manual for storage tent arched plus 9,15x20x4,5m pvc · 9.15x20x2x4.5m arched plus part number...
TRANSCRIPT
30-11-2017
forStorage Tent Arched Plus
9,15x20x4,5m PVC
Manual
Safety Advice AttentionIn some countries approval is needed to set up a marquee/tent larger than 75 m2. It is your responsibility to comply with local rules and regulations and to ensure that the marquee/tent is assembled correctly.
In case of bad weather conditions, it is your responsibility to ensure the marquee/tent is safely secured and that the marquee/tent does not cause damage to others.
close to the tent.
The marquee/tent must be safely secured. We recommend you secure your marquee/tent with straps and pegs as soon as it is assembled.
Make sure to check if the marquee/tent is covered by your home contents insurance.
Marquees/tents must be evacuated under extreme weather conditions.
In the event of snow always remove snow from the roof of the marquee/tent regularly to prevent snow from building on the roof as heavy snow can cause the marquee/tent to collapse.
In the event of rain there is a risk of rain puddles building up on top of the roof of the marquee/tent. Heavy rain puddles can cause the roof to collapse. It is your responsibility to ensure rain puddles do not build up. As a precaution, make sure the roof of the marquee/tent is stretched out properly and adequately over the side frames of the marquee/tent and remove rain water regularly.
Do not unpack or repack your marquee/tent in freezing temperatures. In case of temperatures below zero always unpack and repack your marquee/tent indoors to avoid the risk of cracking parts.
The marquee/tent must be totally dry before you repack and store it to avoid mildew.
Warranty InformationPlease visit dancovershop.com for information on warranty.
Maintenance: You must regularly check and retighten all assembly points of your storage shelter or garage tent. It is especially important to retighten the roof cover 1 month after having erected your shelter or tent. The roof cover of your shelter or tent must always be tensioned to withstand wind and weather.
Please always check our website for the latest safety advice and manual l.
This structure is not tested for snow and wind loads. We always recommend that you remove snow from the roof. This is a none-permanent structure.
Assembly Illustration
For “user friendly” assembly we have identified each individual component
with our partcode number as indicated in the part list.
Please refer to the part code number and drawings to ensure problem free
assembly.
30-11-2017
9.15x20x2x4.5m ARCHED PLUS
Partnumber Description
Top roof curved tube
Roof curved tube
Sidewall tube
Sidewall tube at front and rear
Tube at front and rear
Roof purlin and horizontal tube
Side beam for front and rear
Female Tensioning tube for lower roof cover
Female Door dropping tube at the bottom
Male Door dropping tube at the bottom
Stake peg
Bolt M10x110
Bolt M10x90
Standing support tube
Tube slip for standing support tube
and back panel
Lower standing leg in front and rear panel
Upper standing leg in front and rear panel
Qty. Illustration Box
1
38
4
38
4
100
2
2
4
38
4
4
4
2
4
134
108
359
48
20
2
2
2
2
2A
3
3A
4
5L
5R
6
7
8
9
10
11
12
16
17
18
13
13A
14A
15A
15
A-B
A-C
B
B-C
B
A
A
A
A
A
11A 2 A
Bottom tensioning tube for front and Arear cover
A
14 Male Tensioning tube for lower roof cover
A
A
A
A
B
B
B
B-C
B
B-C
B
B
Male beam for front and rear with 1 wheel pulley
Female beam for front and rearwith 2 wheels pulley
21
Sidewall tube 423B B-C
9.15x20x2x4.5m ARCHED PLUS
Qty. BoxIllustration
1
2
1Roll
42
12
4
22
23
24
31
26
27
A
A
B
B
B
B
B
21 42
Partnumber Description
Roof cover
21A Bolt M10x12 for Tie down rathcet 84 B
Front and back cover
Lace rope for roof cover, front cover and rear cover
Nylon tensioning band for tie down ratchet
Plastic cap for tensioning tube
Plastic cap for part 15
29 Hexagonal Washer M10 B915
30 Hexagonal Nut M10 507 B
Bolt M10x100
Bolt M10x30
Bolt M10x75
16
20
4
18A
19
20
B
B
B
Tie down ratchet ( )
30-11-2017
Frame sketch9,15x20x3,5x4,5
10
18
Figure 2
Position of base flanges
1
2/2A
3/3A
3B
12A
3A
3B
9
8
10
11 11A
65L5R
Frame installation for middle and back panel
Frame installation for front panel
12A
3A
3B
4
Figure 8
Figure 9
As per Figure ll, please pull the roof cover over the frame evenly.
Remark Page:
Assembly Steps
2. Each group of sidewall is made up of Curved Roof Tubes, Sidewall Tubes(Vertical Tubes).
3. Put the left sidewall into the receiving tube on left Base Flange, and push the right sidewallto the receiving tube on right Base Flange. Because it needs tension for every group of sidewall,
'c' show.
all groups of sidewall and Horizontal tubes.
Tensioning Tubes through the pockets at the bottom of both sides of roof cover. Then pull the TieDown Ratchets forth and back to tension the roof cover. Then plz fasten the end of roofcover by ropes
the door installation by yourself.
The receiving tube onleft Base Flange
Figure a.First assemble every groupof sidewall
Figure d.Installation of Horizontal Tubes
The second group of sidewall
The horizontal tube
Figue b.Then put the left sidewall intothe receiving tube on left Base Flange
Figure c.Thirdly, push hard the right sidewall to the receiving tube on right Base Flange
The receiving tube onleft Base Flange
Contact information
Head office:Dancover A/SNordre Strandvej 119 G3150 HellebækDenmark
For more informationplease visit:www.dancovershop.com
National contact
Denmark: 70 26 76 [email protected]
UK: 020 8099 [email protected]
Spain: 911 436 [email protected]
Italy: 02 479 21 [email protected]
Germany: 041 0266 [email protected]
Switzerland: 0840 [email protected]
France: 0975 181 [email protected]
Austria: 0662 [email protected]
Sweden: 040 233 [email protected]
Finland: 0 931 581 [email protected]
Nederland: 0 858 880 [email protected]
Poland: 22 300 [email protected]
Ireland: 0 151 33 [email protected]
Luxembourg: +49 041 0266 [email protected]
Portugal: 308 800 [email protected]
Belgium: 0 28 08 08 [email protected]
Norway: 231 00 [email protected]