manual 3, revision 60 transmission operations
TRANSCRIPT
PJM©2021www.pjm.com | Public
Manual 3, Revision 60Transmission Operations
Dean MannoTransmission OperationsOperations CommitteeNovember 04, 2021
PJM©20212www.pjm.com | Public
M-03, Rev. 60
• Periodic Review• Section 4.2.2 & 4.2.4 – Removed reference to PRC-001 standard due to
retirement.• Attachment A: Removed Elgin Unit Stability Trip Scheme due to upgrades in
the area.• Attachment A: Removed Susquehanna 500kV Catty Corner Scheme.
PJM©20213www.pjm.com | Public
M-03, Rev. 60 – Review/Approval Timeline
Oct.
2021
Manual First Reads
Nov
Second Reads/ Endorsements
Nov. 1SOS
Nov. 17MRC
Nov. 4OC
Nov. 18Implementation
Date
Oct. 7OC
Oct. 4 SOS
Oct. 6MIC (Info Only)
Oct. 15RSCS/TTMS
Oct. 20MRC
Oct. 5PC (info only)
PJM©20214www.pjm.com | Public
Contact
Member Hotl ine(610) 666 – 8980(866) 400 – [email protected]
SME/Presenter: Dean Manno, [email protected]
Manual 03, Rev 60 – Periodic Review
PJM©20216www.pjm.com | Public
M-03B, Rev. 59 – Changes
• Revision 59.1 (06/23/2021):– AEP: Added non-redundant language to Broadford-Atkins 138kV line and Jacksons
Ferry-Peak Creek 138kV line under Additional Regional Procedures.– AEP: Updated amperage setting in the Rockport Operating Guide procedure.– BGE: Updated 230 kV Harbor Crossing Cables (2344 & 2345 circuits) - Special
Ratings procedure.– FE-EAST: Added new Gilbert Stability Restriction procedure.– PEPCO: Updated Chalk Point Transformer #5 Operation procedure due to unit
retirements.– PSEG: Updated the Artificial Island Stability procedure due to system topology
changes.
PJM©20217www.pjm.com | Public
M-03B, Rev. 59 – Changes
• Revision 59.2 (08/17/2021):– AEP: Added Washington Stability procedure.– DVP: Added new Clover and Rawlings STATCOMs procedure.– Duquesne: Updated 302 circuit name for the Common Trench Cable ratings procedure.– PPL: Removed the Susquehanna 500 kV Circuit Breaker Switching Option procedure
due to the retirement of the Susquehanna RAS.
• Revision 59.3 (09/29/2021):– FE-East: Updated Homer City #2 & #3 Stability Trip procedure.– FE-South: Updated the Belmont RAS procedure for the new Flint Run substation.