mark dorhmann - dorhmann consulting ltd - modifying and preparing the workplace for rtw

53
Ergonomics and Return to Work Mark Dohrmann Engineer, Ergonomist [email protected] www.ergonomics.com.au Melbourne, 29 July 2014

Post on 14-Sep-2014

251 views

Category:

Recruiting & HR


1 download

DESCRIPTION

Mark Dorhmann delivered the presentation at the 2014 Return to Work Forum. The 2014 Return to Work Forum brought together speakers from multiple sectors to share best practice in return to work, injury management and rehabilitation. For more information about the event, please visit: http://bit.ly/returntowork14

TRANSCRIPT

Page 1: Mark Dorhmann - Dorhmann Consulting Ltd - Modifying and preparing the workplace for RTW

Ergonomics and

Return to Work

Mark DohrmannEngineer, Ergonomist

[email protected]

Melbourne, 29 July 2014

Page 2: Mark Dorhmann - Dorhmann Consulting Ltd - Modifying and preparing the workplace for RTW

2

Page 3: Mark Dorhmann - Dorhmann Consulting Ltd - Modifying and preparing the workplace for RTW

Preparing tasks to enable return to work

It’s a matching process

Using ergonomic methods to analyse the Using ergonomic methods to analyse the task, then the person, then matching them

Examples

3

Page 4: Mark Dorhmann - Dorhmann Consulting Ltd - Modifying and preparing the workplace for RTW

Ergonomics –

a powerful tool!

Ergonomics means …Ergonomics means …

Fitting work to people

Using peoples’ capabilities

Respecting human limitations 4

Page 5: Mark Dorhmann - Dorhmann Consulting Ltd - Modifying and preparing the workplace for RTW

Ergonomics is concerned with:

Human size, shape

Strength and dexterity

The physical environment (light, noise, climate, vibration)vibration)

Thinking aspects (deduction, interpretation, understanding)

Learning and skilling needs

Communication into and out of the task

Social elements and needs5

Page 6: Mark Dorhmann - Dorhmann Consulting Ltd - Modifying and preparing the workplace for RTW

Ergonomics examines:

peoples’ size, shape

hand function

postures - ideal and actual

tasks – in detail

vision needs, light

hearing and noise hearing and noise

comfort over time

skills assumed or needed

fatigue and its causes

social and communication needs

work routines and systems

… and more …

6

Page 7: Mark Dorhmann - Dorhmann Consulting Ltd - Modifying and preparing the workplace for RTW

Understanding work

Analysing a task

Basics: what do they need to see? Touch? Basics: what do they need to see? Touch? Manipulate?

What knowledge and skills are needed?

7

Page 8: Mark Dorhmann - Dorhmann Consulting Ltd - Modifying and preparing the workplace for RTW

Step 1: analysing the task

Start simply

What does the person need to see?

(acuity, colors, focus, complexity)(acuity, colors, focus, complexity)

Touch?

(distance, grip, fingers, sensitivities, feet)

Control? (coordination, strength, comprehension)

8

Page 9: Mark Dorhmann - Dorhmann Consulting Ltd - Modifying and preparing the workplace for RTW

Step 1 (continued)

What needs moving?

(lift, push, pull, steer, climb, bend)

What has to fit?

(stature, arm length, extremes, legs, gear)

The environment

(light, noise, air, vibration, smell, weather)

What skill sets are assumed?

9

Page 10: Mark Dorhmann - Dorhmann Consulting Ltd - Modifying and preparing the workplace for RTW

Step 1 (continued)

Sustaining effort or attention

(repetition, breaks, endurance, attention)

Social elements

(team, public, language, co-workers)

Communication elements

(task –centred, group, radio, phone, other)

10

Page 11: Mark Dorhmann - Dorhmann Consulting Ltd - Modifying and preparing the workplace for RTW

11

Page 12: Mark Dorhmann - Dorhmann Consulting Ltd - Modifying and preparing the workplace for RTW

12

Page 13: Mark Dorhmann - Dorhmann Consulting Ltd - Modifying and preparing the workplace for RTW

Step 2: what are the persons capabilities … and limitations?

This process should mirror the task This process should mirror the task analysis, item by item.

13

Page 14: Mark Dorhmann - Dorhmann Consulting Ltd - Modifying and preparing the workplace for RTW

14

Page 15: Mark Dorhmann - Dorhmann Consulting Ltd - Modifying and preparing the workplace for RTW

15

Page 16: Mark Dorhmann - Dorhmann Consulting Ltd - Modifying and preparing the workplace for RTW

16

Page 17: Mark Dorhmann - Dorhmann Consulting Ltd - Modifying and preparing the workplace for RTW

17

Page 18: Mark Dorhmann - Dorhmann Consulting Ltd - Modifying and preparing the workplace for RTW

18

Page 19: Mark Dorhmann - Dorhmann Consulting Ltd - Modifying and preparing the workplace for RTW

19

Page 20: Mark Dorhmann - Dorhmann Consulting Ltd - Modifying and preparing the workplace for RTW

20

Page 21: Mark Dorhmann - Dorhmann Consulting Ltd - Modifying and preparing the workplace for RTW

21

Page 22: Mark Dorhmann - Dorhmann Consulting Ltd - Modifying and preparing the workplace for RTW

22

Page 23: Mark Dorhmann - Dorhmann Consulting Ltd - Modifying and preparing the workplace for RTW

23

Page 24: Mark Dorhmann - Dorhmann Consulting Ltd - Modifying and preparing the workplace for RTW

24

Page 25: Mark Dorhmann - Dorhmann Consulting Ltd - Modifying and preparing the workplace for RTW

25

Page 26: Mark Dorhmann - Dorhmann Consulting Ltd - Modifying and preparing the workplace for RTW

26

Page 27: Mark Dorhmann - Dorhmann Consulting Ltd - Modifying and preparing the workplace for RTW

27

Page 28: Mark Dorhmann - Dorhmann Consulting Ltd - Modifying and preparing the workplace for RTW

28

Page 29: Mark Dorhmann - Dorhmann Consulting Ltd - Modifying and preparing the workplace for RTW

29

Page 30: Mark Dorhmann - Dorhmann Consulting Ltd - Modifying and preparing the workplace for RTW

30

Page 31: Mark Dorhmann - Dorhmann Consulting Ltd - Modifying and preparing the workplace for RTW

31

Page 32: Mark Dorhmann - Dorhmann Consulting Ltd - Modifying and preparing the workplace for RTW

32

Page 33: Mark Dorhmann - Dorhmann Consulting Ltd - Modifying and preparing the workplace for RTW

33

Page 34: Mark Dorhmann - Dorhmann Consulting Ltd - Modifying and preparing the workplace for RTW

34

Page 35: Mark Dorhmann - Dorhmann Consulting Ltd - Modifying and preparing the workplace for RTW

35

Page 36: Mark Dorhmann - Dorhmann Consulting Ltd - Modifying and preparing the workplace for RTW

36

Page 37: Mark Dorhmann - Dorhmann Consulting Ltd - Modifying and preparing the workplace for RTW

37

Page 38: Mark Dorhmann - Dorhmann Consulting Ltd - Modifying and preparing the workplace for RTW

38

Page 39: Mark Dorhmann - Dorhmann Consulting Ltd - Modifying and preparing the workplace for RTW

39

Page 40: Mark Dorhmann - Dorhmann Consulting Ltd - Modifying and preparing the workplace for RTW

40

Page 41: Mark Dorhmann - Dorhmann Consulting Ltd - Modifying and preparing the workplace for RTW

Overuse strain checks:

Forceful actions

Unsupported or uncomfortable posture Unsupported or uncomfortable posture

Repetitive, unbroken pattern of movement

41

Page 42: Mark Dorhmann - Dorhmann Consulting Ltd - Modifying and preparing the workplace for RTW

Checking strength demands in a task:

NIOSH

2D and 3D Michigan 2D and 3D Michigan

Snook Tables

… more

42

Page 43: Mark Dorhmann - Dorhmann Consulting Ltd - Modifying and preparing the workplace for RTW

43

Page 44: Mark Dorhmann - Dorhmann Consulting Ltd - Modifying and preparing the workplace for RTW

44

Page 45: Mark Dorhmann - Dorhmann Consulting Ltd - Modifying and preparing the workplace for RTW

45

Page 46: Mark Dorhmann - Dorhmann Consulting Ltd - Modifying and preparing the workplace for RTW

46

Page 47: Mark Dorhmann - Dorhmann Consulting Ltd - Modifying and preparing the workplace for RTW

47

Page 48: Mark Dorhmann - Dorhmann Consulting Ltd - Modifying and preparing the workplace for RTW

48

Page 49: Mark Dorhmann - Dorhmann Consulting Ltd - Modifying and preparing the workplace for RTW

49

Page 50: Mark Dorhmann - Dorhmann Consulting Ltd - Modifying and preparing the workplace for RTW

50

Page 51: Mark Dorhmann - Dorhmann Consulting Ltd - Modifying and preparing the workplace for RTW

51

Page 52: Mark Dorhmann - Dorhmann Consulting Ltd - Modifying and preparing the workplace for RTW

52

Page 53: Mark Dorhmann - Dorhmann Consulting Ltd - Modifying and preparing the workplace for RTW

More information:

www.ergonomics.com.au

[email protected]

03 9376 1844

53