manufactured treatment devices pilot update 2014
TRANSCRIPT
Manufactured Treatment Devices
Pilot Update2014
Types of MTDs?
HydrodynamicSeparators
Car t r idgeF i l te rs
B iofi l t ra t ionIn a Box
TrashCapture
Why MTDs?
• Small footprint
• Retrofit opportunities
• Less costly
• Simple maintenance routine
• Reduced system maintenance
Déjà vu?
• “Traps” installed in early ‘90s• 16 routes/170 inlets proposed• 3 routes/~80 inlets remain
• Renewed focus in downtown Shoal & Waller creeks◦ Lower Shoal Seaholm Redevelopment District◦ Waller Creek District Surface Improvements
• Watershed Capital Projects◦ Lower Shoal Stream Restoration $4M◦ Lower Shoal WQ Retrofit $500k◦ Waller Tunnel & Improvements $149M◦ Waller WQ Retrofit $2.5M
• Lower Shoal PER
Background
Bio C leanIn le t Basket
Bio Clean Inlet Basket
Pilot
• One year• 7 locations• 6 week schedule• Data collected
o Timeo Weight
In service…
6th @ Trinity
Barton Springs
@ S. 1st
Vermiculture?
A helping of leaves with your trash
Ick-factor
Findings
17 Traps 17 Baskets# minutes per route 30 272# visits per year 52 12# of crew per visit 4 2manhours per year 104 109full time equivalent (FTE) .05 .052
labor cost/ yr @ $19.28/hr $
2005 $
2098lbs collected per year 1326 4284
$/lb collected $
1.51 $
0.49
Field ops data
6th street trap route
Extrapolated
pilot data
Pilot Report