managing your wastewater system in 2016

32
Managing Your Wastewater System in 2016 A modern approach to improving operations and maintenance.

Upload: triumvirate-environmental

Post on 24-Jan-2017

313 views

Category:

Environment


2 download

TRANSCRIPT

Managing Your

Wastewater System

in 2016

A modern approach to improving operations

and maintenance.

Meet Your Moderator

James

Ciccone

During this Webinar All lines will be muted.

Communicate via the questions tab in your webinar

panel.

Unanswered questions will be responded to after

the webinar.

Webinar recording and slides will be emailed to you

tomorrow.

Meet Your Presenter

Darrell

Interess

What You Can

Expect • Intended for Facilities and EHS

Managers, and Wastewater

Operators

• Elements of a solid operations

program

• Key maintenance

• Identify performance indicators

• Training and preparing staff

Poll Question

What is your greatest

challenge when it comes

to wastewater system

operations and

maintenance?

AgendaIntroduction

Common Problems & Performance Indicators

Plans & Personnel

Using Information Technology

Summary/Q&A

Introduction

• Characteristics of industrial wastewater

• Permits and regulatory requirements

• Components of a wastewater system

• Reactive and proactive maintenance

Characteristics

of Wastewater

Industrial vs. non-industrial

wastewater

Chemicals and pollutants

Permits & Regulatory

Requirements

Local (POTW)

State(DEP/DEM/DEQ/DNR)

Federal (EPA)

Components of a

Wastewater System

• Tanks

• Pumps

• Filters

• Chemical feeds

• Sensors

• Meters

• Samplers

• Computers/PLCs

Reactive and Proactive

Maintenance

What’s in a plan?

Run to fail

Cookie-cutter approach

AgendaIntroduction

Common Problems & Performance Indicators

Plans & Personnel

Using Information Technology

Summary/Q&A

Common

Problems

Unreliable operation

Repairs not budgeted

Emergencies and time wasters

Performance

IndicatorsPut data to work:

• Flow

• Pressure

• Filter changes

• Sampling analytical data

• Chemical usage

AgendaIntroduction

Common Problems & Performance Indicators

Plans & Personnel

Using Information Technology

Summary/Q&A

O&M Plan

Manuals

Procedures

Service frequencies

Specifications

Maintenance

• CMMS

• Sensors/probes

• Flow measuring devices

• Tanks

• Motors (pumps, agitators)

• Chemical feeds (pumps,

tubing/pipes, injectors)

• Chemical drums and

containment

• Keep spares on-site

State and local regulations for certification

Minimum staffing requirements

Company owners and operator responsibilities

Plans and Personnel

Staffing PlanEmergency contacts and procedures

Staff information

Business operations

Off-hours assignments or contingencies

Flexible to allow for changes

AgendaIntroduction

Common Problems & Performance Indicators

Plans & Personnel

Using Information Technology

Summary/Q&A

Poll Question

Do you currently use

remote connection in your

wastewater process?

Technology

Remote notifications

Data-loggers and storage

Trending and analysis

Remote control

Notifications

• Autodialers

• Telemetry

• Email / text messages

• Basic device features

Data Loggers

and Storage• File formats

• Usefulness and transportability

• Data resolution

• Paperless

• Create charts for summaries

and visual impact

Trending and

Analysis

Create charts for summaries

Add visual impact

Remote Control

Remote Control

AgendaIntroduction

Common Problems & Performance Indicators

Plans & Personnel

Using Information Technology

Summary/Q&A

SummaryUnderstand your needs

Collect data to tackle problems

Develop plans and train staff

Use technology to your advantage

QUESTIONS?

You Will Receive:

• A recording of this presentation

and a copy of this presentation

• A link to a short survey

• An offer to help you get started

with your wastewater system

improvement project

Thank You For Attending!