2,980.50 ii) Philips design ditto 557.90 3,363.65 ditto 557.90 3,363.65

65 Supply and fitting of mercury vapour lamp, complete with

choke set.i) 125 watt lamp Each 213.75 1,140.75 Each 213.75 1,140.75 ii) 250 watt lamp ditto 256.50 2,048.70 ditto 256.50 2,048.70

66 Manufacture and erection of angle iron lattice steel structure Each 9,384.55 26,144.25 Each 9,384.55 26,144.25 38.13 The composite rate will be reducedpole (36.0') 10,923 mm long 9348 mm (30.5') above ground or increased by Rs. 36.50 for eachlevel) 355 mm (14") square at base and 204 mm (8") square at (100 mm) of reduction or addition intop for electric distribution line, using 1¼"x1¼"x3/16" (30x30x5 the height of the pole above groundmm) angle iron legs and ¾"x¾"1/8" (20x20x3 mm) angle iron level.bracing 420 mm (17") long fixed between legs on all the foursides in diagonal position, and 1¾"x1¾"x3/16"(45x45x5 mm)angle iron on top and 4 bands of M.S. flat iron 2"x¼" (50x6 mm)305 mm (12") centre to centre, as per standard drawingincluding silver painting of pole 3 coats, excavation and refillingof foundation cement concrete 1:2:4. 6'-0"x1'-8"x1'-8"(1807x500x500 mm) for foundation, etc, complete in allrespects.

67 Manufacture and erection of galvanized angle iron lattice steel Each 9,082.65 38,240.95 Each 9,082.65 38,240.95 38.13 The composite rate will be reducedstructure pole 37 ft. (11.25 m) long 30 ft. (9 m) above ground or increased by Rs. 237.00 for eachlevel), 34" square (850 mm) at base, 13.75" (35 mm) square at foot (300 mm) of reduction ortop, for electric distribution line, using 2"x2"x5/32" addition in the height of the pole(50x50x4mm) high tensile steel angle iron legs, and 1-3/8"x above ground level.1-3/8"x1/8" (35x35x3 mm) M.S. angle iron bracings fixedbetween legs on all the four sides in diagonal position as perstandard drawing including silver painting of pole, excavationand refilling of foundation, one ft. (300 mm) thick cementconcrete 1:3:6 foundation of outer size 8'x3½'x3½'(2400x1050x1050 mm), etc. complete in all respects.

chapter-24(Electric Installation) Page 152

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

68 Earthing of iron clad/aluminum switches, etc. with G.I. wire No. Job 1,228.25 4,631.25 Job 1,228.25 4,631.25 8 SWG in G.I. pipe 15 mm (½") dia, recessed or on surface ofwall and floor, complete with 1.5 metre long G.I. pipe, 50 mm(2") dia with reducing socket 4 to 5 metre below ground level,and 2 metre away from building plinth.

69 Earthing of Metallic cases, etc. with G.I. wire No. 8 SWG, in 38.1115 mm (½") dia G.I. pipe, best quality:-i) on surface, including clamps, etc. Per Rft. 12.75 60.90 Per Metre 41.85 199.65 ii) recessed in wall, including hooks, ditto 29.95 79.10 ditto 98.25 259.50

jharries and making good surface.

70 Bonding to earth with wire on surface, including cost of wire, dittoclamps, thimbles, etc.

a) G.I. wire:i) 8 SWG Per Rft. 5.45 12.30 Per Metre 17.80 40.30 ii) 16 SWG ditto 5.45 7.25 ditto 17.80 23.75

b) Copper wire:

i) 16 SWG Per Rft. 5.45 12.75 Per Metre 17.80 41.75 ii) 20 SWG ditto 5.45 8.25 ditto 17.80 27.05

71 Erection only, of lightning conductor of copper tape, including Per Rft. 20.40 25.05 Per Metre 66.95 82.10 38.11 Rate includes all materials requiredsupply of copper staple and copper nails and cement, sand in erection (excluding copper tapemortar. lightning conductor).

72 Supply and erection of 600x600x3 mm (2'x2'x1/8") copper Each 818.85 4,682.05 Each 818.85 4,682.05 dittoplate, including revitting to copper tape and placing in mixtureof salt and charcoal, etc.

73 Supply and erection of copper tape, including copper staple copper nails, cement, sand, etc.

i) tape 40x3 mm (1½"x1/8") Per Rft. 29.95 271.45 Per Metre 98.25 890.35 ii) tape 50x3 mm (2"x1/8") ditto 29.95 321.80 ditto 98.25 1,055.45

74 Supply and erection of 25 mm (1") dia and one metre long Job 557.90 2,893.95 Job 557.90 2,893.95 lightning conductor copper rod with 5 spikes on ball and base,etc. complete.

75 Supply and erection of electric energy meter, including meter 38.1testing fee, etc.

a) single phase:

i) 1x10 Amp, 250 volts Each 222.75 2,358.75 Each 222.75 2,358.75 ii) 1x30 Amp, 250 volts ditto 222.75 2,358.75 ditto 222.75 2,358.75

chapter-24(Electric Installation) Page 153

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

b) three phase, 4 wires:

i) 3x15 Amp, 400 volts Each 445.50 6,200.70 Each 445.50 6,200.70 ii) 3x50 Amp, 400 volts ditto 641.20 6,396.40 ditto 641.20 6,396.40 iii) 3x80 Amp, 400 volts ditto 641.20 6,396.40 ditto 641.20 6,396.40

76 Rewinding of A.C. ceiling fan, capacitor type, including cost of The credit of out turn of dismantledwire, leatheride paper cotton tape, soldering, etc. material has been accounted for in

the rate.i) 1200 mm (48") sweep, 275-300 RPM. Each 431.95 1,003.05 Each 431.95 1,003.05 ii) 1400 mm (56") sweep, 250-275 RPM. ditto 480.90 1,152.65 ditto 480.90 1,152.65

77 Rewinding of A.C. exhaust fan, including cost of wire, The credit of out turn of dismantledleatheride paper, cotton tape, soldering, etc. material has been accounted for in

the rate.i) 375 mm (15") sweep, and 1300-1500 RPM Each 297.00 694.50 Each 297.00 694.50 ii) 450 mm (18") sweep, and 1300-1500 RPM ditto 297.00 770.45 ditto 297.00 770.45

78 Rewinding of pedestal fan 600 mm (24") sweep, and 900-950 Each 356.40 896.65 Each 356.40 896.65 The credit of out turn of dismantledRPM, including wire, leatheride paper, cotton, tape, etc. material has been accounted for in

the rate.79 Supply and fitting of regulator knob with shaft Each 55.70 117.50 Each 55.70 117.50 38.1

and plate of electric fan regulator.

80 Supply and fitting of capacitor 2.2 uF, for ceiling fans. Each 44.55 69.25 Each 44.55 69.25 ditto

81 Supply and fitting of ball bearing of size Each 55.70 179.30 Each 55.70 179.30 ditto6201, 6202 or 6203 for ceiling fans.

82 Rewinding regulator of ceiling fan 48"/56" (1200/1400 mm) Each 111.40 216.50 Each 111.40 216.50 The credit out turn of dismantledsweep, to control 3/4 speeds. material has been accounted for in

the rate.83 Erection of ceiling fan alongwith regulator (all sizes), including Each 213.05 251.20 Each 213.05 251.20

carriage from local Railway Station/Store to site of work,electric wire/cable for suspension rod and board connection,and cutting, threading on the rod, where necessary.

chapter-25(Iron work) Page 154

The Rates for all finished works include the removal of surplus debris, unused material and byproducts.

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

Railway Track, etc.

1 Laying, linking and packing tramway line. 100Lft. 2055.80 Metre 67.45

2 Dismantling tramway track. 100Lft. 681.70 Metre 22.35

3 Laying, linking of B.G. track, including packing, 100Lft. 5343.80 Metre 175.30straightening and leveling.

4 Linking points and crossings, complete with fastenings. Each 5163.20 Each 5163.20

5 Bending or strainghtening B.G. rail with Jim Each 569.60 Each 569.60Crow. Point Point

6 Fixing street lamp posts. Each 665.35 Each 665.35

7 Binding ends of sleepers and timber of all sizes and kinds, 100 Nos 6249.85 100 Nos 6249.85including spreading and restacking.

8 Opening stacks of sleepers and timber of all kinds and 100 Nos 785.60 100 Nos 785.60sizes, including spreading for inspection and restackingwithin one chain lead.

IRON WORK

9 Small iron work, such as gusset plates, knees, bends, Per Cwt 3293.40 8886.00 100 Kg 6483.05 17492.15stirrups, straps, rings, etc. including cutting, drilling,riveting, handling, assembling and fixing; but excludingerection in position.

10 Fabrication of heavy steel work, with angle, tees, flat iron Per Cwt 1179.70 6498.00 100 Kg 2322.20 12791.30round iron and sheet iron for making trusses, girders,tanks, etc., including cutting, drilling, revitting, handling,assembling and fixing, but excluding erection in position.

11 Erection and fitting in position iron trusses, staging of Per Cwt 371.95 100 Kg 732.20water tanks, etc.

12 Fixing corrugated iron sheet, including revitting, etc. 100 Sft. 1339.00 sq.m 144.10

13 Erecting corrugated iron sheet tanks, upto 20' Per Cwt 646.90 100 Kg 1273.40(6 m) height.

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

25. IRON WORK

chapter-25(Iron work) Page 155

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

14 Erecting rolled steel beams or old rails, in roofs, etc., Per Cwt 393.20 100 Kg 774.00erection and fixing in position.

15 Erecting rolled steel beams or rails, erection for posts etc. Per Cwt 190.95 100 Kg 375.95(other than in roofs).

16 Making bolts and nuts of iron rods. Per Cwt 2535.40 8612.15 100 Kg 4990.95 16953.10

17 Cutting rails, rolled steel joists and beams, with hacksaw:-

a) upto 6" size (150 mm) Per Cut 251.05 Per Cut 251.05b) above 6" size (150 mm) Per Cut 370.40 Per Cut 370.40

18 Cutting rails or rolled steel beams of size below 6" Per 119.55 Per Cwt 119.55(150 mm), with jim. Cut Cut

19 Bending rolled steel beams or rails. Per 128.00 379.90 Per 128.00 379.90Bend Bend

20 Drilling holes, in plates upto ½" (13 mm) thick, per inch Per 50.30 Per 50.30dia, (25mm) or part thereof. Hole Hole

21 Extra for drilling holes in plates over ½" (13 mm) thick, per Per 27.95 Per 27.95inch dia, (25 mm) or part thereof. Hole Hole

22 Rivetting 1/8" dia (3 mm). 100 Nos 666.05 100 Nos 666.05

23 Cutting out Rivets, all sizes. 100 Nos 2133.45 100 Nos 2133.45

24 Fitting and erection of gutters of sheet iron. Per Lft. 83.55 Metre 274.10

25 Cutting and fixing iron bars, for barred windows. Per bar 47.80 Per bar 47.80

26 Cutting G.I. sheets. Each 26.25 Each 26.25Cut Cut

27 Notching web or foot of rail posts, for housing rail beams. Per 568.90 736.90 Per 568.90 736.90Notch Notch

28 Hoop iron netted trellis work fixed with nails. Per Sft. 33.50 sq.m 360.20

29 Fixing zinc iron or G.I. sheet on table tops. Per Sft. 19.70 sq.m 211.9030 Making and fixing steel grated doors, complete with Per Sft. 206.95 784.15 sq.m 2226.85 8437.50

locking arrangement, angle iron frame 2"x2"x3/8"(50x50x10 mm) and ¾" (20 mm) square bars 4" (100 mm)centre to centre.

31 Making and fixing steel grated door with 1/16" thick Per Sft. 214.90 912.15 sq.m 2312.45 9814.95(1.5mm) sheeting, including angle iron frame 2"x2"x3/8"(50x50x10 mm) and ¾" (20 mm) square bars 4" (100 mm)centre to centre, with locking arrangement.

chapter-25(Iron work) Page 156

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

32 Making and fixing grating in opening, including fixing at Per Sft. 82.70 378.70 sq.m 889.75 4074.80site with flat iron 2"x3/8" (50x10 mm) and ¾" (19 mm)square bars, at 4" (100 mm) centre to centre.

33 Providing and fixing stair railing (all types and designs) of Per Rft. 402.55 904.05 Metre 1320.70 2966.00 The composite rate shall behard wood, including bends and corners, screwed to reduced or increased by Rs. 31.905/8"x5/8" (16x16 mm) M.S. square bars 2.75 ft. (838 mm) for each foot of reduction orhigh, at 5.5 inch (137 mm) inch centre to centre, fixed in addition in the height of the squaresteps of stairs, M.S. flat 1"x1/8" (25x3 mm) welded to bars.bars, painting/polishing 3 coats, etc. complete.

34 Providing/fixing stair railing consisting of M.S. Box section Per Rft. 207.50 597.90 Metre 680.70 1961.55size 1-1/2"x3" of 16 SWG welded with M.S. flat 1"x1/8"continuously and welded over M.S. square bars 5/8"x5/8"punched in M.S. flat 2 ¾' high @ 5½" c/c fixed in steps ofstair I/C painting 3 coats complete.

35 Providing and fixing terrace railing of 2" (50 mm) i/d Per Rft. 149.90 622.75 Metre 491.80 2043.14 -do-conduit pipe 16 SWG, welded with 5/8"x5/8" (16x16 mm)square bar 2.75 ft. (838 mm) high fixed at 5" (125 mm)centre to centre, in reinforced cement concrete slab withsuitable arrangement, complete in all respects, as perdesign and drawing.

36 Providing and fixing collapsible gate made of 2"x2"x"¼" Per Sft. 302.00 742.20 sq.m 3249.25 7986.15(50x50x6 mm) tee iron at top and bottom, channel ironverticals ¾"x¼"x¼"x1/8" (20x6x6x3 mm) at 3" (75 mm) to5" (125 mm) centre to centre (approximate) and flat ironcrosses 3"x3/16" (75x5 mm), and best quality rollers atbottom of 3" (75 mm) diameter including holdfasts,handles 12" (300 mm) long of ¾"x¼"x¼"x1/8" (20x6x6x3mm) channel iron, locking arrangement inside andoutside, painting 3 coats of black Japan enameled,complete in working order.

37 Providing and fixing 24 SWG G.I. sheet rolling shutter, Per Sft. 66.55 247.40 sq.m 716.20 2661.95consisting of steel frame of M.S. channel 2"x1¼"x1/8"(50x30x3 mm), angle iron 1½"x1½"x1/8" (40x40x3 mm),M.S. plate 1'x1'x1/8" (300x300x3 mm), G.I. pipe 1½" (37mm) dia, springs 2' (600 mm) centre to centre, rollers, 24SWG G.I. covering 1 ft. x 1 ft. (300x300 mm), handles,holdfast, and painting three coats, complete in allrespects.

38 Providing and fixing M.S. angle iron 1½"x1½"x¼" Per Rft. 31.45 152.55 Metre 103.15 500.45(40x40x6 mm) edge protector nozing of steps of stairs,having holdfast or 3/8" (10 mm) dia M.S. bars 8" (200 mm)long welded at 2' (600 mm) centre to centre andembedded in cement concrete on steps, complete in allrespects.

39 Providing and fixing stair railing of 2½" (63 mm) i/d G.I. Per Rft. 177.15 745.25 Metre 581.25 2445.00 The composite rate shall bepipe, welded with 5/8"x5/8" (16x16 mm) square M.S. bars reduced or increased by Rs. 31.90

chapter-25(Iron work) Page 157

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

2'-9" (838 mm) high, fixed in each step, complete in all for each foot of reduction orrespects, including painting, polishing three coats. addition in the height of the square

bars.40 Providing and fixing G.I. wire gauze 24 SWG, 12x12 Per Sft. 29.70 69.60 sq.m 319.55 749.00

meshes per square inch, fixed to steel windows or doors,etc., complete in all respects.

41 Providing and fixing steel windows with openable glazedpanels, using beam section for frame 1½"x1"x5/8"x1/8" For fixed pannels, the composite(40x25x16x3 mm), Z-section for leaves ¾"x1"x¾"x1/8" rate will be reduced by Rs.30.00(20x25x20x3 mm), T-section sashes 1"x1"x1/8" (25x25x3 per Sft. or Rs. 305.00 per Sq. mm), glass panes, wooden screed for glazing embedded metre.over a thin layer of putty duly screwed with leaves, brassfittings, holdfast, duly painted, complete in all respects,including all cost of material and labour, etc. as perapproved design and as directed by theEngineer-in-charge:-

a) without wire gauze:

i) glass pane 2 mm thick Per Sft. 75.90 340.95 sq.m 816.80 3668.35ii) glass pane 2.5 mm thick ditto 75.90 343.40 ditto 816.80 3694.95iii) glass pane 3 mm thick ditto 75.90 347.10 ditto 816.80 3734.85iv) glass pane 4 mm thick ditto 75.90 353.30 ditto 816.80 3801.35v) glass pane 5 mm thick ditto 75.90 365.65 ditto 816.80 3934.35

b) fixed with wire gauze, 22 SWG

i) glass pane 2 mm thick Per Sft. 107.05 410.40 sq.m 1151.90 4415.80ii) glass pane 2.5 mm thick ditto 107.05 412.85 ditto 1151.90 4442.40iii) glass pane 3 mm thick ditto 107.05 416.55 ditto 1151.90 4482.30iv) glass pane 4 mm thick ditto 107.05 422.75 ditto 1151.90 4548.80v) glass pane 5 mm thick ditto 107.05 435.10 ditto 1151.90 4681.80

42 Providing and fixing steel windows using M.S. sheet (16SWG) moulded tubular pipe 1½"x1½" (40x40mm) forframe and 1¼"x1¼" (30x30mm) for leaves including M.S.square bars ¼"x¼" (6x6 mm) welded around each panelof frame, 5 mm thick glass panes fixed with double M.S.square tubular pipe 3/8"x3/8" (10x10mm) (22 SWG)beading with U' shaped rubber lining, brass fitting,holdfast, including painting three coats complete in allrespects.a) For openable panels fixed with wire Per Sft. 66.50 330.45 Sq.m 715.70 3555.60

gauze 24 SWG, 12x12 mesh and glasspanes ¼" (6 mm) thick.

b) For fixed panels without wire gauze. ditto 64.30 207.25 ditto 691.70 2230.00

43 Providing and fixing windows consisting of M.S. box Per Sft. 78.10 415.05 Sq.m 840.25 4466.10section frame 2"x1½" (50x40mm), leaves frame 1-½"x1"(40x25mm) box section frame for glazing 3/8"x3/8"

chapter-25(Iron work) Page 158

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

(10x10mm) using 16 SWG sheet 'U' shaped rubbersupported with 1"x1/8" (25x3mm) M.S. flat for fixing 3/16"(5 mm) thick glass panes M.S. box section ½"x½"(13x13mm) of 16 SWG for fixing 24 SWG wire gauze onouter side by means of ¾"x1/8" (20x3mm) M.S. flat andscrews I/C all C.P. fitting and painting 3 coats complete inall respect.

44 Providing and fixing windows consisting of M.S. box Per Sft. 98.35 484.35 Per Sft. 1058.15 5211.55section frame 2"x1½", (50x40mm) leaves frame 1½"x1"(40x25mm) box section frame for glazing 3/8"x3/8"(10x10mm) using 16 SWG sheet 'U' shaped rubbersupported with 1"x1/8" (25x3mm) M.S. flat for fixing 3/16"(5 mm) thick glass panes M.S. box section ½"x½"(13x13mm) of 16 SWG for fixing 24 SWG wire gauze onouter side by means of ¾"x1/8" (20x3mm) M.S. flat andscrews including grill of M.S. flat ½"x1/8" (13x3mm) or¼"x¼" (6x6mm) square bar with independent frame of½"x½" (13x13mm) box section of 16 SWG i/c all C.P.fitting and painting 3 coats complete in all respect.

45 Flapping G.I. pipes for bath room drains. Each 668.25 707.80 Each 668.25 707.80

46 Supply and fixing iron grating for fire place. Per Sft. 128.25 233.30 sq.m 1379.85 2510.30

47 Fixing copper flashing, including cutting of sheets, Per Lft. 55.80 Metre 183.00grooving and rivetting.

48 Providing and fixing angle iron railing, using 2½"x2½"x3/8" Per Rft. 93.60 837.25 Metre 307.00 2746.95(63x63x10 mm) angle iron post 4½" (113 mm) long, 5' to6' (1500 to 1800 mm) apart, with 2½"x2½"x3/8" (63x63x10mm) angle iron top rail, and two rows of M.S. flat 2½"x¼"(63x6 mm) including fixing to side of Bridge/structure withU.bolt 1½' (450 mm) long ¾" (20 mm) dia, painting posts,etc. complete in all respects.

49 Providing and fixing barbed wire fencing on compound 100Rft. 2019.05 10594.25 Metre 66.25 347.60wall, consisting of 1½"x1½"x3/16" (40x40x5 mm), angleiron post 3¼ ft. (990 mm) long, 5 to 6 ft. (1500 to 1800mm) centre to centre, embedded in cement concrete1:4:8, base of size 9"x9"x12" (225x225x300 mm), andthree rows of barbed wire, painting posts, etc. complete inall respects.

50 Providing and fixing barbed wire fencing on compound 100Rft. 3328.15 13665.40 Metre 109.20 448.35wall, consisting of 1½"x1½"x3/16" (40x40x5mm) angleiron post 3' (900 mm) long, 4' (1200 mm) apart embeddedin cement concrete 1:4:8 base of size 6"x6"x9"(150x150x225 mm) and 4 rows of barbed wire, includingbinding wire, painting posts, etc. complete in all respects.

chapter-25(Iron work) Page 159

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

51 Providing and fixing all types of partly fixed and partly (1) Increase rate by Rs. 40.00 per openable glazed anodised bronze colour aluminium Sft or Rs.430.50 per Sq-metre ifdoors, using delux section of M/s Al-Cop or Pakistan sections thickness is 2 mm.Cables, having chowkat frame of size 40 x 100 mm (1½" x (2) Reduce rate by Rs.20.00 per Sft4") and leaf frame of 60x40mm (2½"x1½") wide sections or Rs.215.20 per Sq-metre ifincluding the cost of ¼" (5 mm) thick imported tinted sections are of dull aluminimumglass with aluminium triangular gola and rubber gasket to Per Sft 108.55 546.20 sq. m 1168.00 5877.10 shade.support the glass and leaf edging, using approved (3) Reduce rate by Rs.20.00 perstandard fittings, locks, 3" (75 mm) wide long handles Sft or Rs.215.20 per Sq-metre ifetc., and hardware any required as approved by the local glass is used.engineer in-charge.

52 Providing and fitting all types of glazed aluminium Per Sft 156.95 452.25 sq. m 1688.80 4866.20 (1) Reduce rate by Rs.20.00 per Sftwindows of anodised bronze colour partly fixed and partly or Rs.215.20 per Sq-metre ifsliding using delux sections of approved manufacturer section thickness is 1.2 mm.having frame size of 100 x 20 mm (4"x¾") andleaf frame sections of 50 x 20 mm (2"x¾"), all of 1.6mm (2) Reduce rate by Rs.20.00 per Sftthickness including 5 mm thick imported tinted glass with or Rs.215.20 per Sq-metre ifrubber gasket using approved standard latches, hardware sections are of dull aluminiumetc., as approved by the Engineer in-charge. shade.

(3) Reduce rate by Rs.20.00 per Sftor Rs.215.20 per sq-metre if localglass is used.

53

a) 1.6 mm thick Per Sft 106.60 675.40 Sqm 1147.00 7267.30b) 2 mm thick Per Sft 106.60 761.80 Sqm 1147.00 8196.95

54 Per Sft 68.10 453.60 Sqm 732.85 4880.50 i. If Brass stays will be provided, rate of Rs.20/- P.Sft will be paid.ii. For fixed pannels without guaze, reduce rate of Rs.150/- P.Sft.Iii. If box sections of 18SWG used, reduce rate of Rs. 25/- P.Sft.

Providing and fixing all types of glazed aluminium windows ofanodized champagne colour partly fixed and party sliding usingdeluxe section of approved manufacturer having Frame of size100mm x 30mm using frame at bottom, at top and side leaf leafframe sections of 60mm x 23mm at top & bottom and size 45mm x25mm at center and size 45mm x 25mm at sides, Jali leaf frame size43mm x 13mm i/c fine quality aluminum jali, 5mm thick importedtinted glass with rubber gasket using approved standard latches,wheel, stopper, brush chennel angle joint and hardware etc. completein all respect.

P/F MS box section of 16 SWG, having frames of 2” x 1-1/2” , leaveframe of T-type box section of 2”x1”x1” , with ½”x1/2” box sectionusing, U shaped rubber for fixing 5 mm thick glass panes i/c thecostof fixing of 24 SWG wire guaze on inner side by means of ½”x1/8”MS flat patti, MS grill fitted within the window frame and screwsincluding hinges, brass handles and painting 3 coats. Complete in allrespect

chapter-26( Misc) Page 161

Rates for all finished works include the removal of surplus debris, unused material and byproducts.

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

1 Notice board made of cement, sand mortar 1:3. Per Sft. 72.55 82.60 Per 780.65 888.90 The board is to be of cementsq.m plaster ½" (13 mm) thick, with 2"

(50 mm) wide and 1" (25 mm) thick beading.

2 Fixing handles to iron hammers. Each 92.80 - Each 92.80 -

3 Providing and fixing barbed wire fencing, with 4 horizontal 100Lft. 7,616.65 26,066.15 L.m. 249.90 855.20 Vertical bars in straining andand 2 number cross wires fixed with posts of R.C.C., 1:2:4 stiffening posts to be 4 No. each by(straining posts 7'x9"x9" (2.13 mx225x225 mm) at 100' ½" (13 mm) dia and for(30 m) centre to centre, stiffening posts 7'x6"x6" (2.13 intermediate posts to be 4 No. ofmx150x150 mm) at 50 ft. (15 m) interval and intermediate 3/8" (10 mm) dia Stirrups for allpost 7'x5"x5" (2.13 mx125x125 mm) at 8 ft.(2.4 m) centre posts to be ¼" (6 mm) dia. at 12"to centre), including cost of steel, its fabrication and (300 mm) centre to centre.placing of steel reinforcement, eye bolts, washers, etc.complete.

Surveying

4 Supplying Bamboo Jhandies 10' to 12' (3.00 to 3.65 m) with Each 44.90 174.65 Each 44.90 174.65 iron shoes, and flags 15" (375mm) square.

5 Supplying wooden pegs for levelling, 1½" (40 mm) dia, 6" 100Nos. 148.50 166.20 100Nos. 148.50 166.20 (150mm) long.

6 Supplying wooden pegs for alignment, 2" to 3" dia (50 to 100Nos. 356.40 560.35 100Nos. 356.40 560.35 75 mm), 9" (225 mm) long.

7 Fixing enamalled iron gauges flush with masonry, including Per Lft. 83.70 92.60 Per 274.55 303.75 cost of hooks. L.M.

8 Placing boundary pillars in position, including digging pits. Each 55.80 - Each 55.80 -

9 Fixing main line type distance mark in position, including Each 245.65 434.25 Each 245.65 434.25 Composite rate does not includemaking 1:3:6 cement concrete base block, size cost of iron distance marks.14"x10"x15" (350x250x375 mm).

Hand Pumps & Pressure Pipes

10 Cutting pipes, upto 2" (50 mm) dia. Per cut 55.80 - Per cut 55.80 -

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

26. MISCELLANEOUS

chapter-26( Misc) Page 162

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

11 Cutting pipe, above 2" (50 mm) dia. Per cut 101.5 0 Per cut 101.5 0

12 Threading pipe ends, 1½" (40 mm) to 4" (100 mm) dia. Each 70.65 - Each 70.65 - End End

13 Assembling 1½" (40 mm) dia pressure pipe. 100Lft. 258.15 - Per Metre 8.45 -

14 Boring and fixing 1½" (40 mm) dia pressure pipe:

a) in ordinary soil Per Lft. 90.75 - Per Metre 297.80 - b) in clay Per Lft. 178.85 - Per Metre 586.70 - c) in shingle Per Lft. 266.89 - Per Metre 875.60 -

15 Repairs to hand pump, pulling out and refitting. Per Lft. 40.20 - Per Metre 131.95 -

16 Fixing hand pump (Machine only) Each 178.20 - Each 178.20 -

Rest House Furniture & Fuel, etc.

17 Washing Niwar of bed. Per bed 587.05 622.35 Per bed 587.05 622.35

18 Washing Durries. 100Sft. 782.75 866.75 sq.m 84.25 93.30

19 Recaning chairs:

i) office chairs, single caning seat only. Each 311.85 347.55 Each 311.85 347.55 ii) office chairs, double canning seat only. Each 400.95 451.40 Each 400.95 451.40 iii) office chairs, single caning back only. Each 222.75 225.00 Each 222.75 225.00 iv) office chairs, double caning back only. Each 356.40 375.75 Each 356.40 375.75 v) easy chairs, single caning seat only. Each 222.75 270.65 Each 222.75 270.65 vi) easy chairs, double caning seat only. Each 623.70 695.15 Each 623.70 695.15 vii) easy chairs, single caning only, back and seat in one Each 891.00 1,185.15 Each 891.00 1,185.15

piece.viii) easy chairs, double caning back & seat in one piece Each 1,336.50 2,050.90 Each 1,336.50 2,050.90

or couches with caned area about 16 Sft (1.5 Sqm).

20 Making and fixing Hat pegs ordinary. Each 160.40 523.75 Each 160.40 523.75

21 Weaving charpoy. Each 579.15 - Each 579.15 -

22 Sweeping chimney. Each 130.45 131.75 Each 130.45 131.75

23 Picture railing, including making, fixing and painting. Per Lft. 45.90 113.85 Per LM 150.55 373.45

24 Cutting fuel wood, from plantation. 100Kg 174.70 - 100Kg 174.70 -

25 Splitting fuel wood. 100Kg 365.95 - 100Kg 365.95 -

chapter-26( Misc) Page 163

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

26 Burning charcoal, including loading, unloading and 100Kg of 592.40 - 100Kg of 592.40 - repairing kilns. Char- Char-

coal coal

27 Filling cement bags with coal and sewing (including cost 100Cft. 1,604.65 1,607.80 cu.m 566.75 567.85 of strings).

28 Supplying manure. Cart 195.70 331.65 Cart 195.70 331.65 Capacity of cart, 20 Cft. (0.57Load Load cu.m).

29 Washing punkha frills. Each 178.20 - Each 178.20 -

30 Washing:-

a) table cloth Each 44.55 - Each 44.55 - b) napkins, dusters, etc. Each 29.70 - Each 29.70 -

31 Hoisting and placing sleepers for centring, including Each 69.85 - Each 69.85 - carriage within one chain. No. No.

32 Dismantling sleepers from centring, including stacking Each 79.65 - Each 79.65 - within one chain. No. No.

33 Dredging Sumps. Per 2,935.35 - Per 2,935.35 - Not less than five gangmen to beShift Shift employed for each shift to ensure

effective dredging.

34 Fixing `U' bolt in masonry or concrete, including levelling Each 213.75 - Each 213.75 - and tying for fixing angle iron post.

35 Bailing out water:-

a) by hand 1000 Cft. 2,348.28 - cu.m 82.95 - Rate includes cost of providingb) by pump 1000 Cft. 261.55 451.65 ditto 9.25 15.95 pump, POL and operation charges,

etc.

36 Drilling holes in R.C. Trough. Per Nos. 139.50 - Per Nos. 139.50 -

37 Supplying and laying polythene sheet over D.P.C. under The rate includes overlaps.floors and on roofs, etc.

i) 300 gauge (.003" thick) Per Sft. 1.35 2.95 sq.m 14.40 31.55 ii) 500 gauge (.005" thick) Per Sft. 2.65 4.00 sq.m 28.75 43.15

38 Laying 2" (50 mm) thick sand and bitumen carpet, on top 100Sft. 1,545.80 5,636.60 sq.m 166.35 606.50 of foundation of oil tank.

39 Cutting hole 4"x6" (100x150 mm) in stone masonry or Per 239.10 - Per 239.10 - Same rate to be paid for other typebrick wall with chisel, repairing masonry and removing Hole Hole of masonry and R.C.C. work.debris within one chain lead.

chapter-26( Misc) Page 164

Sr. Description Rate (British System) Rate (Metric System) Spec. RemarksNo. No.

Unit Labour Composite Unit Labour Composite

MRS, 1st BI-ANNUAL-2018 (1st January-2018 to 30th June-2018) DISTRICT DERA GHAZI KHAN

40 Making 1½"x1½" (40x40 mm) groove in wall of stone or Per 209.20 - Per 209.20 - brick masonry in cement for fixing planks upto 9" (225 Plank Plankmm) deep.

41 Drilling holes in stone or brick masonry upto 2" (50 mm) Per hole 78.30 Per hole 31.30 dia, per inch (25 mm) depth. per inch per c.m

depth depth

42 Spraying anti-termite liquid mixed with water in the ratio of 100Sft. of 89.10 227.45 sq.m of 9.60 24.50 1:40. each each

spray spray

43 Providing and fixing barbed wire fencing, with 4 horizontaland two cross wires, with R.C.C. 1:2:4 posts, 5.5'x6"x9"(1.68mx150mmx225 mm) at 8 ft. (2.45 m) centre tocentre, reinforced with 4 No. 3/8" (10 mm) dia vertical barsand 1/8" (3 mm) dia stirrups 12" (300 mm) centre tocentre, complete in all respects.

i) without cement concrete base. 100Rft. 9,040.25 26,586.25 Per Metre 296.50 872.05 ii) in cement concrete 1:4:8 base of size 12"x12"x21" 100Rft. 9,944.40 29,037.50 Per Metre 326.20 952.45

(300x300x525 mm).