managing performance improvement tovey/uren/sheldon

41
MANAGING PERFORMANCE IMPROVEMENT TOVEY/UREN/SHELDON OVERVIEW Part A: Planning Performance 1. Setting goals for the organisation 2. Key performance indicators 3. Operational plans Part B: Performance Management 4. What is performance standard? 5. Principles of setting performance standards 6. Monitoring performance 7. Analysing performance 8. Preparing to appraise performance 9. Appraising performance 10.Improving performance 11.Unsatisfactory performance 12.Skills for managing performance

Upload: armen

Post on 13-Jan-2016

48 views

Category:

Documents


0 download

DESCRIPTION

MANAGING PERFORMANCE IMPROVEMENT TOVEY/UREN/SHELDON. OVERVIEW Part A: Planning Performance 1. Setting goals for the organisation 2. Key performance indicators 3. Operational plans Part B: Performance Management 4. What is performance standard? - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: MANAGING PERFORMANCE IMPROVEMENT TOVEY/UREN/SHELDON

MANAGING PERFORMANCE IMPROVEMENTTOVEY/UREN/SHELDON

OVERVIEWPart A: Planning Performance

1. Setting goals for the organisation2. Key performance indicators3. Operational plans

Part B: Performance Management4. What is performance standard?5. Principles of setting performance standards6. Monitoring performance7. Analysing performance8. Preparing to appraise performance9. Appraising performance10.Improving performance11.Unsatisfactory performance12.Skills for managing performance

Page 2: MANAGING PERFORMANCE IMPROVEMENT TOVEY/UREN/SHELDON

Part A – Planning Performance

How to manage individual performance so that organisation obtains max productivity from staff at low costs with quality, efficient & be competitive in the market.

Continuous learning and improvement important for organistions & its workers.

According to Karpin Report – job creation depends on better management skills, flexibility of organisation stems from management and its skills in managing people within diverse & highly competitive environment that are likely to be in constant change.

Managers must therefore focus on the performance of people as organisational asset, rely on output measure to assess staff and develop new techniques for improve performance.

Page 3: MANAGING PERFORMANCE IMPROVEMENT TOVEY/UREN/SHELDON

What is a manager?

Managers manage other to achieve outcomes or results through others – use few technical skills and more interpersonal & conceptual skills.

Fig A.1 –Skills required at different levels of management

First Line management : conceptual/Interpersonal/technical related skills

Middle management : conceptual/Interpersonal/technical related skills

Senior management : conceptual/Interpersonal/technical related skills

Top Level management : conceptual/Interpersonal/technical related skills

Page 4: MANAGING PERFORMANCE IMPROVEMENT TOVEY/UREN/SHELDON

Fig A.2 Characteristics of the Ideal Manager

1. People skills2. Strategic thinker3. Visionary4. Flexible and adaptable to change5. Self management6. Team Player7. Ability to solve complex problems & make decisions8. Ethical/high personal standards

According to the Report training of managers dropped by 0.3% to 29% - this shows lack ofurgency and implementing recommendations of the report. Without proper training, managers will fail in their roles.

Page 5: MANAGING PERFORMANCE IMPROVEMENT TOVEY/UREN/SHELDON

MANAGEMENT

Gardner & Palmer propose 3 perspectives of management.

Fig A.3 – Three perspectives on management

Administrative – use of classical management systems like division of labour & formal organisation structures

Political – process that resolves conflicts between stakeholders in & out of the organisation. People within the organisation have different power bases & ways of acting and compete with each other for resources and rewards. It accounts how people feel andvalue their relationships that are formed.

Cultural – refers to purpose of beliefs and values within and how things are done in an organisation.

Page 6: MANAGING PERFORMANCE IMPROVEMENT TOVEY/UREN/SHELDON

Defining performance management & performance appraisal

Performance management – powerful tools linking employees responsibilities with

that of the team and overall organisation.

Done by setting & monitoring objectives on an ongoing basis which provides a

snapshot towards strategic plans and objectives.

The Performance Management Institute of Australia (PMIA) defines:

Performance management – the process of setting and monitoring measures and

objectives for employees, managers and executives. It is a closed loop process

meaning that objectives are constantly reviewed and performance diaries are

maintained by the employee and manager, which detail ongoing successes and

challenge.

Performance appraisal – the process that identifies, evaluates and develops

employees performance to meet employee and organisational goals.

Page 7: MANAGING PERFORMANCE IMPROVEMENT TOVEY/UREN/SHELDON

The Global Economy – 1/3In today’s global economy competition is forcing a link between employers and employees making ways for flexible ways of developing people & managingPerformance.

Organisations are having flatter management compared to the older hierarchies.

Customers/Clients are becoming more demanding and in terms of quality and otherrequirements.

Hence training forms an integral part of this process.

The global financial crisis 2008/9 – felt by many – forced to downsized – organisation need to utilize performance management information to assist in the downsizing operations has become more apparent.

Page 8: MANAGING PERFORMANCE IMPROVEMENT TOVEY/UREN/SHELDON

The Global Economy – 2/3Karpin Report identified 6 critical areas to improve skills:

1. Increase levels of education & training2. Use development processes rather than short courses to develop skills3. Management development – focus on future skills required4. Handle the transition from specialist to manager more effectively.5. Specifically link management development to strategic business directions.6. Evaluate the effectiveness of management development activities.

Page 9: MANAGING PERFORMANCE IMPROVEMENT TOVEY/UREN/SHELDON

The Global Economy – 3/3Karpin identified new profile for 21st century manager: (known as leader or coach)

1. Flat structures with team leaders reporting to senior management directly.2. Values of the role including performance management, facilitation, participation and

empowerment of other team members.3. Working environment emphasizing best practice, benchmarking, quality and customer

service.4. Most managers having at least TAFE (Technical And Further Education) level

qualification or a degree.5. 100% managers having formal training for the position.6. Regular in company training for further learning.

Other soft skills need to be developed: communication, negotiation, counselling, listening, delegating and managing conflict.

Page 10: MANAGING PERFORMANCE IMPROVEMENT TOVEY/UREN/SHELDON

Training & DevelopmentEmployees need different knowledge and skills to cope with 21st century. They have to develop skills faster and be more flexible , adaptable and multi-skilled than before. The considerable change in relation to work means the future is difficult especially where specific skills will be needed.

Rubenson & Shutze identified 3 important factor influencing this significant change:

1. Introduction of new & sophisticated technologies2. New forms of work organisation3. New trends in organisational management

Problem solving is one way of learning and developing expertise.

Page 11: MANAGING PERFORMANCE IMPROVEMENT TOVEY/UREN/SHELDON

Employment security – 1/3 According to Baskett and Marsick, self delegating workers with multifunctional expertise are most desirable employees. Employment security is the state of possessing the knowledge a skills that ensure a worker is employable across a range of duties and types of job rather than the single job provided by a single employer previously known as job security.

Fig A.4 - The move from job security to employment security.

Job Security specific skills oriented towards one job in the organisation skills and knowledge development provided mainly by organisation after initial qualification gained.

Employment Security many different skills oriented towards many jobs in many different organisations skills and knowledge development provided mainly by individual after qualification gained.

Page 12: MANAGING PERFORMANCE IMPROVEMENT TOVEY/UREN/SHELDON

Employment security – 2/3 According to Kapin Report managers do not take responsibility for their own learning and development. According to Kapin Report there are 5 areas from which this pressure stems.

• Enterprises increasingly require enhanced management skills.• Enterprises are becoming more strongly committed to helping managers to improve

their skills for a variety of future career possibilities.• Enterprises are making it clear that learning and self development is a partnership

between the firm and the manager.• Individuals are no longer guaranteed a clear career path within one organisation.• Individuals are increasingly planning careers spanning organisation and industries.

Page 13: MANAGING PERFORMANCE IMPROVEMENT TOVEY/UREN/SHELDON

Employment security – 3/3 Rubenson and Schutze indicate that the types of abilities and skills required of employees are:• Capability of analytical thinking applied to different processes of work.• Sense of quantitative appreciation of different processes.• Ability to conduct dialogue with equipment• Sense of responsibility and capacity for autonomous work• Ability to link technical, economic and social considerations in appreciation of equipment &

working methods.• Planned & methodical approach to work• Willingness to take the initiative and perform independently.• Ability to cooperate and work in groups.• Competence in planning and evaluating one’s own work and that of others.• Understanding how to work with people from different cultures and backgrounds.• The ability to make decisions.

Page 14: MANAGING PERFORMANCE IMPROVEMENT TOVEY/UREN/SHELDON

Learning & performance managementLearning is related to individual performance and the development of expertise. It resultsIn new knowledge and skills so that individuals can perform their jobs in more capable wayincreasing individual competence and developing skilled vocational practice towards expertise.

To facilitate learning transfer to workplace, learning methods and activities need to link to skills and knowledge development to work activities and the actual degree of competence required by organisations.

Training is geared towards specific, measureable outcomes for the learner based on descriptions of actual job performance. Competency based training allows for recognitionof skills and prior work experience in attaining national qualifications in a variety of subject areas.

Page 15: MANAGING PERFORMANCE IMPROVEMENT TOVEY/UREN/SHELDON

CHAPTER 1 –SELLING GOALS FOR THE ORGANISATION

Objectives:

Why planning is necessary?

Why plans should be written?

The term of “planning”

Why planning is an important management function?

How better planning reduce mistakes

The components of plans

Why managers need to plan?

The benefits of planning

The purpose of vision & mission statement

Difference between strategic & operational planning

The term “strategic planning”, & “goal”

The process of goal setting

Page 16: MANAGING PERFORMANCE IMPROVEMENT TOVEY/UREN/SHELDON

INTRODUCTION

The old saying:

“If you don’t know where you are going, how are you going to get there?”

It is sensible to say that some form of planning needs to be done before acting on it.

Planning : formal or informal.

Planning cannot guarantee performance but should improve the probability of improved performance.

A plan is an objective reference point for employer & employee.

Page 17: MANAGING PERFORMANCE IMPROVEMENT TOVEY/UREN/SHELDON

What is Planning?

Defination:

1)…… examining the future and drawing up the plan of action.2)…. Planning encompasses defining the organisation’s objectives or goals, establishing and overall strategy for achieving these goals, and developing a comprehensive hierarchy if plans to integrate and coordinate activities.3)…. Plans are projected courses of action and aimed at achieving future objectivities.

In simplified terms it means:

Planning is an activity that looks the future and how you will get there.

Page 18: MANAGING PERFORMANCE IMPROVEMENT TOVEY/UREN/SHELDON

Fig 1.1 – Components of Plans

Planning

Goals

Objectivities

Strategies

Action

Page 19: MANAGING PERFORMANCE IMPROVEMENT TOVEY/UREN/SHELDON

Why Plan? Refer Table 1.1 Why managers should plan ?

Page 20: MANAGING PERFORMANCE IMPROVEMENT TOVEY/UREN/SHELDON

Learning Organisations

Organisations must:

• adapt to changing environment• aim at a learning organisation culture

Focus is on excelling customers, staff, owners through expanding the organisation’s capacity to ensure future success.

Total Quality Management (TQM) – •improvement process for betterment•Empowerment to employees•Best practice is applied•Enhances on people togetherness, honesty, two-way feedback, motivation for employees: professional & personal development

Organisations need to improve, review visions and objectives in response to changes.

Page 21: MANAGING PERFORMANCE IMPROVEMENT TOVEY/UREN/SHELDON

Planning in a Changing Environment

The planning process cannot be abandoned when change occurs.

The process require time and effort. Goals & actions may be suspended due to

reasons beyond your control but the process of planning is not wasted. A skillful

developed plan will always incorporate elements of uncertainty, together with

appropriate contingency measures.

A proper plan will assist in understanding your nature of business in details which will

give your flexibility, and proper timeliness for responses.

A skilled manager must be able to cope with and manage change as an everyday

activity with the use of planning skills. A plan also is likely to reduce stress for all

workers.

Page 22: MANAGING PERFORMANCE IMPROVEMENT TOVEY/UREN/SHELDON

Planning for Performance

Planning starts at the highest level.

Vision must be decided – Statement of things that are important to an organisation.

2 components:

1) Direction – where it is going in the future

2) Identification of values that will influence the strategic decisions & behaviours within an organisation.

A vision statement sets the direction.

Page 23: MANAGING PERFORMANCE IMPROVEMENT TOVEY/UREN/SHELDON

Refer to the following:

Figure 1.2 – Components of a vision statement

Figure 1.3 Mission statement – involves broad description about the organisation & its purpose.

Figure 1.4 Combined vision and mission statement The vision & mission statement leads to the strategic planning process which in turns leads to the operational or business planning setting which forms the basis for an individual’s performance objectives.

Figure 1.5 The planning process

Page 24: MANAGING PERFORMANCE IMPROVEMENT TOVEY/UREN/SHELDON

Strategic Planning

Strategic Planning – 3 to 5 years in the future

Operational or business Planning – 12 months or to 3 years.

This solely depends on the organisation and its effects of change.

Page 25: MANAGING PERFORMANCE IMPROVEMENT TOVEY/UREN/SHELDON

Fig 1.6 Differences between strategic & operational planning

Page 26: MANAGING PERFORMANCE IMPROVEMENT TOVEY/UREN/SHELDON

Complexity of Strategic Management- 1/5

Strategic management is demanding & well structured plans effort can be seenthrough implementation and motivation of the people working in the organisation.

Simply put:

…… aligning the organisation with the internal resources and the external environment to ensure long-term survival.

Strategic management involves:

• Identify where the organisation is currently• Access how external environment is likely to affect the environment• Decide what alternative actions possible in line with vision & mission• Choose an action or actions• Implement the choice

Page 27: MANAGING PERFORMANCE IMPROVEMENT TOVEY/UREN/SHELDON

Complexity of Strategic Management- 2/5

Characteristic of Strategic decisions: (according to Johnson, Scholes & Whittington)

• Concerned with long term direction of organisation• About the scope of an organisation’s activities• Trying to achieve some advantage over competition• Matches the organisation’s activities with the environment in which it operates• Matches the organisation’s activities to its resource capability• Decisions have major resource implications for an organisation• Organisation’s strategy will be effected by environmental forces, values and

expectations of those who have power in and around the organisation

Page 28: MANAGING PERFORMANCE IMPROVEMENT TOVEY/UREN/SHELDON

Complexity of Strategic Management- 3/5

To develop & implement a Strategic plan: (9 steps suggested by Robbins & Mukerji)

1. Identify organisation’s mission, objectives & strategies2. Analyse the environment in which organisation is operating3. Identify opportunities & threats to organisation4. Analyse the organisation’s resources5. Identify the strengths & weakness of the organisation6. Review the organisation’s Mission and Objectives7. Formulate strategies to achieve desired goals8. Implement strategies9. Evaluate the results

The process is complex but the activity can be easily managed with the aid of Succinct (brief) guidelines

Page 29: MANAGING PERFORMANCE IMPROVEMENT TOVEY/UREN/SHELDON

Complexity of Strategic Management- 4/5

Strategic plans

- Focused on the whole organisation, providing objectives, direction & its interaction with the environment.

- Goal form the foundation of all plans and can range from broad to specific targets.

Page 30: MANAGING PERFORMANCE IMPROVEMENT TOVEY/UREN/SHELDON

Complexity of Strategic Management- 5/5

Fig 1.7 – Relationship between goals and other planning activities

Page 31: MANAGING PERFORMANCE IMPROVEMENT TOVEY/UREN/SHELDON

Goal Setting – 1/4

Definition: A direction, point you want to head towards, a destination or a purpose.

Goals can be interpreted as aims, objectives, targets or purposes.

Goal & aim – general descriptions of intentObjective & target – more specific

Process of setting goals (based on Robbins & Hunsaker)

1. Specific2. Challenging3. Time Limits4. Participation5. Feedback

Page 32: MANAGING PERFORMANCE IMPROVEMENT TOVEY/UREN/SHELDON

Goal Setting – 2/4

Research states that goals need to be future based and immediate.

Goals that reach too far in the future without supporting sub-goals remain

unachieved.

Sub-goals need to specific and measureable – essential for appropriate learning and

development to achieve the main goal.

It is a logical process & disciplined based on the 5 steps, be it strategic plans,

operational plans or individual performance objective, the process is the same but

the substance differs.

Page 33: MANAGING PERFORMANCE IMPROVEMENT TOVEY/UREN/SHELDON

Goal Setting – 3/4

8 steps in setting up goals:

1. Broadly identify what you want to achieve

2. Narrow down to specific things (sub-goals) in order to reach the main goal

3. Identify how you will measure – sub-goals (known as objectives)

4. Identify specific level of achievement required for each sub-goal

5. Identify linkages between sub-goals

6. Set time limit for each sub-goal

7. Identify & rank each sub-goal from most important to least

8. Develop and action plan for each sub-goal.

Page 34: MANAGING PERFORMANCE IMPROVEMENT TOVEY/UREN/SHELDON

Goal Setting – 4/4: Fig 1.8 – Goals & sub-goals

Main GoalReduce the consumption of stationery in the organisation

Actions

Actions

Actions

Page 35: MANAGING PERFORMANCE IMPROVEMENT TOVEY/UREN/SHELDON

Conclusion

Skilled goal setting linked to many successful individuals.

It lays down foundation for success.

Plans built on goals. – 5 fundamental rules apply

Goals & plan can change – management must be prepared to adapt to makechanges. Plans made are not wasted – this makes you well prepared and developflexibility to meet up with new changes.

Planning and performance linked through process of goal setting. Strategic planningis the 1st part of performance planning process. Sets up the direction & facilitates thedevelopment of operational plans to individual objectives. Brings together lower level plans e.g.operational & individual performance plans to be developed to the success of the overall organisation’s plan.

Page 36: MANAGING PERFORMANCE IMPROVEMENT TOVEY/UREN/SHELDON

Chapter 2 – Key Performance Indicators

Objectives:• Basis on which organisations are judged.• Key performance indicators (KPI) framework• Understand Critical success factor (CSF)• List four examples of CSF• State the class of managers that should be involved in setting CSFs• Explain a KPI • Explain the terms ”means” and “ends”• Describe relationship between CSPs and KPIs• Explain the role of performance indicators• How KPIs might be used• State most common reasons for development of KPIs• Use KPIs to monitor performance

Page 37: MANAGING PERFORMANCE IMPROVEMENT TOVEY/UREN/SHELDON

Introduction

An organisation is judged by the results it achieves. Business operates for profits ,

returns on investments for shareholders. If no profits are made, shareholders take

action and the market react badly which gives a negative impact on the operation of

the company. In extreme cases bad results can force a company to close.

Performance Indicators (PIs) relate to the results the organisation wants to achieve.

Vital areas are identified by organisation to perform well in order to achieve its

strategic and operational plans for the period. Organisations may have problems like

Strong competition, voter dissatisfaction, poor financial results, introduction of new

Technologies, dollar fluctuations, and cyclical ups and downs. At this time, Key

Performance Indicators are vital if the company need to turnaround. KPIs and CSFs

can be developed and used in day to day activities of its operation to define and

Measure business objectives.

Page 38: MANAGING PERFORMANCE IMPROVEMENT TOVEY/UREN/SHELDON

Key Performance Indicators (KPI) framework – 1/2

Brief description:

Critical Success Factors (CSFs) – identify those aspects of the organisation that

are critical for its success.

Key Performance Indicators (KPIs) – indicators of performance that are of great

Importance to the success of the business. A KPI is quantifiable gauge used to

measure an organisation’s performance against its CSFs. KPIs can be financial or

non-financial and there may be more than one KPI per CSF.

Performance Indicators (PIs) are measures of different parts of the organisation’s

performance.

Page 39: MANAGING PERFORMANCE IMPROVEMENT TOVEY/UREN/SHELDON

Key Performance Indicators (KPI) framework – 2/2

Key Focus Areas (KFAs) use in place of Key Success Factors (CSFs).

Key Result Areas (KRAs) utilised at job level sometimes interchangeable with Key

Performance Areas (KPAs).

e.g. If OHS (Occupational Health Safety) was a key performance area of a job, related PIs could include the number of accidents per occupational group and lost time injuries expressed in days lost.

Page 40: MANAGING PERFORMANCE IMPROVEMENT TOVEY/UREN/SHELDON

Refer to the following:

Fig 2.1 KPI frame work – Pgs 28 -29

Fig 2.2 Theory to Practice - Pgs 30 - 31

Fig 2.3 Examples of CSFs for different industries – Pg32

Fig 2.4 KPIs for a sample organisation – Pg 33

Fig 2.5 Relationship of performance indicators to KPIs – Pg 34

Fig 2.6 Means and ends – Pg 35

Fig 2.7 Sample performance indicators – Pg 36

Why are KPIs needed? Pgs 36 - 37

Steps in developing KPIs – Pgs 38 – 39

Page 41: MANAGING PERFORMANCE IMPROVEMENT TOVEY/UREN/SHELDON

CONCLUSION

KPI fundamental for a sound management system.

Provides focus for measurement throughout the organisation and forms the basis for individual performance objectives.

Required for efficient operation and if skillfully developed contributes to the strategicand operation plans of the organisation.

KPIs used with CSFs which are identified by organisation for its long term survival.

KPIs flow from operational plans and CSFs flow from strategic plans.

KPIs made of 2 components: specific performance and some sort of indicator for the

performance.

5 steps have been outlined to develop suitable CFSs and KPIs.