Introduction:
This report outlines the results of my observation in various departments at
Anjani Portland cements Ltd during our induction programme. We went
through various departments, technical and non-technical, and have collected
detailed information on their respective functions and their impact on the
outcomes of the company. I have made an attempt to describe some of the
things I came across during the course of time.
Non-Technical:
We went to non-technical departments like P&A, Time office and weighbridge,
stores, A/C and sales.
In TO and WB, we learned they way the company keeps track of the in time
and out-time of their employees. We also learned the different shifts the
company follows and their respective timings. We also learned the conditions
for applying leave and different types of leaves an employee can have. Theweighbridge measures the loads of the trucks while coming in and going out
thus having an idea of input raw materials.
During our visit to P&A office we learned that they are responsible for
maintaining health and safety of employees, their recruitment and training for
increasing their potential and safety. Environmental safety also comes under
their supervision.
In stores they have the items that are constantly needed for the industry and
other regular items like nuts and bolts, bulbs etc... They always use standard
items so that they can have them for longer periods of time.
We also visited the accounts department which majorly deals with cash, banks,
and journals. They coordinate with all other departments and have a detailed
record of production parameters, number of workers, work completion, pay
sheet by personnel. Though the budget is prepared by HODs, this department
takes care of the effective implementation of the plans.
-
7/30/2019 Manufacturing of Cement
4/22
~ 4 ~
Sales department deals with orders of the customers and supplies appropriate
amount of material to them will be a sales representative of the company for
each region.
Different stages involved in the process of cement manufacturing are alsocovered in the induction programme. We are also a brief description on the
different machines used in the process like crusher, raw mill, kiln etc...
We also visited different technical departments like mechanical, electrical and
instrumentation. We visited workshop in mechanical engineering department
and learnt different basic machines like lathe, shaper, grinding machine. In the
electrical department we were explained how the power distribution is done in
the plant.
Personnel and Administration (P&A) office:
P&A office ensures that whether all the activities in the
company are going on according to the schedule or not. Any deviations from
the programme are corrected by them.
Three ISOs are followed in the plant. They are:
1. Q.M.S : Quality Management System 9001 ISO
-
7/30/2019 Manufacturing of Cement
5/22
~ 5 ~
2. E.M.S: Environmental Monitoring System 14001 ISO3. O.H.S: Organisational Health Safety 18001 ISO
The P&A department in the factory monitor these isos.
Other functions of the P&A department are briefly described below:
The department helps employees to maintain good behaviour byconducting programmes like yoga, counselling.
It makes sure that each and every employee in the organisation followssafety rules thereby prevents accidents.
P&A department maintains the employees insurance details and takesat most concern about the health of the employees.
P&A prepares the pay sheet and submits it over to the accountdepartment.
It prepares the vehicle bills. It conducts the welfare activates in the factory. It provides training to the employees to do their work efficiently. Training is provided for the career development of the employees.
Time Office and weigh bridge:
Time office: Time office mainly keeps a record of in/out timings of the
employees. Proper software is maintained for this in which the employees
have to scan their identity cards with the machine available in time office and
their in/out timings are loaded automatically. They will maintain the details of
only the employees who have their names in according to form25 muster roll.
-
7/30/2019 Manufacturing of Cement
6/22
~ 6 ~
These employees will be having four types of shifts and the timings for
different shifts are stated below:
A shift:- 6:00am to 2:00pm
B shift:- 2:00pm to 10:00pm C shift:- 10:00pm to 6:00am General shift:-8:00am to 5:30pm (lunch break from 12:00noon to
1:30pm)
Employees working in A, B, C shifts should leave only after the entry of the
employee of the next shift. General shift employees will have weekend
holidays, national holidays, and public holidays.
Time office also keeps a record of the employees leaves. Leaves are classified
as
Sick leaves Casual leaves Personal leaves
Every employee has to submit a leave card in the time office after the approval
from the HOD of the concerned department.
Weigh bridge: Their main function is to keep a record of amount of raw
materials, fuel that was taken into the company and also the amount of
cement leaving the plant.
For raw materials /fuel, they will note the weight of the loaded
truck, after unloading they will take the weight once again and calculates the
net weight of the raw material/fuel. They enter the net weights of different
raw materials and will save them. For cement first they will note down the
-
7/30/2019 Manufacturing of Cement
7/22
-
7/30/2019 Manufacturing of Cement
8/22
~ 8 ~
Main costs and drains in production and respective measures to be taken to
reduce them even at the lowest level are taken care by accounts. For e.g., coal
makes up for around 50% of the total cost of production while the other raw
materials doesnt cost much so decreasing the cost for coal other means of
energy sources reduces the cost of cement by more than 10%.
They maintain records of each department separately and all the respective
costs are submitted to HO (Head Office).
Stores Department:
Stores department coordinate with purchase department to have an
effective transport from various vendors for clearance of goods at different
transports and unloads them after reaching the company. They cheques
quantities of goods physically with respect to document and moves them to
appropriate area where it is to be stored. They classify the materials according
to departments and stores at different places. They protect material against
deterioration and damage.
They will keep the material according to their consumption levels.
From their analysis only 5% of the total material contributes to 70% of total
annual consumption, 20% contribute to 25% of the value and 75% of the items
contribute only 5% to the consumption value. So, they separate the material
according to their consumption value and store them with relevant locations.
Stores department has to coordinate with different department in
their functioning. In planning the targets of production availability of the
materials plays a vital role. They will provide accurate quantities of the
materials available. It keeps a track on the receipt of the purchase goods and
avoids any delay in the receiving of the purchased goods. Wrong
-
7/30/2019 Manufacturing of Cement
9/22
~ 9 ~
supply/rejections/damages are reported to purchase section. They submit the
receipts of various purchases to the purchase section daily.
It has to process the received goods through inspection andidentification marks are made ass advised by inspection department to avoid
mix up of rejected and accepted goods. It forwards the details of the receipt
and their inspection results to finance department for making payment the
suppliers, transporters, customs duty etc. They also inform the accounts
department about the results of stock verification of material for making
necessary book adjustments.
They also maintain the materials required by the personnel
department like stationary items, canteen furniture and others. They supply
the material needed in different areas to personnel department. They supply
the spares and material required by plant maintenance team and assists them
in maintaining the plant safely. The main objective of stores department is to
supply the necessary material required by the production department.
Materials have to be issued to the production department according to the
production programme released PPC within the shortest time to avoid any loss
of production time.
The stores department has to ensure that the materials which
have been carried into store are made available whenever they are required. It
follows the FIFO method for the issuing of the goods to the different
departments. It makes the storing facility in three types
Main store which keeps all new items only. Secondary Godown, keeps separately once used items with
identification tags and used only in emergencies.
-
7/30/2019 Manufacturing of Cement
10/22
~ 10 ~
Scrap yard, once used the items will be scraped thorough intoscrap yard.
Disposal of scrap is also one of main functions of the storesdepartment. Once in 6 months advertisements are given for all items to be
scrapped for receiving tenders. Stores assistant prepares a competitive
statement from the tenders received and submits it to the superiors and a
contractor with higher price is awarded the contract. Stores in charge ensure
that the contractor lifts all the scrap within the scheduled time.
For the transportation of materials from one place to another
it uses different material handling equipment like
Fork link trunks Platform trailers Chain pulley blocks
Sales Office:
The main function of Sales department is to take orders from the
customers and supply accordingly. There will be a sales representative for each
district. There are four sales representatives for Hyderabad region. These sales
representatives take orders from the customers and send their details to the
-
7/30/2019 Manufacturing of Cement
11/22
~ 11 ~
head office. Head office gives instructions to the production units in the
nearest places.
Sales office has to follow the instructions given by the headoffice and has to deliver the load at the particular within a given span of time.
They have to maintain the details of the load leaving from the plant and submit
them to the accounts office.
In the case of the bulk orders they have to properly coordinate
with the customers and should deliver the load in certain intervals of time as
the production unit cannot produce huge amounts in a short period of time.
They maintain proper records of the orders coming and the amount of the load
delivered and ensures that the orders are delivered properly.
-
7/30/2019 Manufacturing of Cement
12/22
~ 12 ~
Manufacturing of cementProcess description
1) Mines:
Anjani Portland Cement Ltd took a land of 142.14 acres for lease from
the Government. There are four benches in the mining area. Breadth of each
bench is 15m and its height is 3m. As we go down that means as the depth
increases the concentration of limestone increases. Holes are made using
drilling machines. Explosives are used to blast the mines. Depth of drilling can
be up to 5m.Drilling is made in such a way that the size of the limestone should
not be more than 1m.Mining area is at a distance of 8km from the plant.
2) Limestone crusher:
The crusher is meant for crushing the limestone from one
meter size to less than 10mm.Crushing process consists of Primary Crusher
followed by secondary crusher. Primary crusher and secondary crusher consist
of vibrating screens. They act as sieves. Primary crusher crushes the limestone
from one meter size to 70mm.Secondry crusher is meant for further crushing
of the limestone from 70mm to less than 10mm.
The capacity of the crusher is 40TPH.The crushing unit
consists of buildings, control room, feeding hoppers, feeding equipment,
conveyors, galleries, platforms, hand railing, de-dusting equipments,
foundations etc...
-
7/30/2019 Manufacturing of Cement
13/22
~ 13 ~
3) Limestone stock pile and transportation:
The crushed limestone of size less than 10mm is
transported through conveyor to the Limestone Stock Pile to stack under
covered shed through Tipper conveyor. From the Limestone stock pile material
with uniform quality will be transported to Hopper through Belt conveyor.
This entire process consists of Control room, Feeding and
Transport conveyors, Galleries, Platforms, Hand railings, Bag filters at all
transfer points to control dust emissions etc.
4) Additives crusher and transportation:
The crusher is meant for crushing the Laterite an Iron ore
to less than 10mm size and it will be stored in Additives stock pile under
covered shed. From additive stock pile material is conveyed to Additive
hoppers through belt conveyers.
5) Raw mill & raw meal preparation:
Raw mill is a Ball mill meant for grinding the limestone,
Laterite, and iron ore of size below 10mm to less than 212 micron size. Thispowdered material is called Raw meal and is transported to storage silo.
The Raw meal preparation process is consisting of feed
hoppers, weigh feeders, conveyers, supports for conveyers, control room,
Bucket elevators, Cyclone separator, coarse and fine particles separation
equipment, pollution control equipment, foundations, platforms, railings and
metal detectors, separators etc..
-
7/30/2019 Manufacturing of Cement
14/22
~ 14 ~
6) Blending silo & kiln feed extraction system:
Storage silo is of concrete construction meant for storage of
the raw meal powder produced by raw mill and also to facilitate blending
through aeration system to homogenize and maintains consistent quality of
raw meal. Homogenized raw meal from the silo transported to kiln feed bin.
From the kiln feed bin, the raw meal conveyed to the top of pre heater
through bucket elevator.
This entire process consists of silo, kiln feed storage bin, level
indicators, solid flow feeder to know the feed rate, bucket elevators, air slides,
bucket elevator support tower, feeding and transport conveyors, galleries,
hand rails, aeration blowers, compressors, pollution control equipment and
foundations.
7) Coal crushing and Transportation:
Coal is main fuel for manufacturing the clinker from RAW MEAL. The raw coal
from the coal hopper is conveyed to coal crusher through series of belt
conveyors. The coal crusher is meant for crushing the raw coal of size less than
200mm to less than 10mm.Crushed coal is conveyed to Coal Mill hopperthrough belt conveyers.
This entire process consists of covered sheds, feeding hoppers, crusher, control
room, platforms, feeding and transport conveyers, galleries, hand railing,
pollution control equipment, foundations etc.
-
7/30/2019 Manufacturing of Cement
15/22
~ 15 ~
8) Coal mill, Fine coal preparation & Fine coal transportation
to Kiln and Calciner:
Coal mill is meant for pulverizing the crushed coal of size
less than 10mm size to below 212 micron size. Pulverized coal is called fine
coal. It is transported to fine coal bins. Fine coal pneumatically conveyed by FK
pumps and is fed to kiln and Pre-calciner.
Entire process consists of Ball mill, Grit separator for
separating fine and coarse material, building with control room, bins, blowers,
weigh feeders, FK pumps, pollution control equipment etc.
9) Pre-Heater:
Pre-heater is a 7 storey building with Pre-calciner,
cyclones, mixing chamber, feed pipes and ducts. Kiln feed enters at a duct
connected between 2nd and twin cyclones. This kiln feed is heated from 70
degrees to 1000 degrees in pre heater itself. Hot gases from the kiln and fine
coal fired in pre calciner will be utilized to heat the kiln feed to 1000 degrees
before it enters into the kiln. In the pre-calciner up to 92% of calcinations of
kiln feed takes place. Calcination is dissociation of limestone into lime and
carbon dioxide.
The pre heater consists of 7 storey building, steel cyclones,
steel ducts, steel chutes, flap valves, gates, doors, bucket elevator, platforms,
hand railing, de dusting equipment, refractory bricks, blowers, compressors,
fans, RCC floors and foundations.
-
7/30/2019 Manufacturing of Cement
16/22
~ 16 ~
10)Rotary Kiln:
Kiln is a long, steel tubular structure with refractory lining
and is placed on support rollers to rotate at required speed. The hot material
which is heated in pre-heater up to 900 degree centigrade enters in to kiln
inlet. The kiln will be in rotating condition with controlled speed and with
pumping of fine coal and air from outlet of the kiln. The entered hot material is
converted at 1350-1400 degree centigrade to clinker after passing through
various phases. The hot clinker is discharged in clinker cooler for further
cooling.
This process consists of steel shell, supporting rollers, and
refractory bricks, drive motors, gear boxes, burner pipe, shell cooling blowers,
gas analyzers, panels and control room.
11) Grate cooler and ESP:
The cooler is meant for cooling hot clinker which is
discharged from kiln with 1100 to 150 degree centigrade by centrifugal fans.
Ambient air is pumped in to cooler through fans at bottom side of grate pass
through hot clinker bed. During the process the ambient air gains heat because
of heat exchange between hot clinker and ambient air. Part of hot air enters in
to kiln as secondary air at 1000 degree centigrade and tertiary air at 800
degree centigrade in to pre calciner and remaining hot air passes through ESP
to ID fan. The clinker moves on grate plate mechanism and by the time it
reaches clinker discharge, the hot clinker cools down. The cooled clinker passes
through a clinker breaker and transported to clinker stock pile by means of
conveyors. The cooler exit gas containing clinker dust passes through ESP
-
7/30/2019 Manufacturing of Cement
17/22
~ 17 ~
(Electro Static Precipitator), where clinker dust is separated and clean air is
exhausted by ID fan through Chimney.
This process consists of grate plates, moving mechanism,fans, hydraulic power pack, drive motors, gear boxes, refractory lining, clinker
breaker, air blasters, deep pan conveyor, bag filters, ESP etc.
12) RABH & Bag Filters:
RABH (Reverse Air Bag House) is de-dusting equipment which
separates dust from pre-heater exhaust gases. The kiln exhaust gas passes
through pre-heater and pre-heater fan and then it enters in to RABH. Here dust
gases are separated and clean gas went out where as the dust collected taken
back in to process.
The entire process consists of control room, building, steel
structures, bin, steel casing, conveyors, filter bags, fans, blowers and drag
chain.
Clinker Stock Pile (CSP):
Clinker stock pile is a closed shed, where clinker is stored. It
is also useful for protecting clinker from rain and to reduce the dust emission
while handling. Clinker discharged from cooler is transported to CSP by
conveyors further the clinker i transported to cement mill hoppers through
underground conveyors.
CSP consists of civil structures, steel structures, conveyors
and pollution control bag filters fans and clinker extraction chutes.
-
7/30/2019 Manufacturing of Cement
18/22
~ 18 ~
Fly ash & Gypsum storage and handling:
Fly ash stored in a closed silo having MS hopper where as
gypsum is stored in covered shed to protect from rain. These materials are
added to clinker as per required percentage in the process of cement grinding.
Gypsum is conveyed to cement mill hoppers by Terex as and when required.
This system consists of shed, conveyors, and hoppers.
Cement mill hoppers:
Cement mill hoppers are of concrete structures and is meant
for storage and feeding of clinker and gypsum to facilitate consistent feeding
to mills through weigh feeders and conveyors.
Cement Mills:
Cement mill is meant for grinding the clinker, fly ash and
gypsum to a powder form around 320Sq.m/Kg. This fine powder is called
cement and it is transported to storage silo through conveyors.
The cement mill circuit consists of ball mill, building, control
room, bucket elevator, classifier, cyclones, bag filters, fans, supporting
structures, hand rails, blowers, compressors etc.
Cement silos:
Cement silo is a concrete structure and meant for storing
the cement. The cement is transported from silo to packing plant for bagging.
It consists of aeration system blowers, compressors, bucket
elevators, air slides, supporting structures and bag filters etc.
-
7/30/2019 Manufacturing of Cement
19/22
~ 19 ~
Packing Plant:
Packing plant is meant for packing the cement into bags
and transports the packed bags in the trucks.
The packing plant circuit consists of rotary packing
machine, buildings, control room, bucket elevator, air slides, belt conveyors,
screen, bin, fans, level indicators, supporting structures, bag filters etc.
Bulk loading system:
Bulk loading system is meant for loading cement to bulk
tankers. It consists of Hopper, Air slides, blowers, supporting structures etc.
-
7/30/2019 Manufacturing of Cement
20/22
~ 20 ~
TECHNICAL DEPARTMENTS:
Electrical & Instrumentation department:
Electrical department mainly deals with
distribution of power in the industry and the operating conditions of various
electrical machines. Anjani Portland Cement Ltd. receives three phase power
of 132kV from the Government power substation. Three phase power of 132kV
from the Government substation directly reaches the SWITCH YARD of the
company. In the switch yard it is stepped down to 6.6kV. This 6.6kV is directly
given to the various substations present in the industry. From the substations
power supply is given to the LOAD CENTRES.
Transformers of various ratings are used in the power distribution. These
transformers give maximum efficiency at 50-65% of maximum load.
Depending on the requirement of the load 6.6kV can be further stepped down
to 3200V or 440V or 110V etc. using step-down or step-up Transformers. At
each and every sub-station, load centre, and at switch yard CT (Current
Transformer) and PT (Potential Transformer) are used to measure the supply
current and supply voltage. Special wire is being used to prevent surges in the
Transformers which are caused due to lightning, thundering etc. Transformers
are being earthed to prevent shocks. In general LV (Low Voltage) side of the
Transformer is earthed.
Special devices like relays are being used to detect the surges (high currents
and high voltages). Mostly Induction Motors are being used in the industry.
Even DC Motors are being replaced with Induction Motors. Capacitive banks
are used to improve the PF (power factor) of the motors. Maximum power
factor reached is around 0.997.
-
7/30/2019 Manufacturing of Cement
21/22
~ 21 ~
LRR (Liquid Rotor Resistor) is used to vary the speed of the motor in starting
condition. VVVFD (Variable Voltage Variable Frequency Device) is used to
change the speed of the motor in running condition.
WORKSHOP:
Workshop mainly deals with repairing the damaged parts that were used in
machines and also designing the new parts according to the requirements.
There are all basic machines that should be present in a workshop and some
work specific machines that are specially used in a cement industry. The
following are the machines present in workshop here in Anjani Cements.
Grinding machine Drilling machine Bench vice Lathe Pipe Vice Shaper machine Power axe-saw Bending machine
The most important machine used in workshop is a Gear Motor. It is a
combination of Gear box and a normal motor. It is used to vary the speed of
the motor depending on the requirement of the machine. The input rpm given
to the motor is called drive and the output taken is called driven. The ratio
of the gear motor is calculated by dividing drive with driven. We can even
change the direction of rotation of resultant driven by using ODD or EVEN
number of gears. By using even numbers of gears we can reverse the direction
of driven to that of drive and vice versa.
-
7/30/2019 Manufacturing of Cement
22/22
~ 22 ~
There are also rotary feeders which help in locking air. Also there are different
types of drives such as belt, chain, gear drives etc Gear drives are used for no
loss condition and depending on required output belt and chain drives are
used.
Acknowledgement:
The following people helped us in respective areas in completion of this report.
P&A Mr.Varma
TO & WB Ramaiah
Stores, A/C, Sales Sr. Mgr Stores, Mgr A/c, Dy. Mgr Sales
Crusher Mr. M.purushottam, Mech eng
Mines Mr. Ramachandram, sr.Mgr
Workshop Mr. PSN Raju
Raw Mills, Kilns, Mills Mr. Subbarao
Packing Plant Mr. P.Subbaraju
ELE & INST Mr. DV Subbaraju