Managing Risk During PV Plant Development
q This webinar will be available afterwards at www.solarpowerworldonline.com & email
q Q&A at the end of the presentation q Hashtag for this webinar: #SolarWebinar
Before We Start
Frank Andorka Solar Power World
Moderator Presenters
Scott Jezwinski UL, LLC
Chris Flueckiger UL, LLC
Managing Risk in PV Plant Developments
UL and the UL logo are trademarks of UL LLC © 2014
Solar Photovoltaic (PV) Power Plants
UL and the UL logo are trademarks of UL LLC © 2014
1. PV Module 2. DC Switch Gear 3. DC/AC Inverter 4. AC Switch Gear 5. Substation 6. Distribution Network 1
2
3 4
5
6
PV Plant Reference Model
DC/AC
UL and the UL logo are trademarks of UL LLC © 2014
• Feasibility analysis • Site control • Permits • Due diligence (EYA) • Technology analysis • Detailed design • Contracts
• Project management • Procurement • Construction management • Regulatory compliance • Environmental compliance • Stakeholder reporting • Commissioning
• Performance monitoring/reporting
• Issue detection • Preventative maintenance • Site maintenance • Production reporting
Short list of development activities
PV Plant Development Phases
Planning & Design Construction Operations & Maintenance
UL and the UL logo are trademarks of UL LLC © 2014
Attractive Risk Fundamentals • Passive systems with no or few moving parts • Modularity of construction • Maturing and stabilizing technology
Simplified PV Project Risk Management Strategy: • Step 1: Identify and assess risks • Step 2: Mitigate and/or distribute risk across stakeholders • Step 3: Insure risk that is not allocated
PV Risk Management
UL and the UL logo are trademarks of UL LLC © 2014
Technical Risk Concerns Impact Solar Resource Estimation Confidence in solar resource data as
basis for projections • Production shortfall
Component Specifications Performance specifications adequate for the location/ application
• Production shortfall • System downtime
System Design Balance integration of components with system reliability, availability and maintainability
• Production shortfalls • System downtime
Energy Yield Projections Confidence in performance estimates • Production shortfalls
Construction Risks Compliance to codes and standards, integrity of the built system, experience of construction staff
• Unplanned cost • Delayed production
In-‐‑Service Risks Component reliability and performance over time.
• Unplanned cost • System downtime • Production shortfalls
General Categories of Risk
UL and the UL logo are trademarks of UL LLC © 2014
Risk and Uncertainty
“Uncertainty factors” are associated with energy yield projections and introduce an additional element of risk.
UL and the UL logo are trademarks of UL LLC © 2014
Spe
nd/In
come
$$
Planning & Design Construction Operations & Maintenance
Commercial Operation Date (COD)
*
Risk Scenario
UL and the UL logo are trademarks of UL LLC © 2014
Financial profile of a PV project. Planned Rate of
Spend
Production
Planning & Design Construction Operations & Maintenance
Spe
nd/In
come
$$
Commercial Operation Date (COD)
*
Added Cost of Defects 1. Rework #1 2. Rework #2
Risk Scenario
2
1
UL and the UL logo are trademarks of UL LLC © 2014
Planning & Design Construction Operations & Maintenance
Spen
d/Inc
ome $
$
Commercial Operation Date (COD)
*
3 4
5
Total Additional Cost of Defects 1. Rework #1 2. Rework #2 3. Corrective Action 4. Contractual Penalty 5. Missed Opportunity
Risk Scenario
2
1
UL and the UL logo are trademarks of UL LLC © 2014
Cost
of Re
movin
g Defe
ct $
Planning & Design Construction Operations & Maintenance
Cost of Defects
1X 10X
100X
UL and the UL logo are trademarks of UL LLC © 2014
Relative cost of removing defects
Planning and Design Phase
• Feasibility analysis • Site control • Permits • Due diligence (EYA) • Technology analysis • Detailed design • Contracts
Planning & Design
Solar Resource
Shading
Weather
Energy Yield
Contracts
Design Approval
Feasibility Analysis
UL and the UL logo are trademarks of UL LLC © 2014
Planning & Design and Risk
Uncertainties impacting risk: • Solar resource and meteorological conditions
• Integrity and performance of products ( hardware)
• System design - balancing cost and performance
UL and the UL logo are trademarks of UL LLC © 2014
Construction Phase
• Project management • Procurement • Construction management • Regulatory compliance • Environmental compliance • Stakeholder Reporting • Commissioning
Construction
DC/AC
UL and the UL logo are trademarks of UL LLC © 2014
Construction and Risk
Risk realization during construction: • Non-compliant construction (codes)
• Non-compliant products (standards)
• Construction errors
• Product modifications in the field
UL and the UL logo are trademarks of UL LLC © 2014
Operations & Maintenance
Operations & Maintenance
• Performance monitoring/reporting
• Issue detection • Preventative maintenance • Site maintenance • Production reporting
SCADA
DC/AC
UL and the UL logo are trademarks of UL LLC © 2014
O&M and Risk
Risk realization during on-going operations: • Hardware failures
• Unplanned power degradation ( beyond expected)
• Electrical hazards develop ( bonding and grounding)
• Interconnection and grid stability
UL and the UL logo are trademarks of UL LLC © 2014
UL - Identify/Mitigating PV Plant Risk • A global service provider for
developers, EPCs, financiers, owners/operators and insurers of PV systems.
• Over 300 PV system related field transactions
• Involved in nearly 1GW of PV plant projects with related services
• Trusted partner across development phases:
• Planning &Design • Construction • Operations & Maintenance
• Mitigating project risk and delay
UL and the UL logo are trademarks of UL LLC © 2014
Thank You
Contact: Sco^ Jezwinski -‐‑ Business Dev Manager Phone: 847-‐‑664-‐‑3310 sco^[email protected] www.ul.com
UL and the UL logo are trademarks of UL LLC © 2014
Contact: Chris Flueckiger – Principal Engineer Phone: 847-‐‑664-‐‑2864 [email protected] www.ul.com
BUILDING TRUST
into the
PV VALUE CHAIN
UL and the UL logo are trademarks of UL LLC © 2014
Questions?
Frank Andorka Solar Power World [email protected] Twitter: @SolarFrankA
Scott Jezwinski UL, LLC [email protected] Phone: 847.664.3310
Chris Flueckiger UL, LLC [email protected] Phone: 847.664.2864
q This webinar will be available at www.solarpowerworldonline.com & email
q Tweet with hashtag #SolarWebinar
q Connect with Solar Power World
q Discuss this topic on EngineeringExchange.com
Thank You