Manual 3, Revision 60Transmission Operations

Dean MannoTransmission OperationsOperations CommitteeNovember 04, 2021

PJM©20212www.pjm.com | Public

M-03, Rev. 60

• Periodic Review• Section 4.2.2 & 4.2.4 – Removed reference to PRC-001 standard due to

retirement.• Attachment A: Removed Elgin Unit Stability Trip Scheme due to upgrades in

the area.• Attachment A: Removed Susquehanna 500kV Catty Corner Scheme.

PJM©20213www.pjm.com | Public

M-03, Rev. 60 – Review/Approval Timeline

Oct.

2021

Manual First Reads

Nov

Second Reads/ Endorsements

Nov. 1SOS

Nov. 17MRC

Nov. 4OC

Nov. 18Implementation

Date

Oct. 7OC

Oct. 4 SOS

Oct. 6MIC (Info Only)

Oct. 15RSCS/TTMS

Oct. 20MRC

Oct. 5PC (info only)

PJM©20214www.pjm.com | Public

Contact

Member Hotl ine(610) 666 – 8980(866) 400 – [email protected]

SME/Presenter: Dean Manno, [email protected]

Manual 03, Rev 60 – Periodic Review

PJM©20215www.pjm.com | Public

Appendix

PJM©20216www.pjm.com | Public

M-03B, Rev. 59 – Changes

• Revision 59.1 (06/23/2021):– AEP: Added non-redundant language to Broadford-Atkins 138kV line and Jacksons

Ferry-Peak Creek 138kV line under Additional Regional Procedures.– AEP: Updated amperage setting in the Rockport Operating Guide procedure.– BGE: Updated 230 kV Harbor Crossing Cables (2344 & 2345 circuits) - Special

Ratings procedure.– FE-EAST: Added new Gilbert Stability Restriction procedure.– PEPCO: Updated Chalk Point Transformer #5 Operation procedure due to unit

retirements.– PSEG: Updated the Artificial Island Stability procedure due to system topology

changes.

PJM©20217www.pjm.com | Public

M-03B, Rev. 59 – Changes

• Revision 59.2 (08/17/2021):– AEP: Added Washington Stability procedure.– DVP: Added new Clover and Rawlings STATCOMs procedure.– Duquesne: Updated 302 circuit name for the Common Trench Cable ratings procedure.– PPL: Removed the Susquehanna 500 kV Circuit Breaker Switching Option procedure

due to the retirement of the Susquehanna RAS.

• Revision 59.3 (09/29/2021):– FE-East: Updated Homer City #2 & #3 Stability Trip procedure.– FE-South: Updated the Belmont RAS procedure for the new Flint Run substation.