Page 1: Managing ITC Tenders & Approvals in the eSourcing Portal (TTS) › esop › kuw-kpc-host › ... · All RFQs/ITBs below 30,000 K.D. will be created in the eSourcing portal without

Managing ITC Tenders & Approvals in the eSourcing

Portal (TTS)

Page 2: Managing ITC Tenders & Approvals in the eSourcing Portal (TTS) › esop › kuw-kpc-host › ... · All RFQs/ITBs below 30,000 K.D. will be created in the eSourcing portal without

PAGE 1

TTS - Basic Process Flow Chart

Page 3: Managing ITC Tenders & Approvals in the eSourcing Portal (TTS) › esop › kuw-kpc-host › ... · All RFQs/ITBs below 30,000 K.D. will be created in the eSourcing portal without

PAGE 2

Contents

FOREWORD ................................................................................................................................ 3

1 LOGIN & NAVIGATION ....................................................................................................... 4

2 ITC PROJECTS ..................................................................................................................... 5

3 CREATING ‘ISSUE NEW TENDER’ REQUEST FORM ............................................................... 5

4 SENDING ‘ISSUE NEW TENDER’ REQUEST FORM FOR APPROVAL ...................................... 13

5 PUBLISHING RFQ/ITB ....................................................................................................... 23

6 CREATING AND COMPLETING ‘AWARD’ REQUEST FORM .................................................. 29

7 SUBMITTING ‘AWARD’ REQUEST FORM FOR APPROVAL .................................................. 36

8 AWARDING RFQ/ITB ON ESOURCING PORTAL .................................................................. 47

9 CREATING AND SUBMITTING ADDITIONAL REQUEST FORMS ........................................... 50

10 CREATING AND COMPLETING ‘VARIATION’ REQUEST FORM............................................. 52

11 SUBMITTING ‘VARIATION’ REQUEST FORM FOR APPROVAL ............................................. 59

12 RECALLING AN APPROVAL REQUEST ................................................................................ 67

13 CHECKING THE STATUS OF AN APPROVAL REQUEST ......................................................... 70

14 REJECTION AN RFQ .......................................................................................................... 73

15 CANCELLING AN RFQ ....................................................................................................... 75

Page 4: Managing ITC Tenders & Approvals in the eSourcing Portal (TTS) › esop › kuw-kpc-host › ... · All RFQs/ITBs below 30,000 K.D. will be created in the eSourcing portal without

PAGE 3

Foreword This document has been created to support Commercial users in managing ITC Tenders through the eSourcing portal. Commercial users that are only required to ‘Approve’ ITC request forms should consult the Guide titled ‘Responding to Approval Requests in the eSourcing Portal (TTS)’.

Page 5: Managing ITC Tenders & Approvals in the eSourcing Portal (TTS) › esop › kuw-kpc-host › ... · All RFQs/ITBs below 30,000 K.D. will be created in the eSourcing portal without

PAGE 4

1 Login & Navigation Access the KNPC eSourcing Portal via - https://esourcing.knpc.com and Login. If you have been setup on the KNPC eSourcing portal use the login details provided to access the site. Your Username is your 6 digit KNPC number. If at any stage you forget your password please use the "Forgot your password?" link on the homepage to request a new one.

Once logged in navigate to the Projects area.

Page 6: Managing ITC Tenders & Approvals in the eSourcing Portal (TTS) › esop › kuw-kpc-host › ... · All RFQs/ITBs below 30,000 K.D. will be created in the eSourcing portal without

PAGE 5

Click on your RFQ created under “Project Title” to start with the Workflow.

2 ITC Projects All RFQs/ITBs below 30,000 K.D. will be created in the eSourcing portal without workflow. All RFQs/ITBS over 30,000 K.D. will be created in the eSourcing portal with workflow to support the approval cycle.

3 Creating ‘ISSUE NEW TENDER’ Request Form Prior to issuing an RFQ above ITC value (excluding single source) necessary approvals must be sought. Issue new tender click on “Request for Tender Issuance”.

Page 7: Managing ITC Tenders & Approvals in the eSourcing Portal (TTS) › esop › kuw-kpc-host › ... · All RFQs/ITBs below 30,000 K.D. will be created in the eSourcing portal without

PAGE 6

The steps on how to proceed will be available in the task instructions.

Page 8: Managing ITC Tenders & Approvals in the eSourcing Portal (TTS) › esop › kuw-kpc-host › ... · All RFQs/ITBs below 30,000 K.D. will be created in the eSourcing portal without

PAGE 7

Click on “Issue New Tender Template” under Auto Create Template links.

OR

Page 9: Managing ITC Tenders & Approvals in the eSourcing Portal (TTS) › esop › kuw-kpc-host › ... · All RFQs/ITBs below 30,000 K.D. will be created in the eSourcing portal without

PAGE 8

Enter the new title “Issue New Tender – MAXIMO RFQ/ITB number” and click on “Create”.

The Request Form is now created under “Objects in the Task”. Click on the request form created.

Click on “Custom Functionality” to import information from MAXIMO. Click on “Save” then on “Close” after the Additional info imported correctly.

Page 10: Managing ITC Tenders & Approvals in the eSourcing Portal (TTS) › esop › kuw-kpc-host › ... · All RFQs/ITBs below 30,000 K.D. will be created in the eSourcing portal without

PAGE 9

Click on “Import project additional info”.

Page 11: Managing ITC Tenders & Approvals in the eSourcing Portal (TTS) › esop › kuw-kpc-host › ... · All RFQs/ITBs below 30,000 K.D. will be created in the eSourcing portal without

PAGE 10

Click ‘Save’.

Click ‘Close’.

Click on “Edit Response” to complete the Request Form.

Page 12: Managing ITC Tenders & Approvals in the eSourcing Portal (TTS) › esop › kuw-kpc-host › ... · All RFQs/ITBs below 30,000 K.D. will be created in the eSourcing portal without

PAGE 11

Click on “Save and Return” after the mandatory information have been completed and then click on “Submit Response”.

Page 13: Managing ITC Tenders & Approvals in the eSourcing Portal (TTS) › esop › kuw-kpc-host › ... · All RFQs/ITBs below 30,000 K.D. will be created in the eSourcing portal without

PAGE 12

Click on “Back to List” to the Project Workflow.

Page 14: Managing ITC Tenders & Approvals in the eSourcing Portal (TTS) › esop › kuw-kpc-host › ... · All RFQs/ITBs below 30,000 K.D. will be created in the eSourcing portal without

PAGE 13

Click on “Request for Tender Issuance” to start adding the Approval Users.

4 Sending ‘ISSUE NEW TENDER’ Request Form for Approval

Click on “Request Approval”

Page 15: Managing ITC Tenders & Approvals in the eSourcing Portal (TTS) › esop › kuw-kpc-host › ... · All RFQs/ITBs below 30,000 K.D. will be created in the eSourcing portal without

PAGE 14

Enter the “Description of Approval” select the list of Approval based on the Estimated Value of the RFQ/ITB (ITC approvals; ITC and HTC approvals; ITC, HTC and CTC approvals). Click on “Edit Selected List”, add your Senior and Team Leader, click on “Save” and then sort them to be shown as sequence approvals.

Page 16: Managing ITC Tenders & Approvals in the eSourcing Portal (TTS) › esop › kuw-kpc-host › ... · All RFQs/ITBs below 30,000 K.D. will be created in the eSourcing portal without

PAGE 15

Page 17: Managing ITC Tenders & Approvals in the eSourcing Portal (TTS) › esop › kuw-kpc-host › ... · All RFQs/ITBs below 30,000 K.D. will be created in the eSourcing portal without

PAGE 16

Page 18: Managing ITC Tenders & Approvals in the eSourcing Portal (TTS) › esop › kuw-kpc-host › ... · All RFQs/ITBs below 30,000 K.D. will be created in the eSourcing portal without

PAGE 17

When the List of the approvals has been setup correctly click on “Send Approval Request”.

Page 19: Managing ITC Tenders & Approvals in the eSourcing Portal (TTS) › esop › kuw-kpc-host › ... · All RFQs/ITBs below 30,000 K.D. will be created in the eSourcing portal without

PAGE 18

By clicking on “Approval” you can see the status of your request if it is “Pending”, “Approved” with the details by clicking on “Approval Title”.

Page 20: Managing ITC Tenders & Approvals in the eSourcing Portal (TTS) › esop › kuw-kpc-host › ... · All RFQs/ITBs below 30,000 K.D. will be created in the eSourcing portal without

PAGE 19

When the ITC Approved then the Workflow status of the Task “1.1 Request for Tender Issuance” will change automatically from “Running” to “Completed”.

Page 21: Managing ITC Tenders & Approvals in the eSourcing Portal (TTS) › esop › kuw-kpc-host › ... · All RFQs/ITBs below 30,000 K.D. will be created in the eSourcing portal without

PAGE 20

Page 22: Managing ITC Tenders & Approvals in the eSourcing Portal (TTS) › esop › kuw-kpc-host › ... · All RFQs/ITBs below 30,000 K.D. will be created in the eSourcing portal without

PAGE 21

Page 23: Managing ITC Tenders & Approvals in the eSourcing Portal (TTS) › esop › kuw-kpc-host › ... · All RFQs/ITBs below 30,000 K.D. will be created in the eSourcing portal without

PAGE 22

Page 24: Managing ITC Tenders & Approvals in the eSourcing Portal (TTS) › esop › kuw-kpc-host › ... · All RFQs/ITBs below 30,000 K.D. will be created in the eSourcing portal without

PAGE 23

5 Publishing RFQ/ITB When the RFQ/ITB “Published” from Maximo the Status of the Task “1.2 Publishing Tender and Bidding management” will change automatically from “Not Started” to “Running” and the RFQ/ITB will be Created and Published under it.

Page 25: Managing ITC Tenders & Approvals in the eSourcing Portal (TTS) › esop › kuw-kpc-host › ... · All RFQs/ITBs below 30,000 K.D. will be created in the eSourcing portal without

PAGE 24

The same process for the Opening of the RFQ/ITB will continue as currently happening Bravo.

Page 26: Managing ITC Tenders & Approvals in the eSourcing Portal (TTS) › esop › kuw-kpc-host › ... · All RFQs/ITBs below 30,000 K.D. will be created in the eSourcing portal without

PAGE 25

In the Final Evaluation Stage, after the Evaluation of the ITC Committee and all the Evaluators, the Procurement/Contract Specialist will be able to do “Pre-Award” only and will not be able to see the “Award” Button till he gets Approval from the ITC Committee to “Award”.

Page 27: Managing ITC Tenders & Approvals in the eSourcing Portal (TTS) › esop › kuw-kpc-host › ... · All RFQs/ITBs below 30,000 K.D. will be created in the eSourcing portal without

PAGE 26

When the RFQ/ITB is under the stage of “Final Evaluation – Pre-Awarded” then you can complete this task and move to the task of “Request to Award”. Click on “1.2 Publishing Tender and Bidding management”

Change the Status Manually by clicking on “Change Status” and hit the Button “Completed”.

Page 28: Managing ITC Tenders & Approvals in the eSourcing Portal (TTS) › esop › kuw-kpc-host › ... · All RFQs/ITBs below 30,000 K.D. will be created in the eSourcing portal without

PAGE 27

After the Status is Completed, click on “Promote Objects” to promote the RFQ/ITB to the next Task “Request to Award” and then “Close”.

Page 29: Managing ITC Tenders & Approvals in the eSourcing Portal (TTS) › esop › kuw-kpc-host › ... · All RFQs/ITBs below 30,000 K.D. will be created in the eSourcing portal without

PAGE 28

Page 30: Managing ITC Tenders & Approvals in the eSourcing Portal (TTS) › esop › kuw-kpc-host › ... · All RFQs/ITBs below 30,000 K.D. will be created in the eSourcing portal without

PAGE 29

As per the Workflow below the Task 1.2 has been Completed and the Task 2.1 start Running and the RFQ/ITB moved with it.

6 Creating and Completing ‘AWARD’ Request Form 2.0 Tender Award To issue Request to Award click on “Request to Award” and read the Task Instructions.

Page 31: Managing ITC Tenders & Approvals in the eSourcing Portal (TTS) › esop › kuw-kpc-host › ... · All RFQs/ITBs below 30,000 K.D. will be created in the eSourcing portal without

PAGE 30

Click on “Award Template” under Auto Create Template links.

OR

Page 32: Managing ITC Tenders & Approvals in the eSourcing Portal (TTS) › esop › kuw-kpc-host › ... · All RFQs/ITBs below 30,000 K.D. will be created in the eSourcing portal without

PAGE 31

Enter the new title “Request to Award - RFQ/ITB number” and click on “Create”

Page 33: Managing ITC Tenders & Approvals in the eSourcing Portal (TTS) › esop › kuw-kpc-host › ... · All RFQs/ITBs below 30,000 K.D. will be created in the eSourcing portal without

PAGE 32

Award request Form is now created under “Objects in the Task”, Click on “Request to Award – RFQ/ITB #”

Click on “Custom Functionality”, import the additional information by clicking on “Import project additional info” button, click on “Save” then on “Close” after the Additional info imported correctly.

Page 34: Managing ITC Tenders & Approvals in the eSourcing Portal (TTS) › esop › kuw-kpc-host › ... · All RFQs/ITBs below 30,000 K.D. will be created in the eSourcing portal without

PAGE 33

Click on “Edit Response” to complete the Form with the Mandatory information.

Page 35: Managing ITC Tenders & Approvals in the eSourcing Portal (TTS) › esop › kuw-kpc-host › ... · All RFQs/ITBs below 30,000 K.D. will be created in the eSourcing portal without

PAGE 34

Click on “Save and Return” after the mandatory information have been completed and then click on “Submit Response”.

Page 36: Managing ITC Tenders & Approvals in the eSourcing Portal (TTS) › esop › kuw-kpc-host › ... · All RFQs/ITBs below 30,000 K.D. will be created in the eSourcing portal without

PAGE 35

Click on “Back to List” to the Project Workflow.

Click on “Request to Award” to start adding the Approval Users.

Page 37: Managing ITC Tenders & Approvals in the eSourcing Portal (TTS) › esop › kuw-kpc-host › ... · All RFQs/ITBs below 30,000 K.D. will be created in the eSourcing portal without

PAGE 36

7 Submitting ‘AWARD’ Request Form for Approval

Click on “Request Approval”

Select the object request and click “Continue Approval Request”

Fill the “Approval Description” select the list of Approval based on the Estimated Value of the RFQ/ITB (ITC approvals; ITC and HTC approvals; ITC, HTC and CTC approvals). Click on “Edit Selected List”, add your Senior and Team Leader, click on “Save” and then sort them to be shown as sequence approvals.

Page 38: Managing ITC Tenders & Approvals in the eSourcing Portal (TTS) › esop › kuw-kpc-host › ... · All RFQs/ITBs below 30,000 K.D. will be created in the eSourcing portal without

PAGE 37

Page 39: Managing ITC Tenders & Approvals in the eSourcing Portal (TTS) › esop › kuw-kpc-host › ... · All RFQs/ITBs below 30,000 K.D. will be created in the eSourcing portal without

PAGE 38

Page 40: Managing ITC Tenders & Approvals in the eSourcing Portal (TTS) › esop › kuw-kpc-host › ... · All RFQs/ITBs below 30,000 K.D. will be created in the eSourcing portal without

PAGE 39

When the List of the approvals has been setup correctly click on “Send Approval Request”.

Page 41: Managing ITC Tenders & Approvals in the eSourcing Portal (TTS) › esop › kuw-kpc-host › ... · All RFQs/ITBs below 30,000 K.D. will be created in the eSourcing portal without

PAGE 40

By clicking on “Approval” you can see the status of your request if it is “Pending”, “Approved” with the details by clicking on “Approval Title”.

Page 42: Managing ITC Tenders & Approvals in the eSourcing Portal (TTS) › esop › kuw-kpc-host › ... · All RFQs/ITBs below 30,000 K.D. will be created in the eSourcing portal without

PAGE 41

When the ITC Approved then the Workflow status of the Task “2.1 Request to Award” needs to be changed Manually from “Running” to “Completed”. Click on the Task “2.1 Request to Award”.

Page 43: Managing ITC Tenders & Approvals in the eSourcing Portal (TTS) › esop › kuw-kpc-host › ... · All RFQs/ITBs below 30,000 K.D. will be created in the eSourcing portal without

PAGE 42

Change the Status Manually by clicking on “Change Status” and hit the Button “Completed”.

Page 44: Managing ITC Tenders & Approvals in the eSourcing Portal (TTS) › esop › kuw-kpc-host › ... · All RFQs/ITBs below 30,000 K.D. will be created in the eSourcing portal without

PAGE 43

After the Status is Completed, click on “2.2 Award” and change the status from “Not Started” to “Running”.

Page 45: Managing ITC Tenders & Approvals in the eSourcing Portal (TTS) › esop › kuw-kpc-host › ... · All RFQs/ITBs below 30,000 K.D. will be created in the eSourcing portal without

PAGE 44

Click on “2.1 Request to Award” and move the RFQ from 2.1 to 2.2 Award

Page 46: Managing ITC Tenders & Approvals in the eSourcing Portal (TTS) › esop › kuw-kpc-host › ... · All RFQs/ITBs below 30,000 K.D. will be created in the eSourcing portal without

PAGE 45

Page 47: Managing ITC Tenders & Approvals in the eSourcing Portal (TTS) › esop › kuw-kpc-host › ... · All RFQs/ITBs below 30,000 K.D. will be created in the eSourcing portal without

PAGE 46

Once the RFQ has been moved to 2.2, click on “Confirm” to have the button “Award” in the RFQ

Page 48: Managing ITC Tenders & Approvals in the eSourcing Portal (TTS) › esop › kuw-kpc-host › ... · All RFQs/ITBs below 30,000 K.D. will be created in the eSourcing portal without

PAGE 47

8 Awarding RFQ/ITB on eSourcing Portal

Now the Button “Award” will be available to the Procurement/Contract Specialist to Award the RFQ/ITB to the winner Vendor.

Page 49: Managing ITC Tenders & Approvals in the eSourcing Portal (TTS) › esop › kuw-kpc-host › ... · All RFQs/ITBs below 30,000 K.D. will be created in the eSourcing portal without

PAGE 48

Page 50: Managing ITC Tenders & Approvals in the eSourcing Portal (TTS) › esop › kuw-kpc-host › ... · All RFQs/ITBs below 30,000 K.D. will be created in the eSourcing portal without

PAGE 49

After the Status changed to “Award”, the Senior Procurement/Contract Specialist can transfer the bid to Maximo and click on the Task “2.2 Award” and change the Status to “Completed”.

Page 51: Managing ITC Tenders & Approvals in the eSourcing Portal (TTS) › esop › kuw-kpc-host › ... · All RFQs/ITBs below 30,000 K.D. will be created in the eSourcing portal without

PAGE 50

9 Creating and Submitting Additional Request Forms For Creating an Additional request, you have to “Activate” the task “1.3 Additional ITC Request Forms”.

Once it is activated many Template will be shown to create your Additional Request.

Page 52: Managing ITC Tenders & Approvals in the eSourcing Portal (TTS) › esop › kuw-kpc-host › ... · All RFQs/ITBs below 30,000 K.D. will be created in the eSourcing portal without

PAGE 51

To activate any of these additional request, you have to click on the Task “1.3.1 Additional Request” and change the status to “Running”.

Page 53: Managing ITC Tenders & Approvals in the eSourcing Portal (TTS) › esop › kuw-kpc-host › ... · All RFQs/ITBs below 30,000 K.D. will be created in the eSourcing portal without

PAGE 52

Once the status changed to “Running” then you will be able to create any of the “Additional Request” in the same way of creating new “Issue Request Form” by clicking on one of the Template below and complete the process.

10 Creating and Completing ‘VARIATION’ Request Form To Create “Variation Order” Request form, first the task “2.2 Award’ should be under “Running” status and then you have to click on “Active” button under Variation order.

Page 54: Managing ITC Tenders & Approvals in the eSourcing Portal (TTS) › esop › kuw-kpc-host › ... · All RFQs/ITBs below 30,000 K.D. will be created in the eSourcing portal without

PAGE 53

Click on “Variation Order” Task and change the status “Running”.

To issue “Variation Order” click on “Variation Order Request” and read the Task Instructions.

Page 55: Managing ITC Tenders & Approvals in the eSourcing Portal (TTS) › esop › kuw-kpc-host › ... · All RFQs/ITBs below 30,000 K.D. will be created in the eSourcing portal without

PAGE 54

Click on “Variation Order Template” under Auto Create Template links.

Page 56: Managing ITC Tenders & Approvals in the eSourcing Portal (TTS) › esop › kuw-kpc-host › ... · All RFQs/ITBs below 30,000 K.D. will be created in the eSourcing portal without

PAGE 55

OR

Enter the new title “Variation Order - RFQ/ITB number” and click on “Create”

Variation Order Form is now created under Objects in the Task, Click on “Variation Order – RFQ/ITB #”

Page 57: Managing ITC Tenders & Approvals in the eSourcing Portal (TTS) › esop › kuw-kpc-host › ... · All RFQs/ITBs below 30,000 K.D. will be created in the eSourcing portal without

PAGE 56

Click on “Custom Functionality”, import the additional information by clicking on “Import project additional info” button, click on “Save” then on “Close” after the Additional info imported correctly.

Page 58: Managing ITC Tenders & Approvals in the eSourcing Portal (TTS) › esop › kuw-kpc-host › ... · All RFQs/ITBs below 30,000 K.D. will be created in the eSourcing portal without

PAGE 57

Click on “Edit Response” to complete the Form with the Mandatory information.

Page 59: Managing ITC Tenders & Approvals in the eSourcing Portal (TTS) › esop › kuw-kpc-host › ... · All RFQs/ITBs below 30,000 K.D. will be created in the eSourcing portal without

PAGE 58

Click on “Save and Return” after the mandatory information have been completed and then click on “Submit Response”.

Click on “Back to List” to the Project Workflow.

Page 60: Managing ITC Tenders & Approvals in the eSourcing Portal (TTS) › esop › kuw-kpc-host › ... · All RFQs/ITBs below 30,000 K.D. will be created in the eSourcing portal without

PAGE 59

Click on “Variation Order Request” to start adding the Approval Users.

11 Submitting ‘VARIATION’ Request Form for Approval

Click on “Request Approval”

OR

Enter the “Description of Approval” select the list of Approval based on the Estimated Value of the RFQ/ITB (ITC approvals; ITC and HTC approvals; ITC, HTC and CTC approvals).

Page 61: Managing ITC Tenders & Approvals in the eSourcing Portal (TTS) › esop › kuw-kpc-host › ... · All RFQs/ITBs below 30,000 K.D. will be created in the eSourcing portal without

PAGE 60

Click on “Edit Selected List”, add your Senior and Team Leader, click on “Save” and then sort them to be shown as sequence approvals.

Page 62: Managing ITC Tenders & Approvals in the eSourcing Portal (TTS) › esop › kuw-kpc-host › ... · All RFQs/ITBs below 30,000 K.D. will be created in the eSourcing portal without

PAGE 61

Page 63: Managing ITC Tenders & Approvals in the eSourcing Portal (TTS) › esop › kuw-kpc-host › ... · All RFQs/ITBs below 30,000 K.D. will be created in the eSourcing portal without

PAGE 62

Page 64: Managing ITC Tenders & Approvals in the eSourcing Portal (TTS) › esop › kuw-kpc-host › ... · All RFQs/ITBs below 30,000 K.D. will be created in the eSourcing portal without

PAGE 63

When the List of the approvals has been setup correctly click on “Send Approval Request”.

Page 65: Managing ITC Tenders & Approvals in the eSourcing Portal (TTS) › esop › kuw-kpc-host › ... · All RFQs/ITBs below 30,000 K.D. will be created in the eSourcing portal without

PAGE 64

By clicking on “Approval” you can see the status of your request if it is “Pending”, “Approved” with the details by clicking on “Approval Title”.

When the ITC Approved then the Workflow status of the Task “3.1 Variation Order Request” will be changed Automatically from “Running” to “Completed”.

Page 66: Managing ITC Tenders & Approvals in the eSourcing Portal (TTS) › esop › kuw-kpc-host › ... · All RFQs/ITBs below 30,000 K.D. will be created in the eSourcing portal without

PAGE 65

OR

Page 67: Managing ITC Tenders & Approvals in the eSourcing Portal (TTS) › esop › kuw-kpc-host › ... · All RFQs/ITBs below 30,000 K.D. will be created in the eSourcing portal without

PAGE 66

Page 68: Managing ITC Tenders & Approvals in the eSourcing Portal (TTS) › esop › kuw-kpc-host › ... · All RFQs/ITBs below 30,000 K.D. will be created in the eSourcing portal without

PAGE 67

12 Recalling an Approval Request To recall an Approval Request already issued navigate to the relevant Project and Task with the status of ‘Awaiting Approval’. Click on the task name.

Once within the task click on the link labelled ‘Approvals’.

Page 69: Managing ITC Tenders & Approvals in the eSourcing Portal (TTS) › esop › kuw-kpc-host › ... · All RFQs/ITBs below 30,000 K.D. will be created in the eSourcing portal without

PAGE 68

Within the Approvals section a list of approval requests relating to this task will be displayed. Click on the title of the Approval Request that is pending.

Page 70: Managing ITC Tenders & Approvals in the eSourcing Portal (TTS) › esop › kuw-kpc-host › ... · All RFQs/ITBs below 30,000 K.D. will be created in the eSourcing portal without

PAGE 69

Click ‘Recall Approval’ to stop the approval request.

‘Confirm’ the action and add any relevant comments for audit trail purposes.

Page 71: Managing ITC Tenders & Approvals in the eSourcing Portal (TTS) › esop › kuw-kpc-host › ... · All RFQs/ITBs below 30,000 K.D. will be created in the eSourcing portal without

PAGE 70

13 Checking the Status of an Approval Request To check the status of an approval request that is still pending navigate to the relevant Project in Bravo. Once in the Project click on the task that is awaiting approval.

Page 72: Managing ITC Tenders & Approvals in the eSourcing Portal (TTS) › esop › kuw-kpc-host › ... · All RFQs/ITBs below 30,000 K.D. will be created in the eSourcing portal without

PAGE 71

Once within the task click on the link labelled ‘Approvals’.

Within the Approvals section a list of approval requests relating to this task will be displayed. Click on the title of the Approval Request that is pending.

Page 73: Managing ITC Tenders & Approvals in the eSourcing Portal (TTS) › esop › kuw-kpc-host › ... · All RFQs/ITBs below 30,000 K.D. will be created in the eSourcing portal without

PAGE 72

You can now see the list of approvers and who the approval is pending with.

Page 74: Managing ITC Tenders & Approvals in the eSourcing Portal (TTS) › esop › kuw-kpc-host › ... · All RFQs/ITBs below 30,000 K.D. will be created in the eSourcing portal without

PAGE 73

If you want to see approver comments/attachments or want to export a pdf report on the approval history this can be done by clicking the button at the top of the page titled ‘Approver Comments’.

14 Rejection an RFQ During the “Request to Issue” stage, the Approval request is sent by Buyer to the list of Approvals and 3 kinds of steps are as below:

- If the Approver “Deny” and the RFQ requires only a minor change in Bravo then Buyer updates the request form and resends.

- IF RFQ is to be cancelled then the Buyer must change the project status to ‘Cancelled’. This should be reflected in Maximo.

- IF RFQ requires updating in Maximo before it can be resent for approval then you navigate to the project settings and click on “Edit” button, change the Additional field “Maximo Update” to “Yes” and click on “Save”. A task runs that checks the value of this field and if updated to “Yes” then the status in Maximo changes to In Progress. The Project number will disappear in Maximo and so that when the user resends the information it updates the additional information fields in a new project.

Page 75: Managing ITC Tenders & Approvals in the eSourcing Portal (TTS) › esop › kuw-kpc-host › ... · All RFQs/ITBs below 30,000 K.D. will be created in the eSourcing portal without

PAGE 74

Page 76: Managing ITC Tenders & Approvals in the eSourcing Portal (TTS) › esop › kuw-kpc-host › ... · All RFQs/ITBs below 30,000 K.D. will be created in the eSourcing portal without

PAGE 75

15 Cancelling an RFQ To Cancel an RFQ that has been rejected by the ITC Committee navigate to the Project in the eSourcing portal. Click ‘Change Status to Cancelled’ to make the cancellation in the eSourcing portal and in MAXIMO.

You will be asked to confirm this action as once completed the action cannot be undone. Click ‘Confirm’ to Cancel the Project/RFQ/ITB in both the eSourcing portal and in MAXIMO.

Page 77: Managing ITC Tenders & Approvals in the eSourcing Portal (TTS) › esop › kuw-kpc-host › ... · All RFQs/ITBs below 30,000 K.D. will be created in the eSourcing portal without

PAGE 76

The Project Status is now cancelled.