managing large multidisciplinary, multicultural eia’s · 2017-05-23 · managing large...

19
Managing Large Multidisciplinary, Multicultural EIA’s Jorge Chavez, Project Manager, Golder Associates Peru S.A. James Anderson, Project Director, Golder Associated Ltd. Michael Raine, Technical Director, Golder Associates Ltd. Holton Burns, Environmental Superintendent, Barrick Misquichilca – Alto Chicama

Upload: others

Post on 03-Apr-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Managing Large Multidisciplinary, Multicultural EIA’s · 2017-05-23 · Managing Large Multidisciplinary, Multicultural EIA’s Jorge Chavez, Project Manager, Golder Associates

Managing Large Multidisciplinary, Multicultural EIA’s

Jorge Chavez, Project Manager, Golder Associates Peru S.A.

James Anderson, Project Director, Golder Associated Ltd.

Michael Raine, Technical Director, Golder Associates Ltd.

Holton Burns, Environmental Superintendent, Barrick Misquichilca – Alto Chicama

Page 2: Managing Large Multidisciplinary, Multicultural EIA’s · 2017-05-23 · Managing Large Multidisciplinary, Multicultural EIA’s Jorge Chavez, Project Manager, Golder Associates

ØØ Share experience from EIA Alto Share experience from EIA Alto Chicama Project in PeruChicama Project in Peru

ØØ Present tools to face the challenges Present tools to face the challenges of large, multidisciplinary, of large, multidisciplinary, multicultural multicultural EIAsEIAs

Objectives

Page 3: Managing Large Multidisciplinary, Multicultural EIA’s · 2017-05-23 · Managing Large Multidisciplinary, Multicultural EIA’s Jorge Chavez, Project Manager, Golder Associates

Alto Chicama ProjectAlto Chicama Project

North Andes of Peru(4000 – 4200 masl)

Location

Minera Barrick Misquichilca S.A.Client:

8 to 10 yearsMine Life

Up to 42 000 t/dCapacity:

Open PitMine Type:

Gold (silver)Ore:

Characteristics of TeamProfessionals: ca. 200Golder Offices: 11Countries: Peru, Canada, USA, Chile

Page 4: Managing Large Multidisciplinary, Multicultural EIA’s · 2017-05-23 · Managing Large Multidisciplinary, Multicultural EIA’s Jorge Chavez, Project Manager, Golder Associates

ØManagementØ TechnicalØMultidisciplinaryØ Culture Aspects

ØSocio-Economic Environment

Challenges

Large Multidisciplinary and Multicultural EIAs

What about the What about the CONSULTANTS?CONSULTANTS?

Consequences in:Ø Respect of Local Capability,

Standards & Legal NormsØ Day to day workØ Review processØ Translations

Page 5: Managing Large Multidisciplinary, Multicultural EIA’s · 2017-05-23 · Managing Large Multidisciplinary, Multicultural EIA’s Jorge Chavez, Project Manager, Golder Associates

Challenges:

Ø Control of budget/person hours (11 different offices)

Ø Different currencies

Ø Schedule

Management

Proposed Solution:

Ø Centralized parallel administration system

Page 6: Managing Large Multidisciplinary, Multicultural EIA’s · 2017-05-23 · Managing Large Multidisciplinary, Multicultural EIA’s Jorge Chavez, Project Manager, Golder Associates

Centralized Parallel Administration System

FOTO of ALTO CHICAMA DATABASE

Page 7: Managing Large Multidisciplinary, Multicultural EIA’s · 2017-05-23 · Managing Large Multidisciplinary, Multicultural EIA’s Jorge Chavez, Project Manager, Golder Associates

Not any more a problem ….. In general terms

Multidisciplinary

Ø As with all EIA’s pressure from every discipline to “put a man on the moon”

ØRely on instincts and PM experience to foresee all potential fatal flaws and key issues

ØFocus effort based on Issue Scoping Outcomes

ØMaintain a level of Balance

Page 8: Managing Large Multidisciplinary, Multicultural EIA’s · 2017-05-23 · Managing Large Multidisciplinary, Multicultural EIA’s Jorge Chavez, Project Manager, Golder Associates

Multidisciplinary

FOTO TEAM BUILDING IN TRUJILLO

Page 9: Managing Large Multidisciplinary, Multicultural EIA’s · 2017-05-23 · Managing Large Multidisciplinary, Multicultural EIA’s Jorge Chavez, Project Manager, Golder Associates

Technical

ØMeet all local regulatory laws, regulations, standards, guidelines

Ø Process & Quality needed to be consistent with international standards (i.e. WB guidelines) & internal corporate standards

Ø Adopt current leading technologies or be innovative in setting new standards (geochemistry assessment for water quality predictions)

Page 10: Managing Large Multidisciplinary, Multicultural EIA’s · 2017-05-23 · Managing Large Multidisciplinary, Multicultural EIA’s Jorge Chavez, Project Manager, Golder Associates

Technical

Ø Detailed project description developed in the initial stage

Ø Challenges:

ØMaintaining balance (baseline, impact assessment, management plans, etc …)

ØContaining/reducing/eliminating iterations

Page 11: Managing Large Multidisciplinary, Multicultural EIA’s · 2017-05-23 · Managing Large Multidisciplinary, Multicultural EIA’s Jorge Chavez, Project Manager, Golder Associates

All staff in Golder have a common corporate vision & shared goals, however,

WE ARE DIFFERENT!!!!

Must recognize need to put Best Team forward maximizing all

available corporate resources recognizing corporate & office profitability pressures.

1) Must be a diplomat2) Must have an extensive network3) Corporate places high level of trust in PM

Multicultural Consultants

Page 12: Managing Large Multidisciplinary, Multicultural EIA’s · 2017-05-23 · Managing Large Multidisciplinary, Multicultural EIA’s Jorge Chavez, Project Manager, Golder Associates

Challenges:Ø I don’t understand you!

Ø We don’t work in that way, therefore it will not work!!!!!!

Ø Relationship with local consultants

Cultural Differences

Proposed Solutions:

Ø Strong local counterpart

Ø Locals manage locals

Ø A good beer or better a good Pisco Sourand good food

Ø Project sponsor assist PM with issues

Page 13: Managing Large Multidisciplinary, Multicultural EIA’s · 2017-05-23 · Managing Large Multidisciplinary, Multicultural EIA’s Jorge Chavez, Project Manager, Golder Associates

Challenges:Ø Which language will be used, for what and at

what stage?

Ø Find a good translation

Ø How long will it take?

Ø How much will it cost?

Translations

Proposed Solutions:

Ø Bilingual staff (Better is a bilingual client!)

Ø Glossary in two languages (consistency and time savings)

Ø Review of translation (several steps) before goes to the senior staff

Page 14: Managing Large Multidisciplinary, Multicultural EIA’s · 2017-05-23 · Managing Large Multidisciplinary, Multicultural EIA’s Jorge Chavez, Project Manager, Golder Associates

The NightmareThe NightmareThe review needs to The review needs to be in both be in both languages at the languages at the same timesame time

Review Process

FOTO

Page 15: Managing Large Multidisciplinary, Multicultural EIA’s · 2017-05-23 · Managing Large Multidisciplinary, Multicultural EIA’s Jorge Chavez, Project Manager, Golder Associates

Review ProcessChallenges:

Ø How to organize the review?

Ø How to track the changes in both languages at the same time?

FOTO

Page 16: Managing Large Multidisciplinary, Multicultural EIA’s · 2017-05-23 · Managing Large Multidisciplinary, Multicultural EIA’s Jorge Chavez, Project Manager, Golder Associates

Review ProcessTracking Sheet

(Vertrauen is gut, Kontrol is besser)

Ø Allows to do the follow up

Ø Have I reviewed this? Has issue/change had appropriate senior review?

Ø The contradictory changes are registered?

Ø Identify and resolve contentious consultant/owner issues.

FOTO

Page 17: Managing Large Multidisciplinary, Multicultural EIA’s · 2017-05-23 · Managing Large Multidisciplinary, Multicultural EIA’s Jorge Chavez, Project Manager, Golder Associates

Review ProcessBilingual Tracking

If one is good, two are better

FOTO

Page 18: Managing Large Multidisciplinary, Multicultural EIA’s · 2017-05-23 · Managing Large Multidisciplinary, Multicultural EIA’s Jorge Chavez, Project Manager, Golder Associates

ConclusionsConclusions

ØCentralized management is necessary

ØTeam building is priority

ØManagement tools have to be developed to face the challenges

Page 19: Managing Large Multidisciplinary, Multicultural EIA’s · 2017-05-23 · Managing Large Multidisciplinary, Multicultural EIA’s Jorge Chavez, Project Manager, Golder Associates

FOTO

Thanks Thanks