managing risk at fedex express bill logue evp & chief operating officer, express u.s. october 9,...

13
Managing Risk At FedEx Express Bill Logue EVP & Chief Operating Officer, Express U.S. October 9, 2008

Upload: cora-atkinson

Post on 20-Jan-2016

217 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Managing Risk At FedEx Express Bill Logue EVP & Chief Operating Officer, Express U.S. October 9, 2008

Managing Risk At FedEx ExpressBill Logue

EVP & Chief Operating Officer, Express U.S.

October 9, 2008

Page 2: Managing Risk At FedEx Express Bill Logue EVP & Chief Operating Officer, Express U.S. October 9, 2008

Oct. 9, 2008Managing Risk At FedEx Express 2

Topics

Size & Scope of Express NetworkOur Business Planning StructureHow We Plan The Shape & Form Of Our

NetworkDaily Operational ExecutionDisaster Relief & Business Continuity

Page 3: Managing Risk At FedEx Express Bill Logue EVP & Chief Operating Officer, Express U.S. October 9, 2008

Oct. 9, 2008Managing Risk At FedEx Express 3

About FedEx Express

Time-definite delivery to 220 countries and territories worldwide and every address in the U.S.

Average daily volume of 3.4 million packages

1,503 daily flight departures 672 aircraft 43,900 motorized vehicles 131,000 employees

Page 4: Managing Risk At FedEx Express Bill Logue EVP & Chief Operating Officer, Express U.S. October 9, 2008

Oct. 9, 2008Managing Risk At FedEx Express 4

Domestic U.S. Operating Divisions

Division Responsibility

U.S. Operations

• Pickup / Delivery• Retail Operations• Vehicle Maintenance

Air Ground Freight Services

• Hub Operations• Ramp Operations• Express Freight

Air Operations

• Crew Resources• Safety / Regulatory• Aircraft Maintenance• A/C Engineering

Page 5: Managing Risk At FedEx Express Bill Logue EVP & Chief Operating Officer, Express U.S. October 9, 2008

Oct. 9, 2008Managing Risk At FedEx Express 5

Risk

Risk is the potential for loss caused by an event (or series of events) that can adversely affect the achievement of a company’s objectives.

Organizations that are most effective and efficient in managing risks to both existing assets and to future growth will, in the long run, outperform those that are less so.

Deloitte, Risk Intelligence Series

Page 6: Managing Risk At FedEx Express Bill Logue EVP & Chief Operating Officer, Express U.S. October 9, 2008

Oct. 9, 2008Managing Risk At FedEx Express 6

Risk Management Starts With Our Business Planning Process

Global Strategic

Plan

Long Range Outlook:Six Year

View

Fiscal Year Start

June 1

• Business Baseline & Interpretation

• Hypothesis Testing

• Identify / Evaluate / Prioritize Initiatives

Divisional Operating Plans

Annual

• Execution• Forecast U.S. & International Volume

• Capacity Plan: Aircraft, Vehicles & Facilities

• Operating Plan: Flights, Manpower, Operating Requirements

• Capital & Expense Plan

Page 7: Managing Risk At FedEx Express Bill Logue EVP & Chief Operating Officer, Express U.S. October 9, 2008

Oct. 9, 2008Managing Risk At FedEx Express 7

System Form Planning

Long Range Planning: 1 – 5 yr

Business Planning: 9 - 15 mo

Current Scheduling & Operational Planning: present - 6 mo

“Satisfy service requirements based upon forecasted volume”

Page 8: Managing Risk At FedEx Express Bill Logue EVP & Chief Operating Officer, Express U.S. October 9, 2008

Oct. 9, 2008Managing Risk At FedEx Express 8

Daily Operational Control & Risk Management

Daily operational oversight resides in our Global Operations Control (GOC) Center

GOC exercises command and control of the FedEx Express linehaul system.

GOC is the highest level of command in our system, monitoring our worldwide line-haul and implementing emergency and contingency action plans as necessary.

Daily!

Page 9: Managing Risk At FedEx Express Bill Logue EVP & Chief Operating Officer, Express U.S. October 9, 2008

Oct. 9, 2008Managing Risk At FedEx Express 9

Disaster Relief – Event Management

FedEx among worldwide first responders to catastrophes:

– Tsunami relief in Southeast Asia– Earthquake Relief in South Central Asia and

South America– Alliances with relief agencies, including Red

Cross and Heart to Heart International

Page 10: Managing Risk At FedEx Express Bill Logue EVP & Chief Operating Officer, Express U.S. October 9, 2008

Oct. 9, 2008Managing Risk At FedEx Express 10

Business Continuity

DRACO (Disaster Recovery and Contingency Operations) Consolidating all Business Continuity and Disaster Recovery

under one umbrella Major Components

Airport Reconstitution Hub/Operations Reconstitution Contingency Aircraft and Truck Schedules IT System Reconstitution Infrastructure Plan

– Safety Issues– Security Issues

Page 11: Managing Risk At FedEx Express Bill Logue EVP & Chief Operating Officer, Express U.S. October 9, 2008

Oct. 9, 2008Managing Risk At FedEx Express 11

Managing Risk Is What We Do

Page 12: Managing Risk At FedEx Express Bill Logue EVP & Chief Operating Officer, Express U.S. October 9, 2008

Oct. 9, 2008Managing Risk At FedEx Express 12

Supply Chain Risks

Fuel–Price–Availability

Economic DisruptionGeopolitical (regional)Terrorism IT NetworkSystem Replication/Duplication

Page 13: Managing Risk At FedEx Express Bill Logue EVP & Chief Operating Officer, Express U.S. October 9, 2008

Oct. 9, 2008Managing Risk At FedEx Express 13

Open Discussion

Questions?