marine core service my ocean myocean sam, 27-28 april 2011, rome, italy wp 6 monitoring &...
TRANSCRIPT
MarineCore
Service
MY OCEAN
MyOcean SAM, 27-28 April 2011, Rome, Italy
WP 6Monitoring & Forecasting
Center for Baltic
Nicolai Kliem
Presented by Jun She
Danish Meteorological Institute
Marine Core Service
Reminder - Partnership
DMI
Danish Meteorological Institute
SMHI
Swedish Meteorological and Hydrological Institute
FMI
Finnish Meteorological Institute
MSI
Marine Systems Institute
BSH
Bundesamt für Seeschifffart und Hydrographie
Marine Core Service
Reminder - Partnership
WP 6Baltic Sea MFC
(coordination DMI)
R&D DevelopmentMaintenance
Production CalVal
BSHDMIFMISMHI
BSHDMIFMISMHI
BSHDMIFMISMHI
BSHDMIFMIMSISMHI
Marine Core Service
Reminder - Objectives for R&D
Main objective was Integrate existing Baltic Sea 3D models into one
operational forecasting system Integrate best practice for code for V1 stream 2 Develop assimilation schemes for Sea Ice, SST & T/S Choose and calibrate bio-module
Main issues Combine forces in model code development Same code, different set-ups
Marine Core Service
R&D : main achievements
Main achievements, model code
New updated model code for V1 (stream2)• Code freeze: Sep 2010
• Bugfixing, testing etc• Release: Nov 2010
• Validation simulation for 2007-2008• Validation report: Feb 2011
Main achievements, data assimiliation
• Data assimilation schemes has been developed and implemented • Operational production V1 will assimilate SST and sea ice
concentration• Re-analysis will assimilate T&S
Marine Core Service
Sea surface temperature on April 24, 2005
Observations
With EnOIWithout DA
Development of data assimilation at DMI
Marine Core Service
Combination of information via data assimilation (PDAF, SEIK Filter)
Improved analyses and forecast of e.g.
- SST- Ice cover
SST: satellite (AVHRR)SST: simulation (BSHcmod)
Development of data assimilation at BSH
Marine Core Service
Status of model code
Code revision through Subversion DMI version has formed the base code New features:
Generalised representation of hydrostatics and pressure gradient force
Dynamic vertical coordinate Short-wave penetration Improved wind stress parameterization Improved submodel coupling interface (e.g. to eco-model) 6-hourly scheduling
Marine Core Service
Reminder - Objectives for Dev. & Maintenance
ObjectivesImplement the Baltic MFC V1
Steps/issues– Define product standards– Interfaces with TACs and MFCs– Tools for post processing and delivery– Code maintenance– Documentation– Technical and product validation
Marine Core Service
Dev. & Maint. : main achievements
Main achievements are • New model for V1 stream2• SVN repository for code exchange• Documentation of code and environment on web• Discussed interface with NWS MFC• V1 structure by consortium approach
Main difficulties Making sure that we are all strict applying same model, same
standards etc.
Remaining tasks Launch of V1 stream2 Model adjustments for V2
Marine Core Service
Reminder - Objectives for Production
Objectives for V1– Real time production by 4 Pus– Min. two PU run with DA SST & ice– Min. two PU run with bio-module– Consolidate into one forecast– Re-analysis (20 years with DA T/S)
Objectives for V2– Multi-model ensemble prediction
Marine Core Service
Production : main achievements
Main achievements are V0:
– Baltic V0 products on ftp & THREDDS servers– User requests handled
V1:– V1 system has been set up– Incidents handled by DMI 24/7-staff– Requests handled by DU (DMI)– All PU has set up their own service desk by email
V1 Remaining objectives – Re-analysis in progress
Marine Core Service
Examples of Products
Objectives for V1• Twice daily 60 hour forecast • Re-analysis (20 years with DA T/S)
Marine Core Service
Reminder - Objectives for Cal / Val
Objectives Calibrate bio-module Validate opr products Validate re-analysis
Issues Several PUs to follow same procedure
Marine Core Service
Cal/Val : main achievements
Main achievements Validation period for 2007-2008 Simulation done by 3 PUs Extensive report showing Product Quality
Main difficulties Lots of data transferred and lots of plots produced.
Remaining tasks Same task (reduced no of figures) for V2
Marine Core Service
Monthly mean surface current July in 2007
Sea level validation 2007-2008
Marine Core Service
Sea level validation: comparison between Pus, 2007-2008
RM
SD
Marine Core Service
DMI Sea level validation: correlation vs RMSD
Marine Core Service
Stations used for T/S profile validation
Marine Core Service
Examples from validation simulation 2007-2008
Marine Core Service
Examples from validation simulation, Arkona Basin, Temperature 2007
Marine Core Service
Examples from validation simulation , Arkona Basin, Salinity 2007
Marine Core Service
Scientific Challenges– Improve vertical mixing modelling– Assimilation: T/S profiles, sea ice– Ecomodel Cal/Val– Multi-model ensemble– Optimise ice model
Main Scientific Challenges
Marine Core Service
Technical Challenges– Coordinate data flow among partners– Implement the best practices in a single model
Operational Challenges– Responding on User Requests
Ultimate Challenges– There are already many operational models for the Baltic among
MyOcean partners and outside MyOcean. It is important to coordinate MyOcean activities to show the benefit and better quality for all users of MyOcean products.
Future Challenges
Marine Core Service
Past (event, work or tasks achieved) :– June 2009 : release 0.1 of HBM– January 2010 : first report of 3DVAR– November 2010 : release 1.0 of HBM– February 2011 : model HBM integrated and tested
Future :– (May/)June 2011 : V1 stream2 operational– October : Release 2.0 of HBM– December : Re-analysis in MyOcean catalogue and available for
external users
Calendar
Marine Core Service
WP 11EXPENSES
Actual(March2010)
Variance versus Budget Comments
K€ K€ %
Coordination + 5 + 10% More…
R&D - 10 - 2% Less…
Dev/Maint.
Production
Cal/Val
WP
Coordination
1st reporting period : Budget
Figures will be provided by PMO
as soon as your partners have
finished reporting and will be
added to your presentation.
Be ready to give short
explanations on main deviances
during your presentation...
We are talking about estimated
budget (best estimates) !
~ 2 mn
MarineCore
Service
MY OCEAN
MyOcean SAM, 27-28 April 2011, Rome, Italy
Thank you!