marine gangway - above dock · 2018-07-31 · project dimensions verifies a max barge elevation b...

2
MARINE GANGWAY - ABOVE DOCK (Includes Horizontal Tracking Units and Platform Mounted Gangways) COMMON FEATURES V Aluminum gangway with self leveling treads. V Hot dipped galvanized platform and track with bar grating walk surface. V Stainless steel control valve enclosure. V Float mode (powered gangways only) allows for the gangway to move with the vessel as its freeboard changes during loading/unloading operations. Typical Pivot Ranges*** +/- 15 degrees +/- 30 degrees Track lengths available** 10’ ~ 22’ In two foot increments. Gangway Operation**** Manual (up to 12* steps) Pneumatic (up to 24* steps ) Hydraulic (up to 34* steps) New Design! Breakaway steps from gangway for replacement eliminates the need to replace entire stand in case of collision with vessel. Simply inspect and replace fasteners. * Customization available upon requerst ** Track a platform allows for accommodation of tight fenderline distances with large vertical ranges. *** Pivot allows for minor adjustments to landing zone without the need to move vessel 90 Degree Storage Available Widths Available* 24” 36” PO Box 511 211 N. Koppers Road Florence, SC 29503 Tel: 843.679.6888 Fax: 843.679.6889 Toll Free: 888.257.5955 www.safe-harbor-marine.com

Upload: others

Post on 17-Jul-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: MARINE GANGWAY - ABOVE DOCK · 2018-07-31 · Project Dimensions Verifies A Max Barge Elevation B Min Barge Elevation C Dock Face to Fender Line D Max Drift From Fender Line E Dock

MARINE GANGWAY - ABOVE DOCK(Includes Horizontal Tracking Units and Platform Mounted Gangways)

COMMON FEATURES V Aluminum gangway with self leveling treads.

V Hot dipped galvanized platform and track with bar grating walk surface.

V Stainless steel control valve enclosure.

V Float mode (powered gangways only) allows for the gangway to move with the vessel as its freeboard changes during loading/unloading operations.

Typical Pivot Ranges***

+/- 15 degrees +/- 30 degrees

Track lengths available**

10’ ~ 22’ In two foot increments.

Gangway Operation****

Manual (up to 12* steps)

Pneumatic (up to 24* steps)

Hydraulic (up to 34* steps)

New Design!

Breakaway steps from gangway for replacement eliminates the need to replace entire stand in case of collision with vessel. Simply inspect and replace fasteners.

* Customization available upon requerst

** Track a platform allows for accommodation of tight fenderline

distances with large vertical ranges.

*** Pivot allows for minor adjustments to landing zone without the need to move vessel

90 Degree Storage Available

Widths Available*

24” 36”

PO Box 511 211 N. Koppers Road Florence, SC 29503Tel: 843.679.6888 Fax: 843.679.6889 Toll Free: 888.257.5955 www.safe-harbor-marine.com

Page 2: MARINE GANGWAY - ABOVE DOCK · 2018-07-31 · Project Dimensions Verifies A Max Barge Elevation B Min Barge Elevation C Dock Face to Fender Line D Max Drift From Fender Line E Dock

Project Dimensions Verifies

A Max Barge Elevation

B Min Barge Elevation

C Dock Face to Fender Line

D Max Drift From Fender Line

E Dock Clearance ~ Depth

F Dock Clearance ~ Width

G Max Overhead Clearance

H Parked Clearance to Fender Line

I Dock Curb Width

J Dock Curb Height

K Max Distance Onto Barge

L Min Pivot Range

Gangway Power Options

Manual Spring Balance OperationLimited to shorter gangway lenths only

Pneumatic OperationAvailable Pressure: < 60PSI 60 ~ 80PSI 80 + PSI

Hydraulic OperationAvailable Voltage: 120 / 1 / 60 VAC 230 / 460 / 3 / 60 VAC Non-Classified ~ NEMA 4/3R Classified ~ NEMA 7 & 9 / CL 1, DIV 2, GRP C & D

Other Gangway Options

Gangway Width 24" Wide Standard 36" Wide

Tracking Drive Manual (Smaller Units) Powered

Live Load Capacity 500 # 750# 1,000 #

Gangway Hardware Plated Steel Stainless Steel

PO Box 511 211 N. Koppers Road Florence, SC 29503Tel: 843.679.6888 Fax: 843.679.6889 Toll Free: 888.257.5955 www.safe-harbor-marine.com

Plan View

Elevation View

MARINE GANGWAY - ABOVE DOCK(Includes Horizontal Tracking Units and Platform Mounted Gangways)

Above Dock Below Dock

Above Dock Below Dock

DO

CK

CLE

ARAN

CE

WID

TH

MAX OVERHEAD CLEARANCE

PARKED CLEARANCE

MAX BARGE EL

MIN BARGE EL

PARKED POSITION

ICURB WIDTH

DOCK CLEARANCE DEPTH

DOCK CLEARANCE DEPTH

CURB HEIGHT

DO

CK

FAC

E

DO

CK

FAC

E

FEN

DER

LIN

E

CURB MAX DRIFT

MAX DRIFT

MAX DISTANCE ONTO BARGE

DOCK MOUNTED

TRACK

LMIN PIVOT

RANGE

LMIN PIVOT

RANGE

TRACKING BASE W/PIVOT

F

G

H

A

B

E

EJ

I C

C

D

D

K